75-555: Arnside Viaduct is a viaduct carrying the Lancaster to Barrow railway line over the River Kent . Construction started in 1856, finished in 1857 and expanded to a two-track railway in 1863. It received a mjor upgrade and repair in the 21st century. It is approximately 505 meters long, with a total of 51 piers. It is situated where the River Kent disgorges into Morecambe Bay . It is located in

150-421: A National Park . The Arnside and Silverdale location is an Area of Outstanding Natural Beauty . A 16-week line closure was thus planned for 2011. As part of the upgrade and repair, jointed rails were replaced by continuously welded rail reducing the noise and enabling quieter journeys. The journey times were also reduced. The closure was 16 weeks duration. Money was later made available to allow construction of

225-690: A branch to Barrow and a link to Ulverston, the largest local town at the time. The line slowly expanded to link up with what is today the Cumbrian Coast Line , in addition to an extension to Ulverston in 1854. In 1857, the Ulverston and Lancaster Railway completed its route, linking to the Carlisle and Lancaster Railway. The line eventually began to expand, purchasing the Whitehaven and Furness Junction Railway . The railway company eventually refused to purchase

300-493: A day) and of locomotives (which meant that the Kirkby branch was not yet being worked), and that 10,000 of the 12,000 passengers carried so far were excursionists from Fleetwood or Blackpool. Passenger services ceased after about two months, and the line between Dalton and Rampside Junction was doubled to remove the difficulties experienced in working both mineral and passenger traffic on a single track line. In 1847, differences between

375-448: A distance of ten miles! The slowest train being an hour and thirty-five minutes. These are the advertised times, but the trains are not infrequently late, consequently a good walker might almost accomplish the journey on foot in the time. The company chairman (the Duke of Devonshire) subsequently conceded that several of the stations "... until lately, were in a condition of which the public had

450-676: A joint line with the Whitehaven Cleator and Egremont Railway linking the WC&;ER at Egremont with the W&;FJR at Sellafield to simplify the movement of ore southwards; this line opened on 1 August 1869. In 1865, before the lease and amalgamation, the W&FJR and the FR had put forward rival Bills for crossing the Duddon estuary much lower down it than the existing crossing at Foxfield, thus usefully shortening

525-550: A loss of 3s 6d per ton: England was the 'dumping ground' for German iron being sold at below its production cost. Vickers had taken over the Barrow Shipbuilding Company in 1897, and its construction of naval warships at Barrow (both as part of the Anglo-German naval arms race and for foreign navies) became an important prop of the prosperity of Barrow. Even with this prop, and the development of tourist traffic,

600-562: A modernised timetable in May 2018, with additional services to Manchester Airport introduced from July 2019. The service is unusual amongst those on the West Coast Main Line as it does not yet have a clockface timetable . This means that there are several gaps in the service, varying between 30 and 90 minutes. The new timetable was criticised by local schools due to the introduction of earlier services between Barrow and Ulverston. Following

675-516: A recasting of rail franchises in the North of England by the Department for Transport , all services on the line are now operated by Northern. Regional services to Manchester and Preston were previously operated by First TransPennine Express until 31 March 2016, and TransPennine Express Class 185s used by the previous franchise were used on some services to Manchester Airport by Northern. The line received

750-567: A recasting of rail franchises in the North of England by the Department for Transport , all services on the line were transferred to Northern in April 2015. Services previously operated by First TransPennine Express will be operated by new 'Northern Connect' services from December 2019, enhancing the previous service with 11 trains per day to Manchester Airport. The enhanced service will use new, air-conditioned Class 195 'Civity' units and offer free onboard WiFi and faster journey times. In addition to

825-518: A right to complain ... On the Whitehaven section especially some of the stations were of the most inferior description, and such as the Board of Trade would not have allowed them to continue; they were mere temporary structure, scarcely more than wooden hovels." In 1881, revenue for the second half of the year was about £300,000 and the dividend 7% a year; second-half revenue declined to £216,000 in 1885 (with

