Commuter rail or suburban rail is a passenger rail transport service that primarily operates within a metropolitan area , connecting commuters to a central city from adjacent suburbs or commuter towns . Commuter rail systems can use locomotive-hauled trains or multiple units, using electric or diesel propulsion. Distance charges or zone pricing may be used.
131-713: Shore Line East ( SLE ) is a commuter rail service which operates along the Northeast Corridor through southern Connecticut , United States. The rail service is a fully owned subsidiary of the Connecticut Department of Transportation (CTDOT) and is operated under the CT Rail brand. SLE provides service seven days a week along the Northeast Corridor between New London and New Haven ; limited through service west of New Haven to Bridgeport and Stamford operates during weekday rush hours. Cross-platform transfers to Metro-North Railroad New Haven Line trains are available at New Haven for service to southwestern Connecticut and New York City. Pre-COVID, around 2,200 riders used
262-578: A $ 50 million transportation program that included $ 900,000 (later reduced to $ 500,000) for basic stations and $ 4 million to refurbish 12 Budd Rail Diesel Cars for rolling stock. The RDCs were found to be insufficient and two diesel trainsets were purchased from the defunct PATrain service in 1989 instead. Testing of the equipment on the Northeast Corridor began on December 2, 1989. The state bought Amtrak's New Haven maintenance facility in May 1989 and signed
393-761: A 2015 bonding proposal made by then-governor Malloy, $ 750,000 was to be allocated for a new station at Niantic. SLE service uses four-car trains of state-owned Kawasaki M8 electric multiple units . These cars are part of a larger fleet, jointly owned by the state and the Metropolitan Transportation Authority , that operate on the Metro-North Railroad New Haven Line and New Canaan Branch . The M8 cars replaced push-pull diesel-powered trains on May 24, 2022. In 2007, CTDOT proposed to use up to 32 M8 cars in SLE service as far as Old Saybrook;
524-621: A Mikado-type engine that was typical to the New Haven. The name of the Hartford Yard Goats Minor League Baseball team reflects the old New York, New Haven and Hartford railroad history and the design of its logo is based on the original NYNHH logo. The team plays in downtown Hartford at Dunkin' Donuts Park , which is adjacent to Hartford Yard , originally built by NYNHH. NH introduced ideas for passenger rail travel, including early use of restaurant and parlor cars in
655-404: A bill ordering various studies, including one that analyzed extending service to New London as had been originally planned. Before the study was completed, CTDOT unilaterally decided to implement New London service, which the report commended. On February 1, 1996, two round trips per weekday were extended to New London. At that point, ridership was up 18 percent over 1991 numbers. In December 2001,
786-729: A capital cost of at least $ 245 million and additional annual operating costs of $ 25 million. With intermediate stops at Groton , Mystic, and Stonington , the service was estimated to attract 159,300 annual riders. The study also analyzed potential service to Norwich via the Palmer Line ( New England Central Railroad mainline) with intermediate stations at Connecticut College / U.S. Coast Guard Academy and Mohegan Sun . Capital costs were estimated as at least $ 636 million and annual operating costs at $ 6.8 million, with 8-10 weekday round trips attracting 126,400 daily riders. Alternate expansion of Southeast Area Transit bus service serving both corridors
917-651: A city's central business district, and often share right-of-way with intercity or freight trains. Some services operate only during peak hours and others use fewer departures during off peak hours and weekends. Average speeds are high, often 50 km/h (30 mph) or higher. These higher speeds better serve the longer distances involved. Some services include express services which skip some stations in order to run faster and separate longer distance riders from short-distance ones. The general range of commuter trains' travel distance varies between 15 and 200 km (10 and 125 miles), but longer distances can be covered when
1048-413: A headway rather than a published timetable and use dedicated tracks (underground or elevated), whereas commuter rail often shares tracks, technology and the legal framework within mainline railway systems, and uses rolling stocks with more seating and higher speed for comfort on longer city-suburban journeys. However, the classification as a metro or rapid rail can be difficult as both may typically cover
1179-720: A lease of the Shore Line Railway (leased in 1870 by the New York and New Haven Railroad). The company later leased more lines and systems, eventually forming a virtual monopoly in New England south of the Boston and Albany Railroad . In 1882, the railroad leased the Boston, New York and Airline Railroad, the last railroad in New Haven not controlled by the NYNH&H. This new acquisition gave
1310-577: A metropolitan area exclusively, run on separate tracks in the centre, and often feature purpose-built rolling stock. The fact that the terminology is not standardised across countries (even across English-speaking countries) further complicates matters. This distinction is most easily made when there are two (or more) systems such as New York's subway and the LIRR and Metro-North Railroad , Paris' Métro and RER along with Transilien , Washington D.C.'s Metro along with its MARC and VRE , London's tube lines of
1441-445: A network of electrified trolley lines that provided interurban transportation for all of southern New England. By 1912, the New Haven operated more than 2,000 miles (3,200 km) of track, with 120,000 employees, and practically monopolized traffic in a wide swath from Boston to New York City. This quest for monopoly angered Progressive Era reformers, alienated public opinion, raised the cost of acquiring other companies and increased
SECTION 10
#17328524626961572-427: A network of low-density branch lines that could not pay their own maintenance and operating costs. The freight business was short-haul, requiring switching costs that could not be recovered in short-distance rates. They operated major commuter train services in New York and Boston (as well as New Haven, Hartford and Providence), but these had always lost money; though heavily patronized, these services operated only during
1703-680: A reduced schedule due to the coronavirus pandemic . All Stamford through service was suspended. Cross-honoring of tickets on Amtrak trains was suspended that June. Weekday service was expanded from 8 to 11.5 round trips (compared to 18 pre-COVID round trips) on July 26, 2021, with all trains running to New London. Cross-honoring resumed on September 27, 2021. Electrification and track work on Track 6 at New London took place from November 2021 to April 2022. This allowed all-electric service using M8 railcars to begin on May 24, 2022. Shore Line East ridership only reached about 25% of pre-pandemic ridership by mid-2022 – compared to 40% to 72% for other rail lines in
1834-442: A reorganization plan approved in federal court, without the vast majority of its previous non-railroad interests, and with a number of unprofitable passenger operations on marginal branches replaced with bus service. In 1948, the company operated 644 locomotives, 1,602 passenger cars and 8,796 freight cars on 1,581 miles of track. After 1951, both freight and passenger service lost money. The earlier expansion had left NH with
