106-543: The Indian Human Spaceflight program (or the Gaganyaan program ) is an ongoing programme by the Indian Space Research Organisation (ISRO) to develop the technology needed to launch crewed orbital spacecraft into low Earth orbit . Three uncrewed flights , named Gaganyaan-1 , Gaganyaan-2 and Gaganyaan-3 are scheduled to launch in 2024, followed by crewed flight in 2024 on an HLVM3 rocket. Before
212-865: A heat sink that can handle very high heat flux , IICT will study crystallization phenomena, and JNCASR will examine fluid mixing characteristics. With an emphasis on microgravity research, space biomanufacturing , bioastronautics , and astrobiology , the Department of Biotechnology and the ISRO have signed a memorandum of understanding (MoU) on 25 October 2024 to collaborate on space biotechnology research. The application will be in ISRO's human space flight project, Gaganyaan. The MoU will address problems like food storage, radiation, microgravity, and constant nutrient supply, as well as health risks like cancer, cataracts , and loss of bone and muscle. A crewed spacecraft would require about ₹ 12,400 crore (US$ 1.77 billion) over
318-702: A memorandum of understanding in 2009 with the Indian Air Force 's Institute of Aerospace Medicine (IAM) to conduct preliminary research on the psychological and physiological needs of the crew and the development of training facilities. IAM played a key role in determining astronaut training, the design of the crew capsule as per the anthropometric dimensions of the Indian population and a number of control and environmental systems as per psychological and physiological needs. The announcement of Gaganyaan by Prime Minister Modi immediately attracted an enthusiastic reaction from
424-574: A ₹ 2,700 crore (US$ 320 million) plan to establish an astronaut training centre at Challakere in Chitradurga district. The facility would take at least 2–3 years to be established after the government's approval. Following their training in Russia for unexpected and extreme situations, Indian astronauts were to return to India in March 2021 for the rest of their training in an Indian module. However, due to
530-770: A 2.9 t (6,400 lb) service module is powered by liquid propellant engines . The crew module is mated to the service module, and together they constitute 8.2 t (18,000 lb) orbital module. The Service Module Propulsion System (SMPS) will perform an orbit raising manoeuvre allowing Gaganyaan to reach 400 km in low Earth orbit (LEO), then remain docked during a deorbit burn until atmospheric reentry . It will use an unified bipropellant system consisting of MON-3 and Monomethylhydrazine as oxidizer and fuel, having five main engines derived from ISRO's liquid apogee motor with 440 N (99 lb f ) thrust and sixteen 100 N reaction control system (RCS) thrusters . On 11 August 2022, ISRO successfully completed
636-529: A better understanding of what weightlessness and radiation do to the human body during long durations in space. A legless humanoid named as Vyom Mitrā was displayed in January 2020 which is expected to fly onboard uncrewed experimental missions as well as assist astronauts on crewed missions. On 7 November 2018, ISRO released an Announcement of Opportunity seeking proposals from the Indian science community for microgravity experiments that could be carried out during
742-571: A chamber pressure of 58.5 bar instead of 62 bar and the Human rated S200 boosters (HS200) will operate at chamber pressure of 55.5 bar instead of 58.8 bar. Segment joints will have three O-rings each. Electro mechanical actuators and digital stage controllers will be employed in all stages of launch vehicle. Gaganyaan's green propellant development was confirmed by K. Sivan , and it will be used in all stages of HLVM3. In order to stop rocket engines from emitting chlorinated exhaust products, ISRO has started
848-647: A critical 'crew bailout test' called the ISRO Pad Abort Test to see how fast and effectively the crew module could be released safely in the event of an emergency. The tests were conducted successfully on July 5, 2018, at Satish Dhawan Space Centre , Sriharikota. This was the first of a series of tests to qualify a crew escape system technology. Parachute tests were scheduled before the end of 2019, and multiple in-flight abort tests were planned starting mid-2020. India will not use any animals for life support system testing but robots resembling humans will be used. ISRO
954-611: A flight suit developed by Defence Bioengineering and Electromedical Laboratory (DEBEL) and the powerful LVM3 launch vehicle. Having met all required technological keystones, the Indian Human Spaceflight Programme was accepted and formally announced by the Prime Minister Narendra Modi on 15 August 2018. Gaganyaan will be the first crewed spacecraft under this programme. To begin the training of doctors and engineers for space mission, Brigitte Godard,
1060-644: A flight surgeon affiliated with the European Space Agency , traveled to India in 2018. ISRO 's Human Space Flight Centre and Glavcosmos , which is a subsidiary of the Russian state corporation Roscosmos , signed an agreement on 1 July 2019, for cooperation in the selection, support, medical examination and space training of Indian astronauts. An ISRO Technical Liaison Unit (ITLU) has been approved to be set up in Moscow for coordination. In 2021, ISRO established
1166-400: A liquid-fueled test vehicle. A new test vehicle was designed in early 2020 for the validation of the crew escape system. The vehicle was built for in-flight crew escape of crew and possesses propulsion on top of the module to pull the module away to a safe distance. ISRO is working on developing an indigenous mechanism to certify its spacecraft that will take humans to space. The spacecraft
SECTION 10
#17328586861421272-481: A pad abort test to validate its launch escape system for fast and effective crew extraction in the event of an emergency. The tests were conducted successfully on July 5, 2018, at Satish Dhawan Space Centre, Sriharikota. This was the first of a series of tests to qualify a crew escape system technology. Work on parachute enlargement is also ongoing. Parachute tests are scheduled before the end of 2019, and multiple in-flight abort tests are planned starting mid-2020, using
