Commuter rail or suburban rail is a passenger rail transport service that primarily operates within a metropolitan area , connecting commuters to a central city from adjacent suburbs or commuter towns . Commuter rail systems can use locomotive-hauled trains or multiple units, using electric or diesel propulsion. Distance charges or zone pricing may be used.

#758241

110-646: Access to the Region's Core ( ARC ) was a proposed commuter-rail project to increase passenger service capacity on New Jersey Transit (NJT) between Secaucus Junction in New Jersey and Manhattan in New York City . New infrastructure would have included new trackage, a new rail yard, and a tunnel under the Hudson River . A new station adjacent to New York Penn Station was to be constructed as running more trains into

220-543: A Federal Transit Administration ruling rejected New Jersey's arguments on the repayment of the funds. The debt carries an interest rate of 1% per year, and began to accrue on that date at a rate of approximately $ 225,000 per month. Christie vowed that he would contest in the decision in court. In September 2011, FTA and NJT reached a deal whereby $ 95 million would be paid back. The agreement waived $ 2.7 million in penalties and interest and stipulated that $ 128 million would be spent on DOT-approved transit-related projects. While

330-592: A Superfund site and would have obstructed busy river shipping channels. In addition to Hudson River impacts, the Penn Station Connector would have required excavation of a wide trench across Manhattan's West Side. Known as cut and cover tunneling construction, this wide trench would have displaced many businesses and residents and required unlikely support from the Hudson River Park Trust, Community Boards, and other stakeholder organizations. After

440-707: A Main Line train was involved in a collision with a Bergen County Line train in Secaucus. Departing the historic 1907-built Hoboken Terminal , the yards for the coaches to the left, trains pass over two city streets and the Hudson Bergen Light Rail before entering the Bergen Tunnels under the Bergen Hill section of Hudson Palisades . Midway through the tunnel there are air shafts allowing light through and venting out

550-582: A Resolution 168 supporting the extension of the line to Hoboken and Secaucus. An economic impact study by the Meadowlands Chamber of Commerce is expected to be released in spring 2015. Commuter-rail The term can refer to systems with a wide variety of different features and service frequencies, but is often used in contrast to rapid transit or light rail . Some services share similarities with both commuter rail and high-frequency rapid transit ; examples include German S-Bahn in some cities,

660-651: A city's central business district, and often share right-of-way with intercity or freight trains. Some services operate only during peak hours and others use fewer departures during off peak hours and weekends. Average speeds are high, often 50 km/h (30 mph) or higher. These higher speeds better serve the longer distances involved. Some services include express services which skip some stations in order to run faster and separate longer distance riders from short-distance ones. The general range of commuter trains' travel distance varies between 15 and 200 km (10 and 125 miles), but longer distances can be covered when

770-570: A federal agency, published a report entitled Commuter Rail Potential Impacts and Cost Estimates for the Cancelled Hudson River Tunnel Project , which concluded that Christie's basis for cancellation was a misrepresentation and that he misstated the estimated costs, cost over-runs, and New Jersey's obligation to pay them. It found that no agreement had been made as to who was responsible for cost over-runs, which Christie claimed were NJ's responsibility. While he had suggested that

880-602: A final decision to terminate the project on October 27, 2010. At the time of cancellation, construction was already underway on the Tonnelle Avenue Underpass and the Palisades Tunnels, one of the project's three tunnel segments in the project. The construction contract for the Manhattan Tunnels was pending award to Barnard-Judlau JV. The Hudson River Tunnels, the third and final tunnel construction contract,

990-413: A headway rather than a published timetable and use dedicated tracks (underground or elevated), whereas commuter rail often shares tracks, technology and the legal framework within mainline railway systems, and uses rolling stocks with more seating and higher speed for comfort on longer city-suburban journeys. However, the classification as a metro or rapid rail can be difficult as both may typically cover

1100-590: A joint probe into the possible misuse of Port Authority funds. NJ State Senator Ray Lesniak reportedly had sent a letter to the SEC and the Internal Revenue Service calling for an investigation into whether the diversion of money to New Jersey roads may have violated securities or tax laws. The SEC ultimately fined the PANYNJ $ 400,000. The PANYNJ conceded that it had acted negligently. The investigation also revealed that

1210-567: A joint venture of Parsons Brinckerhoff , STV, and DMJM Harris/AECOM , and CM Consortium , a joint venture of Tishman , Parsons Corp. and ARUP, both in 2006. In July 2006, the Federal Transit Administration (FTA) announced its decision to allow preliminary engineering to begin on the new trans-Hudson rail tunnel. Supporters called the FTA's announcement a positive sign that the federal government eventually intended to commit funding to

SECTION 10

#1732856210759

1320-577: A metropolitan area exclusively, run on separate tracks in the centre, and often feature purpose-built rolling stock. The fact that the terminology is not standardised across countries (even across English-speaking countries) further complicates matters. This distinction is most easily made when there are two (or more) systems such as New York's subway and the LIRR and Metro-North Railroad , Paris' Métro and RER along with Transilien , Washington D.C.'s Metro along with its MARC and VRE , London's tube lines of

1430-566: A new mid-day rail storage yard in the Kearny Meadows . While the terminal station would have dead-ended trains, there was hope that it would one day be extended eastward depending on future funding. 2009 Federal Transit Administration projections for the cost of the ARC tunnel. Later increases in projected costs, which would have to be assumed by the State of New Jersey, led Governor Chris Christie to cancel

