Misplaced Pages

New York City Subway rolling stock

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#785214

134-562: The New York City Subway is a large rapid transit system and has a large fleet of electric multiple unit rolling stock . As of September 2024, the New York City Subway has 6712 cars on the roster. The system maintains two separate fleets of passenger cars: one for the A Division (numbered) routes, the other for the B Division (lettered) routes. All A Division equipment is approximately 8 feet 9 inches (2.67 m) wide and 51 feet (15.54 m) long. B Division cars, on

268-527: A cross-platform interchange between local and express services. Some four-track lines with express service have two tracks each on two levels and use both island and side platforms. Since the majority of the system was built before 1990, the year the Americans with Disabilities Act (ADA) went into effect, many New York City Subway stations were not designed to be accessible to all. Since then, elevators have been built in newly constructed stations to comply with

402-468: A "minor victory" for "a maligned line." Additionally, exits to the intersection of Powers Street, Hope Street, and Union Avenue at Metropolitan Avenue were reopened on February 28, 2019, to address possible capacity constraints due to the L train shutdown . In 2019, the Court Square station received several new stairways to accommodate increased ridership from L train riders during the reconstruction of

536-484: A G train shuttle would have run between Jamaica Center and Van Wyck Boulevard . On weekdays, the extension would have been served by N trains. This service plan would have allowed E and F trains to remain on the Queens Boulevard mainline toward 179th Street. The final service plan, which took effect on December 11, 1988, had the extension served by E trains, with R trains extended to 179th Street. On May 24, 1987,

670-494: A Vignelli-style interactive subway map, "The Weekender", an online map that provides information about any planned work, from late Friday night to early Monday morning. In October 2020, the MTA launched a digital version of the map showing real-time service patterns and service changes, designed by Work & Co . Several privately produced schematics are available online or in printed form, such as those by Hagstrom Map . Out of

804-520: A cause of passengers missing trains or being bunched into single cars. Beginning in 2013, additional signs were installed along G train platforms. In 2014, several improvements were implemented due to an infusion of extra funding, with G trains to be lengthened in 2019 ( see below ). Save the G!, the Riders Alliance, and other organizations have also lobbied for the creation of new free out-of-system transfers to nearby stations. The most prominent

938-573: A contemporaneous article from The New York Times reported that the Smith–Ninth Streets station served as the GG's original Brooklyn terminus. From April 30 to November 1, 1939, and from May 11 to October 28, 1940, GG trains were extended via the temporary IND World's Fair Line to World's Fair Station at Horace Harding Boulevard at all times during the 1939–1940 World's Fair . Trains were marked as S Special. The fair closed on October 28, 1940, with

1072-556: A few stretches of track run at ground level; 40% of track is above ground. Many lines and stations have both express and local services. These lines have three or four tracks. Normally, the outer two are used by local trains, while the inner one or two are used by express trains. As of 2018 , the New York City Subway's budgetary burden for expenditures was $ 8.7 billion, supported by collection of fares, bridge tolls, and earmarked regional taxes and fees, as well as direct funding from state and local governments. Alfred Ely Beach built

1206-764: A letter or a number and "lines" have names. Trains display their route designation. There are 28 train services in the subway system, including three short shuttles . Each route has a color and a local or express designation representing the Manhattan trunk line of the service. New York City residents seldom refer to services by color (e.g., "blue line" or "green line") but out-of-towners and tourists often do. The 1 , C , G , L , M , R , and W trains are fully local and make all stops. The 2 , 3 , 4 , 5 , A , B , D , E , F , N , and Q trains have portions of express and local service. J , Z , 6 , and 7 trains vary by direction, day, or time of day. The letter S

1340-529: A public authority presided by New York City, was created in 1953 to take over subway, bus, and streetcar operations from the city, and placed under control of the state-level Metropolitan Transportation Authority in 1968. Organized in 1934 by transit workers of the BRT, IRT, and IND, the Transport Workers Union of America Local 100 remains the largest and most influential local of the labor unions. Since

1474-417: A rate of one train every four minutes. South of Bedford–Nostrand Avenues, the G would have a headway of 12 trains per hour. The terminus for most of the remaining G trips would be Church Avenue, but some trains would continue two additional stops to 18th Avenue , because only a limited number of trains can terminate at Church Avenue without causing disruptions to F service. Other temporary improvements during

SECTION 10

#1732859486786

1608-402: A result of the 2013 review. Even so, the G continued to have long headways during weekends until July 2023. Despite the influx of ridership, train lengths did not change. In 2016, it was announced that the G was expected to receive longer trains to accommodate displaced L train riders in 2019, when the 14th Street Tunnel shutdown was supposed to limit direct L train access to Manhattan. As

1742-458: A result, riders in Williamsburg, Greenpoint, and Bushwick would need to use the G to transfer to other subway routes that travel to Manhattan. The delivery of new R179 subway cars to other routes would make it possible for older fleets from these other routes to be passed onto the G. In addition, three extra G trains per hour would run during peak periods, for a total of 11 trains per hour during

1876-472: A single fare to enter the subway system and may transfer between trains at no extra cost until they exit via station turnstiles; the fare is a flat rate regardless of how far or how long the rider travels. Thus, riders must swipe their MetroCard or tap a contactless payment card or smartphone on an OMNY reader upon entering the subway system, but not a second time upon leaving. G (New York City Subway service) The G Brooklyn-Queens Crosstown

2010-482: A station, passengers may use station booths (formerly known as token booths) or vending machines to buy their fare, which is currently stored in a MetroCard or OMNY card. Each station has at least one booth, typically located at the busiest entrance. After swiping the card at a turnstile, customers enter the fare-controlled area of the station and continue to the platforms. Inside fare control are "Off-Hours Waiting Areas", which consist of benches and are identified by