1378-465: A period of seven years of development. The Planning Commission estimated that a budget of ₹ 5,000 crore (US$ 599.1 million) was required for initial work during 2007–2012 for the crewed spaceflight. In February 2009, the Government of India authorized the human space flight programme, but fell short of fully funding it or creating the programme. The trials for crewed space missions began in 2007 with
1484-474: A period of seven years, including the ₹ 5,000 crore (US$ 0.7 billion) for the initial work of the crewed spacecraft during the Eleventh Five-Year Plan (2007–2012) out of which the Government released ₹ 50 crore (US$ 7 million) in 2007–2008. In December 2018, the government approved a further ₹ 10,000 crore (US$ 1.5 billion) for a 7-day crewed flight of 3 astronauts to take place by 2021. Expanding
1590-577: A proposed 140 acres (0.57 km) site near Kempegowda International Airport in Devanahalli , Karnataka. ISRO 's Human Space Flight Centre and Glavcosmos , which is a subsidiary of the Russian state corporation Roscosmos , signed an agreement on July 1, 2019, for cooperation in the selection, support, medical examination, and space training of four Indian astronauts. An ISRO Technical Liaison Unit (ITLU) has been approved to be set up in Moscow for coordination activities. Until September 2019, level 1 of
1696-493: A safe landing. Following three uncrewed orbital flight demonstrations of the spacecraft, a crewed Gaganyaan is slated to be launched on the HLVM3 (Human-rated version of LVM3 ) launcher. While the LVM3 is being human rated for Gaganyaan project, the rocket was designed with potential human spaceflight applications in consideration. The maximum acceleration during ascent phase of flight
1802-486: A satellite may be placed in orbit. Indian vyomanauts will perform four biological and two physical science experiments related to micro-gravity during the mission. India plans to deploy a 20-tonne space station named Bharatiya Antariksha Station, as a follow-up programme to the Gaganyaan missions. On 13 June 2019, ISRO Chief K. Sivan announced the plan, saying that India's space station will be deployed 5–7 years after
1908-579: A temporary ground station for the Gaganyaan mission in the Cocos (Keeling) Islands , following an extended dialogue with the Australian Space Agency . ISRO has plans to build a permanent ground station for the project there. To gain practical space medicine experience, ISRO is sending two flight surgeons specialized in aviation medicine from the Indian Air Force to Russia in 2021. They are in charge of
2014-468: A zero-gravity environment, and monitoring of the radiation environment. While the HSFC will initially operate out of ISRO headquarters, another facility, a dedicated campus, has been planned to be built near Bengaluru. The facility will include offices, housing, testing and integration facilities and will also employ a workforce of 1,000 people in the long term. An astronaut training facility will be established on
2120-456: Is 3.2 meters in diameter, 8.5 meters long, and 5.5 tons in weight. The human-rated variant of the S200 solid strap-on booster, or 'HS200', was developed for the Gaganyaan programme in collaboration with Larsen & Toubro. The first static fire test of HS200 was conducted on 13 May 2022 at Satish Dhawan Space Centre (SDSC) for a duration of 135 seconds, carrying 203 tons of solid propellant. During
2226-540: Is Shubhanshu Shukla, while Prasanth Nair was selected as his backup. Both were thus selected to train at NASA facilities. The necessity for additional astronauts on future space missions has already been acknowledged by ISRO. The broader pool of potential astronauts will be created in collaboration with the IAF's Institute of Aerospace Medicine . Candidates from experimental domains and those engaged in aeronautical research directly are of particular interest to ISRO. Angad Pratap,
SECTION 20
#17328586861422332-689: Is asymmetry. The group worked on a two-colored, asymmetrical style line. The design was commissioned in 2021 by the NIFT team, and in 2022, they handed the design to ISRO. The Mysore -based Defence Food Research Laboratory (DFRL), a unit of the Defence Research and Development Organisation (DRDO), has developed dried and packaged food for astronauts. The food laboratory has developed around 70 varieties of dehydrated and processed food items that have undergone strict procedures to eliminate on microbacterial and macrobacterial nutrients. Special care has to be taken in
2438-594: Is being designed to carry three people, and a planned upgraded version will be equipped with rendezvous and docking capabilities. In its maiden crewed mission, the Indian Space Research Organisation (ISRO)'s largely autonomous 5.3- metric ton capsule will orbit the Earth at 400 km altitude for up to seven days with a two- or three-person crew on board. The first crewed mission was originally planned to be launched on ISRO's HLVM3 rocket in December 2021. As of November 2024, it
2544-422: Is combined with the equipment bay shroud and crew escape module. The Emergency Sea Water Purification Kit was developed by Defence Research and Development Organisation . The package provides astronauts with clean water during operations and emergencies by eliminating excessive levels of Total Dissolved Matter, turbidity , color, and microbiological contamination from sea water in 30 minutes. The user testing for
2650-416: Is crucial for a space station as it will enable the transfer of humans from one vehicle or spacecraft to another. Gaganyaan Gaganyaan ( [ɡəɡənəjɑːnə] ; pronunciation from Sanskrit : gagana , "celestial" and yāna , "craft, vehicle") is an Indian crewed orbital spacecraft intended to be the formative spacecraft of the Indian Human Spaceflight Programme . The spacecraft
2756-568: Is designed and developed by Liquid Propulsion Systems Centre (LPSC). At the ISRO Propulsion Complex (IPRC), the system demonstration model was fired for 450 seconds. The performance met the pre-test prediction model. The propulsion system for the service module is a single bi-propellant system consists of sixteen 100 Newton thrusters for reaction control system (RCS) and five primary 440 Newton thrust engines, using monomethylhydrazine (MMH) and mixed oxides of nitrogen (MON-3) as
