Misplaced Pages

Cambrian Railways

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

A motive power depot ( MPD ) or locomotive depot , or traction maintenance depot ( TMD ), is where locomotives are usually housed, repaired and maintained. They were originally known as "running sheds", "engine sheds" or just "sheds". Facilities are provided for refuelling and the replenishing of water, lubricating oil and grease and, for steam engines , the disposal of ash. There are often workshops for day-to-day repairs and maintenance, but locomotive building and major overhauls are usually carried out at locomotive works. (Note: In American English , the term depot is used to refer to passenger stations or goods (freight) facilities, not to vehicle maintenance facilities.)

#203796

71-561: The Cambrian Railways owned 230 miles (370 km) of track over a large area of mid Wales . The system was an amalgamation of a number of railways that were incorporated in 1864, 1865 and 1904. The Cambrian connected with two larger railways with connections to the northwest of England via the London and North Western Railway , and the Great Western Railway for connections between London and Wales. The Cambrian Railways amalgamated with

142-448: A railway town , from a population of 5,500 in 1861, to nearly 10,000 in 1901. Built of local red brick and costing £28,000, the locomotive erecting shop had a central traverser which was hand-operated, serving 12 roads on each side. On the far north end of the works, 11 sidings accessed a carriage and wagon works. Power to the machines was provided by a large steam engine via overhead shafting and belts. The 150-foot (46 m) chimney

213-502: A slipformed (or pre-cast) concrete base (development 2000s). The 'embedded rail structure', used in the Netherlands since 1976, initially used a conventional UIC 54 rail embedded in concrete, and later developed (late 1990s) to use a 'mushroom' shaped SA42 rail profile; a version for light rail using a rail supported in an asphalt concrete –filled steel trough has also been developed (2002). Modern ladder track can be considered

284-589: A train track or permanent way (often " perway " in Australia or " P Way " in Britain and India), is the structure on a railway or railroad consisting of the rails , fasteners , railroad ties (sleepers, British English) and ballast (or slab track ), plus the underlying subgrade . It enables trains to move by providing a dependable surface for their wheels to roll upon. Early tracks were constructed with wooden or cast iron rails, and wooden or stone sleepers; since

355-440: A "clickety-clack" sound. Unless it is well-maintained, jointed track does not have the ride quality of welded rail and is less desirable for high speed trains . However, jointed track is still used in many countries on lower speed lines and sidings , and is used extensively in poorer countries due to the lower construction cost and the simpler equipment required for its installation and maintenance. A major problem of jointed track

426-415: A continuous reinforced concrete slab and the use of pre-cast pre-stressed concrete units laid on a base layer. Many permutations of design have been put forward. However, ballastless track has a high initial cost, and in the case of existing railroads the upgrade to such requires closure of the route for a long period. Its whole-life cost can be lower because of the reduction in maintenance. Ballastless track

497-481: A development of baulk road. Ladder track utilizes sleepers aligned along the same direction as the rails with rung-like gauge restraining cross members. Both ballasted and ballastless types exist. Modern track typically uses hot-rolled steel with a profile of an asymmetrical rounded I-beam . Unlike some other uses of iron and steel , railway rails are subject to very high stresses and have to be made of very high-quality steel alloy. It took many decades to improve

568-483: A layer of coal dust covering them and the bed". Another key requirement of the steam engine is a supply of water which is carried in the tenders or tanks of the engines. In Australia, water was also carried in water gins (a water tank mounted on a wagon) due to longer distances covered and scarcer water resources. In depots where the limescale content of water was high (known in some areas as ‘Hard Water'), water softening plants were introduced. At Norwich engine shed in

639-481: A locomotive the engine had to be balanced quite precisely on the turntable and it could then be literally pushed around. Some turntables could be powered by fixing the vacuum brake of the engine to the turntable and using that to turn the engine. Later turntables were electrically operated. Many diesel locomotives in the UK have a cab at each end removing the need for the turntables. However, in Australia and America, there are