1540-541: A property in Weehawken that lies in the path of the tunnel, NJT was ordered to pay $ 8.5 million for the parcel. The amount was contested and reduced to $ 6.13 million. The agency also agreed to a $ 5.6 million settlement with a construction company, Barnard/Judlau Joint Venture, for previously completed work final design plans, drawings and reports. In March 2012, the Government Accountability Office (GAO),

1650-615: A six-track, state-of-the-art construction of a new station under 34th Street east of the existing Penn Station with pedestrian connections to the existing station and the Eighth , Seventh , Sixth Avenue , and Broadway lines of the New York City Subway . Also planned were a new rail loop near the Frank R. Lautenberg Secaucus Junction Station allowing Main Line / Bergen County Line and Pascack Valley Line trains direct service to Midtown, and

1760-690: Is Passaic , on an embankment. After Passaic, the Main Line has a stretch through some industrial areas before the Clifton station , also on an embankment. The Main Line passes under U.S. Route 46 and the Garden State Parkway before it crosses under and over several streets in south Paterson . It leaves the DL&;W Boonton Branch alignment at about 40°53′10″N 74°10′01″W  /  40.886°N 74.167°W  / 40.886; -74.167 and reaches

1870-874: Is especially the case for lines operated by Korail , such as the Gyeongui-Jungang Line , the Gyeongchun Line , the Suin-Bundang Line , or the Gyeonggang Line . Even some lines not operated by Korail, such as the AREX Line, the Seohae Line or the Shinbundang Line mostly function as commuter rail. Lastly, even for the "numbered lines" (1–9) of the Seoul Metropolitan Subway which mostly travel in

1980-591: Is heavily used by commuters in the Greater Tokyo Area , who commute between 100 and 200 km (62 and 124 mi) by Shinkansen . To meet the demand of commuters, JR sells commuter discount passes. Before 2021, they operated 16-car bilevel E4 Series Shinkansen trains at rush hour, providing a capacity of 1,600 seats. Several lines in China, such as the Beijing–Tianjin Intercity Railway and

2090-417: Is often a case of asset sweating , by using a single large combined fleet for intercity and regional services. Loco hauled services are usually run in push-pull formation, that is, the train can run with the locomotive at the "front" or "rear" of the train (pushing or pulling). Trains are often equipped with a control cab at the other end of the train from the locomotive, allowing the train operator to operate

2200-1884: Is one suburban rail called the Chittagong Circular Railway . Another suburban railway called the Dhaka Circular Railway is currently proposed. Karachi in Pakistan has a circular railway since 1969. Tehran Metro currently operates the Line 5 commuter line between Tehran and Karaj . Turkey has lines connecting Başkentray , İZBAN , Marmaray and Gaziray . Major metropolitan areas in most European countries are usually served by extensive commuter/suburban rail systems. Well-known examples include BG Voz in Belgrade (Serbia), S-Bahn in Germany, Austria and German-speaking areas of Switzerland, Proastiakos in Greece, RER in France and Belgium, Servizio ferroviario suburbano in Italy, Cercanías and Rodalies ( Catalonia ) in Spain, CP Urban Services in Portugal, Esko in Prague and Ostrava (Czech Republic), HÉV in Budapest (Hungary) and DART in Dublin (Ireland). London has multiple commuter rail routes: The Merseyrail network in Liverpool consists of two commuter rail routes powered by third rail, both of which branch out at one end. At

2310-470: Is operationally more like a typical metro system (frequent trains, an emphasis on standing passengers , short station spacings) than it is like commuter rail in other countries. Japanese commuter rail commonly interline with city center subway lines, with commuter rail trains continuing into the subway network, and then out onto different commuter rail systems on the other side of the city. Many Japanese commuter systems operate various stopping patterns to reduce

SECTION 20

#1732856210759

2420-526: Is still possible to tell them apart. Some operators, for example Thameslink , focus solely on commuter services. Others, such as Avanti West Coast and LNER , run solely intercity services. Others still, such as GWR and EMR , run a mixture of commuter, regional and intercity services. Some of these operators use different branding for different types of service (for example EMR brands its trains as either "InterCity", "Connect" for London commuter services, and "Regional") but even for those operators that do not,

2530-570: Is used in Australia (Sydney for example) to describe the regional trains operating beyond the boundaries of the suburban services, even though some of these "inter-city" services stop all stations similar to German regional services. In this regard, the German service delineations and naming conventions are clearer and better used for academic purposes. Sometimes high-speed rail can serve daily use of commuters. The Japanese Shinkansen high speed rail system

2640-426: Is widely used in many commuter rail trains to increase capacity in rush hours. Carriages are usually not organized to increase seating capacity (although in some trains at least one carriage would feature more doors to facilitate easier boarding and alighting and bench seats so that they can be folded up during rush hour to provide more standing room) even in the case of commuting longer than 50 km and commuters in

2750-677: The 34th Street – Hudson Yards station, which opened on September 13, 2015. The new station is near the Hudson Yards Redevelopment Project site and Jacob K. Javits Convention Center , one block from the Hudson River . If built, the extension would take the New York City Subway outside the city's borders for the first time. It would offer a direct rail access from New Jersey to Times Square , Grand Central Terminal , and Queens as well as connections with most other subway routes. A subway extension would cost less than

2860-900: The Brisbane ( Queensland Rail 's City network ) and Perth ( Transperth ) systems in Australia, in some systems in Sweden, and on the Genoa-Casella line in Italy. Some countries and regions, including Finland , India, Pakistan, Russia , Brazil and Sri Lanka, as well as San Francisco ( BART ) in the US and Melbourne and Adelaide in Australia, use broad gauge track. Metro rail and rapid transit usually cover smaller inner-urban areas within 12 to 20 km (7 to 12 mi) of city centers, with shorter stop spacing, use rolling stocks with larger standing spaces, lower top speed and higher acceleration, designed for short-distance travel. They also run more frequently, to