SECTION 10

#1732858402228

900-501: A sufficiently remunerative price for their pig iron in the market. Pure hematite iron, as such, was generally disliked in the trade on account of a certain amount of red shortness which it was known to give to all kinds of puddled iron produced from it; besides the red hematite was thought difficult to smelt by itself". It had been reported that in 1856, 464,823 tons of iron ore were raised in Furness "of which 445,013 tons were carried over

975-520: A waggonway from their mines to Barrow; the project was adopted and expanded by the Duke of Buccleuch and the Earl of Burlington . Advertisements in 1843 announced a scheme, supported by their Lordships, for a Furness Railway to link Ulverston 'the capital of the district', iron ore mines (at Dalton-in-Furness ) and slate mines (at Kirkby-in-Furness ) with the coast at Barrow harbour and at Piel pier . Traffic on

1050-532: A walking and cycling path across the viaduct. 54°12′19″N 2°50′20″W  /  54.2054°N 2.8390°W  / 54.2054; -2.8390 Furness line The Furness line is a British railway between Barrow-in-Furness and Lancaster , joining the West Coast Main Line at Carnforth . A predominantly passenger line, it serves various towns along the Furness coast, including Barrow-in-Furness , Ulverston and Grange-over-Sands . It runs through Cumbria and Lancashire . Regional services on

1125-546: Is also intended to refurbish all stations served by Northern Connect services. These refreshed stations will provide higher standards with free WiFi and modern facilities. Furness Railway The Furness Railway (Furness) was a railway company operating in the Furness area of Lancashire in North West England . In the early 1840s, the owners of iron ore mines in the Furness district of Lancashire became interested in

1200-500: Is also subject to bore tides, the viaduct deteriorated over time, and so speed limits were imposed on trains. Although the bore is smaller than the River Severn, there is considerable turbulence at the viaduct. This combination of factors meant a major repair was due, but this could not be done without a total blockade and closure. The viaduct also has further restrictions in that it is in an area of Special Scientific Interest and also

1275-412: Is frequently so crammed that many people cannot get to the counter. Added to this inconvenience, travellers who have to wait here are oppressed with a sense of the general dirtiness of the station. The trains also run at inconvenient times, and the waiting for them at Carnforth involves great loss of valuable time. There is no train that takes passengers from Lancaster to Silverdale under forty-five minutes,

1350-511: The Cumbrian Coast line due to a shortage in rolling stock following the move of Class 170 'Turbostar' units to Chiltern Railways . The change was controversial locally as the trains were old, and unreliable. Class 68 locomotives were introduced onto services temporarily in January 2018, until through running of loco-hauled stock ended in May 2018. In April 2016, operation of all services on

1425-559: The London, Midland & Scottish Railway on 31 December 1922. The Roa Island branch was closed in 1936, however the rest of the network remained open until the formation of British Railways . The Coniston branch closed in 1962 and the Lakeside branch in 1965, with part of the route being preserved as the Lakeside and Haverthwaite Railway . Sleeper services to London Euston ceased in 1990. Following

1500-661: The Stainmore line and exported most of its ore to districts better served by the LNWR, but withdrew its objection on being offered the same powers as the Midland over the FR. The F&MJR opened for passenger traffic 6 June 1867; it was worked by the Midland. In 1867, the FR secured an act of Parliament for the construction of the Hincaster Branch from Arnside to the Lancaster and Carlisle Railway at Hincaster . This single-track line

1575-693: The Times to query the absence of lifeboats on the steamers. The Whitehaven and Furness Junction Railway was completed in November 1851, connecting the Furness Railway to Whitehaven and (on completion of the Bransty tunnel at Whitehaven in 1852) to the West Coast Main Line at Carlisle. In 1865, the W&FJR was leased by the Furness Railway, with a full amalgamation taking effect on 1 July 1866, being authorised by an act of Parliament of 1866. The secretary-manager of

SECTION 20

#1732858402228

1650-429: The privatisation of British Rail in the 1990s, services were initially transferred to First North Western . First TransPennine Express took over the operation of regional express services to Manchester and Preston in 2004, while local services were transferred to Northern Rail . Class 37 locomotives hauling Mark 2 carriages were used on the line between May 2015 and May 2018, operating through services along