2862-527: Is designed to carry a total of 3 passengers, the maiden crewed mission may only have one or two crews on board. Having shown success in all preliminary tests, the decisive push for the creation of the Human Spaceflight Programme took place in 2017, and it was accepted and formally announced by the Prime Minister on August 15, 2018. The funding is approximately Rs 10,000 crore. The testing phase
2968-482: Is expected to be launched no earlier than 2026. The Hindustan Aeronautics Limited (HAL)-manufactured crew module underwent its first uncrewed experimental flight on 18 December 2014. As of May 2019, design of the crew module has been completed. Defence Research and Development Organisation (DRDO) will provide support for critical human-centric systems and technologies such as space-grade food, crew healthcare, radiation measurement and protection, parachutes for
3074-574: Is expected to communicate with ISTRAC and other partner antennaes.For the Initial test flights, it has been planned that Two terminal ships are to be placed in both the Pacific Ocean and the Atlantic Ocean for communication with the spacecraft. Future flight s are expected to also be SATCOm capable, talking to India Geostationary Communication Satellites. In the spring of 2009, a full-scale mock-up of
3180-910: Is expected to launch its Ready-to-Eat (RTE) space food by March 2021. The initial batch for the manned spaceflight Gaganyaan-H1 will carry foodstuffs sufficient for 7 days. India sent two flight surgeons to Russia and France to get hands-on experience in space medicines. The flights surgeons are doctors from the Indian Air Force, specializing in aerospace medicine. Gaganyaan and the Indian Human Spaceflight Programme are coming up, hence ISRO Chairman S. Somanath encouraged National Institute of Mental Health and Neurosciences (NIMHANS) to come up with solutions for spaceflight astronauts' psychological health. Unlike other nations that have carried out human spaceflight, India will not fly animals into space. Instead, it will fly humanoid robots for
3286-512: Is meant to supplement the continuing human spaceflight programs. The Gaganyaan initiative has received an extra ₹ 11,170 crore (US$ 1.3 billion) in financing to support its expanded scope, bringing the total budget to ₹ 20,193 crore (US$ 2.4 billion). With four missions under the ongoing Gaganyaan program scheduled by 2026, the development of the BAS-1 module and four additional missions for technology demonstration and validation by 2028,
Indian Human Spaceflight Programme - Misplaced Pages Continue
3392-512: Is targeting more than 99.8% reliability for its crew escape system. ISRO plans to launch its crewed orbiter Gaganyaan atop a Launch Vehicle Mark 3 (LVM3). About 16 minutes after lift-off, the rocket will inject the orbital vehicle into an orbit 300 to km above Earth. The capsule would return for a splashdown in the Arabian Sea near the Gujarat coastline. As of May 2019, the design of
3498-471: Is to develop and fly the 3.7-ton spacecraft called Gaganyaan with the capacity to carry a 3-member crew in low Earth orbit and safely return to Earth after a mission duration of a few orbits to two days. The extendable version of the spaceship will allow flights up to seven days, rendezvous and docking capability. Before the flight of the Gaganyaan module, Group Captain Shubhanshu Shukla would fly on
3604-497: The Gaganyaan mission announcement in August 2018, human spaceflight was not a priority for ISRO, but it had been working on related technologies since 2007, and it performed a Crew Module Atmospheric Re-entry Experiment and a Pad Abort Test for the mission. In December 2018, the government approved a further ₹ 100 billion (US$ 1.5 billion) for a 7-days crewed flight of 2–3 astronauts. If completed successfully, India will become
3710-531: The Axiom-4 Mission to the International Space Station. In the next phase, enhancements will lead to the development of a small habitat, allowing spaceflight durations of 30–40 days at once. Further advances based on experience will subsequently lead to development of a space station . On October 7, 2016, Vikram Sarabhai Space Center Director K. Sivan stated that ISRO was gearing up to conduct
3816-535: The COVID-19 pandemic , training was put on hold from March 28 to May 11 and restarted on May 12, 2020. CNES is supplying the flight system and training flight physicians and technical teams for the Indian Human Spaceflight Program. It is also collaborating and sharing its expertise in the domains of space medicine, astronaut health monitoring and life support. On the 91st Indian Air Force Day in 2023,
3922-560: The Indian Human Spaceflight Program took place in 2017, And it was accepted and formally announced by Prime Minister Narendra Modi during his 2018 Independence Day address to the nation. The Gaganyaan Programme, was approved by the Union Cabinet on 28 December 2018. The current design calls for a crew of three. ISRO will perform four biological and two physical science experiments related to microgravity during
4028-715: The Indian Institute of Space Science and Technology (IIST), University of Agricultural Sciences, Dharwad (UASD), Tata Institute of Fundamental Research (TIFR), IIT Patna , Indian Institute of Chemical Technology (IICT) and the Jawaharlal Nehru Centre for Advanced Scientific Research (JNCASR). Out of the five, two are biological experiments that will be conducted by IIST, UASD and TIFR and will include kidney stone formation and Sirtuin 1 gene marker effects in Drosophila melanogaster . IIT Patna will run experiments on
4134-413: The International Space Station . Kerala Governor Arif Mohammad Khan , Chief Minister Pinarayi Vijayan , Minister of State for External Affairs V. Muraleedharan , ISRO chairman S. Somanath and other high-ranking ISRO officials were present at the reveal. The selected astronauts are: They were given Indian astronaut wings and the Gaganyaan mission logo and moto. The Indo-US joint mission astronaut