1965-459: A second lot with 272 spaces opened at Branford in June 2011. A 585-space, three-level parking garage is eventually planned for Madison station. In 2018, two separate issues caused numerous delays and cancellations with many trains replaced by buses . An Amtrak track maintenance project required single-tracking of sections of the line, and CTDOT lacked sufficient functional locomotives as the aging fleet
2096-660: A second platform and pedestrian bridge at Branford, $ 7.3 million for platform extensions at Guilford, and $ 11 million to electrify several sidings along the line. Construction on the new platform at Branford began in September 2013, while the Guilford work was underway by early 2014. After delays, the enlarged Branford station opened on September 30, 2016, although the north platform was not immediately served by trains. The north platform entered service on November 5, 2016. As with other stations, reverse-peak trains began stopping at Branford with
2227-405: A second platform and three-level parking garage at Madison, planned since 2009, was scheduled to begin in 2013 but did not occur.) Expansion of the original parking facilities was also necessary to meet demand, since many started with small lots suitable for just a few dozen cars. The rebuilt stations at Branford, Guilford, Madison, Clinton, and Westbrook have larger lots than the 1990 stations, and
2358-641: A service contract with Amtrak in November. Construction of 5 intermediate stations was completed in April 1990. Shore Line East service began on May 29, 1990, with four trains each direction during the morning and evening. The service carried the Clamdigger name during planning; "Shore Line East" did not appear until shortly before service began. Shore Line East was threatened to be cut in 1991 by newly elected Governor Lowell Weicker , but it proved more popular than expected, and
2489-428: A significant fraction of ridership increases on Shore Line East during that period. In a 2007 report, CTDOT outlined plans to turn SLE into a full-service bidirectional regional rail line, with full-day service and all trains extended to New London. This involved incremental improvements, similar to those that have already been put into place. One of the first priorities was to add a second platform at all stations, which
2620-518: A single morning rush-hour round trip branded SLExpress was extended to Stamford, with a stop at Bridgeport plus eastbound-only stops at Stratford and Milford. An evening eastbound trip was also extended to Stamford with only the Bridgeport intermediate stop. This trip was intended to allow commuters to reach employment centers in Bridgeport and Stamford without having to make a transfer at New Haven. On June 24, 2002, additional Stamford trains were added, for
2751-555: A temporary service, the five intermediate stations built in 1990 were little more than wooden decks. Since the service was started two months before the Americans with Disabilities Act was signed, the platforms were not built to be accessible . In January 2001, because of changes in Amtrak rules related to the introduction of Acela Express service, passengers were no longer allowed to cross tracks to access trains. New platforms were opened on
SECTION 20
#17328524626962882-536: A total of two westbound and three eastbound trains. South Norwalk station was added as a stop for the single morning eastbound trip. When West Haven opened on August 18, 2013, it was added to these trips as well. In 2003, in order to add four additional Amtrak trips along the corridor, four of the six round trips to New London were cut back to Old Saybrook. An agreement with the Connecticut Department of Energy and Environmental Protection limits service over
3013-967: A wide variety of different features and service frequencies, but is often used in contrast to rapid transit or light rail . Some services share similarities with both commuter rail and high-frequency rapid transit ; examples include German S-Bahn in some cities, the Réseau Express Régional (RER) in Paris, the S Lines in Milan, many Japanese commuter systems, the East Rail line in Hong Kong, and some Australasian suburban networks, such as Sydney Trains . Many commuter rail systems share tracks with other passenger services and freight . In North America, commuter rail sometimes refers only to systems that primarily operate during rush hour and offer little to no service for
3144-874: Is especially the case for lines operated by Korail , such as the Gyeongui-Jungang Line , the Gyeongchun Line , the Suin-Bundang Line , or the Gyeonggang Line . Even some lines not operated by Korail, such as the AREX Line, the Seohae Line or the Shinbundang Line mostly function as commuter rail. Lastly, even for the "numbered lines" (1–9) of the Seoul Metropolitan Subway which mostly travel in
3275-549: Is funded by CTDOT, it is operated under contract by Amtrak. Amtrak owns and controls the Northeast Corridor east of New Haven. West of New Haven, the New Haven Line is owned by CTDOT and trains are dispatched by Metro-North. During the OpSail and SailFest tall ship festivals at New London, extra Friday and weekend service is operated from New Haven to New London. During OpSail 2000, through service operated from New Haven to Mystic –
3406-591: Is heavily used by commuters in the Greater Tokyo Area , who commute between 100 and 200 km (62 and 124 mi) by Shinkansen . To meet the demand of commuters, JR sells commuter discount passes. Before 2021, they operated 16-car bilevel E4 Series Shinkansen trains at rush hour, providing a capacity of 1,600 seats. Several lines in China, such as the Beijing–Tianjin Intercity Railway and
3537-417: Is often a case of asset sweating , by using a single large combined fleet for intercity and regional services. Loco hauled services are usually run in push-pull formation, that is, the train can run with the locomotive at the "front" or "rear" of the train (pushing or pulling). Trains are often equipped with a control cab at the other end of the train from the locomotive, allowing the train operator to operate
3668-1884: Is one suburban rail called the Chittagong Circular Railway . Another suburban railway called the Dhaka Circular Railway is currently proposed. Karachi in Pakistan has a circular railway since 1969. Tehran Metro currently operates the Line 5 commuter line between Tehran and Karaj . Turkey has lines connecting Başkentray , İZBAN , Marmaray and Gaziray . Major metropolitan areas in most European countries are usually served by extensive commuter/suburban rail systems. Well-known examples include BG Voz in Belgrade (Serbia), S-Bahn in Germany, Austria and German-speaking areas of Switzerland, Proastiakos in Greece, RER in France and Belgium, Servizio ferroviario suburbano in Italy, Cercanías and Rodalies ( Catalonia ) in Spain, CP Urban Services in Portugal, Esko in Prague and Ostrava (Czech Republic), HÉV in Budapest (Hungary) and DART in Dublin (Ireland). London has multiple commuter rail routes: The Merseyrail network in Liverpool consists of two commuter rail routes powered by third rail, both of which branch out at one end. At
3799-470: Is operationally more like a typical metro system (frequent trains, an emphasis on standing passengers , short station spacings) than it is like commuter rail in other countries. Japanese commuter rail commonly interline with city center subway lines, with commuter rail trains continuing into the subway network, and then out onto different commuter rail systems on the other side of the city. Many Japanese commuter systems operate various stopping patterns to reduce
3930-522: Is painted in McGinnis-era livery, while the iconic "NH" logo appears on everything from rolling stock, station signage, to tourism materials for the city of New Haven itself. The Connecticut Department of Transportation has painted its diesel commuter rail locomotives used on the non-electrified Danbury and Waterbury Metro-North branches, as well as its Shore Line East operation, in the "McGinnis Scheme," composed of white, black, and orange-red stripes with