1725-658: The Cumbrian Coast Line, the route is considered one of the most scenic in England. The line was designated a community rail partnership by the Department for Transport in 2012. The line is electrified between Lancaster and Carnforth where the route leaves the West Coast Main Line, which previously allowing for sleeper services between Barrow and London Euston . The line was opened in stages between 1846 and 1857 to link

1800-505: The Earl of Burlington had become in 1858) was its chairman; the FR took shares in it, and worked it. It opened for passenger traffic 19 July 1859, although its opening for goods and mineral traffic was deferred for some months as the provision was still incomplete. The Furness Railway obtained powers to amalgamate the Coniston Railway with it in 1862. A branch was built from (just west of)

1875-503: The FR dividend for the last twenty-five years of its existence (up to Grouping in 1923) averaged only marginally above 2% a year. The FR had been closely associated with the Midland Railway for many years; it was strategically important to the Midland as giving it access to an Irish Sea port and hence to Irish traffic. The Midland had repeatedly attempted to purchase the company, but these offers had come during periods of prosperity for

1950-662: The Furness Railway and shipped at Barrow, 16,290 on the Ulverston canal, and 3,550 consumed at the Charcoal Iron Furnaces and at the Low Furness Iron and Steel Works. Of the ore carried over the Furness line 200,000 tons are sent to Wales, and the remainder to the Staffordshire, Cleveland and West Riding Iron districts." A very small village at Barrow grew into one of about 2,000 serving the ore-export facility there, with

2025-498: The Furness Railway as one "which, though a comparatively small line, is noted for its enterprise and go-ahead management."; by the second half of 1899 the dividend had recovered to 4% per annum, "entirely due to the ability an exertions of their excellent general manager" according to the company chairman. The dividend, however, fell back to 0.5% in 1904 because of a renewed depression in iron and steel; Mr Aslett having previously reported that pig iron could only be produced in Furness at

2100-467: The Furness Railway bought the pier. The Kirkby branch was extended to Broughton, passing inspection for passenger traffic at the end of February 1848; when a Broughton to Barrow train was derailed by mis-set points in July 1849, it was noted that "nearly all the gates and points on the Furness line are attended by women" and that a woman had the management of the points which had been mis-set. The Dalton branch

2175-418: The Furness Railway effectively responsible for the settlement. The FR took over Barrow Harbour from its commissioners in 1863 to allow the construction of wet docks at Barrow; in 1864 it obtained powers to supply Barrow and the surrounding district with gas and water. Barrow grew rapidly in the 1860s, as The Engineer noted: "A town of about 20,000 inhabitants, grown up from a village of scarcely one-tenth

2250-449: The Furness and Midland Joint Bill reported that in 1862 over 535,000 tons of iron ore had been raised in Furness (in 1873 the market price of haematite ore was 24-30 shillings per ton) and over 90,000 tons of pig iron produced in local blast furnaces. In 1860, there were four blast furnaces in operation at Barrow, with the number increasing to seven in 1862, ten in 1866, and eleven in 1867. The Barrow Hematite Steel Company operating what

2325-484: The Furness and Midland line (£100,000) and the construction of wet docks at Barrow (£200,000): an Act sanctioning the abandonment was obtained in 1869, but the FR had henceforth to charge on the basis of the mileages if the crossing had been built. After the discovery of a large hematite deposit in the Holborn Hill area, the line between Millom and Barrow was doubled throughout; the line between Seascale and Bootle

Arnside Viaduct - Misplaced Pages Continue

2400-462: The Furness went to law, the matter being resolved by the Midland buying out the FR's interest for £45,000, entering a traffic-sharing agreement for Belfast traffic and undertaking to continue the services from Barrow for seven years. The first locomotive superintendent, recruited from Bury, Curtis and Kennedy in 1846, was later to be knighted as Sir James Ramsden , a leading civic figure and first Mayor of Barrow. No locomotives were actually built in