710-536: A number of shunting locomotives. Normally 0-4-0T or 0-6-0T tank engines, they would be allocated to shunting duties in goods yards, carriage sidings, goods depots and docks. Many large rail connected industrial sites also had engine sheds, primarily using shunting locomotives. Each railway company had its own architectural design of engine shed, but there were three basic designs of shed: The turntables for straight and dead end sheds were generally outside. Those in roundhouses could be inside, such as those at York in

781-426: A number of single ended locomotives and turntables are still in use. Engine sheds would carry out basic maintenance and the bigger sheds would carry out more complex repairs. Locomotives that required further repair were sent to the company's locomotive works. Withdrawn locomotives could often be found at some depots before their final trips to the scrapyard. In the UK, the general practice is that one shed would have

SECTION 10

#1732844844204

852-485: A number of smaller sub-sheds where there were fewer facilities. When engines allocated to sub-sheds required repairs, they were often exchanged for a similar engine or perhaps just visiting the main depot on a Sunday when traffic levels were considerably lower. In terms of locomotive allocation, it seems to have been the practice that for some railways locomotives were all allocated to the main shed but in others each shed had its specific allocation of locomotives. A list of

923-465: A temperature roughly midway between the extremes experienced at that location. (This is known as the "rail neutral temperature".) This installation procedure is intended to prevent tracks from buckling in summer heat or pulling apart in the winter cold. In North America, because broken rails are typically detected by interruption of the current in the signaling system, they are seen as less of a potential hazard than undetected heat kinks. Joints are used in

994-462: Is 115 to 141 lb/yd (57 to 70 kg/m). In Europe, rail is graded in kilograms per metre and the usual range is 40 to 60 kg/m (81 to 121 lb/yd). The heaviest mass-produced rail was 155 pounds per yard (77 kg/m), rolled for the Pennsylvania Railroad . The rails used in rail transport are produced in sections of fixed length. Rail lengths are made as long as possible, as

1065-408: Is a manual process requiring a reaction crucible and form to contain the molten iron. North American practice is to weld 1 ⁄ 4 -mile-long (400 m) segments of rail at a rail facility and load it on a special train to carry it to the job site. This train is designed to carry many segments of rail which are placed so they can slide off their racks to the rear of the train and be attached to

1136-617: Is as of 2009 being used as the headquarters for the newly formed Cambrian Heritage Railways (CHR) restoration project. The largest station premises on the line were at Aberystwyth (part of which has been restored and reopened as a J D Wetherspoon in the mid-2000s). On vesting its headquarters in July 1865 in Oswestry, the company built the Cambrian railways works to the north of the station on Gobowen Road. Its construction hastened Oswestry's boom as

1207-488: Is cracking around the bolt holes, which can lead to breaking of the rail head (the running surface). This was the cause of the Hither Green rail crash which caused British Railways to begin converting much of its track to continuous welded rail. Where track circuits exist for signalling purposes, insulated block joints are required. These compound the weaknesses of ordinary joints. Specially-made glued joints, where all

1278-459: Is graded by its linear density , that is, its mass over a standard length. Heavier rail can support greater axle loads and higher train speeds without sustaining damage than lighter rail, but at a greater cost. In North America and the United Kingdom, rail is graded in pounds per yard (usually shown as pound or lb ), so 130-pound rail would weigh 130 lb/yd (64 kg/m). The usual range

1349-402: Is scarce and where tonnage or speeds are high. Steel is used in some applications. The track ballast is customarily crushed stone, and the purpose of this is to support the sleepers and allow some adjustment of their position, while allowing free drainage. A disadvantage of traditional track structures is the heavy demand for maintenance, particularly surfacing (tamping) and lining to restore

1420-456: Is starting to paint rails white to lower the peak temperatures reached in summer days. After new segments of rail are laid, or defective rails replaced (welded-in), the rails can be artificially stressed if the temperature of the rail during laying is cooler than what is desired. The stressing process involves either heating the rails, causing them to expand, or stretching the rails with hydraulic equipment. They are then fastened (clipped) to