4061-526: Is still possible to tell them apart. Some operators, for example Thameslink , focus solely on commuter services. Others, such as Avanti West Coast and LNER , run solely intercity services. Others still, such as GWR and EMR , run a mixture of commuter, regional and intercity services. Some of these operators use different branding for different types of service (for example EMR brands its trains as either "InterCity", "Connect" for London commuter services, and "Regional") but even for those operators that do not,
Shore Line East - Misplaced Pages Continue
4192-570: Is used in Australia (Sydney for example) to describe the regional trains operating beyond the boundaries of the suburban services, even though some of these "inter-city" services stop all stations similar to German regional services. In this regard, the German service delineations and naming conventions are clearer and better used for academic purposes. Sometimes high-speed rail can serve daily use of commuters. The Japanese Shinkansen high speed rail system
4323-426: Is widely used in many commuter rail trains to increase capacity in rush hours. Carriages are usually not organized to increase seating capacity (although in some trains at least one carriage would feature more doors to facilitate easier boarding and alighting and bench seats so that they can be folded up during rush hour to provide more standing room) even in the case of commuting longer than 50 km and commuters in
4454-478: The Amtrak Old Saybrook–Old Lyme Bridge in order to avoid inconveniencing recreational boaters. CTDOT's agreement with Amtrak allowed commuters with monthly passes to ride certain Amtrak trains instead. After criticism over the service cuts, in April 2008 CTDOT began allowing commuters with multi-ride passes to board the selected Amtrak trains as well. Because Shore Line East was intended to be
4585-900: The Brisbane ( Queensland Rail 's City network ) and Perth ( Transperth ) systems in Australia, in some systems in Sweden, and on the Genoa-Casella line in Italy. Some countries and regions, including Finland , India, Pakistan, Russia , Brazil and Sri Lanka, as well as San Francisco ( BART ) in the US and Melbourne and Adelaide in Australia, use broad gauge track. Metro rail and rapid transit usually cover smaller inner-urban areas within 12 to 20 km (7 to 12 mi) of city centers, with shorter stop spacing, use rolling stocks with larger standing spaces, lower top speed and higher acceleration, designed for short-distance travel. They also run more frequently, to
4716-747: The Chennai MRTS , also covers over 300 stations and carries more than 2.5 million people daily to different areas in Chennai and its surroundings. Other commuter railways in India include the Hyderabad MMTS , Delhi Suburban Railway , Pune Suburban Railway and Lucknow-Kanpur Suburban Railway . In 2020, Government of India approved Bengaluru Suburban Railway to connect Bengaluru and its suburbs. It will be unique and first of its kind in India as it will have metro like facilities and rolling stock. In Bangladesh, there
4847-459: The Clamdigger along with most intercity passenger service, in May 1971. In January 1972, Amtrak discontinued the Clamdigger and Penn Central cut the New London–Boston trip. In 1976–77, Amtrak operated the Clamdigger as a Providence-New Haven round trip with limited local stops; for three months in 1978, it was revived with additional commuter-based stops. It was replaced in April 1978 by
4978-519: The Greater Tokyo Area , Seoul metropolitan area , and Jabodetabek area have to stand in the train for more than an hour. Currently there are not many examples of commuter rail in Africa . Metrorail operates in the major cities of South Africa , and there are some commuter rail services in Algeria , Botswana , Kenya , Morocco , Egypt and Tunisia . In Algeria, SNTF operates commuter rail lines between
5109-811: The Guangshen Railway have more frequent metro-like service. The two MTR lines which are owned and formerly operated by the Kowloon-Canton Railway Corporation ( East Rail line and Tuen Ma line which is integrated from the former West Rail line and Ma On Shan line in 2021), then the "KCR" ), and MTR's own Tung Chung line connect the new towns in New Territories and the city centre Kowloon together with frequent intervals, and some New Territories-bound trains terminate at intermediate stations, providing more frequent services in Kowloon and
5240-612: The Hartford and New Haven Railroad , which began service between New Haven and Hartford in 1839 and reached Springfield, Massachusetts , in 1844, and the New York and New Haven Railroad , which opened in 1848 between its namesake cities. The two companies had a history of cooperation; for a time, they jointly leased the New Haven and Northampton Railroad and coordinated their steamship services with each other. An initial merger attempt between
5371-571: The Jakarta city center with surrounding cities and sub-urbans in Banten and West Java provinces, including Depok , Bogor , Tangerang , Serpong , Rangkasbitung , Bekasi and Cikarang . In July 2015, KRL Commuterline served more than 850,000 passengers per day, which is almost triple of the 2011 figures, but still less than 3.5% of all Jabodetabek commutes. Other commuter rail systems in Indonesia include
Shore Line East - Misplaced Pages Continue
5502-557: The MBTA , and numerous freight operators such as CSX and the Providence and Worcester Railroad . The majority of the surviving system is now owned publicly by the states of Connecticut , Rhode Island , and Massachusetts , with other surviving segments owned by freight railroads; many abandoned lines have been converted into rail trails . The New Haven system was formed by the merger of two railroads that intersected in New Haven, Connecticut :
5633-947: The Metro Surabaya Commuter Line , Commuter Line Bandung , KAI Commuter Yogyakarta–Solo Line , Kedung Sepur , and the Sri Lelawangsa . In the Philippines, the Philippine National Railways has two commuter rail systems currently operational; the PNR Metro Commuter Line in the Greater Manila Area and the PNR Bicol Commuter in the Bicol Region . A new commuter rail line in Metro Manila,
5764-555: The Metro-North Railroad ’s New Haven Line and Shore Line East , providing commuter service from Manhattan’s Grand Central Terminal as far eastward as New London, Connecticut. The New Haven Line is coded red on Metro-North timetables and system maps, a nod to the red livery used by the New Haven for the last decade of its history. MBTA 's Providence/Stoughton Line provides commuter service between Providence and South Station in Boston. Amtrak took over passenger service on
5895-475: The New Haven–Springfield Line in 1976, and was joined by the state of Connecticut's Hartford Line in 2018. On August 28, 1980, American Financial Enterprises, Inc., acquired the remaining assets of the New York, New Haven and Hartford Railroad Company when the plan for reorganization was approved by the court and the company was reorganized. This brought to an end the 108-year corporate history of
6026-597: The North–South Commuter Railway , is currently under construction. Its North section is set to be partially opened by 2021. In Malaysia, there are two commuter services operated by Keretapi Tanah Melayu . They are the KTM Komuter that serves Kuala Lumpur and the surrounding Klang Valley area , and the KTM Komuter Northern Sector that serves Greater Penang , Perak , Kedah and Perlis in
6157-566: The Pearl Harbor Memorial Bridge . The first existing station to be rebuilt specifically for Shore Line East was Old Saybrook. A new high-level island platform and pedestrian bridge opened on November 1, 2002; the final configuration of two platforms serving all three tracks allows Amtrak trains to pass SLE trains at the station. Beginning on May 24, 2004, construction of new platforms began at Clinton , Guilford , and Branford . The rebuilt Clinton station opened on July 25, 2005, and