2144-532: A system of documentation that is still in place under MTA New York City Transit. This included a prefix letter or letters that indicated the department that the specific documentation, followed by a series of numbers of a length defined by the specific department concerned. For example, the Surface Department used the letter "S", while the Rapid Transit Department used the letter "R". A new R- number

2278-528: A total of 850 miles (1,370 km) including non-revenue trackage . Of the system's 28 routes or "services" (which usually share track or "lines" with other services), 25 pass through Manhattan, the exceptions being the G train, the Franklin Avenue Shuttle , and the Rockaway Park Shuttle . Large portions of the subway outside Manhattan are elevated, on embankments , or in open cuts , and

2412-501: A year; the car is manually operated, and there are no plans to automate inspection of the track geometry, which is done manually with the help of high-tech equipment aboard the car. BMT New York City Subway July 3, 1868 ; 156 years ago  ( 1868-07-03 ) (first elevated, rapid transit operation) [REDACTED] The New York City Subway is a rapid transit system in New York City serving

2546-489: A yellow sign. A typical subway station has waiting platforms ranging from 480 to 600 feet (150 to 180 m) long. Some are longer. Platforms of former commuter rail stations—such as those on the IND Rockaway Line , are even longer. With the many different lines in the system, one platform often serves more than one service. Passengers need to look at the overhead signs to see which trains stop there and when, and at

2680-645: Is an 11.4-mile-long (18.3 km) rapid transit service in the B Division of the New York City Subway . Its route emblem, or "bullet", is colored light green since it uses the IND Crosstown Line . The G operates at all times between Court Square in Long Island City, Queens , and Church Avenue in Kensington, Brooklyn . It is the only non- shuttle service in the system that does not run within

2814-480: Is approximately 8 feet 9 inches (2.67 m) wide and 51 feet 4 inches (15.65 m) long, whereas B Division equipment is about 10 feet (3.05 m) wide and either 60 feet 6 inches (18.44 m) or 75 feet (22.86 m) long. The different lengths for the B Division fleet are necessary because 75-foot cars can not be used over the BMT Eastern Division . Cars purchased by

SECTION 20

#1732859486786

2948-427: Is assigned for any vehicle purchase involving a bidding process. Since the 1970s, the system has suffered from "R- inflation" going through only 46 R- numbers in its first 40 years, but over 114 in its subsequent 30. Possible reasons include an increased number of specialized maintenance vehicles that were previously made in house or a lower floor for requiring a formal bidding process to reduce waste and abuse. In 2001,

3082-517: Is between Broadway on the Crosstown Line and either Hewes Street or Lorimer Street on the BMT Jamaica Line , which are both about three blocks away; this transfer has been previously proposed. In 2005, an MTA spokesperson stated, "We have no intention of making that a permanent free transfer." This sentiment was repeated in 2013, with the MTA citing the loss of around $ 770,000 in revenue if

3216-406: Is no nightly system shutdown for maintenance, tracks and stations must be maintained while the system is operating. This work sometimes necessitates service changes during midday, overnight hours, and weekends. When parts of lines are temporarily shut down for construction purposes, the transit authority can substitute free shuttle buses (using MTA Regional Bus Operations bus fleet ) to replace

3350-436: Is not compatible between divisions, being located on opposite sides of the track and train in each division. However, service and maintenance trains are composed of A Division-sized cars, so they can operate with either division's clearances and have safety train stops installed on both sides of the trucks. A typical revenue train consists of 8 or 10 cars. The exceptions are the Franklin Avenue Shuttle , which runs 2-car trains;

3484-505: Is often used on New York Transit Museum-sponsored excursions. Between 1984 and 1989, some of the IRT trains were painted red, giving them the name Redbirds . By January 2022, various older B Division cars, such as the entire fleets of R32s, R38s, R40s, R40As, R42s, and NYCT R44s, were similarly retired and replaced by newer models, including the R160s and R179s . The General Overhaul Program (GOH)

3618-427: Is smaller than the peak of the system. In addition to the demolition of former elevated lines, which collectively have resulted in the demolition of over a hundred stations, other closed stations and unused portions of existing stations remain in parts of the system. Many stations in the subway system have mezzanines . Mezzanines allow for passengers to enter from multiple locations at an intersection and proceed to

3752-547: Is used for three shuttle services: Franklin Avenue Shuttle , Rockaway Park Shuttle , and 42nd Street Shuttle . Though the subway system operates on a 24-hour basis , during late night hours some of the designated routes do not run, run as a shorter route (often referred to as the "shuttle train" version of its full-length counterpart) or run with a different stopping pattern. These are usually indicated by smaller, secondary route signage on station platforms. Because there

3886-567: The 142nd Street and Myrtle Avenue junctions, whose tracks intersect at the same level, as well as the same-direction pairs of tracks on the IRT Eastern Parkway Line at Rogers Junction . The 7,700 workers who built the original subway lines were mostly immigrants living in Manhattan. More recent projects use tunnel boring machines , which increase the cost. However, they minimize disruption at street level and avoid already existing utilities. Examples of such projects include

4020-528: The 14th Street Tunnel shutdown . The transfer was in effect until May 31, 2020. A temporary, MetroCard-only transfer between 21st Street and Hunters Point Avenue (along the IRT Flushing Line ) was proposed, but not implemented. Most stations along the IND Crosstown Line were built with multiple exits to the street. Over the years, many lower-use exits were closed (as they were in other parts of

4154-600: The 472 stations , 470 are served 24 hours a day. Underground stations in the New York City Subway are typically accessed by staircases going down from street level. Many of these staircases are painted in a common shade of green, with slight or significant variations in design. Other stations have unique entrances reflective of their location or date of construction. Several station entrance stairs, for example, are built into adjacent buildings. Nearly all station entrances feature color-coded globe or square lamps signifying their status as an entrance. The current number of stations