1491-556: Is still a local landmark. Whilst many carriages and wagons were built in the workshops, only two locomotives were actually constructed at Oswestry, though many were rebuilt there. After the Cambrian Railways was taken over by the GWR on grouping in 1923, the GWR kept the works open as a regional carriage and wagon works, and locomotive repair shop for the associated locomotive shed . In 1911 there were 91 locomotives and one rail motor car in

SECTION 20

#1732844844204

1562-754: Is to bolt them together using metal fishplates (jointbars in the US), producing jointed track . For more modern usage, particularly where higher speeds are required, the lengths of rail may be welded together to form continuous welded rail (CWR). Jointed track is made using lengths of rail, usually around 20 m (66 ft) long (in the UK) and 39 or 78 ft (12 or 24 m) long (in North America), bolted together using perforated steel plates known as fishplates (UK) or joint bars (North America). Fishplates are usually 600 mm (2 ft) long, used in pairs either side of

1633-435: Is usually considered for new very high speed or very high loading routes, in short extensions that require additional strength (e.g. railway stations), or for localised replacement where there are exceptional maintenance difficulties, for example in tunnels. Most rapid transit lines and rubber-tyred metro systems use ballastless track. Early railways (c. 1840s) experimented with continuous bearing railtrack, in which

1704-654: The Llanidloes and Newtown Railway , the Newtown and Machynlleth Railway and the Oswestry, Ellesmere and Whitchurch Railway . The shareholders of these constituent companies became the shareholders in the new Cambrian Railways Company. The Aberystwith and Welsh Coast Railway was not included in the amalgamation because it was still under construction. In all, the new company had lines totalling 97 + 1 ⁄ 4 miles (157 km) in length. As well as incorporating existing railways,

1775-576: The National Museums & Galleries of Wales . No. 247 is currently being used as the café at Chinnor station on the Chinnor and Princes Risborough Railway and No. 250 as a museum on the neighbouring Cholsey and Wallingford Railway having formerly been the Wallingford station café. Both No. 247 and No. 250 are grounded bodies. An unidentified first class passenger body also stands on

1846-769: The Tanat Valley Light Railway . A full brake car, No. 104, was recovered in August 2018 and currently resides on the Swindon and Cricklade Railway awaiting restoration. No Cambrian standard-gauge locomotives still exist. A road in Brecon which runs off the B4601 and over a part of the former line is known as Cambrian Way in commemoration of it. Railway track A railway track ( British English and UIC terminology ) or railroad track ( American English ), also known as

1917-573: The 1870s, rails have almost universally been made from steel. The first railway in Britain was the Wollaton Wagonway , built in 1603 between Wollaton and Strelley in Nottinghamshire. It used wooden rails and was the first of around 50 wooden-railed tramways built over the next 164 years. These early wooden tramways typically used rails of oak or beech, attached to wooden sleepers with iron or wooden nails. Gravel or small stones were packed around

1988-419: The 1950s and 1960s, the rise of manufacturing industry saw many staff leaving the railway for better working conditions (and pay) and many railways started to modernise as a result. The maintenance of the new diesel locomotives in filthy steam sheds soon proved difficult and, although some old sheds survived, many new diesel depots were built on new sites or on the sites of the old steam sheds. The major problem

2059-449: The British sub-sheds can be found here . The drivers and fireman were the visible face of the engine shed and, as such, certain sheds had reputations for clean locomotives thanks to the dedication of those men. Many companies allocated a specific main line locomotive to a crew and they would usually take a personal interest in the cleanliness of their engine; some companies offered a prize to

2130-606: The Cambrian Railways was at Oswestry railway station in Shropshire. The building still stands today, although detached from modern network main railway lines, and was in use for commercial purposes until 2004. After restoration in 2005, this building was reopened as the Cambrian Visitor Centre in June 2006; but on 11 January 2008 closed due to the terms of the lease not being settled. It has since reopened and, amongst other things,