2970-747: The Chennai MRTS , also covers over 300 stations and carries more than 2.5 million people daily to different areas in Chennai and its surroundings. Other commuter railways in India include the Hyderabad MMTS , Delhi Suburban Railway , Pune Suburban Railway and Lucknow-Kanpur Suburban Railway . In 2020, Government of India approved Bengaluru Suburban Railway to connect Bengaluru and its suburbs. It will be unique and first of its kind in India as it will have metro like facilities and rolling stock. In Bangladesh, there

3080-519: The Greater Tokyo Area , Seoul metropolitan area , and Jabodetabek area have to stand in the train for more than an hour. Currently there are not many examples of commuter rail in Africa . Metrorail operates in the major cities of South Africa , and there are some commuter rail services in Algeria , Botswana , Kenya , Morocco , Egypt and Tunisia . In Algeria, SNTF operates commuter rail lines between

3190-811: The Guangshen Railway have more frequent metro-like service. The two MTR lines which are owned and formerly operated by the Kowloon-Canton Railway Corporation ( East Rail line and Tuen Ma line which is integrated from the former West Rail line and Ma On Shan line in 2021), then the "KCR" ), and MTR's own Tung Chung line connect the new towns in New Territories and the city centre Kowloon together with frequent intervals, and some New Territories-bound trains terminate at intermediate stations, providing more frequent services in Kowloon and

3300-571: The Jakarta city center with surrounding cities and sub-urbans in Banten and West Java provinces, including Depok , Bogor , Tangerang , Serpong , Rangkasbitung , Bekasi and Cikarang . In July 2015, KRL Commuterline served more than 850,000 passengers per day, which is almost triple of the 2011 figures, but still less than 3.5% of all Jabodetabek commutes. Other commuter rail systems in Indonesia include

3410-947: The Metro Surabaya Commuter Line , Commuter Line Bandung , KAI Commuter Yogyakarta–Solo Line , Kedung Sepur , and the Sri Lelawangsa . In the Philippines, the Philippine National Railways has two commuter rail systems currently operational; the PNR Metro Commuter Line in the Greater Manila Area and the PNR Bicol Commuter in the Bicol Region . A new commuter rail line in Metro Manila,

Access to the Region's Core - Misplaced Pages Continue

3520-597: The North–South Commuter Railway , is currently under construction. Its North section is set to be partially opened by 2021. In Malaysia, there are two commuter services operated by Keretapi Tanah Melayu . They are the KTM Komuter that serves Kuala Lumpur and the surrounding Klang Valley area , and the KTM Komuter Northern Sector that serves Greater Penang , Perak , Kedah and Perlis in

3630-638: The Pulaski Skyway and Route 139 , replace Wittpenn Bridge , and extend Route 1&9T , all part of the larger distribution network in the Port of New York and New Jersey . A 2014 article in WNYC claimed: "According to documents and interviews with more than a dozen top-level sources, the governor made clear from the get-go that the agency would be the source of cash for New Jersey's hard-up infrastructure budget. And he and his team proceeded to wrangle billions from

3740-695: The Réseau Express Régional (RER) in Paris, the S Lines in Milan, many Japanese commuter systems, the East Rail line in Hong Kong, and some Australasian suburban networks, such as Sydney Trains . Many commuter rail systems share tracks with other passenger services and freight . In North America, commuter rail sometimes refers only to systems that primarily operate during rush hour and offer little to no service for

3850-528: The Shanghai–Nanjing High-Speed Railway , serve a similar role with many more under construction or planned. In South Korea, some sections of the high-speed rail network are also heavily used by commuters, such as the section between Gwangmyeong Station and Seoul Station on the KTX network ( Gyeongbu HSR Line ), or the section between Dongtan Station and Suseo station on the SRT Line. The high-speed services linking Zürich , Bern and Basel in Switzerland (200 km/h (120 mph)) have brought

3960-424: The Underground and the Overground , Elizabeth line , Thameslink along with other commuter rail operators , Madrid's Metro and Cercanías , Barcelona's Metro and Rodalies , and Tokyo's subway and the JR lines along with various privately owned and operated commuter rail systems. Regional rail usually provides rail services between towns and cities, rather than purely linking major population hubs in

4070-426: The Yamanote Line , Keihin Tohoku Line , Chūō–Sōbu Line services arguably are more akin to rapid transit with frequent stops, simple stopping patterns (relative to other JR East lines) no branching services and largely serving the inner suburbs; other services along the Chūō Rapid Line , Sōbu Rapid Line / Yokosuka Line , Ueno–Tokyo Line , Shōnan–Shinjuku Line etc. are mid-distance services from suburban lines in

4180-414: The $ 95 million taken as loss in 2011, the re-payment schedule will be $ 19 million per year for five years. In June 2010, a $ 162.7 million insurance premium payment was made by NJT when the project started, $ 144.5 million of which was reimbursed. The remaining $ 18,208,603 was used to cover the cost of insurance coverage for the project until it was shut down. In October 2012, in an eminent domain case for

4290-433: The 1903 Kingsland tunnel. Kingsland station is shortly after the tunnel in an open cut. Just beyond Kingsland station is Lyndhurst station, on an embankment. After Lyndhurst the train crosses the Passaic River on a swing bridge that has been bolted shut (although it is technically required by Federal regulation to be opened on 24 hours notice). The train passes under Route 3 and approaches Delawanna station. Next stop