New York City Subway rolling stock - Misplaced Pages Continue

4288-532: The 63rd Street Lines , opened in 1989. The new South Ferry station was built and connected to the existing Whitehall Street–South Ferry station in 2009. The one-stop 7 Subway Extension to the west side of Manhattan, consisting of the 34th Street–Hudson Yards station, was opened in 2015, and three stations on the Second Avenue Subway in the Upper East Side were opened as part of Phase 1 of

4422-684: The Chicago "L" plans all stations to be accessible in the 2030s, the Toronto subway will be fully accessible by 2025, and Montreal Metro plans all stations to be accessible by 2038. Both the Boston and Chicago systems are as old or older than the New York City Subway, though all of these systems have fewer stations than the New York City Subway. Newer systems like the Washington Metro and Bay Area Rapid Transit have been fully accessible from their opening in

4556-578: The City of New York since the inception of the IND and for the other divisions beginning in 1948 are identified by the letter "R" followed by a number, e.g., R46 . This number is the contract number under which the cars were purchased. Cars with nearby contract numbers (e.g., R1 through R9 , or R21 through R36 , or R143 through R179 ) may be virtually identical, simply being purchased under different contracts. The New York City Board of Transportation settled on

4690-469: The City of New York since the inception of the IND and for the other divisions beginning in 1948 are identified by the letter "R" followed by a number. Various kinds of cars are also used for maintenance work, including flatcars and vacuum trains. As of September 2024, the New York City Subway has 6712 cars on the roster. The system maintains two separate fleets of passenger cars: one for the A Division routes,

4824-484: The IND Sixth Avenue Line for Queens Boulevard Local passengers who previously had to transfer to an express train at Queens Plaza . The New York Times prematurely described the service plan as "complex and heavily criticized" because it put more crowding on the E train. In response to complaints from G riders at public hearings about losing a major transfer point to Manhattan-bound trains at Queens Plaza ,

4958-468: The IND Sixth Avenue Line was completed in 1940, the city went into great debt , and only 33 new stations have been added to the system since, nineteen of which were part of defunct railways that already existed. Five stations were on the abandoned New York, Westchester and Boston Railway , which was incorporated into the system in 1941 as the IRT Dyre Avenue Line . Fourteen more stations were on

5092-697: The IRT Broadway–Seventh Avenue Line , which ran directly underneath the World Trade Center . Sections of the tunnel, as well as the Cortlandt Street station, which was directly underneath the Twin Towers, were severely damaged. Rebuilding required the suspension of service on that line south of Chambers Street. Ten other nearby stations were closed for cleanup. By March 2002, seven of those stations had reopened. Except for Cortlandt Street,

5226-672: The IRT subway debuted in 1904, the typical tunnel construction method was cut-and-cover . The street was torn up to dig the tunnel below before being rebuilt from above. Traffic on the street above would be interrupted due to the digging up of the street. Temporary steel and wooden bridges carried surface traffic above the construction. Contractors in this type of construction faced many obstacles, both natural and human made. They had to deal with rock formations and groundwater, which required pumps. Twelve miles of sewers, as well as water and gas mains, electric conduits, and steam pipes had to be rerouted. Street railways had to be torn up to allow

5360-527: The MTA agreed to a number of compromises, including installing a moving sidewalk in the passageway between Court Square and 23rd Street–Ely Avenue (now served by the E and ​ M trains) on the Queens Boulevard Line. In addition, a free out-of-system MetroCard transfer to 45th Road–Court House Square on the IRT Flushing Line was created at those two stations. This special transfer

5494-508: The N and R services switched terminals in Queens . As part of the reroute plan, Queens Plaza became the northern terminal for the G train on evenings, weekends, and late nights. Three years later, on September 30, 1990, G service was extended to 179th Street during late nights to replace the R , which terminated at 36th Street and Fourth Avenue . On April 14, 1991, weekend service was extended from Queens Plaza to 71st Avenue. Weekend G service

New York City Subway rolling stock - Misplaced Pages Continue

5628-603: The R142 , R142A , R143 , R160 , R179 and R188 were placed into service. These cars are collectively known as New Technology Trains (NTTs) due to modern innovations such as LED and LCD route signs and information screens, as well as recorded train announcements and the ability to facilitate Communication-Based Train Control (CBTC) . As part of the 2017–2020 MTA Financial Plan, 600 subway cars will have electronic display signs installed to improve customer experience. Riders pay

5762-628: The R44s and R46s were rebuilt, the rollsigns on the side of the cars were replaced with electronic LCD signs while the front service sign remained as a rollsign. In sharp contrast, the rebuilt R32s and R38s retained rollsigns on the sides, but a flip-dot display was placed in the front. The MTA has been incorporating newer subway cars into its stock in the past two decades. Since 1999, the R142s , R142As , R143s , R160s , R179s , R188s , and R211s have been added into service. All cars built since 1992 (including

5896-411: The R44s , R46s , R68s , and R68As , are not permitted on BMT Eastern Division – the J , L , M , and Z trains – because of sharper curves on those tracks. All rolling stock, in both the A and B Divisions, run on the same 4 foot 8.5 inches (1,435 mm) standard gauge and use the same third-rail geometry and voltage. However, trains operate only in their own division; operating in

6030-500: The Rockaway Park Shuttle , which runs 4- and 5-car trains; the 42nd Street Shuttle , which runs 6-car trains; the G , which runs 5-car trains; and the 7 , which runs 11-car trains. When the Brooklyn Rapid Transit Company entered into agreements to operate some of the new subway lines, they decided to design a new type of car, 10 feet (3.05 m) wide and 67 feet (20.42 m) long. The subject of several patents,

6164-523: The boroughs of Manhattan , Brooklyn , Queens , and the Bronx . It is owned by the government of New York City and leased to the New York City Transit Authority , an affiliate agency of the state-run Metropolitan Transportation Authority (MTA). Opened on October 27, 1904, the New York City Subway is one of the world's oldest public transit systems, one of the most-used, and the one with

