116-724: The Millennium Line is the second line of the SkyTrain rapid transit system in the Metro Vancouver region of British Columbia , Canada. The line is owned and operated by BC Rapid Transit Company, a subsidiary of TransLink , and links the cities of Vancouver , Burnaby , Coquitlam and Port Moody . The line was opened in 2002 and was named in recognition of the new millennium . The Millennium Line operates from VCC–Clark station in Vancouver to Lafarge Lake–Douglas station in Coquitlam. The line
232-492: A Quester Tangent brake assurance monitor (BAM) that controls propulsion and braking systems. The VCCs have a command-line-console, but normally the trains are controlled through a system known as the SMC, which also provides scheduling. All commands from the SMC are verified to be safe by the VCC before execution. However if the SMC fails, the system can still be operated through the VCC. This
348-644: A Burnaby factory. Similar trains are used in Kuala Lumpur's Kelana Jaya Line , New York's JFK AirTrain , and the Beijing Airport Express . These trains are run in four-car configurations on the Expo Line, and two-car configurations on the Millennium Line. Each pair of cars is semi-permanently joined together in a twin unit or "married pair", with a length of 33.4 metres (110 ft). Mark II trains have
464-432: A Compass Card or a 90-minute paper Compass ticket to operate. This means that a bus rider paying cash is required to pay a second fare to transfer to SkyTrain or SeaBus. Those transit users paying cash but beginning their trips at a SkyTrain or SeaBus station are not subject to this second fare because they are issued Compass tickets which are accepted as valid transfers on TransLink buses. Construction of SkyTrain fare gates
580-650: A depth of 15 to 20 metres (49 to 66 ft) below the surface. The two machines were named Elsie and Phyllis, honoring two influential Vancouver residents: aeronautical engineer Elsie MacGill and mountaineer Phyllis Munday . Elsie began tunneling the eastbound tunnel from Great Northern Way–Emily Carr station in October 2022, with Phyllis beginning work on the westbound tunnel in late November. Both machines had reached Broadway–City Hall station by May 26, 2023, and South Granville station by February 8, 2024. Phyllis completed boring at Arbutus station on March 20, 2024, and
696-629: A different design from the Expo and Millennium Lines' Bombardier-built fleet. They use conventional electric motors rather than linear induction motor technology. Canada Line tracks do not interconnect with the rest of the SkyTrain network, and there is a separate fleet maintenance depot. SkyTrain provides high-frequency service, with trains arriving every 2 to 6 minutes at all stations during peak hours. Trains operate between 4:48 a.m. and approximately 1:30 a.m. on weekdays, with reduced hours on weekends on
812-488: A plan to have a contractor selected by April 2020 to allow for construction to begin later that year. On July 17, 2020, the provincial Ministry of Transportation announced that Acciona Infrastructure , a Spanish conglomerate, and Ghella , an Italian company, would be in charge of construction. Demolition of buildings, to make room for station entrances and construction staging areas, began in February 2021. Major construction on
928-601: A proposed route for the extension: the line would continue west under Broadway, with stations at Macdonald and Alma Streets. It would then deviate slightly north to a station serving the redevelopment at the Jericho Lands . In the University Endowment Lands , the line would either take an elevated route following University Boulevard, or a tunnelled route underneath the University Golf Club , to get to UBC at
1044-556: A rapid transit line as early as 1979 but such a project was not funded until the early 2000s with the approval of the Canada Line. The line opened on August 17, 2009, 15 weeks ahead of schedule and on budget. Ridership rose three years ahead of forecasts, hitting 100,000 passengers per weekday in May 2010 and 136,000 passengers per weekday in June 2011. The Canada Line is operationally independent from
1160-513: A route established by the Westminster and Vancouver Tramway Company as an interurban line in 1890. The Expo Line (originally referred to as simply "SkyTrain" until the opening of the Millennium Line) was built in 1985 in time for Expo 86 . It now has 24 stations. The Expo Line ran only as far as New Westminster station initially. In 1989, it was extended to Columbia station and in 1990, once
1276-510: A security hazard. On-board speaker phones provide two-way communication between passengers and control operators. In 2007, it was reported that the entire surveillance system was upgraded from analogue two-hour tape recording to digital technology, which was to allow police to retrieve previous footage for up to seven days. However, incidents since the upgrade have still limited police to a two-hour loop, resulting in loss of potential evidence. By November 2008, at least 54 deaths had occurred on
SECTION 10
#17328441278651392-485: A short spur east of Columbia station, which was later incorporated into the new Millennium Line. In 1995, the British Columbia government announced that an entirely new line, a street-level light rail line, would be built along Broadway and Lougheed Highway to Lougheed Mall (served by Lougheed Town Centre station ), as the first phase of the "T"-Line (one of three Intermediate Capacity Transit System lines) outlined in
1508-474: A shortage of trains, the Mark IIIs are being used on the Expo Line, while 2-car Innovia 200 (Mk2) serve the Millennium Line. On December 16, 2016, TransLink ordered 28 more Mark III cars, bringing the total of Mark III cars to 56 by the end of 2019. On February 22, 2018, TransLink announced a further order of 28 Mark III cars, which will bring the total number of Mark III cars to 84 once all trains are in service by
1624-729: A single-day record of 567,000 on February 20, 2010. At times, every available train was in service on all three lines. After the Olympics ended, overall transit usage remained 7.8 percent above the previous year. The cost of operating SkyTrain in 2008, with an estimated 73.5 million boardings, was $ 83 million. To cover this, TransLink draws mostly from transit fares, advertising ($ 360 million in 2008) and tax ($ 262 million from fuel taxes and $ 298 million from property taxes in 2008), funds which are also shared with bus services, roads and bridge maintenance, and other infrastructure and services. The capital costs of building