6288-498: The Penn Central system, formed a year earlier by the merger of the New York Central Railroad and Pennsylvania Railroad . Already a poorly conceived merger, Penn Central went bankrupt in 1970, becoming the largest U.S. bankruptcy until the Enron Corporation superseded it in 2001. The remnants of the system now comprise Metro-North Railroad 's New Haven Line , much of the northern leg of Amtrak 's Northeast Corridor , Connecticut 's Shore Line East and Hartford Line , parts of
6419-469: The Providence/Stoughton Line , was extended southward instead (although only to Wickford Junction ). However, both RIDOT and SLE have long-term plans to extend their services to meet at Westerly. Extending SLE service would require negotiations with the US Coast Guard , the Marine Trades Association, and other stakeholders for increased use of the Thames River Bridge and the Mystic River Bridge . As part of Malloy's 2015 30-year transit plan, Shore Line East
6550-528: The Shanghai–Nanjing High-Speed Railway , serve a similar role with many more under construction or planned. In South Korea, some sections of the high-speed rail network are also heavily used by commuters, such as the section between Gwangmyeong Station and Seoul Station on the KTX network ( Gyeongbu HSR Line ), or the section between Dongtan Station and Suseo station on the SRT Line. The high-speed services linking Zürich , Bern and Basel in Switzerland (200 km/h (120 mph)) have brought
6681-424: The Underground and the Overground , Elizabeth line , Thameslink along with other commuter rail operators , Madrid's Metro and Cercanías , Barcelona's Metro and Rodalies , and Tokyo's subway and the JR lines along with various privately owned and operated commuter rail systems. Regional rail usually provides rail services between towns and cities, rather than purely linking major population hubs in
SECTION 50
#17328524626966812-426: The Yamanote Line , Keihin Tohoku Line , Chūō–Sōbu Line services arguably are more akin to rapid transit with frequent stops, simple stopping patterns (relative to other JR East lines) no branching services and largely serving the inner suburbs; other services along the Chūō Rapid Line , Sōbu Rapid Line / Yokosuka Line , Ueno–Tokyo Line , Shōnan–Shinjuku Line etc. are mid-distance services from suburban lines in
6943-402: The 300 km/h (186 mph) Nuremberg–Ingolstadt high-speed railway . The regional trains Stockholm – Uppsala , Stockholm– Västerås , Stockholm– Eskilstuna and Gothenburg – Trollhättan in Sweden reach 200 km/h (120 mph) and have many daily commuters. In Great Britain , the HS1 domestic services between London and Ashford runs at a top speed of 225 km/h, and in peak hours
7074-425: The Board of Estimate and Apportionment, which only became defunct in 1989. Morgan and Mellen achieved a complete monopoly of transportation in southern New England, purchasing other railroads and steamship and trolley lines. More than 100 independent railroads eventually became part of the system before and during these years, reaching 2,131 miles at its 1929 peak. Substantial improvements to the system were made during
7205-542: The COVID-19 pandemic. Diesel trains were replaced by Kawasaki M8 electric multiple units in May 2022. Proposals for future expansion include extensions to Westerly, Rhode Island , and Norwich, Connecticut , and an infill station in Niantic . Most weekday SLE trains run local between New London and New Haven , with one peak train in each direction operating through New Haven as far as Stamford . Eastbound morning trains and westbound afternoon trains skip Madison because it only has one platform, and trains operating in
7336-448: The Central Business Districts (CBDs) of these three cities within 1 hour of each other. This has resulted in unexpectedly high demand for new commuter trips between the three cities and a corresponding increase in suburban rail passengers accessing the high-speed services at the main city-centre stations ( Hauptbahnhof ). The Regional-Express commuter service between Munich and Nuremberg in Germany runs at 200 km/h (120 mph) on
7467-439: The Connecticut Public Utilities Commission in February 1960 if the company's survival was in imminent danger, the New Haven's comptroller replied, "Yes, even with the best of management". Continuing financial problems forced the New Haven into bankruptcy on July 7, 1961, and federal court judge Robert P. Anderson assumed trusteeship . The railroad reported it would have only $ 9,262,000 in funds to cover expenses of $ 33,480,000 at
7598-402: The East Rail Line share tracks with intercity trains to mainland China . The three KCR lines are integrated into the MTR network since 2008 and most passengers do not need to exit and re-enter the system through separate fare gates and purchase separate tickets to transfer between such lines and the rest of the network (the exceptions are between the Tuen Ma line's East Tsim Sha Tsui station and
7729-478: The Mellen years, including electrification between New York and New Haven . Morgan and Mellen went further and attempted to acquire or neutralize competition from other railroads in New England, including the New York Central 's Boston and Albany Railroad, the Rutland Railroad , the Maine Central Railroad , and the Boston and Maine Railroad . But the Morgan-Mellen expansion left the company overextended and financially weak. In 1914, 21 directors and ex-directors of
7860-409: The NH was purchased by PC, which operated the train. Other passenger trains: Beginning November 21, 1914, the railroad operated special trains to bring football fans to and from the new Yale Bowl stadium in New Haven. Passengers rode extra trains from Springfield, Boston, and especially New York to the New Haven Union Station, where they transferred to trolleys for the 2-mile (3.2 km) ride to
7991-433: The Netherlands carry many commuters, while their equipment, range, and speeds are similar to those of commuter trains in some larger countries. The United Kingdom has a privatised rail system, with different routes and services covered by different private operators. The distinction between commuter and intercity rail is not as clear as it was before privatisation (when InterCity existed as a brand of its own), but usually it
SECTION 60
#17328524626968122-524: The New Haven Railroad a connection to Willimantic, Connecticut . Two more companies, the Naugatuck Railroad and the Connecticut Valley Railroad , were leased by the New Haven in 1887. With these two leases, the New Haven was in control of 10 of the 22 railroads in Connecticut at the time. Around the beginning of the 20th century, New York investors led by J. P. Morgan gained control, and in 1903 installed Charles S. Mellen as President. Charles Francis Murphy's New York Contracting and Trucking company
8253-591: The New Haven–Providence–Boston Beacon Hill , which made local stops including Branford, Madison, Old Saybrook, Niantic , New London, and Mystic. The Beacon Hill (which served the Providence and Boston commuting markets rather than New Haven) was discontinued in 1981 due to funding cuts, ending commuter rail service in Connecticut east of New Haven. In 1981 and 1986, legislation was proposed to restore commuter service between New Haven and New London, as well as between New Haven and Hartford . A 1986 CTDOT study analyzed congestion on Interstate 95 , which runs parallel to