2475-449: The Furness, whose directors had rebuffed the Midland's terms as insufficiently generous. The Midland's announcement of a planned extension of its Morecambe line to a new deep-water port at Heysham gave rise to concern about the future of steamer services from Barrow and the reliability of the Midland as a partner. Negotiations with the Midland led to a further offer to purchase the FR (with a guaranteed 3% dividend to FR shareholders) which

2550-485: The Leven viaduct to Greenodd (allowing suppression of a swing bridge in the viaduct) then through Newby Bridge to a terminus beside Windermere at Finsthwaite; the locality had been known as The Landing, but the station was named Lake-side . The line opened June 1869; a company part-owned (after 1873 fully owned) by the FR ran Windermere steamer services in conjunction with the trains; a Bowness resident promptly writing to

2625-637: The Midland and the FR; a service to Douglas was also run in the summer months, but both services ran from Piel pier transferring to Barrow docks in 1881. In 1872, the FR obtained powers to build a third dock (the Ramsden); the spoil from the excavation of this was used to enclose an area of water intended for the construction of a fourth (the Cavendish). The original main line did not run through Barrow, though its headquarters and engineering works were adjacent to St. George's Square . Through trains had to run into

2700-515: The W&FJR became secretary of the Furness Railway, whose general manager was promoted to the board of the company, retaining his salary but now being styled 'resident director'. The Furness Railway now extended to Whitehaven, with running powers to Workington, and to the iron works on the North side of the Derwent there. The FR also inherited the W&FJR's involvement in the Cleator and Furness Railway ,

2775-620: The WC&ER became a joint line of the Furness and the LNWR. The FR also bought shares in the Cleator and Workington Junction Railway, and worked the main line of the C&;WJR. The Furness Railway's prosperity came originally from the export of haematite ore, but the growth of heavy industry at Barrow became a significant contributor. In 1867, The Engineer explained why the demand for Furness haematite had formerly been limited: "The ironstone mines there had been worked for some considerable time, and

2850-570: The Whitehaven Junction railway, leading to a situation where the Furness Railway was heavily influenced by the London and North Western Railway . The line continued to develop in the 1880s, especially in the Barrow area. A through station was constructed, removing the need to reverse as was the case at the Strand terminus. A passenger station had been opened at Ramsden Dock a year before to connect with

2925-524: The county of Cumbria but very close to the county of Lancashire border. It is cited as a major tourist attraction. As it goes over the River Kent, it is sometimes referred to as the Kent Viaduct. It is notable in that it was the first viaduct in the world to use water jetting to dig the piles in construction. It was substantially rebuilt and strengthened in 1915 to allow wartime supplies to and from Barrow. Because of its age and its being in an estuary that

3000-449: The dividend being cut to 2%), but recovered to £275,000 in 1889, allowing a dividend of 5% a year. In 1892, there was no dividend for the first year-half (because of a prolonged strike in the Durham coalfield) this triggered a renewal of previous complaints from shareholders that the company had sunk between two and three million pounds into docks at Barrow, but refused to give any indication of

3075-405: The furnaces at short distances, and we get an average of only 1s. a ton, Therefore it is not the docks which have reduced our dividends, but the introduction of Spanish ore and the altered circumstances of the trade." In 1894, it was reported that only 33 of the 75 blast furnaces in Furness and West Cumberland were working. In May 1895, Sir James Ramsden, by now 73, resigned due to ill health. He

Arnside Viaduct - Misplaced Pages Continue

3150-521: The great network of the rest of England", allowing a lucrative goods traffic: " A few days ago some 67 tons of pig iron, the produce of the new blast furnace at Harrington passed over the Whitehaven Junction and Whitehaven and Furness Railways en route direct to South Staffordshire by the newly-opened railway across the Ulverston Sands". In 1858, after completion of the U&;LR, modifications were made to

3225-528: The introduction of Northern Connect services, an enhanced local service will also be introduced with 21 trains per day (tpd) in both directions, compared to between 18-20 tpd today. Additional services are to be extended from Lancaster to Preston to allow better links to Manchester, Liverpool and other West Coast Main Line services. On Sundays, an enhanced service is planned with up to 5-8 extra trains per day in each direction to both Lancaster and Manchester Airport. It

