The Kawartha Lakes Railway was a Canadian rail line. It was created in 1996 to assume the operations of the Havelock and Nephton Subdivisions of the Canadian Pacific Railway which serve the Peterborough , Ontario area.
101-605: The line originally had 19 employees and it is now a Canadian Pacific internal shortline railway , with a unique collective agreement and employee-managed operation. Originally built by the Ontario and Quebec Railway , which was leased by the CPR for 99 years, the Havelock Subdivision originally began at Glen Tay . In fact, the mile posts on this route are still measured in miles from Glen Tay. The section between Glen Tay and Havelock
202-720: A 999-year lease on the O&Q on January 4, 1884. In 1895, it acquired a minority interest in the Toronto, Hamilton and Buffalo Railway , giving it a link to New York and the Northeast United States. The last spike in the CPR was driven on November 7, 1885, by one of its directors, Donald Smith. The first transcontinental passenger train departed from Montreal 's Dalhousie Station , at Berri Street and Notre Dame Street, at 8 pm on June 28, 1886, and arrived at Port Moody at noon on July 4. This train consisted of two baggage cars,
303-468: A locomotive on the east end and a cab control car on the west end. In push configuration, the cab car has a complete set of engineer's controls built into it, allowing the engineer to remotely control the locomotive pushing the whole train from the back of the train. This enables trains to travel in either direction without requiring one locomotive on each end. All GO trains have a total of three crew members. The conductor and engineer are located in
404-523: A corporate reorganization, each of the major operations, including its rail operations, were organized as separate subsidiaries. The name of the railway was changed to CP Rail, and the parent company changed its name to Canadian Pacific Limited in 1971. Its air, express, telecommunications, hotel and real estate holdings were spun off, and ownership of all of the companies transferred to Canadian Pacific Investments. The slogan was: "TO THE FOUR CORNERS OF THE WORLD". The company discarded its beaver logo, adopting
505-529: A corporate restructuring in 2001. The railway is headquartered in Calgary , Alberta. In 2023, the railway owned approximately 20,100 kilometres (12,500 mi) of track in seven provinces of Canada and into the United States, stretching from Montreal to Vancouver , and as far north as Edmonton . Its rail network also served Minneapolis–St. Paul , Milwaukee , Detroit , Chicago , and Albany, New York , in
606-462: A day, paid in rice mats, and not including expenses, leaving barely anything to send home. They did the most dangerous construction jobs, such as working with explosives to clear tunnels through rock. The exact number of Chinese workers who died is unknown, but historians estimate the number is between 600 and 800. By 1883, railway construction was progressing rapidly, but the CPR was in danger of running out of funds. In response, on January 31, 1884,
707-469: A fleet of over a thousand Colonist cars , low-budget sleeper cars designed to transport immigrant families from eastern Canadian seaports to the west. During the first decade of the 20th century, the CPR continued to build more lines. In 1908, the CPR opened a line connecting Toronto with Sudbury . Several operational improvements were also made to the railway in Western Canada. On November 3, 1909,
808-564: A last spike at Feist Lake, near Vermilion Bay, Ontario , the line was turned over to the newly-minted private Canadian Pacific Railway company. In 1883, the first wheat shipment from Manitoba was transported over this line to the Lakehead (Fort William and Port Arthur) on Lake Superior. Macdonald would later return as prime minister and adopt a more aggressive construction policy; bonds were floated in London and called for tenders to complete sections of
909-501: A mail car, one second-class coach, two immigrant sleepers, two first-class coaches, two sleeping cars and a diner (several dining cars were used throughout the journey, as they were removed from the train during the night, with another one added the next morning). By that time, however, the CPR had decided to move its western terminus from Port Moody to Granville , which was renamed "Vancouver" later that year. The first official train destined for Vancouver arrived on May 23, 1887, although
1010-449: A million troops and passengers and four million tons of cargo. Twenty seven survived and returned to CPR. CPR also helped the war effort with money and jobs. CPR made loans and guarantees to the Allies of some $ 100 million. As a lasting tribute, CPR commissioned three statues and 23 memorial tablets to commemorate the efforts of those who fought and those who died in the war. After the war,
1111-519: A partnership with GO Train , VIA Rail , or another partner). CP Rail The Canadian Pacific Railway ( French : Chemin de fer Canadien Pacifique ) ( reporting marks CP , CPAA , MILW , SOO ), also known simply as CPR or Canadian Pacific and formerly as CP Rail (1968–1996), was a Canadian Class I railway incorporated in 1881. The railway is owned by Canadian Pacific Kansas City Limited , known until 2023 as Canadian Pacific Railway Limited , which began operations as legal owner in
SECTION 10
#17328553245451212-484: A rail link between Cambridge and Guelph operated by Metrolinx, with an estimated 14 to 17 minute travel time and frequency of every 30 to 60 minutes. The line would be built along a Canadian National spur between the two cities. Reports have forecasted a ridership of over 500,000 by 2041, and would cut travel time between Cambridge and Union Station to 87 minutes. Since the founding of GO Transit in 1967, GO trains have operated in push-pull configuration . Each train has