8384-420: The Providence & Worcester, Bay Colony, Boston & Maine, Connecticut Central, Pioneer Valley, Housatonic and Connecticut Southern railroads. Those lines still operated by Conrail in 1999 became part of CSX Transportation as the result of the breakup of the Conrail system. The state of Connecticut frequently alludes to the New Haven in its modern transportation projects; much of the state’s commuter equipment
8515-415: The Shore Line up until its merger with Penn Central on January 1, 1969, when most commuter service east of New Haven was abandoned. Intercity service continued, but generally only stopped at New Haven, Old Saybrook, and New London. Penn Central continued to operate the Clamdigger , a single daily New London-New Haven round trip with local stops, as well as a New London-Boston round trip. Amtrak took over
8646-411: The Tsuen Wan line's Tsim Sha Tsui station . In Taiwan, the Western line in the Taipei - Taoyuan Metropolitan Area, Taichung Metropolitan Area and Tainan - Kaohsiung Metropolitan Area as well as the Neiwan - Liujia line in the Hsinchu Area are considered commuter rail. In South Korea, the Seoul Metropolitan Subway includes a total of 22 lines, and some of its lines are suburban lines. This
8777-492: The United States from 1872 to 1968. Founded by the merger of the New York and New Haven and Hartford and New Haven railroads, the company had near-total dominance of railroad traffic in Southern New England for the first half of the 20th century. Beginning in the 1890s and accelerating in 1903, New York banker J. P. Morgan sought to monopolize New England transportation by arranging the NH's acquisition of 50 companies, including other railroads and steamship lines, and building
8908-519: The addition of cross-honoring of multiple-ride and monthly tickets on two Amtrak trains. The major obstacle preventing full New London service was the bridge over the Connecticut River between Old Saybrook and Old Lyme. The drawbridge section is closed for a certain period of time to allow trains to pass, which prevents large boats from passing under. The Marine Trades Association opposes additional service, which would mandate more bridge closings. The 2003 agreement with Amtrak limited weekday traffic over
9039-447: The application for additional bridge closings was approved by the state Department of Energy and Environmental Protection. By July, New London represented 26 percent of weekend ridership. In December 2013, the state announced that ridership was up 35 percent for the year as a result of the increased service. From 2009 to 2014, monthly New London ridership increased from less than 1,000 monthly passengers to approximately 5,000, accounting for
9170-415: The authentic script-lettering insignia of the original "New York, New Haven and Hartford" railroad on the tenders of its resident steam locomotives, 2-8-0 Consolidation type Number 97 and 2-8-2 Mikado type number 40. There is a third steam locomotive in restoration to running order; a Chinese SY-class Mikado, formerly known as the 1658, it is being renumbered and painted as New Haven 3025, and is to be based on
9301-433: The brash Patrick B. McGinnis led a proxy fight against incumbent president Frederic C. "Buck" Dumaine Jr. , vowing to return more of the company's profit to shareholders. McGinnis won control of the railroad and appointed Arthur V. McGowan, a longtime acquaintance, Vice President. McGinnis attempted to accomplish many of his financial goals by deferring all but the most essential maintenance. Under McGinnis, Knoll Associates
9432-539: The bridge to 2 SLE and 39 Amtrak trains until 2018, although it was revised in 2010 and 2013. Since 2003, New London had been served by cross-honored Amtrak trains plus one or two dedicated SLE round trips. On February 16, 2010, an additional round trip was extended to New London. Three more were extended on May 10, 2010. However, advocates for full service to New London said that then-governor Jodi Rell failed to deliver on promises to New London, with one newspaper columnist writing that "she seems incapable of standing up to
9563-512: The capital Algiers and its southern and eastern suburbs. They also serve to connect Algiers ' main universities to each other. The Dar es Salaam commuter rail offers intracity services in Dar es Salaam , Tanzania. In Botswana, the ( Botswana Railways ) "BR Express" has a commuter train between Lobatse and Gaborone . In Japan, commuter rail systems have extensive network and frequent service and are heavily used. In many cases, Japanese commuter rail
9694-539: The corporation. Penn Central was bankrupt by 1970 and the New Haven corporate entity remained in existence throughout the 1970s as the Trustee of the Estate pursued just payment from Penn Central for the New Haven's assets. Leased by the New Haven since before 1900, the Providence and Worcester Railroad (P&W) successfully exited its lease under Penn Central and resumed operating its own line in 1973. A substantial portion of
9825-639: The dense parts of Seoul, some track sections extend far outside of the city, and operate large sections at ground level, such as on the Line 1 , Line 3 and Line 4 . In Busan, the Donghae Line , while part of the Busan Metro system, mostly functions as a commuter rail line. In Indonesia , the KRL Commuterline is the largest commuter rail system in the country, serving the Greater Jakarta . It connects
9956-544: The diesel equipment would then be used on the Hartford Line and for use with low platforms on New London / Mystic / Westerly service. Amtrak crew qualification of M8 electric multiple units on Shore Line East took place in April 2022; testing had previously taken place as early as 2015. SLE operated diesel service from 1990 to 2022, as Amtrak had not yet electrified the Northeast Corridor between New Haven and Boston at
10087-690: The entire motive power fleet. These were supplemented in 2005 with 8 GE P40DC Genesis diesels leased from Amtrak. CTDOT purchased the P40DCs in 2008. To augment capacity CTDOT acquired 33 Mafersa coaches from the Virginia Railway Express in 2004. These began entering service in 2006, displacing the Shoreliners and Constitution Liners. CTDOT acquired an additional four GE P40DC locomotives from New Jersey Transit in 2015. Originally built for Amtrak in 1993, these locomotives had been used by NJ Transit on
10218-466: The former BR 's Regional Railways , France's TER ( Transport express régional ), Germany's Regionalexpress and Regionalbahn , and South Korea's Tonggeun and Mugunghwa-ho services. In some European countries, the distinction between commuter trains and long-distance/intercity trains is subtle, due to the relatively short distances involved. For example, so-called " intercity " trains in Belgium and
10349-410: The former New Haven main line between New York and Boston was transferred to Amtrak in 1976 and now forms the northern leg of the electrified Northeast Corridor , hosting high-speed Acela Express and regional rail service. The main line between New Rochelle and New Haven is jointly owned by the state of Connecticut and the Metropolitan Transportation Authority of New York, and is served by
10480-635: The iconic NH logo. Although a new livery was introduced with the opening of the Hartford Line commuter service in 2018, much of its equipment is shared with Shore Line East , of which some continue to bear the McGinnis livery and the rest have been repainted into the new " CT Rail " livery. All of these lines were formerly owned by the New Haven. The Valley Railroad , a preservation line based in Essex, Connecticut that runs both steam and diesel traction, has painted
10611-480: The interior of a never-built design for articulated commuter coaches. When McGinnis departed in 1956, he left the company financially wrecked, a situation exacerbated by severe damage from the 1955 Connecticut floods . In 1959, the New Haven discontinued passenger service on the Old Colony Railroad network in southeastern Massachusetts. That year, the company reported close to $ 11 million in losses. Asked by