1740-833: A station under the University Boulevard bus loop. The station locations at Macdonald Street, Alma Street, and the Jericho Lands were approved by the Vancouver City Council in March 2022. When the Evergreen Extension was built, the first few metres of track and a track switch to allow for an eventual eastward extension to Port Coquitlam were built at Coquitlam Central station . This would create two branches where trains would alternate between going east to Lafarge Lake–Douglas station or to Port Coquitlam. A feasibility study
1856-401: A streamlined front and rear, an articulated joint allowing passengers to walk the length of a married pair, white/grey/blue interior, and six doors per car, three per side. TransLink also ordered 48 Mark II ART (2009/2010 model) in 2009 to further supplement supply and integrate new features like CCTV and visual maps with LED lights. The Bombardier ART model has undergone several redesigns from
1972-469: A symmetrical red-brick facade dominated by a row of smooth, white Ionic order columns. The Ionic columns are repeated in the grand interior hall, flanking the perimeter of the space. The main hall features two large clocks facing each other high on the east and west walls. Paintings depicting various scenic Canadian landscapes, completed in 1916 by Adelaide Langford, line the walls above the columns. The Montreal architecture firm Barott, Blackader and Webster
2088-462: A temporary shuttle bus service between the SeaBus terminal, the main concourse area, and Burrard station was instated. In 2022, TransLink relocated the in-person service centre at Stadium–Chinatown station and opened a new 580-square-metre (6,200 sq ft) customer service centre at Waterfront station on September 23. Waterfront's main station building was designed in a neoclassical style , with
2204-545: A third platform at the station was roughed-in in anticipation of the extension. Phase II was postponed following a change in provincial government and a shuffling of priorities that led to prioritizing building the Canada Line due to Vancouver's hosting of the 2010 Olympics. Preliminary construction of the Evergreen Extension began in July 2012 and major construction started in June 2013 with the construction of support columns for
2320-478: A total length of 562 m (1844 ft), with shorter 47-metre (154 ft) towers necessitated by its proximity to the Vancouver International Airport , and also has a pedestrian/bicycle deck connecting the bicycle networks of Vancouver and Richmond. The Middle Arm Bridge is a shorter box girder bridge . The signalling technology used on all three SkyTrain lines to run trains automatically
2436-441: A valid Go-Card and the elderly. Children under 12 have been able to ride the system for free since September 2021. Until April 2016, SkyTrain's fare system was a proof-of-payment system; there were no turnstiles at the entrances to train platforms. Instead, fares were typically enforced by random ticket inspections – usually by police or transit security but occasionally by SkyTrain attendants – through trains and stations. This
SECTION 20
#17328441278652552-465: A westbound Millennium Line train. For passengers arriving eastbound at Lougheed, transfers between eastbound Millennium and Expo Line trains were now same-platform. TransLink stated the change to traditional right-track running would provide faster and more reliable trips for passengers as the many track changes the initial service pattern required had resulted in delays. When the Expo Line was opened in 1985, an extension to Lougheed Mall in east Burnaby
2668-483: A whole, TransLink had $ 1.1 billion in long-term debt in 2006, of which $ 508 million was transferred from the province in 1999 when responsibility for SkyTrain was given to TransLink. The province retained ownership of the causeway, bridge, certain services, and a portion of SkyTrain's debt. Law enforcement services are provided by the Metro Vancouver Transit Police (MVTP). They replaced
2784-583: A yard next to Bridgeport station in Richmond. Waterfront station (Vancouver) Waterfront station is a major intermodal public transportation facility and the main transit terminus in Vancouver , British Columbia, Canada. It is on West Cordova Street in Downtown Vancouver , between Granville and Seymour Street. The station is also accessible via two other street-level entrances, one on Howe Street to
2900-569: A year later, Via consolidated its Vancouver operations at Pacific Central Station , the CN station near False Creek , and ceased using the CPR station. The last scheduled Via passenger train to use Waterfront station departed on October 27, 1979. Waterfront station's transformation into a public intermodal transit facility began in 1977. That year, the SeaBus began operating out of a purpose-built floating pier that
3016-404: Is a six-car configuration, totalling 76.2 metres (250 ft). The SkyTrain fleet includes 150 Mark I cars. These trains have a mix of forward-, reverse- and side-facing seats; red, white, and blue interiors; and four doors per car, two per side. When the Millennium Line was built, TransLink ordered new-generation Mark II ART trains from Bombardier Transportation , some of which were assembled in
3132-419: Is also added to trips initiated at Sea Island stations for travel east to Bridgeport station and beyond using Compass Card stored value or DayPasses. It is not applied to trips using monthly passes, nor to trips travelling to the airport using DayPasses or single-use Compass tickets which were purchased and activated off Sea Island. The YVR AddFare came into effect on January 18, 2010. The revenue collected from
3248-424: Is elevated to Burquitlam station , where it then goes through a 2-kilometre (1.2 mi) bored tunnel to the city of Port Moody . In Port Moody, the line runs at grade level, rising to cross railway tracks. From Coquitlam Central station , the line is elevated to the terminus at Lafarge Lake–Douglas station. When the Evergreen Extension opened in late 2016, eastbound trains crossed the westbound tracks to access
3364-496: Is generated and the command is ignored. The VCC communicates with the train's vehicle on board computer (VOBC), whose data is transmitted through coax cables laid along the tracks. There are up to two VOBCs per married-pair trains, i.e. 4-car train would have two VOBCs. If the VCCs fail or communication between the VCC and the VOBC is lost, the train will "time-out" and emergency-brake (EB) through