1313-585: A range of eventualities including electrifying the entire Lakeshore route and service to Collingwood, Ontario. In 2011, a group named the Shining Waters Railway was established with the goals of inheriting the Kawartha Lakes Railway's two subdivisions, the Havelock and Nephton from CP Rail to continue freight service and even resume passenger rail service from Toronto to Peterborough and beyond (in
1414-756: A series of different owners since being spun off of the Canadian Pacific in 1995. The first operator was the Canadian American Railroad a division of Iron Road Railways . In 2002 the Montreal, Maine & Atlantic took over operations after CDAC declared bankruptcy. The Central, Maine and Quebec Railway started operations in 2014 after the MMA declared bankruptcy due to the Lac-Mégantic derailment. On this new acquisition, CP CEO Keith Creel remarked that this gives CP
1515-884: A significant port on the Atlantic Ocean. The CPR acquired the Quebec Central Railway on December 14, 1912. During the late 19th century, the railway undertook an ambitious program of hotel construction, building Glacier House in Glacier National Park , Mount Stephen House at Field, British Columbia , the Château Frontenac in Quebec City and the Banff Springs Hotel . By then, the CPR had competition from three other transcontinental lines, all of them money-losers. In 1919, these lines were consolidated into
1616-502: A single rail line along Lake Ontario 's shoreline. GO Train service ran throughout the day from Oakville to Pickering with limited rush hour train service to Hamilton. This line, now divided as the Lakeshore East and Lakeshore West lines is the keystone corridor of GO Transit, and continued to be its only rail line for its first seven years of operation. GO's other five lines were opened between 1974 and 1982, significantly expanding
1717-513: A station, but before opening the doors, the CSA is required to point towards both ends of the train and announce that the platform is clear as a way to confirm that the train is stopped properly. After the CSA closes the doors, the same process is repeated to confirm that nobody is caught in the doors. According to Metrolinx, incorporating the pointing and calling procedure within GO Transit's daily operations
1818-592: A true coast-to-coast network across Canada and an increased presence in New England. On June 4, 2020; Canadian Pacific bought the Central Maine and Quebec. On March 21, 2021, CP announced that it was planning to purchase the Kansas City Southern Railway (KCS) for US$ 29 billion. The US Surface Transportation Board (STB) would first have to approve the purchase, which was expected to be completed by
1919-439: Is also offloaded at Harper road and elevated into trucks for use in wood stove pellet production. As well, Cavan Agri Products receives carloads of grain, feed, and potash at Cavan. The method of control is Rule 105 from the end of track east of Havelock to the begin/end main track sign just west of Havelock, Occupancy Control System (OCS) from the begin/end main track sign to Mile 178 just outside Toronto Yard. Beyond Toronto Yard,
2020-533: Is an important way to enhance safety, "especially as the transit agency gets ready to launch the largest expansion of GO service in it’s [sic] history". In winter conditions, trains are stored near Union Station to so that afternoon and evening trains can travel through less snow. Trains are kept at specific temperatures during storage to speed up engine startup on cold days and to eliminate frozen train doors. Fans are used to blow hot air onto track switches to keep them from freezing in extreme cold. Track snow removal
2121-484: Is conducted using high-pressure blower snow removal equipment. In the event of exceptionally severe winter conditions, GO trains run on different schedules. Express trains will stop at all stations. The cancellation of train trips may occur, as well as replacing trains with buses. GO Transit inspects train air conditioning more frequently during summer, as A/C systems have to work harder on hot days. In extremely hot weather, train tracks can expand and buckle under
SECTION 20
#17328553245452222-719: Is publicly traded on both the Toronto Stock Exchange and the New York Stock Exchange under the ticker CP. Its U.S. headquarters are in Minneapolis . As of March 30, 2023, the largest shareholder of Canadian Pacific stock exchange is TCI Fund Management Limited , a London-based hedge fund that owns 6% of the company. The creation of the Canadian Pacific Railway was undertaken as the National Dream by
2323-724: The Agincourt rail yards ." Via Rail provided train service to Peterborough until 1990, when service was cancelled. The potential to provide commuter rail service to Peterborough was noted by GO Transit in its 2020 strategic plan, and was also included in The Big Move . Metrolinx completed a study for bringing commuter rail service to Peterborough in February 2010. Different routes were explored, all of which use CPKC's existing Havelock subdivision between Peterborough and Toronto. Once reaching Toronto, three different routes were explored through
2424-640: The Canada-U.S. Free Trade Agreement of 1989, which liberalized trade between the two nations, the CPR's expansion continued during the early 1990s: CP Rail gained full control of the Soo Line in 1990, adding the "System" to the former's name, and bought the Delaware and Hudson Railway in 1991. These two acquisitions gave CP Rail routes to the major American cities of Chicago (via the Soo Line and Milwaukee Road as part of its historically logical route) and New York City (via
2525-772: The Conservative government of John A. Macdonald , together with mining magnate Alexander Tilloch Galt . As a condition for joining the Canadian Confederation , British Columbia had insisted on a transport link to the East, with the rest of the Confederation. In 1873, Macdonald, among other high-ranking politicians, bribed in the Pacific Scandal , granted contracts to the Canada Pacific Railway Company, which