6298-423: The eleventh-busiest rapid transit rail system in the world. The subway carried 2,027,286,000 unlinked, non-unique riders in 2023. Daily ridership has been calculated since 1985; the record, over 6.2 million, was set on October 29, 2015. The system is also one of the world's longest. Overall, the system contains 248 miles (399 km) of routes, translating into 665 miles (1,070 km) of revenue track and

6432-626: The extension of the IRT Flushing Line and the IND Second Avenue Line . Since the opening of the original New York City Subway line in 1904, multiple official and planning agencies have proposed numerous extensions to the subway system. One of the more expansive proposals was the " IND Second System", part of a plan to construct new subway lines in addition to taking over existing subway lines and railroad rights-of-way. The most grandiose IND Second Subway plan, conceived in 1929,

6566-410: The 1970s. In November 2016, the New York City Subway had 6712 cars on the roster. A typical New York City Subway train consists of 8 to 11 cars, although shuttles can have as few as two, and the train can range from 150 to 600 feet (46 to 183 m) in length. The system maintains two separate fleets of cars, one for the A Division routes and another for the B Division routes. A Division equipment

6700-450: The 1980s, make the current fleet of subway cars graffiti-free, as well as order 1,775 new subway cars. By the early 1990s, conditions had improved significantly, although maintenance backlogs accumulated during those 20 years are still being fixed today. Entering the 21st century, progress continued despite several disasters. The September 11 attacks resulted in service disruptions on lines running through Lower Manhattan, particularly

6834-407: The 2002 New York gubernatorial race, but the transit authority said, "Unfortunately, putting the G back to full service is just not an option, given our track capacity—and that's not likely to change." To increase service and reduce waiting time due to the 63rd Street Connector cutbacks, the G would need more trains, but there were not enough cars available in the system. The solution was to reduce

SECTION 50

#1732859486786

6968-415: The 2020–2024 Capital Program. This would allow one of every two to four stations on every line to be accessible, so that all non-accessible stops would be a maximum of two stops from an accessible station. In 2022, the MTA agreed in a settlement to make 95 percent of subway and Staten Island Railway stations accessible by 2055. By comparison, all but one of Boston's MBTA subway stations are accessible,

7102-521: The ADA. (Most grade-level stations required little modification to meet ADA standards.) Many accessible stations have AutoGate access. In addition, the MTA identified "key stations", high-traffic and/or geographically important stations, which must conform to the ADA when they are extensively renovated. Under plans from the MTA in 2016, the number of ADA accessible stations would go up to 144 by 2020. As of May 2024 , there were 145 ADA-accessible stations. Over

7236-515: The BMT Canarsie Line tunnels under the East River , which started in late April 2019. The G train's southern extension to Church Avenue, implemented in 2009 and confirmed permanently in 2012, was also seen as a service improvement. It reduced the need for riders from Park Slope and Kensington to make multiple train transfers to get to northern Brooklyn and Long Island City. In 2013, at

7370-799: The Board, Modification 1 exercising the Option for TGC4 was awarded on January 18, 2006, for $ 9,622,858. Subsequent modifications added newer equipment, such as a more advanced laser scanner, to TGC4 prior to its delivery to NYCTA. The cars use sensors, measuring systems, and data management systems to get a profile of the tracks. The train crew consists of two-track equipment maintainers, one maintenance supervisor, and two to three engineers. The trains typically operate during off-peak weekday daytime hours so as to not interfere with more frequent rush hour service. A single car weighs 45 tons. The cars measure: The track geometry car typically checks each stretch of track about 6 times

7504-549: The CBTC signaling would be capable of handling lengthened G trains. Full service resumed on September 3, 2024. The G uses the following lines with the same service pattern at all times. For a more detailed station listing, see the articles on the lines listed above. The G train is shown in the TV series Girls , as the show's main character, Hannah, lives in Greenpoint (near a stop along

7638-486: The CBTC upgrades, the Crosstown Line was partially closed in three phases starting on June 28, 2024, and G service was partially suspended. Initially, the northern half of the line was closed, followed by the southern half. Local politicians asked the MTA to operate full-length G trains and extend the route to Forest Hills following the partial closures. However, MTA chairman Janno Lieber said that longer G trains would not be restored until ridership levels increase, though

7772-540: The City of New York since the inception of the IND and the other divisions beginning in 1948 are identified by the letter "R" followed by a number; e.g.: R32 . This number is the contract number under which the cars were purchased. Cars with nearby contract numbers (e.g.: R1 through R9 , or R26 through R29 , or R143 through R179 ) may be relatively identical, despite being purchased under different contracts and possibly built by different manufacturers. From 1999 to 2019,

7906-467: The F running local east of Queens Plaza replacing G service, meaning that the G only ran along the Queens Boulevard Line on weekdays. Evening service between 9 p.m. and 11 p.m. was cut back from Queens Plaza to Court Square. On December 16, 2001, the 63rd Street Connector opened and Court Square became the northern terminal for the G train during weekdays, while G service was extended to Forest Hills–71st Avenue at all other times, which represented

8040-468: The F train had more frequent service. Additionally, riders from northern Brooklyn and Long Island City had a direct route to Kensington. Finally, since the Church Avenue terminal had four tracks to store terminating G trains, as opposed to only one storage track at Smith–9th Streets, this reduced delays on both services because terminating G trains could switch to the storage tracks without having to wait in

8174-442: The G as the subway system's "outcast" and the "unwanted drunk uncle everyone has." One reporter wrote of the G, "[Riders] need it because it goes where no other train does, but they hate that they need it." Compounding to the G 's "outcast" reputation, some of the G 's stations along the Crosstown Line are in bad shape. Since 2001, a series of service cuts and missing connections to other lines has worsened public opinion of

SECTION 60

#1732859486786

8308-418: The G in 1985, had its southern terminal at Smith–Ninth Streets from 1976 to 2009. In the 21st century, the G suffered from a wide range of issues that has resulted in complaints by people living along the route. These issues included a dearth of transfers to other services; the lack of direct service to Manhattan; short train lengths; and low frequencies. Since the 2000s, several improvements have been made to