10742-657: The line. The study showed that Old Saybrook was a better terminus for initial service, with an expected ridership of 420 riders in each direction daily. An additional study in 1989 indicated higher potential ridership of 700 to 1350 daily riders. Based on the 1986 study, Governor William O'Neill ordered CTDOT in October 1986 to initiate rail service on the corridor. It was established as a temporary service to newly reopened local stations between Union Station in New Haven and Old Saybrook , to alleviate traffic congestion that arose from scheduled construction work on I-95. O'Neill introduced
10873-500: The marine trades lobby" regarding the bridge openings. In July 2012, then-governor Dannel Malloy announced that five weekend round trips would be extended to New London beginning in April 2013. However, the extension was dependent on ongoing negotiations with the marine industry over mandated closings of the Connecticut River bridge. Two weekday midday trips were added in May 2013, while weekend service began on June 1, 2013, after
11004-489: The morning and evening rush hours , and were unable to recover their infrastructure costs. The demise of the New Haven was likely hastened by the 1958 opening of the Connecticut Turnpike , largely paralleling the railroad’s mainline across the state, and the subsequent construction of other interstate highways. With decades of inadequate investment, the New Haven could not compete against automobiles or trucks. In 1954,
11135-917: The northern region of Peninsular Malaysia. In Thailand, the Greater Bangkok Commuter rail and the Airport Rail Link serve the Bangkok Metropolitan Region . The SRT Red Lines , a new commuter line in Bangkok, started construction in 2009. It opened in 2021. Another commuter rail system in Southeast Asia is the Yangon Circular Railway in Myanmar . In India, commuter rail systems are present in major cities and form an important part of people's daily lives. Mumbai Suburban Railway ,
11266-1003: The number expected to rise even higher upon full completion of the Acharnes Railway Center . Eskişehir-Ankara and Konya-Ankara high speed train routes serve as high speed commuter trains in Turkey. Commuter/suburban trains are usually optimized for maximum passenger volume, in most cases without sacrificing too much comfort and luggage space, though they seldom have all the amenities of long-distance trains. Cars may be single- or double-level , and aim to provide seating for all. Compared to intercity trains, they have less space, fewer amenities and limited baggage areas. Commuter rail trains are usually composed of multiple units , which are self-propelled, bidirectional, articulated passenger rail cars with driving motors on each (or every other) bogie . Depending on local circumstances and tradition they may be powered either by diesel engines located below
11397-522: The oldest suburban rail system in Asia, carries more than 7.24 million commuters on a daily basis which constitutes more than half of the total daily passenger capacity of the Indian Railways itself. Kolkata Suburban Railway , one of the largest suburban railway networks in the world, consists of more than 450 stations and carries more than 3.5 million commuters per day. The Chennai Suburban Railway along with
11528-527: The only time Shore Line East service has run east of New London. The section of the Northeast Corridor that Shore Line East operates on was once the New York– Boston mainline of the New York, New Haven and Hartford Railroad . The section from New Haven to New London was built as the New Haven and New London Railroad. It was charted in 1848, began construction in 1850, and opened for service in July 1852. The line
11659-404: The opening of the second platform. Construction of a second platform at Clinton station was originally planned to start in early 2012, but was indefinitely delayed by 2014. Construction was again announced in October 2017. After delays due to funding issues, construction began in June 2019. The second platform opened on April 4, 2022, leaving Madison as the only single-platform station. (Bidding on
11790-658: The other direction would have to switch tracks to serve the station. All trains that do not operate west of New Haven make a connection with a Metro-North Railroad New Haven Line train at New Haven, for service to and from points in Connecticut, Westchester County, New York , and New York City. These connections are commonly used by extreme commuters who live in suburban Connecticut and work in New York City. New London SLE multi-ride pass holders are also allowed to board selected Northeast Regional trains. Although SLE service
11921-511: The other, the Northern line continues out of the city centre to a mainline rail interchange, while the Wirral line has a city-centre loop. New York, New Haven, and Hartford Railroad The New York, New Haven and Hartford Railroad ( reporting mark NH ), commonly known as The Consolidated , or simply as the New Haven , was a railroad that operated principally in the New England region of
12052-688: The outer reaches of Greater Tokyo through operating into these lines to form a high frequency corridor though central Tokyo. Other commuter rail routes in Japan include: Commuter rail systems have been inaugurated in several cities in China such as Beijing , Shanghai , Zhengzhou , Wuhan , Changsha and the Pearl River Delta . With plans for large systems in northeastern Zhejiang , Jingjinji , and Yangtze River Delta areas. The level of service varies considerably from line to line ranging high to near high speeds. More developed and established lines such as
12183-423: The passenger compartment ( diesel multiple units ) or by electricity picked up from third rails or overhead lines ( electric multiple units ). Multiple units are almost invariably equipped with control cabs at both ends, which is why such units are so frequently used to provide commuter services, due to the associated short turn-around time. Locomotive hauled services are used in some countries or locations. This
12314-608: The railroad were indicted for "conspiracy to monopolize interstate commerce by acquiring the control of practically all the transportation facilities of New England." In 1925, the railroad created the New England Transportation Company as a subsidiary to operate buses and trucks on routes where rail service was no longer profitable. Under the stress of the Great Depression the company became bankrupt in 1935, remaining in trusteeship until 1947. Common stock
12445-467: The railroad's Main Line from New Haven to Springfield, Massachusetts . In recognition of the large role played by the New Haven in the history of Connecticut, CTDOT painted SLE's diesel -powered locomotives in the New Haven's orange and black style. New Haven Railroad colors and emblems were placed at several stations, particularly New Haven Union Station . The New Haven Railroad operated local service on
12576-516: The railroad's construction costs. The company's debt soared from $ 14 million in 1903 to $ 242 million in 1913, while the advent of automobiles, trucks and buses reduced its profits. Also in 1913, the federal government filed an antitrust lawsuit that forced the NH to divest its trolley systems. The line became bankrupt in 1935. It emerged from bankruptcy, albeit reduced in scope, in 1947, only to go bankrupt again in 1961. In 1969, its rail assets were merged with
12707-404: The rebuilt Branford station opened on August 8, 2005; both consist of a single high-level platform on the south side of the tracks. The new Guilford station, which has platforms on both sides of the tracks (connected by a pedestrian bridge) to allow for greater operational flexibility, opened on November 28, 2005. Construction at Madison started on September 24, 2007, and finished with the opening of