3300-541: The iron trade in the mid-1870s; capital expenditure on other projects was minimised, and the dividend was cut from 10% to 6.5%. This triggered complaints from shareholders that the directors were pursuing the development of Barrow at the expense of the profitability of the FR, and from passengers at the service provided – with the possible exception of fast trains serving Barrow (which did not stop at most stations) FR passenger trains were infrequent, inconvenient, unpunctual, uncomfortable, and slow. The Directors rely too much on

3375-527: The junctions at Foxfield (with the W&FJR) and at Millwood (where the Broughton and Ulverston branches met) to allow through running of Whitehaven-Carnforth traffic without reversing. From its opening, the U&LR was worked by the Furness Railway, which purchased it (with effect from July 1861) in 1862, taking over the Ulverston Canal Company in the same year. The line from Barrow to Ulverston

3450-523: The line start from Manchester Airport and Preston , while local services start from Preston and Lancaster . The majority of services along the line terminate at Barrow-in-Furness, however some services continue along the Cumbrian Coast Line to Millom , Sellafield and Carlisle . The line was constructed by the Ulverston and Lancaster Railway and the Furness Railway between 1846 and 1857, and today has services operated by Northern . Along with

3525-449: The line was transferred to Arriva Rail North , with regional and local services again operated by the same train operating company. Services were operated using a variety of Sprinter diesel multiple units and Class 185 'Desiro' units subleased from TransPennine Express until July 2019. In July 2019, new Class 195 'Civity' units were introduced as part of the new franchise, with an increased number of services to Manchester . Following

3600-460: The line would be horse-drawn, but the line was to be laid out to allow easy conversion to the use of steam power. A survey had already been carried out by James Walker . "The primary object of this undertaking" explained a subsequent advertisement "is to improve the present very dilatory provision for the transport of the valuable Mineral products of Furness and adjoining Districts to the Coast" but it

3675-744: The local works itself: they were generally standard designs, purchased from other manufacturers. By 1921, fifteen different works were represented. However, W. F. Pettigrew , who had taken over operations in 1896, was to introduce some measure of standardisation. There were also carriage and wagon-building shops, and repairs and maintenance was carried out on the equipment of Barrow Docks. Details given are those shown for 1912: Barrow-Fleetwood service - four paddle steamers; lake steamers - two on Coniston Water ; six on Windermere ; three Barrow steam tugs Capacity 780 passengers. Diesel engine fitted in 1958. Scrapped in 1998. The Furness Railway operated as an independent company until December 1922, when it

3750-496: The mineral industries in the area. The area was very isolated before the railway opened, with the only road crossing to reach the area over Morecambe Bay . The Furness Railway was first proposed in November 1843, linking the slate quarries of Kirkby in Furness and iron ore in the Lindal in Furness area to a deep water berth at Roa Island. It was originally intended to be used solely as a mineral railway, however provisions were made for

3825-439: The mineral traffic and ignore the cultivation of the passenger traffic. A glance at the timetables shows that it is almost impossible to reach some of the most beautiful places on Morecambe Bay in anything like reasonable time, and the accommodation at Carnforth, when the delay takes place, is most miserable. On the Furness side of the line there are two seats for about 200 passengers, one waiting room, and one refreshment room, which

SECTION 50

#1732858402228

3900-518: The new Isle of Man and later Belfast steamer services. In the early 20th century, passenger numbers had continued to decline. As a result, an effort was made to modernise the line as a tourist railway, linking the country to the Lake District. This began a new era for the area, bringing thousands of tourists to Coniston and Windermere . Under the Big Four , the line was brought under the control of

3975-507: The ore was carried by rail and by sea to the coal districts of Lancashire, to the Staffordshire blast furnaces, and to Wales. The mining operations were, of course, very limited, and the price of the ore subject to extensive fluctuations, owing to the circumstance that the red haematite ore was only used as an admixture to other ores to improve the quality of iron, and the ironmasters used a small proportion of this more expensive ore, or tried to do entirely without it, whenever they could not obtain