3480-483: Is known as "degraded mode". The SkyTrain health monitoring unit (HMU) developed by Quester Tangent provides monitoring and diagnostic functionality for vehicle maintenance by connecting to CAN vehicle network and providing a maintenance display in the Hostler Panel. SkyTrain's signalling system later provided the basis of SelTrac , which is currently maintained and sold by Thales and has equipped many lines around
3596-498: Is provided for deaf individuals through real-time English signage and displays at stations and on newer trains, although a reliance on verbal communication for service disruptions has been identified as a transportation barrier. The distinctive three-tone chime used in the SkyTrain system was recorded in 1984–85 at Little Mountain Sound Studios in Vancouver. The automated train announcements have been voiced by Laureen Regan since
Millennium Line - Misplaced Pages Continue
3712-470: Is the third CPR station. The previous CPR station was located one block west, at the foot of Granville and, unlike the current classical-styled Waterfront station, was built in "railway gothic" like the CPR's many railway hotels. In 1978, when Via Rail took over the passenger operations of the CPR and the Canadian National Railway , it continued using both railways' stations in Vancouver, but
3828-427: Is three years ahead of ridership forecasts. SkyTrain's highest ridership came during the 2010 Winter Olympics when each event ticket included unlimited day-of transit usage. During the 17-day event, Canada Line ridership rose 110 per cent to an average of 228,000 per day, with a single-day record of 287,400 on February 19, 2010. Expo and Millennium Line ridership rose 64 per cent to an average of 394,000 per day, with
3944-560: The Expo Line , the Millennium Line , and the Canada Line . The Expo and Millennium Lines are operated by British Columbia Rapid Transit Company under contract from TransLink (originally BC Transit), a regional government transportation agency. The Canada Line is operated on the same principles by the private concessionaire ProTrans BC under contract to TransLink and is an integrated part of
4060-595: The Fraser River . With the opening of the Evergreen Extension on December 2, 2016, SkyTrain became the longest rapid transit system in Canada and the longest fully automated driverless system in the world. The total lengths of the automated lines of the Shanghai Metro , Singapore MRT , Kuala Lumpur Rapid KL and Dubai Metro have since surpassed those of SkyTrain. SkyTrain has 53 stations served by three lines:
4176-870: The Skybridge was finished, it continued across the Fraser River to Scott Road station in Surrey. In 1994, the terminus of the Expo Line became King George station in central Surrey. It was built on a budget of $ 854 million (1986 dollars). Effective October 22, 2016, Expo Line trains began operating on a new branch to Production Way–University station , taking over the previous Millennium Line service between Waterfront and that station. During peak periods, trains between Waterfront and Columbia arrive every 2 to 3 minutes. Between Waterfront and King George, trains arrive every 2 to 5 minutes during peak hours, while trains between Waterfront and Production Way arrive every 6 to 7 minutes in
4292-505: The AddFare goes back to TransLink. Passengers on SkyTrain made an average of 526,400 trips on weekdays by the end of September 2019 . Overall in 2017, the network carried a total of 151 million passengers. This compares to 117.4 million passengers in 2010: 38,447,725 on the Canada Line and 78,965,214 on the interlined Expo and Millennium Lines. The Canada Line carried an average of 110,000 passengers per weekday in early 2011, and
4408-533: The Canada Line splits into two branches, one heading west to the YVR–Airport station at Vancouver International Airport and the other continuing south to the Richmond–Brighouse station in Richmond's city centre. Opened on August 17, 2009, the Canada Line added 15 stations and 19.2 km (11.9 mi) to the SkyTrain network. Waterfront station is the only station where the Canada Line directly connects with
4524-568: The Canadian Pavilion at Canada Place to the main Expo site along False Creek. A private ferry company, Royal SeaLink Express, ran passenger ferries from a new dock on the west side of the SeaBus terminal to Victoria and Nanaimo in the early 1990s, but ultimately folded. In 2003, HarbourLynx began operating out of Royal Sealink's old facility at the SeaBus terminal. In 2006, following major engine problems with their only vessel, they folded as well. In 1995, platforms were built adjacent to
4640-688: The Evergreen Line during construction, is the second phase of the Millennium Line, extending from Lougheed Mall in Burnaby to the Douglas College campus in Coquitlam. Originally referred to as the Port Moody-Coquitlam (PMC) Line, it provides a "one-seat ride" from Coquitlam to Vancouver. Switches to the PMC Line were installed to the east of Lougheed Town Centre station during its initial construction and
4756-477: The Expo Line. The Canada Line travels southward from Waterfront station in Downtown Vancouver to Richmond , where the track splits at Bridgeport station ; trains alternate between a southern branch ending at Richmond–Brighouse station and a western branch ending at Vancouver International Airport . Although most of the system is elevated, SkyTrain runs at or below grade through Downtown Vancouver, for
Millennium Line - Misplaced Pages Continue
4872-514: The Expo Line; however, Vancouver City Centre station is within a three-minute walk from Granville station via the Pacific Centre mall, making an unofficial transfer to the Expo Line. The Canada Line cost $ 1.9 billion, financed by the Governments of Canada and British Columbia, TransLink, and InTransitBC. The Canada Line's trains, built by Hyundai Rotem , are fully automated, but are of
4988-552: The Expo and Millennium lines. SkyTrain has longer hours of service during special events, such as New Year's Eve, the Vancouver 2010 Olympics , and marathons. TransLink's SkyTrain service area is divided into three zones, with fares varying depending on how many zone boundaries are crossed during one trip (two- and three-zone passengers are charged the one zone rate after 6:30 pm rush hour, and on weekends and statutory holidays). Customers may purchase fares using cash, debit cards, or credit cards from self-serve ticket vending machines at