2201-714: The Cambrian's rolling stock. At grouping in 1922, 94 standard-gauge engines and five narrow-gauge engines were transferred to the GWR, identified by type and builder at Locomotives of the Great Western Railway . After becoming part of the London Midland Region in 1963, the depot closed in January 1965, the works in early 1966. A Grade II listed building , the works today is an antiques centre, small business hub and document storage centre. A registered museum dedicated to

Cambrian Railways - Misplaced Pages Continue

2272-602: The Great Western Railway on 1 January 1922 as a result of the Railways Act 1921 . The name is continued today in the route known as the Cambrian Line . The Cambrian Railways Company was created on 25 July 1864 when the Cambrian Railways Act 1864 ( 27 & 28 Vict. c. cclxii) received royal assent . The company was formed by amalgamating most of the railway companies in mid Wales: the Oswestry and Newtown Railway ,

2343-582: The UK, or outside, such as that at the East Broad Top Railroad & Coal Company in Rockhill, Pennsylvania , USA. There were six primary activities that took place at sheds. When a steam engine arrived on shed, it would drop its fire and the ash that had built up would be removed. Disposal of the ash was a filthy job and carried out at quiet times, although some bigger depots had facilities for disposing of ash more efficiently. Study of photographs from

2414-400: The UK, the sludge was discharged into a tank and emptied every three years or so with the sludge being dumped into the sea at Lowestoft. Tender locomotives required turning so they were facing the right way before their next duty. In the early days, these were typically around 45 feet long. As the technology improved and engines got bigger, then the turntables got longer. In order to turn

2485-400: The bolt heads on the same side of the rail. Small gaps which function as expansion joints are deliberately left between the rail ends to allow for expansion of the rails in hot weather. European practice was to have the rail joints on both rails adjacent to each other, while North American practice is to stagger them. Because of these small gaps, when trains pass over jointed tracks they make

2556-564: The canefields themselves. These tracks were narrow gauge (for example, 2 ft ( 610 mm )) and the portable track came in straights, curves, and turnouts, rather like on a model railway. Railway depot The equivalent of such depots in German-speaking countries is the Bahnbetriebswerk or Bw , which has similar functions, with major repairs and overhauls being carried out at Ausbesserungswerke . The number of those

2627-458: The continuous welded rail when necessary, usually for signal circuit gaps. Instead of a joint that passes straight across the rail, the two rail ends are sometimes cut at an angle to give a smoother transition. In extreme cases, such as at the end of long bridges, a breather switch (referred to in North America and Britain as an expansion joint ) gives a smooth path for the wheels while allowing

2698-602: The crew of the best kept engine. Many drivers would spend their own time on improving their knowledge and sharing best practice with younger drivers. The footplate staff (as drivers and fireman were known) were unionised from the 19th century and in the UK were generally in the ASLEF whilst other shed staff tended to be in the Amalgamated Society of Railway Servants (later National Union of Railwaymen ). Many engine shed workers put up with very poor conditions for many years. In

2769-440: The desired track geometry and smoothness of vehicle running. Weakness of the subgrade and drainage deficiencies also lead to heavy maintenance costs. This can be overcome by using ballastless track. In its simplest form this consists of a continuous slab of concrete (like a highway structure) with the rails supported directly on its upper surface (using a resilient pad). There are a number of proprietary systems; variations include

2840-507: The duties carried out by that depot. Most depots had a mixture of passenger, freight and shunting locomotives, but some, such as Mexborough , had predominantly freight locomotives, reflecting the industrial nature of that area in South Yorkshire . Others, such as Kings Cross engine shed in London, predominantly provided locomotives for passenger workings. Nearly all depots at that time had

2911-440: The end of one rail to expand relative to the next rail. A sleeper (tie or crosstie) is a rectangular object on which the rails are supported and fixed. The sleeper has two main roles: to transfer the loads from the rails to the track ballast and the ground underneath, and to hold the rails to the correct width apart (to maintain the rail gauge ). They are generally laid transversely to the rails. Various methods exist for fixing