8442-552: The G to Forest Hills had been intermittent, with frequent service changes due to "track work". The 2010 route reduction did increase service frequency on the remainder of the route. Finally, the G has few transfers to other services, with missing transfer points to the J and ​ M trains at Broadway and the 2 , ​ 3 , ​ 4 , ​ 5 ​, B , ​ D , N , ​ Q ​, R and ​ W ​ trains at Fulton Street . When

8576-416: The G train running past Court Square and farther into Queens on weekdays, but because of the addition of the V train, which shared space along the Queens Boulevard Line with the trains already there (the E, F and R trains), G trains could not fit during the daytime, when service is heaviest." However, due to construction on the Queens Boulevard Line, the G train frequently terminated at Court Square even when

8710-467: The G was once again extended south at all times to Church Avenue. This was required for overhaul of the Culver Viaduct, which caused the express tracks at Smith–Ninth Streets and Fourth Avenue/Ninth Street —used to switch G trains between tracks after they terminated at Smith–Ninth Streets—to be temporarily taken out of service. This had several benefits. First, five stations previously served by only

8844-415: The G was part of the original plans of the 63rd Street tunnel and connector, going back to the late 1960s. The service plan was designed to redistribute Queens-bound passenger loads on the crowded IND Queens Boulevard Line, which ran under 53rd Street while in Manhattan. In turn, this plan was intended to bring better service and transfer opportunities, as the V train allowed direct access to 53rd Street and

8978-551: The G, including a route extension in Brooklyn and a full-route audit in 2013 that identified solutions for issues on the G service. As of 2023 , additional improvements are planned for the G route, including the automation of the entire route. The original Brooklyn–Queens Crosstown Local service began on August 19, 1933, as a shuttle between Queens Plaza on the IND Queens Boulevard Line and Nassau Avenue . This service

9112-521: The G. On December 16, 2001, the G 's northern terminus was cut back from Forest Hills to Court Square during weekdays, and since April 2010, this service pattern has applied at all times . This service pattern not only puts more ridership pressure on the E route—already one of the system's busiest before 2001 —but also resulted in G trains' lengths being shortened by one third, from 450 feet (140 m) or 6 cars to 300 feet (91 m) or 4. In addition, between 2001 and 2010, weekend service along

9246-598: The L train shutdown would include free-out-of-system transfers between the G at Broadway and the J , M , and Z ​ trains at Lorimer Street and Hewes Street , as well as between the G at 21st Street and the 7 and <7> ​ trains at Hunters Point Avenue . In addition, closed entrances would be reopened at Metropolitan Avenue, and the Nassau Avenue and Metropolitan Avenue stations' fare control areas would be reconfigured to accommodate increased ridership. The L train shutdown

9380-477: The MTA board. An alternate version was implemented in September 2019 when limited rush hour F trains (designated as a diamond <F>) began running express between Jay Street and Church Avenue, stopping at Seventh Avenue. Beginning on March 23, 1997, G trains started terminating at Court Square on weekends. On August 30, 1997, late night service was permanently cut back from 179th Street to Court Square, with

9514-409: The New York City Subway that measure the system's track geometry to ensure that safe train operation is maintained. The cars are numbered TGC1–TGC4. TGC1 was ordered under contract R59 in 1984 for $ 1.4 million, TGC2 was ordered under contract R63 and cost $ 2.5 million,. Contract R-34152 purchasing TGC3 was awarded on December 29, 2004, for $ 9,610,963, and after additional funding was later authorized by

9648-589: The New York City Transit Authority started disposing of retired subway cars by dumping them at sea to create artificial reefs , with the intention of promoting marine life. This option was chosen because it was less expensive than removing asbestos from the cars; the asbestos was determined to not be a hazard in the ocean. The artificial reefs would provide environmental and economic benefits, such as providing shelter for marine animals and creating new fishing opportunities. The first reef constructed

9782-409: The V was not running), and run more trains on that route. There was a four-hour period where the G, R , and V, as well as the Queens Boulevard line's express services, the E and the F, were all running at once since the V stopped running at midnight and the G was extended to 71st Avenue at 8:00 pm. The authority "had spent several hundred thousand dollars on tests, trying to figure out a way to keep

9916-595: The abandoned LIRR Rockaway Beach Branch (now the IND Rockaway Line ), which opened in 1955. Two stations ( 57th Street and Grand Street ) were part of the Chrystie Street Connection , and opened in 1968; the Harlem–148th Street terminal opened that same year in an unrelated project. Six were built as part of a 1968 plan : three on the Archer Avenue Lines , opened in 1988, and three on

10050-526: The arriving train to identify it. There are several common platform configurations. On a double track line, a station may have one center island platform used for trains in both directions, or two side platforms , one for each direction. For lines with three or four tracks with express service, local stops will have side platforms and the middle one or two tracks will not stop at the station. On these lines, express stations typically have two island platforms, one for each direction. Each island platform provides

10184-528: The borough of Manhattan . The G serves two stations in Queens —Court Square and 21st Street , both in Long Island City. Prior to 2010, it served all stations on the IND Queens Boulevard Line between Court Square and 71st Avenue in Forest Hills . In 1939 and 1940, the then-designated GG also used the now-demolished IND World's Fair Line to access the 1939 New York World's Fair . The GG, which became

10318-453: The car's larger profile was similar to that of steam railroad coaches, permitting greater passenger capacity, more comfortable seating, and other advantages. The BRT unveiled its design, designated BMT Standard , to the public in 1913 and received such wide acceptance that all future subway lines, whether built for the BRT, the IRT, or eventually the IND, were built to handle the wider cars. When