12838-526: The rebuilt station platform on July 28, 2008. Reconstruction of Westbrook station was delayed due to environmental and cost issues. No site was available until Westbrook and CTDOT traded the new station site on Norris Avenue for a highway garage site off Route 145 . The controversial land swap was begun in 2004 but was not finalized until 2006, and town operations were not moved to the Route 145 site until September 2011. Site clearing began in November 2011, and ground
12969-399: The region called the proposals political and defended the line's ability to reduce congestion and pollution, while opponents of the line called it an example of government waste. The Shore Line East Rider's Association and other groups lobbied to save both services each time, and after public hearings a small fare increase was enacted in late 1997 instead. In July 1995, Governor Rowland signed
13100-552: The rest of the day, with regional rail being used to refer to systems that offer all-day service. Most commuter (or suburban) trains are built to main line rail standards, differing from light rail or rapid transit (metro rail) systems by: Compared to rapid transit (or metro rail), commuter/suburban rail often has lower frequency , following a schedule rather than fixed intervals, and fewer stations spaced further apart. They primarily serve lower density suburban areas (non inner-city), generally only having one or two stops in
13231-488: The same right-of-way can drastically reduce system construction costs. However, frequently they are built with dedicated tracks within that right-of-way to prevent delays, especially where service densities have converged in the inner parts of the network. Most such trains run on the local standard gauge track. Some systems may run on a narrower or broader gauge. Examples of narrow gauge systems are found in Japan, Indonesia , Malaysia , Thailand , Taiwan, Switzerland, in
13362-409: The service on weekdays. The service was introduced in 1990 as a temporary measure to reduce congestion during construction work on I-95 . However, it proved more popular than expected, and service was continued after construction ended despite criticisms that the line was too expensive to operate. Limited service was extended to New London in 1996 and to Stamford in 2001. A second station in New Haven
13493-492: The short-lived Atlantic City Express Service . In January 2018, ConnDOT awarded a contract to Amtrak to overhaul all twelve P40DC locomotives at the Beech Grove Shops . The first unit was completed in early 2021. The GP40-2H locomotives were sent to NRE for rebuilding in 2017 and 2018, followed by use on the new Hartford Line service. All stations are accessible . Commuter rail The term can refer to systems with
13624-407: The south side of the tracks at Branford and Westbrook at approximately the same locations. Later that year, accessible high-level platforms were added at New London to support Acela Express service. On June 7, 2002, State Street station was opened in New Haven to provide better access to the downtown area than Union Station. It was built as a traffic mitigation measure during the reconstruction of
13755-546: The state – which was attributed to previous riders largely being white-collar workers who shifted to remote work. In April, 2024 a bill to restore service to pre-pandemic levels stalled in the state Senate. However, in May 2024, $ 5 million in American Rescue Plan Act funds were allocated for the restoration of two additional weekday round trips, as well as the restoration of Stamford through service. This increase took effect on October 7, 2024. One Stamford round trip
13886-548: The steam era, and more during the transition to diesel. NH was a pioneer in many ways; in streamliners with the Comet , in the use of diesel multiple units (DMUs) in the U.S. with both Budd's regular Budd Rail Diesel Cars (RDCs) and the all-RDC Roger Williams trainset, in the use of rail-adapted buses, in lightweight trains such as the Train X -equipped Dan'l Webster , and in experimentation with Talgo -type (passive tilt) equipment on
14017-518: The storied railroad, and the end to the 19-year saga of its second bankruptcy reorganization. American Financial Enterprises would become the largest single stockholder of Penn Central Company shares by the mid-1990s, controlling 32% of the stock of the company. Freight operations on former New Haven lines passed to Conrail with its government-overseen creation on April 1, 1976. During the subsequent 23 years, Conrail withdrew from much of that territory, abandoning some track and handing other lines over to
14148-635: The time service began. Initial service used two F7 locomotives and ten Pullman-Standard coaches purchased from Pittsburgh's PATrain for $ 1.7 million. In 1991, CTDOT purchased 10 Bombardier Shoreliner III coaches, similar to ones already used on the Danbury Branch and Waterbury Branch, and leased three additional diesel locomotives: two EMD GP38s and one EMD GP7 . In 1994, Amtrak rebuilt 11 of CTDOT's surplus SPV-2000 diesel railcars into coaches, dubbed "Constitution Liners." In 1996, SLE took delivery of six remanufactured GP40-2H diesels to replace
14279-461: The towns closer to Kowloon. They use rolling stocks with a faster maximum speed and have longer stop spacing compared to other lines which only run in the inner urban area, but in order to maximise capacity and throughput, these rolling stocks have longitudinal seatings, 5 pairs of doors in each carriage with large standing spaces like the urban lines, and run as frequent as well. Most of the sections of these four lines are overground and some sections of
14410-625: The train John Quincy Adams . An audacious experiment was the UAC TurboTrain , which with passive tilt , turbine engines and light weight attempted to revolutionize medium—distance railway travel in the U.S. Sponsored by the U.S. Department of Transportation , the Turbo Train holds the U.S. railway speed record of 170 mph, set in 1968. The NH never operated the Turbo in revenue service, as
14541-515: The train from either end. The motive power for locomotive-hauled commuter trains may be either electric or diesel–electric , although some countries, such as Germany and some of the former Soviet-bloc countries, also use diesel–hydraulic locomotives. In the US and some other countries, a three-and-two seat plan is used. Middle seats on these trains are often less popular because passengers feel crowded and uncomfortable. In Japan, South Korea and Indonesia, longitudinal (sideways window-lining) seating
14672-549: The trains can be full with commuters standing. The Athens Suburban Railway in Greece consists of five lines, 4 of which are electrified. The Kiato – Piraeus line and the Aigio – Airport lines reach speeds of up to 180 km/h (112 mph). The Athens – Chalcis line is also expected to attain speeds of up to 200 km/h (124 mph) upon upgrading of the SKA–Oinoi railway sector. These lines also have many daily commuters, with
14803-517: The trains run between two or several cities (e.g. S-Bahn in the Ruhr area of Germany). Distances between stations may vary, but are usually much longer than those of urban rail systems. In city centres the train either has a terminal station or passes through the city centre with notably fewer station stops than those of urban rail systems. Toilets are often available on-board trains and in stations. Their ability to coexist with freight or intercity services in
14934-465: The travel time to distant locations, often using station passing loops instead of dedicated express tracks. It is notable that the larger Japanese commuter rail systems are owned and operated by for-profit private railway companies, without public subsidy. East Japan Railway Company operates a large suburban train network in Tokyo with various lines connecting the suburban areas to the city center. While