4400-402: The 300 km/h (186 mph) Nuremberg–Ingolstadt high-speed railway . The regional trains Stockholm – Uppsala , Stockholm– Västerås , Stockholm– Eskilstuna and Gothenburg – Trollhättan in Sweden reach 200 km/h (120 mph) and have many daily commuters. In Great Britain , the HS1 domestic services between London and Ashford runs at a top speed of 225 km/h, and in peak hours

4510-413: The ARC tunnel, as its eastern end would be the new subway station at Eleventh Avenue , avoiding the expensive tunnel boring work east to Herald Square . Travel times into Manhattan could be longer than under the original ARC proposal, because riders would need to transfer to the subway from New Jersey Transit trains at Secaucus. On the other hand, riders would gain direct access to Grand Central Terminal on

Access to the Region's Core - Misplaced Pages Continue

4620-458: The Access to the Region's Core Major Investment Study (MIS) in which an initial list of 137 alternatives was identified, including bus, light rail, subway, Port Authority Trans-Hudson (PATH) rail, commuter rail, ferry, new technologies, and auto. This Major Investment Study was completed in 2003, and recommended two alternatives for advancement into a Draft Environmental Impact Statement . Alternative P would create new tracks and platforms under

4730-549: The Administration ever contemplated such a possibility. On October 7, 2010, New Jersey governor Chris Christie announced that the ARC Tunnel project was officially cancelled, citing rising costs and concerns over New Jersey residents fronting the bill for the estimated $ 15 billion project. The next day the governor agreed to a two-week reprieve, so that additional options for funding the tunnel could be developed. Christie did briefly reconsider, reviewing options in discussions with US Secretary of Transportation Ray LaHood , but made

4840-461: The Bergen County Line curves right on its new connection to the Erie alignment. The Main Line then crosses over the Hackensack River on the single-track Upper Hack Lift bridge, built in 1958. Double track resumes under the New Jersey Turnpike 's western spur after 0.4 mile of single track. The train continues through the Meadowlands and passes the first grade crossing at Valley Brook Avenue in Lyndhurst . The line curves slightly and passes through

4950-448: The Central Business Districts (CBDs) of these three cities within 1 hour of each other. This has resulted in unexpectedly high demand for new commuter trips between the three cities and a corresponding increase in suburban rail passengers accessing the high-speed services at the main city-centre stations ( Hauptbahnhof ). The Regional-Express commuter service between Munich and Nuremberg in Germany runs at 200 km/h (120 mph) on

5060-414: The Christie administration had already eyed the money prior to announcing the cancelation of the project in order to prevent a transportation funding crisis in NJ. In February 2011 Amtrak announced its intention to build a small segment of a high-speed rail corridor called the Gateway Project to also be used by New Jersey Transit . While Amtrak acknowledged that the region represented a bottleneck in

5170-402: The East Rail Line share tracks with intercity trains to mainland China . The three KCR lines are integrated into the MTR network since 2008 and most passengers do not need to exit and re-enter the system through separate fare gates and purchase separate tickets to transfer between such lines and the rest of the network (the exceptions are between the Tuen Ma line's East Tsim Sha Tsui station and

5280-408: The Erie Main Line alignment at 40°54′18″N 74°09′50″W  /  40.905°N 74.164°W  / 40.905; -74.164 . This connection was single track when built circa 1963, then double-tracked in a rehabilitation project in 2002. The line passes under Interstate 80 and heads into downtown Paterson. The Erie station in Paterson is elevated, with a center platform. Continuing north

5390-499: The Erie alignment-- since the Bergen County line was rerouted adjacent to the Main Line to pass through Secaucus Junction . At Secaucus Junction , all trains stop for passengers to change to and from Northeast Corridor Line , North Jersey Coast Line , Raritan Valley Line and Midtown Direct trains on the Morristown Line , the Gladstone Branch , and the Montclair-Boonton Line on the upper level. The Main Line then runs through an industrial section of Secaucus . Shortly afterwards

5500-460: The Erie's Greenwood Lake division up to its junction the Lackawanna Boonton Branch at Mountain View in Wayne as the Lackawanna right-of-way in Paterson was used for the construction of Interstate 80 . The Erie Jersey City terminal was abandoned circa 1959 after all Erie service had moved to the Lackawanna Hoboken Terminal. Service under Erie Lackawanna introduced new GE U34CH diesels and Comet I cars in 1970 which lasted under NJ DOT and Conrail into

5610-447: The Main Line is elevated through Paterson, passing over streets. After several grade crossings in an industrial area, the tracks cross the Passaic River on a truss bridge. Hawthorne is the next stop, at grade level. After a long stretch, the train reaches Glen Rock station, at grade level at a crossing. After Glen Rock the Main Line merges with the Bergen County Line at Ridgewood Junction. The line widens to three tracks (in Erie days

SECTION 50

#1732856210759

5720-403: The NJ Transit era. Metro-North took over service north of Suffern in 1983. Effective April 18, 1983, Metro-North Railroad shifted its Port Jervis Line service to run on the Graham Line , thus ending the direct passenger route from Harriman through Monroe and Goshen to Middletown. Service was increased along with the opening of the Secaucus Junction station in late 2003. On February 9, 1996,