4050-558: The places to which hematite ore was carried" had allowed "extraordinary economy and consequent commercial success. ": "But there was another fact still more decisive and important for the prosperity of the Barrow blast furnaces and for the prosperity of the whole mining district surrounding them, and that was the adoption of the Bessemer process . No sooner had Mr. Bessemer's great invention got into practical use than there arose an almost unlimited demand for pure hematite iron. " Witnesses for

4125-643: The population in the short space of seven years is a unicum in European geography" ) It gave two reasons: "The stimulus to which in the first instance the rapid rise of Barrow-in-Furness has been due, is the erection of blast furnaces on that spot for the production of pig iron from the red hematite ore, belonging to the district near Barrow and Ulverston, and further north of both towns". The first blast furnaces had been brought into operation at Barrow in 1859. Proximity to mines, and to Barrow harbour, and "the advantage of obtaining coke and coal as return freights from

4200-457: The post; the locomotive superintendent retired at the same time after forty-six years with the company. The new regime benefited from a recovery in the Furness iron and steel trade, and from a wholesale replacement of passenger rolling stock occasioned by the need to provide a continuous automatic brake, but also made strenuous efforts to develop passenger traffic, with day and weekend excursion tickets being introduced and advertised. Second class

4275-404: The profitability (or otherwise) of the docks. The additional complaint was now made that most of the directors were ornamental and deferred to Sir James Ramsden who had held managerial posts with the company since 1846, and had been the managing director since 1866. For the second half of 1892, despite the disruption to traffic and loss of an engine caused by subsidence at Lindal , a dividend at

4350-406: The rail distance between Whitehaven (and points north) and Barrow (and Carnforth). The parliamentary committee had decided in favour of the W&FJR, and the scheme was inherited by the FR. However, in 1868 the FR decided to abandon the project: there was a trade recession (the FR's dividend being consequently reduced to 8% from its accustomed 10%) and the FR had recently made major capital outlays on

4425-451: The railway company and the owner of Piel pier saw the Fleetwood steamer running to Barrow; it returned to Piel pier in 1848; subsequently, steamers also ran between Piel pier and Poulton-le-Sands , connecting with the "Little" North Western Railway . Periodic disagreements and reconciliations saw the steamer service terminal switch between Piel and Barrow on a number of occasions until (1853)

4500-413: The rate of 3% a year was declared; amendments seeking to force the resignation of Sir James were moved, but defeated. The secretary of the FR denied that its low dividends were caused by injudicious expenditure on Barrow docks; without them there would be no dividend at all: "The docks have led to the development of many industries in Barrow and the establishment of many feeders to our line". The problem

4575-472: The terminal station and then out again to continue their journey. In 1882, through working became possible when a new station called Barrow Central was opened on a new loop line; the Whitehaven-Carnforth passenger traffic now started to running over this section. The old station at the dockside was retained as the goods station. Heavy expenditure on the docks at Barrow coincided with a down-turn in

SECTION 60

#1732858402228

4650-606: Was abolished (1897) and new corridor bogie carriages introduced on Barrow-Yorkshire services were as good as anything to be found on major railways. To promote tourist traffic, the FR published guides to tours in the Lake District not only in English, but also in French and German. By 1903, passenger revenue was 40% higher than that for 1895, and passenger revenue per train-mile was 10d higher. The Railway Magazine of August 1898 described

4725-448: Was again rejected, and ended in an agreement that the joint Furness/Midland trains from Barrow would continue to run, and the same company which managed (and owned a third of the shares in) the Barrow trains for the railways would also manage the services from Heysham. When services began running from Heysham in 1905, the Barrow services became unprofitable: it became evident that the Midland was preferentially routing traffic via Heysham and

4800-573: Was already double-track, and the line between Ulverston and Carnforth was doubled in 1863. In 1863, in conjunction with the Midland Railway , the FR promoted a bill for the Furness and Midland Joint Railway between Wennington and Carnforth; the intention was said to be to give a more direct connection between the iron ore of Furness and Yorkshire ironworks and coal-mines. The London and North Western Railway cast doubt on this, pointing out that Furness got its metallurgical coke from South Durham over