10452-410: The complexity of the system (Manhattan being the smallest borough, but having the most services), but they do show major city streets as an aid to navigation. The newest edition took effect on June 27, 2010, and makes Manhattan bigger and Staten Island smaller, with minor tweaks happening to the map when more permanent changes occur. Earlier diagrams of the subway, the first being produced in 1958, had

10586-476: The connector to the IND 63rd Street Line from the IND Queens Boulevard Line was put into regular passenger service in December 2001, it not only introduced the new V service, but also allowed up to nine additional trains to and from Manhattan on the Queens Boulevard Line during peak hours. However, to make room for the V train on Queens Boulevard, the G had to terminate at Court Square on weekdays. The reroute of

10720-425: The correct platform without having to cross the street before entering. Inside mezzanines are fare control areas, where passengers physically pay their fare to enter the subway system. In many older stations, the fare control area is at platform level with no mezzanine crossovers. Many elevated stations also have platform-level fare control with no common station house between directions of service. Upon entering

10854-602: The first demonstration for an underground transit system in New York City in 1869 and opened it in February 1870. His Beach Pneumatic Transit only extended 312 feet (95 m) under Broadway in Lower Manhattan operating from Warren Street to Murray Street and exhibited his idea for an atmospheric railway as a subway. The tunnel was never extended for political and financial reasons. Today, no part of this line remains as

10988-482: The five-cent fare of the time, or 10¢ ($ 3 in 2023 dollars ). In 1940, the city bought the two private systems. Some elevated lines ceased service immediately while others closed soon after. Integration was slow, but several connections were built between the IND and BMT. These now operate as one division, called the B Division . Since the former IRT tunnels are narrower, have sharper curves, and shorter station platforms, they cannot accommodate B Division cars, and

11122-400: The former IRT remains its own division, the A Division . Many passenger transfers between stations of all three former companies have been created, allowing the entire network to be treated as a single unit. During the late 1940s, the system recorded high ridership, and on December 23, 1946, the system-wide record of 8,872,249 fares was set. The New York City Transit Authority (NYCTA),

11256-486: The headway for rush hour and Saturday morning and afternoon service decreased from 10 minutes to 8 minutes. On April 27, 2003, Saturday morning and afternoon G service was decreased, with service running every 12 minutes instead of every 8 minutes, and Sunday afternoon service was decreased to run every 12 minutes instead of every 10 minutes. In addition, Saturday morning and afternoon G trains turned out of service at Fourth Avenue instead of Church Avenue. On July 5, 2009,

11390-544: The hurricane included the restoration of the new South Ferry station from 2012 to 2017; the full closure of the Montague Street Tunnel from 2013 to 2014; and the partial 14th Street Tunnel shutdown from 2019 to 2020. Annual ridership on the New York City Subway system, which totaled nearly 1.7 billion in 2019, declined dramatically during the COVID-19 pandemic and did not surpass one billion again until 2022. When

11524-497: The hurricane, the tube needed permanent repairs. To allow for these repairs, G service ran only between Nassau Avenue and Church Avenue for twelve weekends between July and December 2013. This schedule was also in effect daily between July 25 and September 2, 2014. In the 21st century, the G suffered from a wide range of issues that has resulted in complaints by people living along the route. Historically, it has connected only Brooklyn and Queens, resulting in many people thinking of

11658-506: The leftover cars together to make the extra trains for the G, and the additional trains needed for V service. Thus, G service now operates 300-foot (91 m) trains, half the length of normal B Division standards. It also operates One Person Train Operation (OPTO) service during late nights and weekends. This, however, meant that riders would be packed into smaller trains, and led some passengers to miss trains because they were standing at

11792-468: The length of the G route. The contract includes not only the Crosstown Line between Court Square and Bergen Street, but also the Culver Line between Bergen Street and Church Avenue. The project also included adding Wi-Fi in the tunnels . Upon the completion of the contract, the G would be one of three routes in the system to be entirely equipped with CBTC, besides the L and 7 trains. To accommodate

11926-441: The length of trains to increase service frequency. Previously, the G service had run 8 60-foot (18 m) car trains or 6 75-foot (23 m) car trains; both were shorter than the typical 600-foot (180 m) length of B Division trains because ridership was deemed too low to justify running full-length G trains in frequent intervals. Under the 2001 plan, trains were shortened from six 75-foot (23 m) cars to four, sticking all

12060-463: The line at the beginning of 2017. Many rapid transit systems run relatively static routings, so that a train "line" is more or less synonymous with a train "route". In New York City, routings change often, for various reasons. Within the nomenclature of the subway , the "line" describes the physical railroad track or series of tracks that a train "route" uses on its way from one terminal to another. "Routes" (also called "services") are distinguished by

12194-403: The lines and leased them to the companies. The first line of the city-owned and operated Independent Subway System (IND) opened in 1932. This system was intended to compete with the private systems and allow some of the elevated railways to be torn down but stayed within the core of the city due to its small startup capital. This required it to be run 'at cost', necessitating fares up to double

12328-629: The modern-day New York City Subway system were already in service by then. The oldest structure still in use opened in 1885 as part of the BMT Lexington Avenue Line in Brooklyn and is now part of the BMT Jamaica Line . The oldest right-of-way, which is part of the BMT West End Line near Coney Island Creek , was in use in 1864 as a steam railroad called the Brooklyn, Bath and Coney Island Rail Road . The first underground line of

12462-518: The most stations, with 472 stations in operation (423, if stations connected by transfers are counted as single stations). The system has operated 24/7 service every day of the year throughout most of its history, barring emergencies and disasters. By annual ridership, the New York City Subway is the busiest rapid transit system in both the Western Hemisphere and the Western world , as well as

12596-564: The now out-of-service R110As and R110Bs ) are equipped with digital signs on the front, sides, and interior (except for the R110Bs , which had rollsigns on the front). Old cars, some from the original companies ( IRT , BMT , and IND ), are preserved at the New York Transit Museum , while others have been sold to private individuals and/or other railway/trolley museums. Private companies include Railway Preservation Corp., whose equipment