15065-511: The two in 1870 was rejected by the Connecticut General Assembly , largely over fears that the merged railroad would form a monopoly. But the legislature approved a second attempt just two years later, and the New York, New Haven and Hartford Railroad was formed on July 24, 1872. The newly-combined railroad owned a main line from New York City to Springfield via New Haven and Hartford, and also reached New London, Connecticut via
15196-574: The type of train, amenities offered, and stopping pattern, usually tell the services apart. Russian commuter trains , on the other hand, frequently cover areas larger than Belgium itself, although these are still short distances by Russian standards. They have a different ticketing system from long-distance trains, and in major cities they often operate from a separate section of the train station. Some consider "inter-city" service to be that which operates as an express service between two main city stations, bypassing intermediate stations. However, this term
15327-470: The way inter-city rail does. Regional rail operates outside major cities. Unlike Inter-city, it stops at most or all stations between cities. It provides a service between smaller communities along the line that are often byproducts of ribbon developments , and also connects with long-distance services at interchange stations located at junctions, terminals, or larger towns along the line. Alternative names are "local train" or "stopping train". Examples include
15458-472: The year's end. Company president George Alpert blamed "government subsidies direct and indirect to our competitors, and inequitable taxes" for the railroad's deficits, pointing to billions of dollars in federal funding for highways and airports. At the insistence of the Interstate Commerce Commission, the New Haven was merged into Penn Central on December 31, 1968, ending rail operations by
15589-465: Was added in 2002, and most of the stations were rebuilt for accessibility between 2001 and 2008. Reverse peak service was added in 2007, followed by weekend service in 2008. Second platforms were added to several stations between 2014 and 2022 to support bidirectional service. Service was temporarily cut during 2018–2019 due to Amtrak track work and a locomotive shortage. It was again cut in March 2020 due to
15720-544: Was awarded a $ 6 million contract in 1904 to build rail lines in the Bronx for the New York, New Haven, and Hartford Railroad. An executive at the railroad said the contract was awarded to avoid friction with New York City’s Tammany Hall political machine. In response to this contract, the New York State Legislature amended the city's charter so that franchise-awarding power was removed from the city council and given to
15851-530: Was broken for the $ 14.4 million station in January 2012. A new station with a larger 210-space lot and platforms on both tracks opened on March 25, 2014, with full bidirectional service to the station beginning on May 11. On October 8, 2007, reverse-peak and more midday service were introduced, which officials hailed as the beginning of Shore Line East as a true bidirectional system. Several existing express trains also began to stop at Guilford. A pilot of weekend service
15982-458: Was effectively made permanent. A 1996 study found that Shore Line East captured eight percent of regional commuter trips and attracted a loyal ridership base. In 1995 and 1997, then-governor John Rowland proposed to replace Shore Line East and the Waterbury Branch with bus service, citing a high subsidy of $ 18.70 per rider per trip, in order to decrease the unpopular gas tax. Lawmakers from
16113-471: Was estimated to have capital costs of $ 9-10 million and annual operating costs of $ 4.1 million, with an additional 303,000 annual riders. In April 2012, state officials released a report detailing possible sites for an infill station in East Lyme . Four sites were analyzed – two near downtown Niantic and two at Rocky Neck State Park . ( Niantic station had previously been a stop on the Clamdigger .) As part of
16244-477: Was mandated by the 2003 agreement with Amtrak. By that time, several stations already had multiple platforms (New London, Old Saybrook, Guilford, and the stations from New Haven Union Station west), while State Street had an island platform serving two tracks. Branford was the first previously rebuilt station to be further renovated with a second platform. A $ 60 million bond in February 2011 included $ 16.5 million for
16375-612: Was owned by the New York, Providence and Boston Railroad (the "Stonington Road") from 1858 to 1862, and by the Shore Line Railway from 1864 until it was acquired by the New York, New Haven, and Hartford Railroad (the "New Haven") in 1870. Crossing the Connecticut River required a ferry transfer until a drawbridge was built in 1870. The line was referred to by the New Haven Railroad as the Shore Line , to distinguish it from
16506-559: Was restored, with South Norwalk no longer a stop. The possibility of extending service eastward and/or northward from New London has been considered at several points. In a 2001 report examining commuter rail for Rhode Island, the Rhode Island Department of Transportation (RIDOT) considered an extension of Shore Line East to Providence via Westerly (effectively restoring the Clamdigger service). Ultimately, MBTA Commuter Rail service, which already ran to Providence as part of
16637-559: Was retained to design a new visual identity for the company. Green and gold trim on rolling stock was replaced by black, red-orange and white, accompanied by a stylized "NH" emblem. Knoll employed architect Marcel Breuer to design the interiors and exterior styling of the three experimental trainsets – the Dan'l Webster , John Quincy Adams , and Roger Williams – that were ordered in 1955. Breuer also designed new station buildings for Rye and New London , neither of which were built, as well as
16768-403: Was run from November 17, 2007, to December 30, 2007, with six "Shopper's Special" round trips from Old Saybrook to New Haven. The trains were scheduled to connect with similar Metro-North specials at New Haven. Year-round weekend service began on July 4, 2008, with 9 daily Old Saybrook – New Haven round trips on weekends. No weekend service was run to New London, but weekday service was increased by
16899-445: Was sent out for refurbishment. Three weekday round trips were reverted from bus to train in January 2019 when one locomotive returned from refurbishment, though additional issues were expected during a second summer of track work in 2019. Full service was restored on August 5, 2019. By that time, ridership had fallen by 25 percent, averaging 1,340 weekday riders and 767 weekend riders. On March 16, 2020, weekday service began operating on
17030-444: Was to be extended to Westerly at a cost of $ 200 million. In February 2016, the state public transportation commission issued a report recommending extension of Shore Line East rail service to Mystic and Westerly as soon as possible. In 2021, state lawmakers allocated $ 2.3 million for CTDOT to study an eastward extension to Westerly. Released in 2023, the study indicated that extending 12 weekday round trips to Westerly would have
17161-692: Was voided and creditors assumed control. During the 88 stations case , the railroad closed 88 stations in Massachusetts and 5 in Rhode Island in 1938, and unsuccessfully attempted to abandon the Boston-area portion of the Old Colony Division. The twelve-year reorganization resulted in "eight Supreme Court decisions, fourteen circuit court decisions, five district court decisions, and eleven ICC reports." The railroad emerged in September 1947 under
#695304