5104-507: The Metro Vancouver's Livable Region Strategic Plan that extended into Coquitlam . An 18-month review of rapid transit was scheduled and started in January 1998 but was cut short by the government's announcement of its choice of Bombardier's technology in June 1998. This meant that the first phase of the line would have to connect to the existing Expo Line to use its maintenance yard. Connecting
5220-443: The Millennium Line opened in 2002, with Braid and Sapperton stations. Most of the remaining portion began operating later that year, serving North Burnaby and East Vancouver . Phase I of the Millennium Line was completed $ 50 million under budget. Critics of the project dubbed it the "SkyTrain to Nowhere", claiming that the route of the new line was based on political concerns, not the needs of commuters. One illustration of
5336-407: The Millennium Line shortly after it was completed. The new, wider edges are brighter and are tiled to provide a safer environment for the visually impaired. The Canada Line also uses this safety feature in its stations. Since the opening of the Millennium Line, aside from platform tile upgrading, many Expo line stations have also been refitted with new signage and ticket vending machines. Accessibility
5452-554: The Millennium Line's Evergreen Extension , from Lougheed Town Centre in Burnaby to Lafarge Lake–Douglas in Coquitlam, was completed in 2016 and it was opened for revenue service on December 2, 2016. This extension adds 11 km (6.8 mi) and 6 new stations to the Millennium Line. The Canada Line begins at the Waterfront station hub, then continues south through Vancouver into the City of Richmond and Sea Island. From Bridgeport station ,
5568-421: The Millennium Line. On June 25, 2018, service patterns were changed to eliminate all left-track running. This change meant passengers arriving westbound at Lougheed on the Expo Line who wished to continue towards VCC–Clark could either change platforms at Lougheed or remain on their Expo Line train until its terminus at the next station, Production Way–University , where they could make a same-platform transfer to
5684-507: The Port Moody–Coquitlam (PMC) Line), which would have provided a "one-seat ride" from Coquitlam to VCC–Clark station. A short spur and switches to the PMC Line were installed to the east of Lougheed Town Centre station and a third platform was roughed-in in anticipation of the extension. Phase II was placed on hold following a change in provincial government. A SkyTrain extension from Lougheed Town Centre station to Coquitlam Town Centre
5800-523: The SkyTrain station for the West Coast Express , which uses the existing CPKC tracks. The platforms for the West Coast Express were built in the same location as the old CPR platforms. In 2002, Millennium Line trains began to share tracks with the Expo Line at Waterfront station. The lines continued to share tracks until late 2016, when an Expo Line branch to Production Way–University station
5916-450: The Surrey section of the Expo Line. In 2009, it was estimated that ridership had grown to at least 80,000 passengers per day. Initially, the Millennium Line service followed the Expo Line from Waterfront to Columbia stations, then looped back into Vancouver via the new route, passing through Commercial–Broadway again at a different platform, and terminating at VCC–Clark station. After a reconfiguration on October 22, 2016, in preparation for
SECTION 50
#17328441278656032-461: The Vancouver portion of the Canada Line until just before it reaches Richmond at Marine Drive station, through the 2.1-kilometre (1.3 mi) tunnel used by the Millennium Line between Coquitlam and Port Moody, through the 0.6-kilometre (0.4 mi) tunnel between Columbia and Sapperton stations in New Westminster, and for short stretches in Burnaby and New Westminster. SkyTrain's Expo Line uses
6148-594: The West Coast Express commuter train ( Moody Centre and Coquitlam Central ). The original Millennium Line's stations were designed by British Columbia's top architects and are very different from those on the Expo Line. In 2004, Busby and Associates Architects, designers of the Brentwood Town Centre station in Burnaby , were honoured for their work with a Governor General's Medal in Architecture . Construction on
6264-404: The bus system, bus loops, and SeaBus. SkyTrain attendants provide customer service and first aid, troubleshoot train and station operations, and perform fare checks alongside the transit police force. SkyTrain attendants can be identified by their uniforms which say "SkyTrain" on them. Over the years, violence and other criminal activities have been concerns at time, but TransLink maintains that
6380-469: The construction of such a system. During the same period, Urban Transportation Development Corporation , then an Ontario crown corporation, was developing a new rapid transit technology known as an "Intermediate Capacity Transit System". In 1980, the "Advanced Light Rapid Transit" system was selected by the British Columbia provincial government for use on one of two planned corridors, connecting Vancouver to New Westminster in time for Expo 86 . SkyTrain
6496-586: The downtown campuses for Simon Fraser University and the British Columbia Institute of Technology , are also located within the vicinity of the station. Waterfront station was built by the Canadian Pacific Railway (CPR) and opened on August 1, 1914. It was the Pacific terminus for the CPR's transcontinental passenger trains to Montreal , Quebec, and Toronto , Ontario. The current station
6612-539: The driving force of the investment, though it did not disaggregate the general growth in that area. There are three main routes: the Expo Line, Millennium Line and Canada Line. The Expo Line travels between Waterfront station in Downtown Vancouver and Columbia station in New Westminster , serving the cities of Vancouver, Burnaby , and New Westminster. From Columbia, the Expo Line splits into two branches. One branch travels through Surrey to King George station , while
6728-457: The end of 2020. The Canada Line uses Hyundai Rotem EMU vehicles, with cars powered by conventional electric motors instead of the linear induction motor (LIM) technology used by the Expo and Millennium Line vehicles; as a result, the Canada Line vehicles cannot be used on the Expo and Millennium Lines. There are 20 trains, which operate as two-carriage articulated units and can reach a speed of 80 km/h (49.7 mph). They are maintained at
6844-424: The end-to-end average speed is 45 km/h (28.0 mph), three times faster than a bus and almost twice as fast as a B-Line express bus. During cold weather, TransLink crews use hockey sticks to clear snow and ice from train doors, which would otherwise prevent some doors from being able to open. The trains are also slowed and staffed by TransLink attendants, who can manually override the automatic controls in