12730-436: The other division is not allowed. A Division sections have narrower tunnel segments, tighter curves, and tighter platform clearances than the B Division sections, so B Division trains cannot fit in the A Division tunnels and stations, while A Division trains would have an unacceptably large gap between the platform and train if they were allowed in service on B Division lines. Also, the safety train stop (trip cock) mechanism

12864-421: The other for the B Division routes. There are 2,890 A Division cars and 3,822 B Division cars as of September 2024. All A Division equipment is approximately 8 feet 9 inches (2.67 m) wide and 51 feet (15.54 m) long. B Division cars are larger, about 10 feet (3.05 m) wide and either 60 feet 6 inches (18.44 m) or 75 feet 6 inches (23.01 m) long. The 75-foot cars,

12998-412: The other hand, are about 10 feet (3.05 m) wide and either 60 feet 6 inches (18.44 m) or 75 feet 6 inches (23.01 m) long. The A Division and B Division trains operate only in their own division; operating in the other division is not allowed. All rolling stock, in both the A and B Divisions, run on the same 4 foot 8.5 inches (1,435 mm) standard gauge and use

13132-404: The perception of being more geographically inaccurate than the diagrams today. The design of the subway map by Massimo Vignelli , published by the MTA between 1972 and 1979, has become a modern classic but the MTA deemed the map flawed due to its placement of geographical elements. A late night-only version of the map was introduced on January 30, 2012. On September 16, 2011, the MTA introduced

13266-441: The platform at different times of the day; public service announcement systems on platforms along the IND Crosstown Line; relocated benches; and new CCTV systems installed for OPTO. Such improvements eliminated the infamous "G train sprint," wherein riders ran for G trains that stopped at the other end of the platforms. From 2010 to 2015, ridership on the G rose 17%, with approximately 150,000 riders per weekday in 2015. At

13400-473: The published timetable said it ran to 71st Avenue. Some riders were suspicious that the service disruptions were "simply a de facto way to implement the original plan of halving G train service." The original plans called for the G terminate at Court Square at all times; that plan was shelved in 2001 in the face of community opposition, but due to budget cuts, the MTA decided to implement it in 2010. An MTA spokesman said, "It's not personal.... If you want to keep

13534-651: The request of State Senators Daniel Squadron and Martin Malave Dilan , the MTA conducted a review of the entire G route. The route had been maligned by riders because of its unreliability, and the review recommended a few service changes for the G. On June 9, 2014, a budget surplus in the MTA allowed these improvements to be implemented. These improvements included an increase in the number of trains per hour, from six to 7 + 1 ⁄ 2 trains per hour during evening rush hour; uniform stopping locations for trains, whereas previously, trains stopped at different places along

13668-447: The rest reopened in September 2002, along with service south of Chambers Street. Cortlandt Street reopened in September 2018. In October 2012, Hurricane Sandy flooded several underwater tunnels and other facilities near New York Harbor , as well as trackage over Jamaica Bay . The immediate damage was fixed within six months, but long-term resiliency and rehabilitation projects continued for several years. The recovery projects after

13802-512: The reverse of the previous pattern. Service along the IND Queens Boulevard Line was replaced by the new V train during weekdays. The G was to be truncated to Court Square at all times to make room for the V, but due to rider opposition it was cut back only on weekdays until 8:30 pm. Four G trains in each direction ran to or from Church Avenue. The headway for weekday evening service increased from 12 minutes to 15 minutes, while

13936-468: The routes proposed over the decades have never seen construction, discussion remains strong to develop some of these lines, to alleviate existing subway capacity constraints and overcrowding, the most notable being the proposals for the Second Avenue Subway . Plans for new lines date back to the early 1910s, and expansion plans have been proposed during many years of the system's existence. After

14070-403: The routes that would normally run on these lines. The Transit Authority announces planned service changes through its website, via placards that are posted on station and interior subway-car walls, and through its Twitter page. Current official transit maps of the New York City Subway are based on a 1979 design by Michael Hertz Associates . The maps are not geographically accurate due to

14204-496: The same third-rail geometry and voltage. A typical revenue train consists of 8 to 10 cars, although in practice they can range between 2 and 11 cars. The subway's rolling stock have operated under various companies: the Interborough Rapid Transit (IRT), Brooklyn–Manhattan Transit (BMT), and Independent Subway System (IND), all of which have since merged into the New York City Transit Authority . Cars purchased by

14338-414: The shutdown. A full-length G train would run every five to six minutes, more than doubling the route's total capacity. Since the G train's schedule is designed around that of the F train, train frequencies on both routes would have to be modified. In July 2018, the MTA published a report stating that the G route would have 15 full-length trains per hour between Court Square and Bedford–Nostrand Avenues, or

14472-428: The station and line being demolished later that year. As a result, GG service was truncated to Forest Hills–71st Avenue. Additional GG service was provided for the 1964 New York World's Fair , running nonstop between Hoyt–Schermerhorn Streets station and Roosevelt Avenue every 30 minutes between 10 a.m. and 3:30 pm. It took 23 minutes for trains to travel between the two stations. On August 19, 1968, service

14606-507: The station for another train to leave, as had occurred at Smith–Ninth Street. On July 19, 2012, MTA officials made this extension permanent because it provided more direct connections between Kensington and north Brooklyn. Due to the MTA's financial crisis in the late 2000s, as well as continued capacity issues on the IND Queens Boulevard Line, the G was to be cut back from Forest Hills–71st Avenue to Court Square at all times beginning June 27, 2010. However, due to planned track repairs during

14740-727: The subway opened on October 27, 1904, almost 36 years after the opening of the first elevated line in New York City (which became the IRT Ninth Avenue Line ). The 9.1-mile (14.6 km) subway line, then called the "Manhattan Main Line", ran from City Hall station northward under Lafayette Street (then named Elm Street) and Park Avenue (then named Fourth Avenue) before turning westward at 42nd Street . It then curved northward again at Times Square , continuing under Broadway before terminating at 145th Street station in Harlem . Its operation