4875-405: Was also doubled. The Ulverstone and Lancaster Railway was built by a separate company to link Ulverston with Carnforth , on the Lancaster and Carlisle Railway thus giving a rail link southwards from Furness and West Cumbria to the West Coast Main Line so that – as the Earl of Burlington noted at a celebratory banquet marking the opening of the line on 26 August 1857 – they "were now joined in

4950-564: Was dropped. The company's bill was not opposed in Parliament and the act was given royal assent on 23 May 1844 as the Furness Railway Act 1844 ( 7 & 8 Vict. c. xxii). A further act in 1846 authorised extensions from Kirkby to Broughton-in-Furness , and from Dalton to Ulverston. Goods traffic began running between Dalton and Barrow in June 1846, operated by a single locomotive. The line

5025-408: Was extended to Lindal (goods traffic running from mines there from early May 1851 ) and then on to Ulverston , eight waggons of coal being delivered there from Whitehaven in April 1854, even before the station was complete. Passenger services on that section began in June 1854. In 1854, 330,000 tons of iron ore travelled over the railway (as against 225,000 tons the previous year), other goods traffic

5100-466: Was foreign competition: "..the introduction of Spanish ore into England has led to a serious diminution of the receipts of the Furness Railway company owing to the reduction in price it has affected all over the country in pig iron and steel; and whereas we used to send away nearly half a million tons of ore to Middlesbrough and other places at rates which gave us an average of 3s. a ton, we are now carrying that ore – in less quantities, I am sorry to say – to

5175-421: Was intended to shorten the distance to Barrow for the coke traffic over Stainmore. In 1870, the FR brought forward, and then abandoned, a bill authorising abandonment of the project; construction was pursued with no great urgency, the line not opening until June 1876. The FR objected when in 1877 the Whitehaven, Cleator and Egremont Railway agreed terms for its amalgamation with the LNWR; instead as of July 1879

5250-506: Was not replaced as managing director. A new general manager (Alfred Aslett) was recruited from the Cambrian Railways , where he had 'worked wonders ... from being one of the most sluggish it has become one of the most enterprising lines in the kingdom'. The incumbent 'secretary and general manager' became 'secretary' only (his assistant, Ramsden's son, became 'superintendent of the line') before retiring in 1897 after thirty-three years in

5325-408: Was noted from the start that much of the line would form part of any coastal route north from Lancaster. The subscription to the company was largely taken up by the duke and the earl, and their associates; although there were some local subscribers – Henry Schneider was on the company's provisional committee – failure to attract local capital meant that the original intention to serve Ulverston

5400-530: Was passed for passenger use early in August 1846; by the end of the month, passenger trains were running from Dalton to Piel pier, connecting with a steamer to Fleetwood . At a celebratory excursion and dinner for the directors and friends held at the end of October 1846, it was remarked that the mineral traffic was limited by a shortage of wagons (which prevented the Dalton branch handling more than 2,000 tons of iron ore

5475-692: Was said to have been a director of the Furness Railway, the Barrow Hematite Steel Company, the Barrow Jute and Flax Company, and the Barrow Shipbuilding Company.) The docks at Barrow opened in September 1867. There were two wet docks; the Devonshire (30 acres) and the Buccleuch (33 acres). The Midland Railway's Morecambe-Belfast steamer service was replaced by a Barrow-Belfast service jointly owned by

5550-573: Was then "the largest Bessemer steel works in the country" and "one of the largest in the world". The Dukes of Devonshire and Buccleuch were both major shareholders in the steel company as was the managing director of the Furness Railway, who was also the managing director of the Hematite Steel Company and (following the incorporation in 1867 of Barrow) its first mayor. (Similarly, after the Phoenix Park Murders , Lord Frederick Cavendish

5625-462: Was up from 22,000 tons in 1853 to 40,000 tons, and there were 145,000 passenger movements (95,000 in 1853); the company declared a dividend at a rate of 6% a year. Copper mining interests at Coniston promoted the Coniston Railway , running from the Furness Railway at Broughton to Coniston and on to the copper mines. The line was nominally independent of the FR, but the Duke of Devonshire (as