4240-532: The South Asia satellite , ISRO has effectively proven an electric propulsion technology for station keeping operations. On 17 November 2020, Larsen & Toubro (L&T) delivered the first piece of hardware—a booster segment—for the Gaganyaan launch vehicle LVM3 . The Powai Aerospace Manufacturing Facility in Mumbai, owned by L&T, is where the booster segment was manufactured. The crucial booster segment
4346-893: The 600 kg Space Capsule Recovery Experiment (SRE), launched using the Polar Satellite Launch Vehicle (PSLV) rocket, and safely returned to Earth 12 days later. This was followed by the Crew Module Atmospheric Re-entry Experiment and the Pad Abort Test in 2018. This enables India to develop heat-resistant materials, technology, and procedures necessary for human space travel. As per memorandum of understanding (MoU), Defence Research and Development Organisation (DRDO) will provide support for Human Space Mission with critical human-centric systems and technologies like space-grade food, crew healthcare, radiation measurement and protection, parachutes for
Indian Human Spaceflight Programme - Misplaced Pages Continue
4452-664: The Astronaut Training School (ATS) is aero-medical training. Also required is survival training in a variety of settings, including the sea, the desert, and the snow. The ground uniforms were developed by the staff and students of the National Institute of Fashion Technology (NIFT), Bengaluru . Under the direction of the former NIFT director Susan Thomas, the NIFT team—which consisted of three students, Lamia Anees, Samarpan Pradhan, and Tuliya D—as well as two professors, Jonalee Bajpai and Mohan Kumar V—worked on designing
4558-478: The Crew Module's maximum angle of attack it might experience during its mission. All these tests served as a critical qualification milestone for the drogue parachutes, confirming their readiness for integration into Test Vehicle Abort Mission-1 . Rail Track Rocket Sled Facility already completed the test of pilot and apex cover separation parachutes. Ten parachutes will be used in the complex parachute sequence for
4664-597: The Development of Microgravity Applications and Space Operations, or CADMOS, at the Toulouse Space Centre will provide training to flight physicians and Capsule Communicator (CAPCOM) mission control teams for Gaganyaan. Additionally, CNES will operate as a point of contact between ISRO and European Space Agency . CNES will assist in the execution of a scientific experiment plan for validation missions, knowledge sharing regarding food packaging and nutrition programs, and
4770-520: The Gaganyaan Group Captain, has stated that priority will be given to research work that will address the difficulties that ISRO faces in its technical endeavors. Even if researchers and military aviators might make up the majority of the initial batches, subsequent choices are probably going to be more diverse. The astronauts have to become experts in space theory, take part in simulator training, and interact with scientists. One essential part of
4876-401: The Gaganyaan mission at Bombay Dockyard was successfully completed in 2022. In order to visit the International Space Station (ISS) and Bharatiya Antariksha Station in the future, ISRO intends to incorporate International Docking System Standard (IDSS) compatibility. A Docking Adaptor called Bhartiya Docking System is currently under development. The Gaganyaan Spacecraft will have
4982-825: The Gaganyaan mission's ascending phase, the RCS thrusters will ensure precise attitude correction, while the LAM engines will supply the primary propulsive force. The SMPS carries out orbit injection, circularization burn, on-orbit control, de-boost maneuvering, and service module based abort if necessary during the ascent phase for the Orbital Module. On 20 July 2023, hot test was conducted in final configuration of SMPS in which sixteen RCS thrusters with 100 Newton thrust and five LAM engines with 440 Newton thrust were used. The propellant tank feed system, helium pressurization system, flight-qualified thrusters, and control components were all included in
5088-414: The Gaganyaan mission. ISRO is planning to replace hydrazine with green propellant on Gaganyaan missions, for which Liquid Propulsion Systems Centre (LPSC) is already working on a monopropellant blended formulation consisting of hydroxylammonium nitrate (HAN), ammonium nitrate , methanol and water . Many of the fundamental technologies were realized by ISRO by the time Gaganyaan was approved by
5194-443: The Government of India and Soviet Union. Preliminary studies and technological development of Gaganyaan started in 2006 under the generic name "Orbital Vehicle". The plan was to design a simple capsule with an endurance of about a week in space, a capacity of two astronauts, and a splashdown landing after re-entry. The project was commissioned in 2007, with expected completion by 2024 and a budget of around ₹10,000 crore. The design
5300-556: The IAF released a video on Twitter , sharing a glimpse of the astronauts (without revealing their faces) training for the Gaganyaan mission. While two or three out of the four astronauts will be selected to fly on the first crewed flight, one of the remaining backup astronauts on this mission will fly before the Gaganyaan prime crew on a mission to the ISS aboard Ax-4 in early 2024, as the second Indian astronaut in space after Rakesh Sharma , though
5406-564: The Indian Human Spaceflight project. With extra facilities needed for launch escape systems . Russia is likely to provide astronaut training. In Spring 2009, the full-scale mock-up of the crew capsule of Gaganyaan was built and delivered to Satish Dhawan Space Center for the training of astronauts. India has already successfully developed and tested several building blocks, including re-entry space capsule , pad abort test , safe crew ejection mechanism in case of rocket failure,
SECTION 50
#17328586861425512-490: The Indian diaspora, and ISRO received millions of letters and emails from Indian residents as well as expats willing to volunteer as astronauts for the project. In January 2019, ISRO Chairman K. Sivan announced the creation of India's Human Space Flight Centre in Bengaluru for training astronauts. The ₹ 1,000 crore (US$ 119.8 million) centre will train the selected astronauts in rescue and recovery operations, operations in