2626-587: The Delaware and Hudson Railway in the northeastern United States. However, the new subsidiary, threatened with being sold off and free to innovate, quickly spun off money-losing track to short lines, instituted scheduled freight service, and produced an unexpected turn-around in profitability. On 1 January 2001 the StL&H was formally amalgamated with the CP Rail system. In 2001, the CPR's parent company, Canadian Pacific Limited , spun off its five subsidiaries, including
2727-564: The Kettle Valley Railway in British Columbia, was built in response to the booming mining and smelting economy in southern British Columbia, and the tendency of the local geography to encourage and enable easier access from neighbouring US states than from Vancouver or the rest of Canada, which was viewed to be as much of a threat to national security as it was to the province's control of its own resources. The local passenger service
2828-704: The Lethbridge Viaduct over the Oldman River valley at Lethbridge , Alberta, was opened. It is 1,624 metres (5,328 feet) long and, at its maximum, 96 metres (315 feet) high, making it one of the longest railway bridges in Canada. In 1916, the CPR replaced its line through Rogers Pass , which was prone to avalanches (the most serious of which killed 62 men in 1910) with the Connaught Tunnel , an eight-kilometre-long (5-mile) tunnel under Mount Macdonald that was, at
2929-705: The Locust Hill line to Locust Hill . GO Transit has contemplated a Midtown corridor since the 1980s as a contingency plan once capacity at Union Station became constrained, making North Toronto an alternate station for Downtown Toronto . The major barrier to these plans, however, is the fact that the Midtown corridor is composed of existing rail lines owned and actively used by the CPKC as its main freight line between Ottawa , Montreal , London and Windsor . CPKC has been reluctant to provide capacity to GO Transit on its tracks, and
3030-558: The Milton line (which runs along CPKC tracks to the west) only came after considerable negotiations, the 1979 Mississauga train derailment , and an investment of hundreds of millions of dollars. All three lines in the corridor were listed under the 15-year plan of The Big Move upon its publication in 2008. However, the Havelock line was moved to the 25-year plan on February 14, 2013, because of "very modest ridership potential and significant infrastructure and operational challenges related to
3131-643: The New Brunswick Railway in 1891 for 991 years, and built the International Railway of Maine , connecting Montreal with Saint John, New Brunswick , in 1889. The connection with Saint John on the Atlantic coast made the CPR the first truly transcontinental railway company in Canada and permitted trans-Atlantic cargo and passenger services to continue year-round when sea ice in the Gulf of St. Lawrence closed
Kawartha Lakes Railway - Misplaced Pages Continue
3232-557: The Quebec, Montreal, Ottawa & Occidental Railway from the Quebec government and by creating a new railway company, the Ontario and Quebec Railway (O&Q). It also launched a fleet of Great Lakes ships to link its terminals. Through the O&Q, the CPR had effected purchases and long-term leases of several railways, and built a line between Perth, Ontario , and Toronto (completed on May 5, 1884) to connect these acquisitions. The CPR obtained
3333-809: The Rocky Mountains via the Yellowhead Pass . However, a more southerly route across the arid Palliser's Triangle in Saskatchewan and via Kicking Horse Pass and down the Field Hill to the Rocky Mountain Trench was chosen. In 1881, construction progressed at a pace too slow for the railway's officials who, in 1882, hired the renowned railway executive William Cornelius Van Horne to oversee construction. Van Horne stated that he would have 800 km (500 mi) of main line built in 1882. Floods delayed
3434-564: The last spike was driven at Craigellachie, British Columbia . Four days earlier, the last spike of the Lake Superior section was driven in just west of Jackfish, Ontario . While the railway was completed four years after the original 1881 deadline, it was completed more than five years ahead of the new date of 1891 that Macdonald gave in 1881. In Eastern Canada, the CPR had created a network of lines reaching from Quebec City to St. Thomas, Ontario , by 1885 – mainly by buying
3535-517: The locomotive or the cab car to operate the train. Another guard-like staff member, the Customer Service Ambassador (CSA), is located in the accessibility coach, which is the fifth car from the locomotive. The CSA is responsible for opening and closing the train doors, making announcements over the PA system, and acts as the first responder in case of an emergency on board. The CSA announces
3636-528: The nepheline syenite mines owned by Unimin Canada at Blue Mountain and Nephton . This line also served the former 3M plant east of Havelock. Other customers are served by Peterborough-based crews including Quaker Oats , Canadian General Electric , and formerly United Canadian Malt, Kingdon Lumber/TIM-BR MART, and Poly Tubes receives plastic pellets by rail within the City of Peterborough. Waste product from Quaker Oats
3737-582: The " Crow Rate " was permanently replaced by the Western Grain Transportation Act , which allowed the gradual increase of grain shipping prices. The Crowsnest Pass line opened on June 18, 1898, and followed a complicated route through the maze of valleys and passes in southern British Columbia, rejoining the original mainline at Hope after crossing the Cascade Mountains via Coquihalla Pass . The Southern Mainline, generally known as
3838-474: The 15- to the 25-year plan on February 14, 2013, when amendments were made to The Big Move. The Midtown corridor refers to three new GO Transit services in The Big Move . The first is a Crosstown line from Dundas Street to the former CP North Toronto and Leaside stations in Toronto . The second and third segments would extend east from North Toronto and/or Union Station : the Seaton line to Seaton , and