5830-433: The Netherlands carry many commuters, while their equipment, range, and speeds are similar to those of commuter trains in some larger countries. The United Kingdom has a privatised rail system, with different routes and services covered by different private operators. The distinction between commuter and intercity rail is not as clear as it was before privatisation (when InterCity existed as a brand of its own), but usually it

5940-404: The PANYNJ agreed to redirect $ 1.8 billion earmarked for the project to repairs to road and bridges in Hudson County that it saw as part of the larger network of the distribution system in the Port of New York and New Jersey . In September 2011, the Turnpike Authority voted to spend the funds committed to the project on roads within the state. In 1995, the ARC project began with the initiation of

6050-425: The Pulaski Skyway. As the Port Authority's jurisdiction includes access roads to the Lincoln Tunnel but not the Holland Tunnel , the Christie administration allegedly pressured the Port Authority to classify the Skyway as an access route to the Lincoln Tunnel. In April 2014, media reported that lawyers from the New York office of the Securities and Exchange Commission were working with the Manhattan DA's office in

6160-411: The Tsuen Wan line's Tsim Sha Tsui station . In Taiwan, the Western line in the Taipei - Taoyuan Metropolitan Area, Taichung Metropolitan Area and Tainan - Kaohsiung Metropolitan Area as well as the Neiwan - Liujia line in the Hsinchu Area are considered commuter rail. In South Korea, the Seoul Metropolitan Subway includes a total of 22 lines, and some of its lines are suburban lines. This

6270-408: The agency. In March 2014, Manhattan District Attorney Cyrus Vance, Jr. subpoenaed records from the PANYNJ seeking correspondence among authority officials and Christie's administration regarding projects such as the rebuilding of the World Trade Center site and the PATH transportation hub in lower Manhattan. Vance's office has conducted interviews about the agency's funding of reconstruction of

6380-451: The bi-state authority to further his political goals — much of that for projects that had never been under the Port Authority's jurisdiction before. In February 2014, a special joint committee of the New Jersey Legislature investigating the Fort Lee lane closure scandal subpoenaed the PANYNJ for documents related to the ARC project, specifically with regard to projected cost overruns and to discussions related to Christie's appointments to

6490-467: The capital Algiers and its southern and eastern suburbs. They also serve to connect Algiers ' main universities to each other. The Dar es Salaam commuter rail offers intracity services in Dar es Salaam , Tanzania. In Botswana, the ( Botswana Railways ) "BR Express" has a commuter train between Lobatse and Gaborone . In Japan, commuter rail systems have extensive network and frequent service and are heavily used. In many cases, Japanese commuter rail

6600-460: The construction of the in-fill station at 10th Avenue , tunnels running along the path of the ARC tunnel, and a multi-level multi-modal addition to Secaucus Junction. A widening of the right-of way of the Northeast Corridor was considered. The study revived hope for the project, with Mayor Bloomberg saying "Extending the 7 train to Secaucus is a promising potential solution ... and is deserving of serious consideration." Citing budget considerations,

6710-451: The current station was deemed unfeasible. An estimated budget for the project was $ 8.7 billion. Construction began in mid-2009 and the project was slated for completion in 2018, but it was cancelled in October 2010 by Chris Christie , the governor of New Jersey , who cited the possibility of cost overruns and the state's lack of funds. Six hundred million dollars had been spent on the project. The decision remains controversial. The project

SECTION 60

#1732856210759

6820-437: The decision to cancel the project and provided comments that questioned Christie's rationale. Manhattan District Attorney Cyrus Vance, Jr. and Securities and Exchange Commission conducted investigations into possible misuse of PANYNJ funds towards projects involving roadways possibly not under the agency's purview, such as the Pulaski Skyway . Eventually $ 400,000 in fines were paid. The project would have more than doubled

6930-417: The dense parts of Seoul, some track sections extend far outside of the city, and operate large sections at ground level, such as on the Line 1 , Line 3 and Line 4 . In Busan, the Donghae Line , while part of the Busan Metro system, mostly functions as a commuter rail line. In Indonesia , the KRL Commuterline is the largest commuter rail system in the country, serving the Greater Jakarta . It connects

7040-443: The diesel fumes. Exiting the tunnel, the train curves right onto the Main Line at West End interlocking in Jersey City . Until 1963 this was the DL&W Boonton Branch; about a mile ahead was the connection built circa 1956 with the Erie main line (that after 1963 became the Bergen County Line). Two trains collided head-on here in 1996, killing two engineers and a passenger. The ramps for New Jersey Turnpike Interchange 15X now occupy

7150-414: The director of the MTA , Joe Lhota , said that it was doubtful the extension would be built in the foreseeable future. In a November 2013 Daily News opinion article, the president of the Real Estate Board of New York and the chairman of Edison Properties called for the line to be extended to Secaucus in tunnels to be shared with the Gateway Project. Later in November 2013 the New Jersey Assembly passed

7260-411: The east side of Manhattan. This was one of the original key goals of the ARC project that the final ARC proposal didn't satisfy. The 7 route might not have the same capacity as the ARC tunnel, as trains would not be arriving at a terminal station with multiple platforms. Bloomberg had not discussed the project with either New York Governor Andrew Cuomo or Christie, and it would not automatically receive

7370-410: The existing Penn Station. Alternative S would create a new rail link to existing Penn Station as well as new East River Tunnels to expanded rail storage facilities at Sunnyside Yard . Alternative G would have provided a link to Grand Central Terminal , but that alternative was not recommended for further advancement. The environmental review stage lasted from 2003 to 2009. In the very early stages of