5618-502: The Phase-1 test series. Eight 100 Newton RCS thrusters and five 440 Newton liquid apogee motor (LAM) engines were used in Phase 1. The system's hot testing replicated the operation of the flight-qualified thruster, helium pressurization system, propellant tank feed system, and control components. During the test, which lasted 250 seconds, RCS thrusters and LAM engines were used continuously. During
5724-497: The SMPS with success. The thrusters were run in tandem with the mission profile, both in continuous and pulsed mode. The first hot test, which lasted 723.60 seconds, was intended to show how to pump fuel into the orbital module and burn 100 Newton thrusters and LAM engines for calibration. The calibration burn was essential to identify and isolate any non-operational engines. The RCS thrusters and LAM engines operated as anticipated. The goal of
5830-527: The Union Cabinet. After receiving approval, many of them were human-rated to make sure their dependability satisfied the requirements needed for human spaceflight. Space Capsule Recovery Experiment II (SRE-2), an extension of the 2007 SRE mission, was canceled in 2018 as a result of excessive delays. Onboard science experiments As of October 2021, ISRO selected five science experiments that will be conducted on Gaganyaan. The payloads will be developed by
5936-497: The acceptance of liquid oxygen/ liquid hydrogen and LOX /kerosene based propulsion systems for launch vehicles, ISRO has already started the transition towards environmentally benign and green propellants. Currently in use in the cryogenic upper stages of the GSLV and LVM3 is the LOX/ LH2 mix. In place of traditional hydrazine , ISRO developed ISROSENE, a rocket grade version of kerosene. In
6042-457: The actual crew module mass was taken to an altitude of 2.5 km and dropped from Ilyushin Il-76 by Indian Air Force . Two small pyro-based mortar-deployed pilot parachutes then pulled the main parachutes free. The size of the main parachutes was initially restricted to a smaller area to reduce opening shock. After 7 seconds, the pyro-based reefing line cutters cut the area restricting line, allowing
6148-459: The astronaut selection process was completed in Bengaluru. The selected test pilots underwent physical exercise tests, lab investigations, radiological tests, clinical tests, and evaluations on various facets of their psychology. By November 2019 the Indian Air Force had selected 12 potential astronauts who would then go to Russia for further training in two batches. As selection criteria require test pilot experience, any females will not be part of
6254-511: The building of an astronaut training facility in Bangaluru . Gaganyaan crew module is a fully autonomous 5.3 t (12,000 lb) spacecraft designed to carry a 3-member crew to orbit and safely return to the Earth after a mission duration of up to seven days. The crew module is equipped with two parachutes for redundancy, with one parachute enough for a safe splashdown. The parachutes would reduce
6360-527: The completion of the Gaganyaan missions. ISRO is working to develop spacecraft docking and berthing technology, with initial funding of ₹10 crore cleared in 2017. A Space Docking Experiment, or SPADEX , is being worked out by ISRO with systems like signal analysis equipment, high-precision videometer for navigation, docking system electronics and real-time decision making for landing systems being developed in various stages. As part of SPADEX , ISRO will launch 2 small satellites for testing. This technology
6466-417: The completion of the Gaganyaan programme. He also said that India will not join the International Space Station program . The space station would be capable of harbouring a crew for 15–20 days at a time. It is expected to be placed in a low Earth orbit of 400 km altitude and be capable of harbouring three humans. Final approval is expected to be given to the programme by the Indian government only after
SECTION 60
#17328586861426572-476: The contract. On 7 December 2022, The Hindu reported that the crew module had entered the production stage. Following fruitless attempts to obtain the Environmental Control and Life Support System (ECLSS) from other countries, ISRO has declared that it will be developing it on its own for Gaganyaan mission. According to ISRO Chairman S Somanath , ISRO has no experience in producing ECLSS, but it
6678-506: The creation of the Human Spaceflight Programme. He further indicated that within a year, ISRO would report on its development of new space capsule technologies. Development of a fully autonomous orbital vehicle to carry a two-member crew into low Earth orbit (LEO) began a few months after that when the government allocated ₹ 95 crore (US$ 11.4 million) for pre-project initiatives for 2007 through 2008. A crewed orbital spaceflight would require about ₹ 12,400 crore (US$ 1.5 billion) and
6784-479: The crew capsule was built and delivered to Satish Dhawan Space Centre for astronaut training. India was to shortlist 200 Indian Air Force pilots for this purpose. The selection process would begin with the candidates completing an ISRO questionnaire, after which they would be subjected to physical and psychological analyses. Only 4 of the 200 applicants were to be selected for the first space mission training. While two will fly, two shall act as reservists. ISRO signed
6890-465: The crew module and lowering its velocity to a safe level during re-entry, were deployed as part of this test. Pyrotechnic devices called mortars are developed to launch parachutes into the air upon command. With a diameter of 5.8 meters, these conical ribbon-type parachutes use a single-stage reefing system that reduces canopy area and lessens opening stress to provide a controlled and smooth descent. A variety of real-world conditions were recreated during
6996-604: The crew module was complete. The spacecraft will be flown twice uncrewed for validation before conducting actual human spaceflight. As of January 2020, the crew module was due to undergo testing in the wind tunnel facility of the Council of Scientific and Industrial Research (CSIR) at the National Aerospace Laboratories (NAL). The spacecraft will carry one crew in its maiden crewed mission to an orbit of 400 km (250 mi). The first uncrewed flight will involve