3939-480: The 1950s, the railway introduced new innovations in passenger service. In 1955, it introduced The Canadian , a new luxury transcontinental train. However, in the 1960s, the company started to pull out of passenger services, ending services on many of its branch lines. It also discontinued its secondary transcontinental train The Dominion in 1966, and in 1970, unsuccessfully applied to discontinue The Canadian . For
4040-639: The Bradford and Stouffville lines. This coincided with GO's initial purchases of the rail corridors it operated on, taking ownership of the entire Stouffville line past Scarborough station, and most of the Barrie line north of the Toronto border. In addition, GO took control of the critical Union Station Rail Corridor , which all GO trains on all lines used. By the end of 2005, GO owned over a third of its rail network. From 2007 to 2017, GO's network saw six extensions, requiring
4141-573: The Bradford line to be renamed as the "Barrie line", and the Georgetown line to "Kitchener line." These long distance extensions, along with the other extensions on the Lakeshore West, Richmond Hill and Stouffville lines, expanded GO's network length by 29%. Six critical corridor purchases were also made, tripling its length of owned corridors and bringing its ownership percentage to over 80%. Finally, 10 new stations were added, one of which coincided with
Kawartha Lakes Railway - Misplaced Pages Continue
4242-785: The CPR Act of 1874, work began in 1875 on the Lake Superior to Manitoba section of the CPR. The ceremonial sod-turning at Westfort on June 1, 1875, was prominently reported in the June 10 edition of the Toronto Globe . It noted that a crowd of "upwards of 500 ladies and gentlemen" gathered to celebrate the event on the left bank of the Kaministiquia River in the District of Thunder Bay, about four miles upriver from Fort William. Once completed in 1882 with
4343-469: The CPR, into independent companies. In September 2007, CPR announced it was acquiring the Dakota, Minnesota and Eastern Railroad from London-based Electra Private Equity . The merger was completed as of October 31, 2008. Canadian Pacific Railway Ltd. trains resumed regular operations on June 1, 2012, after a nine-day strike by some 4,800 locomotive engineers, conductors and traffic controllers who walked off
4444-482: The CPR, to action. During this time the railway land grants were formalized. The Great Depression , which lasted from 1929 until 1939, hit many companies heavily. While the CPR was affected, it was not affected to the extent of its rival CNR because it, unlike the CNR, was debt-free. The CPR scaled back on some of its passenger and freight services and stopped issuing dividends to its shareholders after 1932. Hard times led to
4545-592: The Canadian government to build the railway, the CPR was granted 100,000 square kilometres (25 million acres). Canadian Pacific then began an intense campaign to bring immigrants to Canada; its agents operated in many overseas locations, where immigrants were often sold a package that included passage on a CP ship, travel on a CP train and land sold by the CP railway. Land was priced at $ 2.50 an acre and up but required cultivation. To transport immigrants, Canadian Pacific developed
4646-753: The D&H). During the 1990s, both CP Rail and CN attempted unsuccessfully to buy out the eastern assets of the other, so as to permit further rationalization. In 1996, CP Rail moved its head office from Windsor Station in Montreal to Gulf Canada Square in Calgary and changed its name back to Canadian Pacific Railway. A new subsidiary company, the St. Lawrence and Hudson Railway , was created to operate its money-losing lines in eastern North America, covering Quebec , Southern and Eastern Ontario , trackage rights to Chicago, Illinois , (on Norfolk Southern lines from Detroit ) as well as
4747-470: The Federal government created Canadian National Railways (CNR, later CN) out of several bankrupt railways that fell into government hands during and after the war. CNR would become the main competitor to the CPR in Canada. In 1923, Henry Worth Thornton replaced David Blyth Hanna becoming the second president of the CNR, and his competition spurred Edward Wentworth Beatty , the first Canadian-born president of
4848-1670: The GO's rail corridors. All GO Transit fares are calculated by the fare zones that the origin and destination of the trip are in, as well as by passenger category (adult, student, senior or child). GO train fares are not differentiated based whether or not buses are used for part of the trip. [REDACTED] Mississauga Oakville Burlington Hamilton St. Catharines Niagara Falls Aldershot GO Hamilton GO West Harbour GO Niagara Falls station Limited two-way service to Niagara Pickering Ajax Whitby Oshawa Oshawa GO Brampton Georgetown Acton Guelph Kitchener Bramalea GO Mount Pleasant GO Kitchener station Limited two-way service to Kitchener Two-way all day service to Mount Pleasant on weekends Mississauga Milton Milton GO Rush hour one-way to Milton in afternoon No weekend service No service outside rush hour Vaughan King City Aurora Newmarket Bradford Barrie Aurora GO Allandale Waterfront GO Rush hour one-way to Barrie in afternoon Two-way service to Aurora outside rush hour Limited service to Barrie outside rush hour Two-way all-day service to Aurora on weekends Limited service to Barrie on weekends Richmond Hill Aurora Bloomington GO Rush hour one-way to Bloomington in afternoon No weekend service No service outside rush hour Markham Stouffville Mount Joy GO Old Elm GO Rush hour one-way service to Old Elm in afternoon Two-way all day service to Mount Joy outside rush hour Two-way all day service to Mount Joy during weekends Limited service to Old Elm during weekends GO Transit rail service began on May 23, 1967, on
4949-467: The Havelock Sub is CTC to the junction with the CP Belleville Sub. The entire Nephton Sub is under OCS. In the 1980s CN abandoned its operations in the area, and KLR has assumed their customers and two sections of remaining CN trackage, including a swing bridge, within the city of Peterborough. In September 2012, Canadian Pacific announced that it were considering closing the former Grand Junction Railway of Canada /CN spur because of deteriorating condition of