7480-425: The federal funds allotted to the ARC tunnel. Christie stated that he would be open to the discussion. On February 2, 2011, the city's Economic Development Corporation voted to budget up to $ 250,000 for a feasibility study of a tunnel for the subway line extension awarded to Parsons Brinckerhoff , a major engineering firm that was working on the ARC tunnel. The report was released in April 2013. The proposal includes

7590-409: The federal government demanded repayment of funding received by NJT for the project. The Christie administration engaged a law firm to present its arguments for non-payment, which were subsequently rejected by the Federal Transit Administration . An agreement was eventually reached in which part of the funds would be returned while other monies would be used on transit-related projects. Soon after work

7700-416: The former BR 's Regional Railways , France's TER ( Transport express régional ), Germany's Regionalexpress and Regionalbahn , and South Korea's Tonggeun and Mugunghwa-ho services. In some European countries, the distinction between commuter trains and long-distance/intercity trains is subtle, due to the relatively short distances involved. For example, so-called " intercity " trains in Belgium and

7810-429: The initial engineering and expert peer review in 2006 and 2007, NJ Transit determined that moving the station deeper and using modern tunnel boring techniques was the only way to avoid environmental, community, and engineering concerns. The agency opted to construct an underground terminal, which later became a source of controversy. Design and construction management contracts were awarded respectively to THE Partnership,

7920-413: The line was four tracks from here to Suffern NY). Ridgewood station is next, with Spanish-style design on the station building and with newly constructed high-level platforms. Next is Ho-Ho-Kus , also at grade. Waldwick follows with an abandoned station building on the northbound side and a footbridge connecting the two platforms. Waldwick Yard is just north of the station with the restored WC tower on

8030-449: The national system, its timetable for beginning the project was advanced in part due to ARC's cancellation. The project is similar in scope, but passengers travelling from Bergen , Passaic , Rockland , and Orange counties will still require a transfer at Secaucus Junction . Rather than a deep cavern station, a new southern terminal annex, considered more integral to an expanded New York Penn Station complex, will be built. A track from

8140-610: The new ARC tunnels somewhere under the Hudson River. This would have required approval by the United States Environmental Protection Agency and the United States Coast Guard to allow construction of a very large, expensive cofferdam mid-river. Regulatory approvals seemed unlikely; construction of the cofferdam would have disrupted the contaminated river bottom, which was previously declared

8250-650: The new tunnel will also connect to the existing Penn Station, allowing for use by Amtrak 's Northeast Corridor through-service trains. On May 28, 2021, the project was formally approved by the federal government; the Gateway Development Commission announced that the new tunnels would be completed in 2035 at a cost of $ 16.1 billion. The first contracts for the project were awarded in September 2023. On November 16, 2010, The New York Times reported that New York City Mayor Michael Bloomberg 's administration

8360-917: The northern region of Peninsular Malaysia. In Thailand, the Greater Bangkok Commuter rail and the Airport Rail Link serve the Bangkok Metropolitan Region . The SRT Red Lines , a new commuter line in Bangkok, started construction in 2009. It opened in 2021. Another commuter rail system in Southeast Asia is the Yangon Circular Railway in Myanmar . In India, commuter rail systems are present in major cities and form an important part of people's daily lives. Mumbai Suburban Railway ,

8470-1003: The number expected to rise even higher upon full completion of the Acharnes Railway Center . Eskişehir-Ankara and Konya-Ankara high speed train routes serve as high speed commuter trains in Turkey. Commuter/suburban trains are usually optimized for maximum passenger volume, in most cases without sacrificing too much comfort and luggage space, though they seldom have all the amenities of long-distance trains. Cars may be single- or double-level , and aim to provide seating for all. Compared to intercity trains, they have less space, fewer amenities and limited baggage areas. Commuter rail trains are usually composed of multiple units , which are self-propelled, bidirectional, articulated passenger rail cars with driving motors on each (or every other) bogie . Depending on local circumstances and tradition they may be powered either by diesel engines located below

8580-484: The number of trains from New Jersey to Midtown Manhattan , providing direct, one-seat service from most of New Jersey Transit 's rail lines, as well as more frequent service to in-state destinations. The improvement would have included the construction of two new rail tunnels under the Hudson River as a supplement to the North River Tunnels , which operate at 100% capacity. The new tunnels would have connected to

8690-522: The oldest suburban rail system in Asia, carries more than 7.24 million commuters on a daily basis which constitutes more than half of the total daily passenger capacity of the Indian Railways itself. Kolkata Suburban Railway , one of the largest suburban railway networks in the world, consists of more than 450 stations and carries more than 3.5 million commuters per day. The Chennai Suburban Railway along with

8800-567: The other, the Northern line continues out of the city centre to a mainline rail interchange, while the Wirral line has a city-centre loop. Main Line (NJ Transit) The Main Line (or Erie Main Line ) is a commuter rail line owned and operated by New Jersey Transit running from Suffern , New York to Hoboken , New Jersey , in the United States. It runs daily commuter service and

8910-688: The outer reaches of Greater Tokyo through operating into these lines to form a high frequency corridor though central Tokyo. Other commuter rail routes in Japan include: Commuter rail systems have been inaugurated in several cities in China such as Beijing , Shanghai , Zhengzhou , Wuhan , Changsha and the Pearl River Delta . With plans for large systems in northeastern Zhejiang , Jingjinji , and Yangtze River Delta areas. The level of service varies considerably from line to line ranging high to near high speeds. More developed and established lines such as