7102-434: The deceleration system of the Gaganyaan crew module. The two apex cover separation parachutes are deployed first in the process, and two drogue parachutes are deployed when stability is accomplished. The mission enters the extraction phase once the drogue parachutes are released. Three pilot parachutes separately remove the three main parachutes, which is a crucial step in lowering the Crew Module's speed to acceptable levels for
7208-434: The development of an environmentally benign solid propellant based on Glycidyl Azide Polymer (GAP) as fuel and Ammonium dinitramide (ADN) as oxidizer. Green propellant combinations including hydrogen peroxide , kerosene , liquid oxygen , liquid methane , ADN-methanol-water, ADN-glycerol-water are all part of the technology demonstration projects that ISRO is conducting. With the use of electric propulsion for spacecraft and
7314-545: The first Indian born citizen to enter space through a joint Interkosmos mission between ISRO and Soviet space program , when he flew aboard the Soviet rocket Soyuz T-11 launched from Baikonur Cosmodrome in the Kazakh Soviet Socialist Republic on 3 April 1984. The Soyuz T-11 spacecraft carrying cosmonauts including Sharma docked and transferred the three member Soviet-Indian international crew, consisting of
7420-649: The first Indian crewed spaceflight. The first crewed flight will consist of a crew of three with one backup and this team of four went to Russia for astronaut training. In December 2019, the selection process came to a close, and four candidates began their 12-month training at the Gagarin Research & Test Cosmonaut Training Center (GCTC) on February 10, 2020. The astronauts were trained for abnormal landings in various terrains, including forests, rivers, and sea. In February 2020, Indian astronaut candidates completed their winter survival training. ISRO has also proposed
7526-489: The first two robotic flights of Gaganyaan . The scope of the experiments is not restricted, and other relevant ideas will be entertained. The proposed orbit for microgravity platform is expected to be in an Earth-bound orbit at approximately 400 km altitude. All the proposed internal and external experimental payloads will undergo thermal, vacuum and radiation tests under required temperature and pressure conditions. To carry out micro-gravity experiments for long duration,
7632-412: The flight’s ascent phase, module preparation facility for assembly and testing will be built. All the facilities will be connected to an upcoming Gaganyaan control facility which will be built nearby and facilitate communication and monitor the crew capsule during flight. Human-rating allows the system to be capable of safely transporting humans. ISRO will be building and launching 3 missions to validate
7738-477: The fourth nation to conduct independent human spaceflight after the Soviet Union /Russia, United States, and China. After conducting the first crewed spaceflights, the agency intends to start a space station programme, crewed lunar landings , and crewed interplanetary missions in the long term. On August 9, 2007, the then Chairman of the ISRO, G. Madhavan Nair , indicated the agency was "seriously considering"
7844-548: The fuel and oxidizer, respectively. Additionally, IPRC is constructing a new facility to test the Service Module Propulsion System. To validate the propulsion system on the ground, the test model for the system demonstration employed only eight 100 Newton thrusters and five 440 Newton engines. On 19 July 2023, ISRO successfully completed the test of Gaganyaan Service Module Propulsion System. Five hot tests totaling 2,750 seconds were conducted by ISRO as part of
7950-482: The future of the project in serious doubt. And in August 2013, it was announced that all crewed spaceflight efforts by India had been designated as being "off ISRO's priority list". By early 2014, the project had been reconsidered and was one of the main beneficiaries of a substantial budget increase announced in February 2014. Space Capsule Recovery Experiment ISRO is developing the Gaganyaan orbital vehicle based on
8056-415: The ground uniform for the Gaganyaan mission. The team highlighted the importance for the astronaut-designates' pockets to fit perfectly and the uniform must operate well in order to support their motions. Seventy possibilities were considered before the final design was chosen. The NIFT team examined various space agency uniforms, such as those from SpaceX and NASA . The theme that the NIFT team has explored
8162-411: The head-end mounted safe arm (HMSA) based ignition system performance, and evaluate side thrust due to misalignment and variation in flow and other functional parameters including flow reversal. A system demonstration model (SDM) of the Service Module Propulsion System (SMPS), which will be incorporated into the Gaganyaan spacecraft, was successfully tested by ISRO on 28 August 2021. The service module
8268-578: The health of the astronauts prior to, during, and following their space journey. Also, in order to receive training and expand their theoretical expertise, the flight surgeons will visit France. ISRO and CNES announced on April 15, 2021, a space agreement for cooperation in space equipment, consumables, and space medicine. The CNES team at the European Astronaut Centre in Cologne and the Centre for
8374-519: The hot test which simulated the fluid circuit of the SMPS. The combined performance of SMPS was showcased in the first hot test of the Phase-2 test series. Each 440 Newton thrust engine will also be tested individually for longer duration involving various parameters to gain human-rating certification . ISRO has scheduled five additional tests to demonstrate both nominal and off-nominal mission scenarios. On 26 July 2023, ISRO conducted two more hot tests on