Cambrian Railways - Misplaced Pages Continue

2982-428: The gaps are filled with epoxy resin , increase the strength again. As an alternative to the insulated joint, audio frequency track circuits can be employed using a tuned loop formed in approximately 20 m (66 ft) of the rail as part of the blocking circuit. Some insulated joints are unavoidable within turnouts. Another alternative is an axle counter , which can reduce the number of track circuits and thus

3053-438: The history of the Cambrian Railways is run by Cambrian Heritage Railways in Oswestry. A selection of original Cambrian Railways coaches have survived into the present day. Coaches 4, 251 and an unidentified saloon/brake car all stand in private residence. No. 9 is in private storage. No. 110 is being restored to service on the Swindon and Cricklade Railway . No. 238 and an unidentified six-wheel brake resides with

3124-626: The intrinsic weakness in resisting vertical loading results in the ballast becoming depressed and a heavy maintenance workload is imposed to prevent unacceptable geometrical defects at the joints. The joints also needed to be lubricated, and wear at the fishplate (joint bar) mating surfaces needed to be rectified by shimming. For this reason jointed track is not financially appropriate for heavily operated railroads. Timber sleepers are of many available timbers, and are often treated with creosote , chromated copper arsenate , or other wood preservatives. Pre-stressed concrete sleepers are often used where timber

3195-474: The iron came loose, began to curl, and intruded into the floors of the coaches. The iron strap rail coming through the floors of the coaches came to be referred to as "snake heads" by early railroaders. The Deeside Tramway in North Wales used this form of rail. It opened around 1870 and closed in 1947, with long sections still using these rails. It was one of the last uses of iron-topped wooden rails. Rail

3266-402: The joints between rails are a source of weakness. Throughout the history of rail production, lengths have increased as manufacturing processes have improved. The following are lengths of single sections produced by steel mills , without any thermite welding . Shorter rails may be welded with flashbutt welding , but the following rail lengths are unwelded. Welding of rails into longer lengths

3337-863: The mid- to late-20th century used rails 39 feet (11.9 m) long so they could be carried in gondola cars ( open wagons ), often 40 feet (12.2 m) long; as gondola sizes increased, so did rail lengths. According to the Railway Gazette International the planned-but-cancelled 150-kilometre rail line for the Baffinland Iron Mine , on Baffin Island , would have used older carbon steel alloys for its rails, instead of more modern, higher performance alloys, because modern alloy rails can become brittle at very low temperatures. Early North American railroads used iron on top of wooden rails as an economy measure but gave up this method of construction after

3408-596: The new company had agreements to share traffic with the Mid-Wales Railway , the Manchester and Milford Railway and the Great Western Railway . This allowed it to control the transportation of goods and passengers across mid Wales. The earliest section of the Cambrian was the section from Three Cocks to Talyllyn Junction . This had been opened in 1816 as part of the Hay Railway, a tramroad worked by horses connecting

3479-620: The number of insulated rail joints required. Most modern railways use continuous welded rail (CWR), sometimes referred to as ribbon rails or seamless rails . In this form of track, the rails are welded together by utilising flash butt welding to form one continuous rail that may be several kilometres long. Because there are few joints, this form of track is very strong, gives a smooth ride, and needs less maintenance; trains can travel on it at higher speeds and with less friction. Welded rails are more expensive to lay than jointed tracks, but have much lower maintenance costs. The first welded track

3550-443: The outer walls constructed of dry blocks much in the style of a dry stone wall with smaller pieces behind these. As technology advanced and the bigger sheds got busier, this process became mechanised and huge coaling towers above the neighbourhoods indicated where the engine shed was. The sheds were not clean places to work. The large east London depot of Stratford had an engineman's dormitory and its occupants would "wake up with