9020-423: The passenger compartment ( diesel multiple units ) or by electricity picked up from third rails or overhead lines ( electric multiple units ). Multiple units are almost invariably equipped with control cabs at both ends, which is why such units are so frequently used to provide commuter services, due to the associated short turn-around time. Locomotive hauled services are used in some countries or locations. This

9130-601: The previous shallow tunnel and station. The Final Environmental Impact Statement (FEIS) was approved in October 2008. In January 2009, the FTA issued the Record of Decision for the project and approved the start of final design. The first construction contract was awarded to construct a new railroad underpass at Tonnelle Avenue in North Bergen in June 2009, and the project's groundbreaking

9240-477: The project would cost up to $ 14 billion, NJ state officials stated that in their estimation before the cancellation it would cost around $ 10 billion. The report concluded that New Jersey would have been responsible for 14.4% of the costs of project, and that Christie's claim of 70% included funds committed by the PANYNJ (a bi-state agency) and a $ 775 million contribution to the rebuilding of the Portal Bridge , which

9350-441: The project, there were plans for track connections from the new tunnels to existing Penn Station, the Penn Station Connector, which would have provided NJ Transit and Amtrak with the operational flexibility to use either the existing rail tunnels or the new ARC tunnels. In order to achieve a less than two percent grade from the low point in the tunnel under the river to Penn Station, the Penn Station Connector would have to diverge from

9460-468: The project. The Federal Transit Administration (FTA) projected the cost for ARC as $ 8.7 billion in their 2009 Annual Report on Funding Recommendations for the New Starts Program, which identified the funding for the project as follows. Projections rose to close to $ 11 billion by the time of the cancellation of New Jersey's funding of the project It is estimated that $ 610 million has been spent on

9570-548: The project. Before being terminated, the Port Authority had purchased, or otherwise acquired rights or leased land on Manhattan's West Side. About $ 250 million was spent on studies and design. Condemnation procedures initiated by the state for properties along the route in Hudson County were left pending at various stages after the cancellation. Christie later directed that funding be directed to road projects. In March 2011

9680-760: The project. The FTA approved the Draft Environmental Impact Statement (DEIS) for the project in January 2007, and the Supplemental Draft Environmental Impact Statement (SDEIS) in March 2008. The SDEIS identified and evaluated the environmental impacts of a deeper profile tunnel with no track connections to existing Penn Station. These changes to the project scope were necessitated by a significant number of environmental, community, and engineering concerns regarding construction of

9790-552: The rest of the day, with regional rail being used to refer to systems that offer all-day service. Most commuter (or suburban) trains are built to main line rail standards, differing from light rail or rapid transit (metro rail) systems by: Compared to rapid transit (or metro rail), commuter/suburban rail often has lower frequency , following a schedule rather than fixed intervals, and fewer stations spaced further apart. They primarily serve lower density suburban areas (non inner-city), generally only having one or two stops in

9900-488: The same right-of-way can drastically reduce system construction costs. However, frequently they are built with dedicated tracks within that right-of-way to prevent delays, especially where service densities have converged in the inner parts of the network. Most such trains run on the local standard gauge track. Some systems may run on a narrower or broader gauge. Examples of narrow gauge systems are found in Japan, Indonesia , Malaysia , Thailand , Taiwan, Switzerland, in

10010-542: The southbound side by the yard. Just following Waldwick Yard is a grade crossing . North of the grade crossing (which has three tracks) the line becomes two tracks. Allendale and Ramsey follow, both as grade-level stations. Ramsey-Route 17 station (opened August 22, 2004) is next. It is a park-and-ride facility located off of Route 17  south in Ramsey. Mahwah follows and is the last station in New Jersey. Crossing over

10120-527: The state repay $ 271,101,291 by December 24, 2010. New Jersey hired the Washington, D.C. law firm Patton Boggs to argue against the repayment. As of April 2011, Patton Boggs had billed the state $ 803,000 in legal fees. In a letter to New Jersey U.S. senators and congressional representatives, Secretary LaHood wrote that the state was liable for the money, and that non-payment could result in the withholding of federal funding for other projects. On April 29, 2011,

10230-415: The state's Congestion Mitigation Air Quality account to be used on future projects. The Christie administration did not accept the offer. The federal government then demanded total repayment by New Jersey of federal grants, as stipulated under federal law. The Christie administration has refused to repay and is involved in legal proceedings to avoid doing so. The Federal Transit Administration requested that

10340-461: The towns closer to Kowloon. They use rolling stocks with a faster maximum speed and have longer stop spacing compared to other lines which only run in the inner urban area, but in order to maximise capacity and throughput, these rolling stocks have longitudinal seatings, 5 pairs of doors in each carriage with large standing spaces like the urban lines, and run as frequent as well. Most of the sections of these four lines are overground and some sections of

10450-515: The train from either end. The motive power for locomotive-hauled commuter trains may be either electric or diesel–electric , although some countries, such as Germany and some of the former Soviet-bloc countries, also use diesel–hydraulic locomotives. In the US and some other countries, a three-and-two seat plan is used. Middle seats on these trains are often less popular because passengers feel crowded and uncomfortable. In Japan, South Korea and Indonesia, longitudinal (sideways window-lining) seating

10560-549: The trains can be full with commuters standing. The Athens Suburban Railway in Greece consists of five lines, 4 of which are electrified. The Kiato – Piraeus line and the Aigio – Airport lines reach speeds of up to 180 km/h (112 mph). The Athens – Chalcis line is also expected to attain speeds of up to 200 km/h (124 mph) upon upgrading of the SKA–Oinoi railway sector. These lines also have many daily commuters, with