8480-483: The human rating of the LVM3. Existing launch facilities will be upgraded to enable them to carry out launches under the Indian Human Spaceflight campaign. ISRO has been modifying propulsion modules of various stages of the rocket for human rating. Theoretical parameters for human rating were expected to be achieved by August or September 2020 to be followed by simulations and three test launches. ISRO has successfully conducted
8586-711: The launch of a 5,000 kg (11,000 lb) module which, after orbiting will re-enter the atmosphere and decelerate at an altitude of 7 km (4.3 mi) before splashing down. India's maiden crewed mission is expected to take off from the Satish Dhawan Space Centre Second Launch Pad . In November 2019, ISRO released tenders for the pad's augmentation. A third launch pad in Sriharikota has been proposed for India's future launch vehicles and crewed missions. Systems for crew ingress and egress, an access platform, recovery setup for emergencies during
8692-456: The life support system will also handle waste products of crew members. Throughout the mission, the thermal control system will maintain the spacecraft's component within permissible temperature limits. The Human Space Flight Center and Glavkosmos signed a deal on 11 March 2020, for the manufacture and supply of individual equipment packages. NPP Zvezda will manufacture customized couch liners and individual seats for Indian astronauts as part of
8798-440: The media that Vikram Sarabhai Space Centre in collaboration with Aerial Delivery Research and Development Establishment (ADRDE), a lab under Defence Research & Development Organisation successfully conducted a series of Drogue Parachute Deployment Tests at Rail Track Rocket Sled Facility of Terminal Ballistics Research Laboratory (TBRL), Chandigarh from 8 to 10 August 2023. Drogue parachutes, which are essential for stabilizing
8904-481: The orbital vehicle was free for a docking mechanism, but primary entry was evidently through a side hatch secured by explosive bolts. Glavkosmos and Human Space Flight Centre signed a deal in October 2019 for Energia to equip the Gaganyaan crew with life support system and supply thermal control system for the spacecraft. In addition to supplying food, water, and oxygen and assisting in regulating body temperature,
9010-399: The packaging, and the food items should be of limited weight, but at the same time should be high in nutritional quality. Waste disposal systems for leftover food, liquid dispensing systems, food rehydrating systems and heaters adaptable to outer space conditions are in development, although the list of food products planned to fly aboard Gaganyaan is yet to be publicized as of August 2020. DFRL
9116-566: The parachutes to inflate fully. The fully inflated main parachutes reduced the payload speed to a safe landing speed. The entire sequence lasted about 2–3 minutes. The Parachute Deceleration System is jointly developed by ISRO and DRDO . System design, analytical simulations for parachute deployment, development of ordnance devices for parachute ejection, mechanical assembly, instrumentation and avionics were done by VSSC. In total, five air dropped tests (of 10 parachutes) are planned as part of qualification process. On 8 August 2023, ISRO informed
9222-543: The plan is yet to be finalized. The four have been conducting mission-specific training in India ever since they returned from Russia. [REDACTED] On 27 February 2024, at the Vikram Sarabhai Space Center , Prime Minister Narendra Modi announced the names of the four designated astronauts who will be eligible for future flights as part of the Gaganyaan program, as well as an Indo-US joint mission ( Ax-4 ) to
9328-524: The program aims to develop and demonstrate critical technologies for long-duration human space missions. Madhavan Chandradathan , director of Satish Dhawan Space Centre (SDSC), stated that ISRO would need to set up an astronaut training facility in Bangalore . The newly established Human Space Flight Centre (HSFC) will coordinate the IHSF efforts. Existing launch facilities will be upgraded for launches under
9434-565: The safe recovery of the crew module, and the fire suppression system. The Gaganyaan Mission will be led by V. R. Lalithambika , the former Director of the Directorate of the Human Spaceflight Programme with ISRO Chairman S Somnath and S. Unnikrishnan Nair , Director of Vikram Sarabhai Space Centre . Imtiaz Ali Khan superseded V. R. Lalithambika as the Director of the Directorate of Human Spaceflight Programme. In 1984, Rakesh Sharma became
9540-403: The safe recovery of the crew module, fire suppression systems, etc. Defence Food Research Laboratory (DFRL) has worked on the space food for the crew and has been conducting trials on a G-suit for astronauts as well. A prototype called 'Advanced Crew Escape Suit' weighing 13 kg and built by Sure Safety (India) Private Limited has been tested and performance verified. While the crew module
9646-527: The scope of the Gaganyaan initiative, the Union Cabinet , led by Prime Minister Narendra Modi , approved on September 18, 2024, the development of the Bharatiya Antariksh Station 's initial module, BAS-1. The launch of the BAS-1 unit is one of the eight missions that are now part of the redesigned Gaganyaan program, which is scheduled for completion by December 2028. Hardware requirements and more unmanned flights are part of this expansion, which
9752-567: The second hot test, which lasted 350 seconds, was to show how the Orbital Module circularizes to reach the final orbit. The RCS thrusters functioned in pulse mode throughout this test, while the LAM engines ran continuously. On 18 November 2022, Vikram Sarabhai Space Centre (VSSC) conducted an Integrated Main Parachute Airdrop Test (IMAT) of the Parachute Deceleration System (PDS), in which 5-ton dummy mass equivalent of
9858-549: The ship's commander, Yury Malyshev , and flight engineer, Gennadi Strekalov , to the Salyut 7 Orbital Station. Sharma spent 7 days, 21 hours, and 40 minutes aboard the Salyut 7. He conducted an Earth observation program concentrating on India . He also did life sciences and materials processing experiments, including silicium fusing tests. To commemorate the occasion special stamps and first day covers were released by