6960-569: The event of an obstruction caused by snow or ice. The initial fleet consisted of 12.7 m (41 ft 8 in) lightweight Mark I ICTS cars from Urban Transportation Development Corporation , similar to those used by Toronto's Line 3 Scarborough and the Detroit People Mover . Mark I vehicles are composed of mated pairs and normally run as six-car trains and only on the Expo Line, but can be run in two-, four-, or six-car configurations. The maximum based on current station platform lengths
7076-527: The expense of implementing, maintaining, and enforcing them would exceed the losses prevented. In 2005, TransLink estimated it was losing $ 4 million (5 percent of revenue attributed to SkyTrain) annually to fare evasion on SkyTrain. While the Canada Line stations, along with those on the Millennium Line, were designed to allow for future fare gates, the Canada Line opened in 2009 without them, despite stated intentions to include them. Expo Line stations have since been redesigned and retrofitted to accommodate
SECTION 60
#17328441278657192-423: The extension began on May 13, 2021. "Traffic decks" began to be installed over Mount Pleasant, Broadway–City Hall, Oak–VGH, South Granville, and Arbutus stations, to avoid closing Broadway while station construction takes place underneath. Construction of the elevated guideway at the eastern end of the extension began on December 13, 2021. This 700-metre-long (2,300 ft) guideway is the only above-ground portion of
7308-470: The extension, and connects the existing VCC–Clark station to a tunnel portal adjacent to the Emily Carr University of Art and Design . The tunnel boring machines for the project were delivered to Vancouver between April and June 2022. Two identical machines, each 6 metres (20 ft) in diameter and 150 metres (490 ft) in length, would dig about 18 metres (59 ft) of tunnel per day, at
7424-443: The extension, to facilitate higher ridership, shorten travel times and to integrate seamlessly with the existing SkyTrain network. As a result, the junction tracks and roughed-in third platform at Lougheed Town Centre station were used as part of the Evergreen Extension. Construction of the Evergreen Extension began in 2013 and was completed in late 2016. The extension opened for revenue service on December 2, 2016. On March 16, 2018,
7540-482: The fare-paid zone. Starting in April 2016, they were initially fully closed only during peak hours, with one gate remaining open during off-peak times for people with accessibility issues who could not reach their Compass Cards to the fare gates to tap in or out. Full implementation of the fare gates was also delayed by problems with Compass Cards when riders were tapping out as they exited buses. The tapping-out process on buses
7656-502: The gates in place by the end of 2010. However, in August 2009, a TransLink spokesman said the gates would not be installed before 2012, and that a smart card system would be implemented at the same time. It was announced on August 14, 2013, that bus-issued transfers (magnetic strip paper cards) would continue to be issued for cash fares paid on buses, but that these transfers would not work at SkyTrain or SeaBus station fare gates, which require
7772-406: The legitimacy of this complaint is that the end of the Millennium Line is located in a vacant field, chosen because it was supposed to be the location for a new high-tech development and is close to the head office of QLT Inc., but additional development was slow to get off the ground. That station, VCC–Clark near Clark Drive and Broadway, did not open until 2006 due to the struggles of negotiating
7888-435: The line was extended to its present terminus, VCC–Clark station , on January 6, 2006. The Millennium Line was now completed at a cost of $ 1.2 billion, $ 40 million under budget. In 2007, the non-interlined portion of the Millennium Line served an average of 70,000 passengers per day. Of these, 14,000 passengers arrived on trains travelling from Expo Line stations west of Columbia station, and 7,000 transferred from
8004-399: The line. The extension began revenue service on December 2, 2016. The Canada Line was built as a public–private partnership, with the winning consortium (now known as ProTransBC), led by SNC-Lavalin , contributing funds toward its construction and operating it for 35 years. A minimum ridership was guaranteed to ProTransBC by TransLink. The Richmond–Vancouver corridor had been considered for
8120-630: The mezzanine level of each station. A variety of transit passes are available, such as the pre-paid FareSaver ticket, daily DayPass, monthly FareCard, annual EmployerPass, post-secondary student U-Pass , and other specialized passes. Canadian National Institute for the Blind identification cards are accepted without the need to be read by the fare box. One-time fares are valid for 90 minutes on any mode of transportation with any number of transfers, including all SkyTrain lines and bus and SeaBus routes. Concession fares are available for secondary school students with
8236-483: The new fare gate system. The 2008 Provincial Transit Plan outlined several SkyTrain system upgrades, including replacement of the proof-of-payment system with a gated-ticket system. According to Minister of Transportation Kevin Falcon , the gated-ticket system was to be implemented by a private company by 2010. In April 2009, it was announced that the provincial and federal governments would spend $ 100 million to put
8352-578: The new northernmost platform (Platform 3) at Lougheed Town Centre station. Trains then operated left-track running to a crossover junction just before Burquitlam Station, where trains crossed back to right-track running. Westbound Millennium Line trains crossed over to left-hand running just south of Burquitlam station, which allowed them to access westbound Platform 2 at Lougheed Town Centre station. This unusual service design allowed same-platform interchange for Expo Line passengers arriving at Lougheed Town Centre and continuing west towards VCC–Clark station on
8468-418: The old TransLink Special Provincial Constables , who had limited authority. On December 4, 2005, MVTP officers became the first and only transit police force in Canada to have full police powers and carry firearms. There was public concern in March 2005 when it was announced that transit police would carry firearms. Solicitor General of British Columbia John Les defended the move at the time, saying that it