5050-641: The Havelock rail yard, has been restored and operated as a restaurant since 2004. The train hijacking scene in the 1984 film Martin's Day was filmed at mile marker 10/Peterborough County Rd. #44 crossing of the Nepthon Subdivision north of Havelock , Ontario. With the elimination of passenger service on January 14, 1990, the typical weekly traffic now consists of freight. In 2008, the federal government announced plans to restart passenger rail service to Peterborough from Toronto. The service would be operated by Via Rail , but it has been estimated that it would carry fewer than 100 passengers per day. Via Rail cited
5151-511: The Kicking Horse River just after the Trans Canada Highway overpass. The three crew members on the lead locomotive were killed. The Canadian Pacific Police Service (CPPS) investigated the fatal derailment. It later came to light that, although Creel said that the RCMP "retain jurisdiction" over the investigation, the RCMP wrote that "it never had jurisdiction because the crash happened on CP property". On January 26, 2020, Canadian current affairs program The Fifth Estate broadcast an episode on
SECTION 50
#17328553245455252-411: The Quebec government added the CPR, along with lessor World Fuel Services (WFS), to the list of corporate entities from which it seeks reimbursement for the environmental cleanup of the Lac-Mégantic derailment. On July 15, the press reported that CP would appeal the legal order. On October 12, 2014, it was reported that Canadian Pacific had tried to enter into a merger with American railway CSX , but
5353-402: The United States. The railway was first built between eastern Canada and British Columbia between 1875 and 1885 (connecting with Ottawa Valley and Georgian Bay area lines built earlier), fulfilling a commitment extended to British Columbia when it entered Confederation in 1871; the CPR was Canada's first transcontinental railway . Primarily a freight railway, the CPR was for decades
5454-457: The abandonment process is finalized. During the 1990s, GE Capital ran a rail car repair centre on the south side of the Havelock rail yard at the old CP roundhouse location. CP crews brought cars in from Toronto for repairs and shipped them out when they were finished. The location is now the current office for local section and rail crews since GE closed the shop, and the train station was sold off. The former Canadian Pacific station, next to
5555-612: The best method to carry passengers into Toronto from the Mactier subdivision, and the preferred option was to direct trains east-west along CN's Halton subdivision, and north-south again along GO Transit's existing Barrie line . This would provide four new stations in the communities of Woodbridge and Kleinburg in the City of Vaughan , and Bolton in the Town of Caledon , and also use the existing Downsview Park station before terminating at Union. The feasibility study estimated that minimum infrastructure costs were $ 160 million for peak direction rush-hour service, and resulting ridership
5656-427: The company could not use a voting trust to assume control of KCS, due to concerns about potentially reduced competition in the railroad industry. GO Train GO Transit rail services are provided throughout the Greater Toronto and Hamilton Area (GTHA) and the Greater Golden Horseshoe . The GO Transit rail fleet consists of 90 MPI MP40 locomotives and 979 Bombardier BiLevel Coaches . In 2023,
5757-407: The company owns the Indiana Harbor Belt Railroad , a Hammond, Indiana -based terminal railroad along with Conrail Shared Assets Operations . CPR purchased the Kansas City Southern Railway in December 2021 for US$ 31 billion . On April 14, 2023, KCS became a wholly owned subsidiary of CPR, and both CPR and its subsidiaries began doing business under the name of its parent company, CPKC . The CPR
5858-418: The controlling interests of the Toronto, Hamilton and Buffalo Railway (TH&B) from Conrail and molded it into the Canadian Pacific System, dissolving the TH&B's name from the books in 1985. In 1987, most of CPR's trackage in the Great Lakes region, including much of the original Soo Line, were spun off into a new railway, the Wisconsin Central , which was subsequently purchased by CN . Influenced by
5959-575: The cost of construction for two-way all day service on the Milton line. The project would involve a complete separation from CPKC's tracks by building dedicated GO Transit tracks along the rail corridor, and is estimated to be at $ 6 billion dollars. No timeline has been provided, and construction has not yet started. In 2010, then-premier Kathleen Wynne announced plans to electrify GO Transit. Electrification would drastically cut down on GO Transit's carbon emissions and would allow GO Transit to run faster, more frequent trains, increasing ridership. In 2018, it
6060-550: The country. Additionally, 22 of the CPR's ships went to war, 12 of which were sunk. After the Second World War, the transportation industry in Canada changed. Where railways had previously provided almost universal freight and passenger services, cars, trucks and airplanes started to take traffic away from railways. This naturally helped the CPR's air and trucking operations, and the railway's freight operations continued to thrive hauling resource traffic and bulk commodities. However, passenger trains quickly became unprofitable. During
6161-453: The country. The CPR and the CNR shared the honours of pulling the royal train across the country, with the CPR undertaking the westbound journey from Quebec City to Vancouver. Later that year, the Second World War began. As it had done in World War I, the CPR devoted much of its resources to the war effort. It retooled its Angus Shops in Montreal to produce Valentine tanks and other armoured vehicles, and transported troops and resources across
SECTION 60