3621-404: The outside of sharp curves compared to the rails on the inside. Rails can be supplied pre-drilled with boltholes for fishplates or without where they will be welded into place. There are usually two or three boltholes at each end. Rails are produced in fixed lengths and need to be joined end-to-end to make a continuous surface on which trains may run. The traditional method of joining the rails

SECTION 50

#1732844844204

3692-423: The quality of the materials, including the change from iron to steel. The stronger the rails and the rest of the trackwork, the heavier and faster the trains the track can carry. Other profiles of rail include: bullhead rail ; grooved rail ; flat-bottomed rail (Vignoles rail or flanged T-rail); bridge rail (inverted U–shaped used in baulk road ); and Barlow rail (inverted V). North American railroads until

3763-682: The rail by special clips that resist longitudinal movement of the rail. There is no theoretical limit to how long a welded rail can be. However, if longitudinal and lateral restraint are insufficient, the track could become distorted in hot weather and cause a derailment. Distortion due to heat expansion is known in North America as sun kink , and elsewhere as buckling. In extreme hot weather special inspections are required to monitor sections of track known to be problematic. In North American practice, extreme temperature conditions will trigger slow orders to allow for crews to react to buckling or "sun kinks" if encountered. The German railway company Deutsche Bahn

3834-425: The rail ends and bolted together (usually four, but sometimes six bolts per joint). The bolts have alternating orientations so that in the event of a derailment and a wheel flange striking the joint, only some of the bolts will be sheared, reducing the likelihood of the rails misaligning with each other and exacerbating the derailment. This technique is not applied universally; European practice being to have all

3905-494: The rail to the sleeper. Historically, spikes gave way to cast iron chairs fixed to the sleeper. More recently, springs (such as Pandrol clips ) are used to fix the rail to the sleeper chair. Sometimes rail tracks are designed to be portable and moved from one place to another as required. During construction of the Panama Canal , tracks were moved around excavation works. These track gauge were 5 ft ( 1,524 mm ) and

3976-567: The rail was supported along its length, with examples including Brunel's baulk road on the Great Western Railway , as well as use on the Newcastle and North Shields Railway , on the Lancashire and Yorkshire Railway to a design by John Hawkshaw , and elsewhere. Continuous-bearing designs were also promoted by other engineers. The system was tested on the Baltimore and Ohio railway in the 1840s, but

4047-549: The rolling stock full size. Portable tracks have often been used in open pit mines. In 1880 in New York City , sections of heavy portable track (along with much other improvised technology) helped in the move of the ancient obelisk in Central Park to its final location from the dock where it was unloaded from the cargo ship SS Dessoug . Cane railways often had permanent tracks for the main lines, with portable tracks serving

4118-426: The sleepers in their expanded form. This process ensures that the rail will not expand much further in subsequent hot weather. In cold weather the rails try to contract, but because they are firmly fastened, cannot do so. In effect, stressed rails are a bit like a piece of stretched elastic firmly fastened down. In extremely cold weather, rails are heated to prevent "pull aparts". CWR is laid (including fastening) at

4189-603: The sleepers to hold them in place and provide a walkway for the people or horses that moved wagons along the track. The rails were usually about 3 feet (0.91 m) long and were not joined - instead, adjacent rails were laid on a common sleeper. The straight rails could be angled at these joints to form primitive curved track. The first iron rails laid in Britain were at the Darby Ironworks in Coalbrookdale in 1767. When steam locomotives were introduced, starting in 1804,

4260-540: The sleepers with base plates that spread the load. When concrete sleepers are used, a plastic or rubber pad is usually placed between the rail and the tie plate. Rail is usually attached to the sleeper with resilient fastenings, although cut spikes are widely used in North America. For much of the 20th century, rail track used softwood timber sleepers and jointed rails, and a considerable amount of this track remains on secondary and tertiary routes. In North America and Australia, flat-bottomed rails were typically fastened to