8584-445: The opening of the Evergreen Extension , the Millennium Line ran between VCC–Clark station in the west to Lougheed Town Centre station in the east. Transfers to the Expo Line were now made possible at Production Way–University and Lougheed Town Centre stations. Braid and Sapperton stations were reassigned to the Expo Line. The second phase of the Millennium Line was to be an extension from Lougheed Mall to Coquitlam (then known as
8700-399: The opening of the Millennium Line in 2002, and by Karen Kelm between 1985 and 2001. The Expo Line and Millennium Line use Bombardier 's Advanced Rapid Transit (ART) system, a system of automated trains driven by linear induction motors , formerly known as Intermediate Capacity Transit System (ICTS). These trains reach speeds of 90 km/h (55.9 mph); including wait times at stops,
8816-543: The original UTDC ICTS model, and the Mark II design has been updated by Bombardier, with this newest offering being the Innovia Metro 300 . Dimensions are similar to the Mark II, with capacity improvements offered over the outgoing model through redesigned car layout. TransLink ordered 28 Mark III cars, which began delivery in 2015, and went into service beginning in August 2016. The vehicles appear sleeker, with larger windows on
8932-444: The other SkyTrain lines, using different rolling stock (shorter overall train and station length, but wider cars) that is incompatible with the Expo and Millennium Lines. SkyTrain has had a significant impact on the development of areas near stations, and has helped to shape urban density in Metro Vancouver. Between 1991 and 2001, the population living within 500 m (1,640 ft) of SkyTrain increased by 37 percent, compared to
9048-463: The other travels through New Westminster and Burnaby, terminating at Production Way–University station . Millennium Line trains travel between VCC–Clark station and Lafarge Lake–Douglas station in the city of Coquitlam . Near the western end of the line is a major transfer point with the Expo Line at Commercial–Broadway station. Further east, Lougheed Town Centre station and Production Way–University station serve as two more transfer points with
9164-486: The peak hours. Prior to October 22, 2016, the Millennium Line shared tracks with the Expo Line from Waterfront station to Columbia station in New Westminster, then continued along its own elevated route through North Burnaby and East Vancouver , ending at VCC–Clark station , near Vancouver Community College 's Broadway campus. It was built on a $ 1.2-billion budget and the final extension from Commercial Drive station (now Commercial–Broadway station ) to VCC–Clark station
9280-429: The platforms and tracks of the Expo and Millennium Lines. 44 of those deaths were suicides, while the remaining ten were accidental. Vancouver had plans as early as the 1950s to build a monorail system, with modernist architect Wells Coates to design it; that project was abandoned. The lack of a rapid transit system was said to be the cause of traffic problems in the 1970s, and the municipal government could not fund
9396-525: The prior two days), with trains operating between Waterfront station on the Expo Line and Braid station in eastern New Westminster. For the second phase, service was extended to Commercial Drive station (since merged with Broadway station to form Commercial–Broadway ) on August 31, 2002 (with full integration with the bus network occurring on September 3, 2002). Lake City Way station , located between Sperling–Burnaby Lake and Production Way–University stations, opened on November 21, 2003. Three years later,
9512-402: The project: Preliminary work on the extension began on February 19, 2019, with the installation of trolley poles and wires on 12th Avenue between Arbutus and Granville Streets that were required in order to reroute trolley buses off of Broadway for the duration of the construction of the subway. On June 22, 2020, trolleybuses were removed from Broadway. The provincial government initially had
9628-414: The provincial government approved the construction of the "Broadway Subway Project", an initiative which will extend the Millennium Line west to Arbutus Street and add six new stations. The extension will be 5.7 kilometres (3.5 mi) long, all but 700 metres (2,300 ft) of which will be underground, and cost an estimated $ 2.83 billion. Originally scheduled for a 2025 opening, the expected opening
9744-417: The regional average of 24 percent. Since SkyTrain opened, the total population of the service area rose from 400,000 to 1.3 million people. According to BC Transit's document SkyTrain: A catalyst for development , more than $ 5 billion of private money had been invested within a 10–15 minute walking distance of the SkyTrain and SeaBus . The report claimed that the two modes of transportation were
9860-500: The regional transport system. SkyTrain uses a fare system shared with other local transit services and is policed by the Metro Vancouver Transit Police . SkyTrain attendants (STAs) provide first aid, emergency response, directions and customer service, inspect fares, monitor train faults, and operate the trains manually if necessary. The Expo Line connects Waterfront station in Vancouver to King George station in Surrey , principally along
9976-403: The right-of-way with BNSF, the owner of the freight tracks beside the station, but it is still five kilometres short of the original proposed Phase II terminus at Granville Street and 10th Avenue. At the time VCC–Clark station opened, it was revealed that the additional westward extension and its three stations was out of favour and "not a high priority anymore". The Evergreen Extension, known as
10092-568: The sides of the train, and redesigned windows and headlights on the ends of the cars. The interior is largely similar to the second generation of Mark II cars, with the some seats removed to better accommodate bicycles and strollers. TransLink has claimed that the interior of the Mark III offers better sound and heat insulation. TransLink ordered the cars for the Evergreen Extension in a 4-car articulated configuration, with two centre cars, to allow full-length train movements by passengers. However, due to
10208-490: The system are shared with other government agencies. Capital expenses were $ 216 million in 2008. For example, the cost of building the Canada Line was shared between TransLink ($ 335 million or 22 percent), the federal government (29 percent), the provincial government (28 percent), the airport authority (19 percent), and the City of Vancouver (2 percent). While TransLink has run surpluses for operating costs since 2001, it incurs debt to cover these capital costs. As