#17328553245456262-412: The creation of new political parties such as the Social Credit movement and the Cooperative Commonwealth Federation , as well as popular protest in the form of the On-to-Ottawa Trek . One highlight of the late 1930s, both for the railway and for Canada, was the visit of King George VI and Queen Elizabeth during their 1939 royal tour of Canada , the first time that the reigning monarch had visited
6363-424: The current Oshawa GO station and continue along the CPKC corridor to Bowmanville, adding four more stations, Thornton's Corners East, Ritson, Courtice, and Bowmanville. The Milton line is owned and operated by Canadian Pacific Kansas City which has restricted the number of passenger trains, only allowing for one-way service. In 2024, the Ontario government under Doug Ford called on the federal government to share
6464-462: The derailment, and the next day the Canadian Transportation Safety Board (TSB) called for the RCMP to investigate as lead investigator Don Crawford said, "There is enough to suspect there's negligence here and it needs to be investigated by the proper authority". On February 4, 2020, the TSB demoted its lead investigator in the crash probe after his superiors decided these comments were "completely inappropriate". The TSB stated that it "does not share
6565-447: The derailment. Part of the compromise was to accept GO Transit commuter rail service along the Galt Subdivision corridor up to Milton, Ontario . Limited trains ran along the Milton line on weekdays only. Expansions to Cambridge, Ontario may be coming in the future. In 1984, CP Rail commenced construction of the Mount Macdonald Tunnel to augment the Connaught Tunnel under the Selkirk Mountains . The first revenue train passed through
6666-415: The doors are closing and will remind passengers to stand clear of the doorways. All cars have a speaker above the doors, which plays a door closing chime in the form of a descending major triad . The chimes are an accessibility feature intended to warn the visually-impaired that the doors are closing. In March 2021, Metrolinx adopted the Japanese shisa kanko (pointing and calling) method. Upon entering
6767-530: The east end, to deal with the same "significant infrastructure and operational challenges related to the Agincourt rail yards" that complicate GO's Havelock line. The study also kept the option open of using either Union Station or North Toronto station as the terminus of the line. Capital costs to upgrading the Havelock subdivision were estimated to be between C$ 329 and 384 million. GO introduced bus service between Peterborough and Oshawa on September 5, 2009. Proposals from regional councillors have pushed for
6868-477: The government passed the Railway Relief Bill, providing a further $ 22.5 million in loans to the CPR. The bill received royal assent on March 6, 1884. In March 1885, the North-West Rebellion broke out in the District of Saskatchewan . Van Horne, in Ottawa at the time, suggested to the government that the CPR could transport troops to Qu'Appelle in the District of Assiniboia in 10 days. Some sections of track were incomplete or had not been used before, but
6969-519: The government-owned Canadian National Railways . During the First World War, CPR put the entire resources of the "world's greatest travel system" at the disposal of the British Empire , not only trains and tracks, but also its ships, shops, hotels, telegraphs and, above all, its people. Aiding the war effort meant transporting and billeting troops; building and supplying arms and munitions; arming, lending and selling ships. Fifty-two CPR ships were pressed into service during World War I, carrying more than
7070-411: The high cost per passenger that resulted in cancellation of the service in 1990; however, the government of the day had actually decided that Via Rail should serve intercity passengers only and felt that the Havelock traffic clearly belonged to the commuter market serviced by GO Transit. GO Transit has a contingency plan for establishing rail service to Peterborough but also has studies and plans that cover
7171-429: The job on May 23, stalling Canadian freight traffic and costing the economy an estimated CA$ 80 million ( US$ 77 million ). The strike ended with a government back-to-work bill forcing both sides to come to a binding agreement . On July 6, 2013, a unit train of crude oil which CP had subcontracted to short-line operator Montreal, Maine and Atlantic Railway derailed in Lac-Mégantic , killing 47. On August 14, 2013,
7272-592: The line had already been in use for three months. The CPR quickly became profitable, and all loans from the federal government were repaid years ahead of time. In 1888, a branch line was opened between Sudbury and Sault Ste. Marie where the CPR connected with the American railway system and its own steamships. That same year, work was started on a line from London, Ontario , to the Canada–US border at Windsor, Ontario . That line opened on June 12, 1890. The CPR also leased
7373-452: The middle of 2022. However, a competing cash and stock offer was later made by Canadian National Railway (CN) on April 20 at $ 33.7 billion. On 13 May, KCS announced that they planned to accept the merger offer from CN, but would give CP until May 21 to come up with a higher bid. On May 21, KCS and CN agreed to a merger. However, CN's merger attempt was blocked by a STB ruling in August that
7474-406: The network experienced two long distance extensions to southern Barrie and Guelph in 1990, only to have those extensions reversed three years later. GO did extend its Lakeshore East line again in 1995 from Whitby to Oshawa , finishing that line as it exists today. The reach of GO's network remained relatively unchanged between 1996 and 2005. However, seven new infill stations were opened along
7575-486: The new Multimark (which, when mirrored by an adjacent "multi-mark" creates a diamond appearance on a globe) that was used – with a different colour background – for each of its operations. On November 10, 1979, a derailment of a hazardous materials train in Mississauga, Ontario , led to the evacuation of 200,000 people; there were no fatalities. Mississauga Mayor Hazel McCallion threatened to sue Canadian Pacific for