4331-428: The sleepers with dog spikes through a flat tie plate. In Britain and Ireland, bullhead rails were carried in cast-iron chairs which were spiked to the sleepers. In 1936, the London, Midland and Scottish Railway pioneered the conversion to flat-bottomed rail in Britain, though earlier lines had made some use of it. Jointed rails were used at first because contemporary technology did not offer any alternative. However,

SECTION 60

#1732844844204

4402-422: The steam era show it was not uncommon for piles of ash to be scattered around the depot site. After completing their last duty and arriving on shed, locomotives would have a regular boiler washout to remove scale, improve efficiency and protect safety. Locomotives generally ran on coal. Initially this job was done by hand and many depots had significant coal stacks on site. These would be neatly constructed with

4473-511: The ties (sleepers) in a continuous operation. If not restrained, rails would lengthen in hot weather and shrink in cold weather. To provide this restraint, the rail is prevented from moving in relation to the sleeper by use of clips or anchors. Attention needs to be paid to compacting the ballast effectively, including under, between, and at the ends of the sleepers, to prevent the sleepers from moving. Anchors are more common for wooden sleepers, whereas most concrete or steel sleepers are fastened to

4544-514: The town of Hay-on-Wye with the Brecknock and Abergavenny Canal at Brecon . The western section was sold to the Brecon and Merthyr Railway ; the eastern section became part of the Mid-Wales Railway . In the following list the dates are: date of incorporation; opening date (The information in this section was taken largely from The Railway Year Book 1912 .) The Cambrian had connections with many independent lines, including: The headquarters of

4615-406: The track then in use proved too weak to carry the additional weight. Richard Trevithick 's pioneering locomotive at Pen-y-darren broke the plateway track and had to be withdrawn. As locomotives became more widespread in the 1810s and 1820s, engineers built rigid track formations, with iron rails mounted on stone sleepers, and cast-iron chairs holding them in place. This proved to be a mistake, and

4686-467: Was first introduced around 1893, making train rides quieter and safer. With the introduction of thermite welding after 1899, the process became less labour-intensive, and ubiquitous. Modern production techniques allowed the production of longer unwelded segments. Newer longer rails tend to be made as simple multiples of older shorter rails, so that old rails can be replaced without cutting. Some cutting would be needed as slightly longer rails are needed on

4757-432: Was found to be more expensive to maintain than rail with cross sleepers . This type of track still exists on some bridges on Network Rail where the timber baulks are called waybeams or longitudinal timbers. Generally the speed over such structures is low. Later applications of continuously supported track include Balfour Beatty 's 'embedded slab track', which uses a rounded rectangular rail profile (BB14072) embedded in

4828-526: Was reduced drastically following the changeover from steam to diesel and electric traction, and most modern Bw in Germany are specialised depots, often responsible for a single locomotive class . Engine sheds could be found in many towns and cities, as well as in rural locations. They were built by the railway companies to accommodate the locomotives that provided their local train services. Each engine shed would have an allocation of locomotives that would reflect

4899-466: Was soon replaced with flexible track structures that allowed a degree of elastic movement as trains passed over them. Traditionally, tracks are constructed using flat-bottomed steel rails laid on and spiked or screwed into timber or pre-stressed concrete sleepers (known as ties in North America), with crushed stone ballast placed beneath and around the sleepers. Most modern railroads with heavy traffic use continuously welded rails that are attached to

4970-458: Was the disposal of oil, which initially was left lying around causing pollution and safety issues. The new depots were equipped to deal with diesel fuel and the ability to access the underside, as well as upper body work, was improved. The tasks were not that much different in that diesel locomotives were fuelled rather than coaled, although they did require water as early diesels were equipped with steam generators for train heating purposes. Since

5041-450: Was used in Germany in 1924. and has become common on main lines since the 1950s. The preferred process of flash butt welding involves an automated track-laying machine running a strong electric current through the touching ends of two unjoined rails. The ends become white hot due to electrical resistance and are then pressed together forming a strong weld. Thermite welding is used to repair or splice together existing CWR segments. This

#203796