10324-430: The system had a ridership of 141,339,300, or about 455,700 per weekday as of the third quarter of 2024. The name "SkyTrain" was coined for the system during Expo 86 because the first line (Expo) principally runs on elevated guideway outside of Downtown Vancouver , providing panoramic views of the metropolitan area. SkyTrain uses the world's third-longest cable-supported transit-only bridge, known as SkyBridge , to cross
10440-490: The system has been in full operation since. Travel on the Canada Line is free between the three Sea Island stations near the Vancouver International Airport: Templeton , Sea Island Centre , and YVR–Airport. Single-use Compass tickets purchased with cash at Compass vending machines in stations on Sea Island include a surcharge, the "YVR AddFare", of $ 5.00 on top of the normal fare. This charge
10556-656: The system is safe. In 2009, Inspector Kash Heed of the Vancouver Police Department said that little crime takes place in the stations themselves; however, criminal activity becomes more visible 400–700 metres (1,000–2,000 ft) outside them. Each station is monitored with an average of 23 closed-circuit television cameras, allowing SkyTrain operators to monitor passenger and station activity. Designated waiting areas have enhanced lighting, benches, and emergency telephones. Trains have yellow strips above each window which, when pressed, silently alert operators of
10672-552: The system, from Waterfront to New Westminster station , opened for limited and fare-free service on December 11, 1985. Revenue service began on January 3, 1986, and within its first year the line had carried over 30 million passengers—including visitors to Expo 86. The following year, construction began on an extension including the SkyBridge, Columbia station, and Scott Road station , extending service by 3.1 kilometres (1.9 mi) to Surrey; it opened on March 16, 1990. The line
10788-508: The tunnel boring phase was fully completed when Elsie reached Arbutus on April 26, 2024. On January 14, 2008, the Government of British Columbia announced a commitment to the expansion of the Millennium Line to the University of British Columbia (UBC) by 2020 as part of a $ 14-billion transit spending package to address global warming . It was not clear what route the new line would take, but it
10904-483: The two lines at Broadway station was deemed impracticable, so the lines were connected in New Westminster. Switches to the Millennium Line were installed on the Expo Line just east of Columbia station. Expo Line service was reduced to a single track over the Skybridge during the installation of these switches. The Millennium Line opened for revenue service on January 7, 2002 (a preview for SkyTrain passengers took place on
11020-481: The west for direct access to the Expo Line and another on Granville Street to the south for direct access to the Canada Line. The station is within walking distance of Vancouver's historical Gastown district, Canada Place , Vancouver Convention Centre , Harbour Centre , Sinclair Centre , and the Vancouver Harbour Flight Centre float plane terminal. A heliport operated by Helijet , along with
11136-544: The world's second longest bridge dedicated to transit services, the SkyBridge, which crosses the Fraser River between New Westminster and Surrey. It is a 616-metre-long (2021 ft) cable-stayed bridge , with 123-metre-tall (404 ft) towers. Two additional transit-only bridges, the North Arm Bridge and the Middle Arm Bridge , were built for the Canada Line. The North Arm Bridge is an extradosed bridge with
11252-598: The world. Largely as a result of this, the Expo and Millennium Lines have a combined punctuality record of over 96 percent; the principal cause of train delays is passenger interference with train doors. There have been two derailments during revenue service in the system's history. The SkyTrain network is fully mobility-needs accessible, including vehicles and stations. Mark I train cars have one designated wheelchair position, Mark II, Mark III and Hyundai Rotem cars have two, and all stations have elevators. TransLink upgraded all Expo Line platform station edges to match those on
11368-450: The yard. Additional VCCs were added as Skytrain expanded. Each VCC is a cluster of three IBM Type 7588 rack-mount single-board computers with Intel-IA32 Pentium processors and proprietary hardware in a fault-tolerant configuration. For example, VCC3 is composed of CPU1, CPU2, and CPU3. For every command that is sent to a train, at least two of the CPUs must agree with the action, otherwise an error
11484-508: Was completed in December. In 2020, TransLink started work on replacing the escalators connecting to the Expo Line. The first step in this project was to close access to the Expo Line from Cordova Street for three weeks in June. The closure forced passengers to access the Expo Line from the Howe Street entrance. Because the construction blocked access to the elevators to the Expo Line platforms,
11600-417: Was completed in May 2014, but they remained open until April 2016 owing to multiple system problems. While open for the nearly two-year period, holders of paper-based monthly passes, bus-issued transfers, and FareSaver tickets continued to pass through the gates into the stations' fare-paid zones unimpeded, although they were subject to having their fare inspected by transit security or transit police once inside
11716-621: Was conceived as a legacy project of Expo 86 and the first line was finished in time to showcase the fair's theme: "Transportation and Communication: World in Motion – World in Touch". Construction was funded by the provincial and federal governments and began in March 1982. It was built through the Dunsmuir Tunnel under downtown, which had originally been built for the Canadian Pacific Railway , to save costs. The first 21.4 kilometres (13.3 mi) of
11832-797: Was conducted, started during early 2020 and running for about six months. Port Coquitlam mayor Brad West, the Port Coquitlam city council, and the Coquitlam City Council all voiced support for the extension. However, as of 2022, no funding had been secured nor a formal plan created. SkyTrain (Vancouver) SkyTrain is the medium-capacity rapid transit system serving the Metro Vancouver region in British Columbia, Canada. SkyTrain has 79.6 km (49.5 mi) of track and uses fully automated trains on grade-separated tracks running on underground and elevated guideways, allowing SkyTrain to hold consistently high on-time reliability. In 2023,