7676-460: The next eight years, it continued to apply to discontinue the service, and service on The Canadian declined markedly. On October 29, 1978, CP Rail transferred its passenger services to Via Rail , a new federal Crown corporation that is responsible for managing all intercity passenger service formerly handled by both CP Rail and CN. Via eventually took almost all of its passenger trains, including The Canadian , off CP's lines. In 1968, as part of
7777-471: The next station after the train departs a station, and an automated voice will repeat the announcement when the train arrives at its next station. Automated public service announcements are made in both English and French . When a train arrives at a station, the CSA puts a small accessibility bridge across the gap between the platform and the doorway. This is to allow passengers with mobility devices such as wheelchairs, walkers, or strollers to board and exit
7878-493: The only practical means of long-distance passenger transport in most regions of Canada and was instrumental in the colonization and development of Western Canada. The CPR became one of the largest and most powerful companies in Canada, a position it held as late as 1975. The company acquired two American lines in 2009: the Dakota, Minnesota and Eastern Railroad (DM&E) and the Iowa, Chicago and Eastern Railroad (IC&E). Also,
7979-658: The opening of the Toronto-York Spadina Subway Extension , creating a new interchange between GO and the TTC subway. A 20km extension of the Lakeshore East line to Bowmanville was announced by then-premier Kathleen Wynne in 2016. Construction began on July 22, 2024 and is not expected to finish for years. No completion date has been provided. The extension is expected to cost $ 730 million, and will provide two-way all day service. The line will travel upwards from
8080-502: The port of Montreal during the winter months. By 1896, competition with the Great Northern Railway for traffic in southern British Columbia forced the CPR to construct a second line across the province, south of the original line. Van Horne, now president of the CPR, asked for government aid, and the government agreed to provide around $ 3.6 million to construct a railway from Lethbridge, Alberta , through Crowsnest Pass to
8181-410: The rail network from 86 to 332 kilometres long, and from 16 to 43 stations. To that point, all of GO's rail services ran on tracks mostly owned by the two major freight railways of Canada: Canadian National (CN) and Canadian Pacific (CP). in 1988, a small but significant milestone in network growth occurred when it expanded its Lakeshore East line on new track it built by itself. But following that,
8282-506: The railway in British Columbia. American contractor Andrew Onderdonk was selected, and his men began construction on May 15, 1880. In October 1880, a new consortium signed a contract with the Macdonald government, agreeing to build the railway for $ 25 million in credit and 25 million acres (100,000 km ) of land. In addition, the government defrayed surveying costs and exempted the railway from property taxes for 20 years. A beaver
8383-469: The south shore of Kootenay Lake , in exchange for the CPR agreeing to reduce freight rates in perpetuity for key commodities shipped in Western Canada. The controversial Crowsnest Pass Agreement effectively locked the eastbound rate on grain products and westbound rates on certain "settlers' effects" at the 1897 level. Although temporarily suspended during the First World War , it was not until 1983 that
8484-662: The start of the construction season, but over 672 km (418 mi) of main line, as well as sidings and branch lines, were built that year. The Thunder Bay branch (west from Fort William ) was completed in June 1882 by the Department of Railways and Canals and turned over to the company in May 1883. By the end of 1883, the railway had reached the Rocky Mountains, just 8 km (5.0 mi) east of Kicking Horse Pass. The treacherous 190 km (120 mi) of railway west of Fort William
8585-563: The system had a ridership of 40,807,100 passengers per year. GO Transit started on May 23, 1967, running single-deck trains powered by diesel locomotives in push-pull configuration on a single rail line along Lake Ontario 's shoreline. When GO trains began operation, they ran on tracks mostly owned the two major freight railways of Canada: Canadian National (CN) and CPKC . Over time, GO Transit (and subsequently Metrolinx ) have acquired tracks, ensuring GO Transit has control over track maintenance and expansion. Metrolinx currently owns 80% of
8686-597: The time of its opening, the longest railway tunnel in the Western Hemisphere . On January 21, 1910, a passenger train derailed on the CPR line at the Spanish River bridge at Nairn, Ontario (near Sudbury ), killing at least 43. On January 3, 1912, the CPR acquired the Dominion Atlantic Railway , a railway that ran in western Nova Scotia . This acquisition gave the CPR a connection to Halifax ,
8787-507: The track and swing bridge. The line is currently locked off by Engineering services due to bridge condition, which would leave the businesses in the south end Industrial section such as Poly Tubes without rail service. The former CN spur that also serves United Canada Malt was locked off and closed in October 2014. The City of Peterborough is buying the former CN lines, as well as the section crew office on Rink St., for use as recreational trails once
8888-410: The train. Each car has a number of accessibility seats provided. If the CSA sees a passenger with a physical disability and there are no accessibility seats available, they could ask that a passenger sitting in one of those seats to move to another area in the train to allow the passenger with a disability to sit in an accessibility seat. Before closing the doors, the CSA will make an announcement that