10670-517: The trains run between two or several cities (e.g. S-Bahn in the Ruhr area of Germany). Distances between stations may vary, but are usually much longer than those of urban rail systems. In city centres the train either has a terminal station or passes through the city centre with notably fewer station stops than those of urban rail systems. Toilets are often available on-board trains and in stations. Their ability to coexist with freight or intercity services in

10780-465: The travel time to distant locations, often using station passing loops instead of dedicated express tracks. It is notable that the larger Japanese commuter rail systems are owned and operated by for-profit private railway companies, without public subsidy. East Japan Railway Company operates a large suburban train network in Tokyo with various lines connecting the suburban areas to the city center. While

10890-503: The tunnel to be suspended for 30 days for a 30-day risk review of the project's cost and schedule, because of concerns that the project would go $ 1 billion over budget which the State of New Jersey could not afford to pay. News reports mentioned the possibility that Governor Christie's administration was considering scrapping the project to use the project's funding to replenish New Jersey's Transportation Trust Fund, however New Jersey's Transportation Commissioner James S. Simpson denied that

11000-574: The type of train, amenities offered, and stopping pattern, usually tell the services apart. Russian commuter trains , on the other hand, frequently cover areas larger than Belgium itself, although these are still short distances by Russian standards. They have a different ticketing system from long-distance trains, and in major cities they often operate from a separate section of the train station. Some consider "inter-city" service to be that which operates as an express service between two main city stations, bypassing intermediate stations. However, this term

11110-719: The waterfront Pavonia Terminal , Jersey City, with connections to the Pavonia Ferry to Lower Manhattan . The Erie Railroad's major long-distance passenger trains to Chicago , the Atlantic Express and Pacific Express , the Erie Limited , and the Lake Cities , ran along this section, through Passaic, Paterson , Ridgewood, on to Port Jervis , northwest to Binghamton , New York State's Southern Tier , Jamestown , and west to Chicago. The final long-distance train along this route

11220-470: The way inter-city rail does. Regional rail operates outside major cities. Unlike Inter-city, it stops at most or all stations between cities. It provides a service between smaller communities along the line that are often byproducts of ribbon developments , and also connects with long-distance services at interchange stations located at junctions, terminals, or larger towns along the line. Alternative names are "local train" or "stopping train". Examples include

11330-704: Was halted, there was speculation that the previously discussed idea of the New York City Transit Authority 's 7 Subway Extension continuing into New Jersey would be revived, but was later scuttled. In February 2011, Amtrak announced the Gateway Project , a plan to build a right of way and new tunnels from Newark Penn Station to New York Penn Station , passing through Secaucus Junction, which would be shared with NJT trains. Christie later directed PANYNJ funding toward New Jersey road projects. A March 2012 Government Accountability Office investigated

11440-492: Was held on June 8, 2009. The Palisades Tunnels construction contract, the first major tunneling contract for the project was awarded on May 5, 2010. Governor Christie endorsed the project in April 2010, but his support for the project was later called into question. On September 10, 2010, with final design and construction on the first two contracts was already underway, NJ Transit's executive director, James Weinstein, ordered work on

11550-423: Was in the procurement phase. The cancellation forfeited federal funding for the project, and put into question the use of Port Authority money. In November 2010, U.S. Secretary of Transportation Ray LaHood agreed to an arrangement proposed by New Jersey's congressional delegation in which the state would return $ 271 million already received for the project and the federal DOT would in turn put $ 128 million into

11660-638: Was initiated after studies conducted in the 1990s determined that new rail tunnels under the Hudson River were the best approach to address transportation needs for the New York metropolitan area . At times called the Trans Hudson Express Tunnel , THE Tunnel or the Mass Transit Tunnel , it eventually became known by the name of a Major Investment Study, and received endorsements from both New Jersey and New York governors. After its cancellation,

11770-442: Was not in the scope of ARC project. New Jersey's funds earmarked for ARC were eventually diverted to the state transportation trust, normally funded by a gasoline tax , one of the lowest in the United States. In a controversial move in 2011, Governor Chris Christie directed the PANYNJ to divert money originally earmarked for ARC to highway projects. The agency agreed to pay $ 1.8 billion to partially fund efforts to rehabilitate

11880-812: Was once the north–south main line of the Erie Railroad . It is colored yellow on NJ Transit system maps, and its symbol is a water wheel . The Bergen County Line splits off the Main Line just west of the Secaucus Junction transfer station and rejoins it at Ridgewood . Trains on both lines are push-pull , powered by diesel locomotives (ordinarily on the west end of the train). The Erie Railroad 's main line ran from Jersey City to Chicago via Binghamton and Jamestown, New York , Akron and Marion, Ohio , and Huntington, Indiana , with branches to Buffalo , Cleveland , and Dayton . The section in New Jersey and lower New York State saw frequent commuter service to

11990-711: Was the Atlantic Express and Pacific Express in 1965. In 1963, the Erie Main Line south of Paterson to its connection with the Bergen County Line at Carlton Hill in Rutherford was abandoned and service began using the former Lackawanna Boonton Branch south of Paterson via the Lyndhurst Draw and Upper Hack Lift bridges as the route through downtown Passaic was abandoned. Boonton Line service began using

12100-468: Was working on a plan in lieu of the ARC tunnel, to extend the IRT Flushing Line of the New York City Subway to Secaucus Junction . This revived previous discussions about the possible extension that were not pursued given New Jerseyans presumed preference for a "one seat ride" into Manhattan. Construction on the 7 Subway Extension saw the line extended southwest from Times Square – 42nd Street to