11948-441: Was connected to the main terminal building via an overhead walkway above the CPR tracks. The CPR's passenger platform and some of its tracks were torn up in the early 1980s to make way for the guideway of the original SkyTrain line ( Expo Line ), which opened on December 11, 1985. During Expo 86 , SkyTrain operated special shuttle trains between Waterfront station and Stadium–Chinatown station (then named Stadium station), connecting
12064-411: Was created in replacement of the Millennium Line service between VCC–Clark and Waterfront stations. In 2009, the Canada Line opened with separate platforms which are accessible via the main station building, but require leaving the fare-paid zone when transferring between other modes. Waterfront station serves as a common terminus point for both the Expo Line and the Canada Line. Waterfront station
12180-404: Was expanded again in 1994 with the opening of Gateway , Surrey Central , and King George stations. SkyTrain is part of the 1996 Greater Vancouver Regional District 's (GVRD) Livable Region Strategic Plan, which discusses strategies to deal with the anticipated increase of population in the region. These strategies include increasing transportation choices and transit use. The first section of
12296-585: Was hinted that there would be less use of cut-and-cover tunnelling to minimize disruption to businesses along Broadway and avoid the same problems seen during the Canada Line construction along Cambie Street . This expansion failed to materialize. On February 15, 2019, the TransLink Mayors' Council again approved an extension of the line to the UBC campus, although funding for this continuation past Arbutus Street had not yet been secured. In 2022, TransLink unveiled
12412-640: Was necessary to enhance SkyTrain security. Transit officers receive the same training as officers in municipal and RCMP forces. They may arrest people for outstanding warrants, enforce drug laws, enforce the criminal code beyond TransLink property, and deal with offences that begin off TransLink property and make their way onto it. They issue tickets for fare evasion and other infractions on SkyTrain, transit buses, SeaBus , and West Coast Express . Transit police officers and Transit Security officers inspect fares at Skytrain stations as part of TransLink's fare audit. Transit Security officers mostly focus their efforts on
12528-537: Was one of the first stations to receive TransLink's "T" signage, denoting a transit station. This signage was originally installed in the downtown core of Vancouver to help visitors during the 2010 Olympics. In 2018, TransLink announced that Waterfront's Canada Line platforms, as well as two other stations on the line within downtown Vancouver, would receive an accessibility upgrade including additional escalators, as most Canada Line stations were built with only up-escalators initially. Construction began in early 2019 and
12644-489: Was opened on January 6, 2006. From October 22, 2016, to December 1, 2016, the Millennium Line operated from VCC–Clark to Lougheed Town Centre station. As of December 2, 2016, the Millennium Line operates between VCC–Clark station in Vancouver and Lafarge Lake–Douglas station in Coquitlam. The Millennium Line has 17 stations, three of which are transfer stations with the Expo Line (Commercial–Broadway, Production Way–University, and Lougheed Town Centre) and two which connect with
12760-402: Was originally developed by Alcatel and loaded from a 3.5" diskette . There were initially four systems called the vehicle control computer (VCC) with three divided over the mainline and one for the storage yard. VCC1 controls trains from Waterfront to Royal Oak; VCC2 controls trains from Royal Oak to King George (it now also controls a portion of the Millennium Line); and VCC3 controls trains in
12876-428: Was proposed when the original Millennium Line was built and the necessary junction tracks for such an extension were built at the station during its initial construction. At one point prior to 2008, the mode planned for the extension was changed to light rail instead of SkyTrain, which meant that the junction tracks would have remained unused. However, in February 2008, plans reverted to the use of SkyTrain technology for
12992-470: Was proposed. The most likely junction point for the spur to Lougheed Mall would have been from Royal Oak station , up Edmonds Street to Lougheed Mall, although early SkyTrain route maps also suggested an extension northeast from New Westminster . Neither plan was realized, although the extension of Expo Line tracks to Columbia Station in 1989 and the completion of the SkyBridge to Surrey in 1990 resulted in
13108-534: Was pushed back to early 2026 in November 2022. The delay was caused by a labour dispute involving concrete workers which started in June 2022. On May 24, 2024, the province revealed that the project would be delayed further, to late 2027. While six new stations are confirmed for the Broadway extension, one will become part of the existing Broadway–City Hall Canada Line station, which is scheduled to be upgraded as part of
13224-413: Was supplemented by controlled access – with the payment of a fare or proof of payment required to pass through a staffed gate – at special events where extremely high ridership was expected, such as immediately after BC Lions or Vancouver Canucks games. Installing faregates to prevent fare evasion was considered as early as at the time of the system's opening, but was rejected multiple times because
13340-421: Was supposed to be operational by 2013. A solution was finally implemented where the requirement to tap out of buses was removed and all bus travel was considered as within a single zone, creating significant savings for those travelling multiple zones using buses only and in some cases changing transit usage patterns. The last fare gates left open for users with accessibility issues were closed on July 25, 2016, and
13456-406: Was too slow and did not always record the tap which—because the system initially deducted a three-zone fare until a tap-out was recorded and a refund was issued to those having only travelled one or two zones—often resulted in customers being charged for travelling through three zones when in fact they had only travelled through one or two. This was a serious setback for TransLink as the entire system