9964-400: The solid rocket motor. The reverse flow nozzle makes exhaust gas flow in opposite direction in the nozzle region. The objective of this test was to check ballistic parameters, validate motor subsystem performance (and confirm the design margins), evaluate the thermal performance of nozzle liners especially to confirm the ablative characteristics, validate integrity of all interfaces, evaluate
10070-399: The speed of the crew module from over 216 m/s (480 mph) to under 11 m/s (25 mph) at splashdown. The space capsule will have life support and environmental control systems. It will be equipped with emergency mission abort capabilities and a Crew Escape System (CES) that can be activated during the first stage or second rocket stage burn. The nose of the original version of
10176-553: The strongest electro-mechanical actuators available, complete with many redundancies and safety measures. The enhancement of S200 solid strap-on booster resulted in a decrease in chamber pressure, increased robustness, proof-leakability, and higher margins. Vikas engine variants are used to power the second stage of the Polar Satellite Launch Vehicle (PSLV), boosters and second stage of the Geosynchronous Satellite Launch Vehicle (GSLV) Mark I and II, and also
10282-424: The test firing of Low Altitude Escape Motor (LEM) for Crew Escape System. LEM consists of a solid rocket motor with four reverse flow nozzles that generates maximum sea level thrust of 842 kN (nominal) with burn time of 5.98 second (nominal). The nozzle end of LEM is mounted at the fore end of the launch vehicle to avoid exhaust plume impingement on crew module. This is why there are reverse flow multiple nozzle in
10388-652: The test, about 700 parameters were monitored and the performance of all the systems were normal. The second-largest functioning solid propellant booster in the world is 20 meters in length and 3.2 meters in diameter. Like all systems for Gaganyaan mission, the HS200 booster was designed with a number of enhancements intended to increase the safety and dependability of different systems. The enhancements include stronger ignition and insulation systems, improved digital control electronics as well as extra safety features for motor case joints. This booster's control system makes use of one of
10494-667: The tests performed with their scaled 555 kilograms (1,224 lb) experimental spacecraft from Space Capsule Recovery Experiment (SRE), which was launched and recovered in January 2007. In SRE, an experimental capsule that had been in orbit earlier splashed into the Bay of Bengal after descending from a height of 635 km. The purpose of the mission was to test reusable thermal protection system , management of communication blackout , guidance, navigation and control , hypersonic aero-thermodynamics, braking system, deceleration system, flotation devices and recovery procedures. The latest push for
10600-411: The three comprehensive tests in order to thoroughly assess the functionality and dependability of the drogue parachutes. The first test, which replicated the maximum reefed weight, introduced reefing in a mortar-deployed parachute for the first time in India. The second test replicated the maximum disreefed load, while the third test demonstrated the drogue parachute's deployment in a scenario that mirrored
10706-468: The uncrewed second and crewed third flights to follow afterward. As per ISRO, the initial review process is complete for food, potable water, emergency first aid kits, and health monitoring systems for the Gaganyaan mission until March 16, 2021. ISRO and the CNES joint working group on the Human Spaceflight Programme are collaborating on space medicine for Gaganyaan project. The first phase of this programme
10812-494: The use of French medical tools, equipment, and consumables by Indian astronauts. The Indian space crew will thus have access to French technology created by CNES that has been tested and is now in use aboard the International Space Station . CNES will also provide radiation- and shock-resistant carry bags to India to protect equipment. The future cooperation include parabolic flights conducted by Novespace for instrument testing and astronaut training, as well as technical assistance for
10918-476: Was expected to begin in December 2020, and the first crewed mission was to be undertaken in December 2021. However, on June 11, 2020, it was announced that the overall schedule for the Gaganyaan launches had been postponed due to the impact of the COVID-19 pandemic in India , in turn revising the timetable for the HSP. As of December 2022, the first uncrewed test flight is scheduled to launch no earlier than mid-2024, with
11024-474: Was finalized by March 2008 and submitted to the Government of India for funding. The government's funding for the Indian Human Spaceflight Program was sanctioned in February 2009, But it fell short due to limited developmental funding. Initially, the first uncrewed flight of the orbital vehicle was proposed to be in 2013, then it was revised to 2016. However, in April 2012, it was reported that funding problems placed
11130-406: Was forced to urge national laboratories and domestic industry to begin developing the technology because there were no foreign partners available to share the technology. The first orbiter module adaptor assembly (OMA) for Gaganyaan was provided by Kineco Kaman Composites on 23 December 2023. The OMA is a conical structure with a diameter of 4 meters, composed of carbon-fiber-reinforced polymers . It
11236-841: Was limited to 4 Gs for crew comfort and a 5-metre (16 ft) diameter payload fairing was used to be able to accommodate large modules like space station segments. The aerodynamic characterization research was conducted at the National Aerospace Laboratories ' 1.2m Trisonic Wind Tunnel Facility. Furthermore, a number of changes to make safety-critical subsystems reliable are planned for lower operating margins, redundancy, stringent qualification requirements, revaluation and strengthening of components. Avionics improvements includes an Integrated Health Monitoring System (LVHM), Dual chain Telemetry & Telecommand Processor (TTCP) and Quad-redundant Navigation and Guidance Computer (NGC). The High Thrust Vikas engines (HTVE) of L110 core stage will operate at
#141858