8989-458: The trip to Winnipeg was made in nine days and the rebellion quickly suppressed. Controversially, the government subsequently reorganized the CPR's debt and provided a further $ 5 million loan. This money was desperately needed by the CPR. Even with Van Horne's support with moving troops to Qu'Appelle, the government still delayed in giving its support to CPR, due to Macdonald pressuring George Stephen for additional benefits. On November 7, 1885,
9090-591: The tunnel in 1988. At 14.7 km (nine miles), it is the longest tunnel in the Americas. During the 1980s, the Soo Line Railroad , in which CP Rail still owned a controlling interest, underwent several changes. It acquired the Minneapolis, Northfield and Southern Railway in 1982. Then on February 21, 1985, the Soo Line obtained a controlling interest in the bankrupt Milwaukee Road , merging it into its system on January 1, 1986. Also in 1980, Canadian Pacific bought out
9191-677: The view of the lead safety investigator". The CPPS say they did a thorough investigation into the actions of the crew, which is now closed and resulted in no charges, while the Alberta Federation of Labour and the Teamsters Canada Rail Conference called for an independent police probe. On November 20, 2019, it was announced that Canadian Pacific would purchase the Central Maine and Quebec Railway from Fortress Transportation and Infrastructure Investors . The line has had
9292-579: Was abandoned in stages until the present mileage remains: Mile 90.8 near Havelock westward to Mile 182.4 which is the junction with the CP Belleville Sub at Kennedy in Toronto. The Nephton Subdivision extends from Mile 94.4 west of Havelock to Blue Mountain, a distance of twenty track miles. Crews are based at Havelock and Peterborough. Havelock crews run trains to Toronto Agincourt Yard and return (Train 90/91 now known as T07/08) as well as to Blue Mountain via Nephton and back. The railway primarily serves
9393-457: Was chosen as the railway's logo in honour of Donald Smith, 1st Baron Strathcona and Mount Royal , who had risen from factor to governor of the Hudson's Bay Company over a lengthy career in the beaver fur trade. Building the railway took over four years. The Canadian Pacific Railway began its westward expansion from Bonfield, Ontario , where the first spike was driven into a sunken railway tie. That
9494-711: Was completed by Purcell & Company, headed by "Canada's wealthiest and greatest railroad contractor," industrialist Hugh Ryan . Many thousands of navvies worked on the railway. Many were European immigrants. An unknown number of Stoney Nakoda also assisted in track laying and construction work in the Kicking Horse Pass region. In British Columbia, government contractors eventually hired 17,000 workers from China, known as " coolies ". After 2 + 1 ⁄ 2 months of hard labour, they could net as little as $ 16 ($ 485 in 2023 adjusted for inflation) Chinese labourers in British Columbia made only between 75 cents and $ 1.25
9595-529: Was decided to use an overhead wire system over a third rail. Hydrogen fuel cells were studied as an alternative to rail electrification but ultimately were deemed unfeasible. A report suggested the trains would be 30% faster and 60% cheaper per kilometre. In 2022, the Ontario government under premier Doug Ford began the first phase of electrification, with plans to electrify 600 kilometres of track and an estimated finish date of 2032. GO Transit rail service to Bolton
9696-578: Was first proposed by the Ontario government under the MoveOntario 2020 plan in June 2007. It was subsequently carried over to The Big Move , where it was placed on the 15-year plan. In November 2010, Metrolinx completed a feasibility study that focused on utilization of Canadian Pacific Railway's Mactier subdivision, which runs from the West Toronto Diamond in Toronto northward to Bolton. Four different service alternatives were assessed to determine
9797-465: Was forecasted to be 2,391, 2,884, and 4,388 in 2015, 2021, and 2031, respectively, in the morning peak period. If service was increased for two-way all-day service, total costs increased to $ 210 million, and ridership was forecasted to be 6,074, 7,324, and 11,146 in 2015, 2021, and 2031, respectively. Metrolinx determined that the projected ridership did not justify the costs, and downgraded the Bolton line from
9898-562: Was re-routed to this new southerly line, which connected numerous emergent small cities across the region. Independent railways and subsidiaries that were eventually merged into the CPR in connection with this route were the Shuswap and Okanagan Railway , the Kaslo and Slocan Railway , the Columbia and Kootenay Railway , the Columbia and Western Railway and various others. Under the initial contract with
9999-721: Was the point where the Canada Central Railway (CCR) extension ended. The CCR started in Brockville and extended to Pembroke. It then followed a westward route along the Ottawa River and continued to Mattawa at the confluence of the Mattawa and Ottawa rivers. It then proceeded to Bonfield. It was presumed that the railway would travel through the rich "fertile belt" of the North Saskatchewan River Valley and cross
10100-618: Was unrelated to the current company, as opposed to the Inter-Ocean Railway Company, which was thought to have connections to the Northern Pacific Railway Company in the United States. After this scandal, the Conservatives were removed from power, and Alexander Mackenzie , the new Liberal prime minister, ordered construction of the railway under the supervision of the Department of Public Works. Enabled by
10201-548: Was unsuccessful. In 2015–16 Canadian Pacific sought to merge with American railway Norfolk Southern . and wanted to have a shareholder vote on it. CP ultimately terminated its efforts to merge on April 11, 2016. On February 4, 2019, a loaded grain train ran away from the siding at Partridge just above the Upper Spiral Tunnel in Kicking Horse Pass . The 112-car grain train with three locomotives derailed into
#544455