14874-508: The subway system runs on surface or elevated tracks, including steel or cast-iron elevated structures , concrete viaducts , embankments , open cuts and surface routes. As of 2019 , there are 168 miles (270 km) of elevated tracks. All of these construction methods are completely grade-separated from road and pedestrian crossings, and most crossings of two subway tracks are grade-separated with flying junctions . The sole exceptions of at-grade junctions of two lines in regular service are

15008-529: The subway), as the city was concerned that they were a magnet for criminals; this resulted in G trains along the Crosstown Line needing to stop at the locations closest to the exits. However, in July 2005, in response to community pressure, the MTA agreed to re-open an exit to the southwestern corner of South Portland Avenue to the southbound platform of the Fulton Street station. The New York Times described it as

15142-434: The system up to date, you need to make sure the track and switching are all in good repair." Community groups such as Save the G! and the Riders Alliance have been frequent activists for improvements of G service. Save the G! regularly lobbied the MTA for more G train service since the original cutbacks when the V was introduced in 2001. They made the restoration of service to the Queens Boulevard Line at all times an issue in

15276-443: The time, it was the route with the fastest growing ridership base in the entire system. These improvements also had the additional benefit of being able to accommodate the growing ridership base in gentrified neighborhoods along the line, like Park Slope, Carroll Gardens , Bedford–Stuyvesant , Williamsburg , Greenpoint , and Long Island City . This was due in part to the G 's weekday frequencies having become more dependable as

15410-522: The times the G normally ran on the Queens Boulevard Line, it ceased running on that line on April 19. In addition, train headways were increased, which inconvenienced about 201,000 weekly commuters since they had to wait longer for G trains. Flood waters from Hurricane Sandy caused significant damage to the Greenpoint Tubes under the Newtown Creek . Although the G was back in service days after

15544-613: The transfer were to become free. Temporary free transfers have been provided in the past, including one to Lorimer Street in 1999 due to suspended service over the Williamsburg Bridge on the J , M , and Z ​ trains, and again during the Summer 2014 G service suspension north of Nassau Avenue. A second transfer, from Fulton Street to the busy Atlantic Avenue–Barclays Center complex in Downtown Brooklyn ,

15678-407: The tunnel was completely within the limits of the present-day City Hall station under Broadway. The Great Blizzard of 1888 helped demonstrate the benefits of an underground transportation system. A plan for the construction of the subway was approved in 1894, and construction began in 1900. Even though the underground portions of the subway had yet to be built, several above-ground segments of

15812-535: The union's founding, there have been three union strikes over contract disputes with the MTA: 12 days in 1966 , 11 days in 1980 , and three days in 2005 . By the 1970s and 1980s, the New York City Subway was at an all-time low. Ridership had dropped to 1910s levels, and graffiti and crime were rampant. Maintenance was poor, and delays and track problems were common. Still, the NYCTA managed to open six new subway stations in

15946-717: The work. The foundations of tall buildings often ran near the subway construction, and in some cases needed underpinning to ensure stability. This method worked well for digging soft dirt and gravel near the street surface. Tunnelling shields were required for deeper sections, such as the Harlem and East River tunnels, which used cast-iron tubes. Rock or concrete-lined tunnels were used on segments from 33rd to 42nd streets under Park Avenue ; 116th to 120th Streets under Broadway ; 145th to Dyckman Streets (Fort George) under Broadway and St. Nicholas Avenue ; and 96th Street and Broadway to Central Park North and Lenox Avenue . About 40% of

16080-451: The wrong part of the platform. In the past, there have been signs indicating where the train stops at some stations, in addition to the "4" and "6" markers next to the tracks used by train operators as stop points. Still, the overall lack of visual identifiers of train stop points on the platforms, the differing stop points during different times of day, and the location of staircases, transfer passageways and platform benches have been cited as

16214-538: The years, the MTA has been involved in a number of lawsuits over the lack of accessibility in its stations. The Eastern Paralyzed Veterans Association filed what may have been the first of these suits in 1979, based on state law. The lawsuits have relied on a number of different legal bases, but most have centered around the MTA's failure to include accessibility as a part of its plans for remodeling various stations. As of January 2022 , ADA-accessibility projects are expected to be started or completed at 51 stations as part of

16348-471: Was Redbird Reef in Delaware. Eventually, multiple states received retired subway cars for reefs. The program was discontinued in 2010, after more than 2,500 cars were reefed, because newer cars contained more plastic, which was too expensive to economically remove before reefing. Various kinds of cars are used for maintenance work, including flatcars and vacuum trains. There are four track geometry cars on

16482-854: Was a mid-life overhaul program for neglected subway cars, which involved a thorough rebuilding of the fleet. Since the completion of the GOH program, the new Scheduled Maintenance System (SMS) program has replaced the GOH program by ensuring that trains do not reach a state in which they would need such an overhaul. The car types, which were part of the MTA NYCT GOH program, are the IRT Redbirds ( R26 , R28 , R29 , R33 , R33S , R36 ), as well as IND/BMT cars ( R30 GE, R32 , R38 , R40, R40A , R42 , R44 , and R46 ). These cars were rebuilt between 1985 and 1993. Some cars in various classes from R10 to R46 were also given lighter overhauls during this period. Cars purchased by

16616-479: Was curtailed in January 2019. Instead of being a full-time closure, it would only be a partial closure on nights and weekends. However, the station enhancements along the route were still implemented. The following month, the MTA decided that the G would not receive full-length trains, though it would still see an increase in train frequencies during nights and weekends. A spokesperson for the MTA said in 2023 that there

16750-673: Was cut back to Queens Plaza on July 26, 1992. In January 1991, F express service was proposed to speed service during the height of rush hours which would have reduced travel time by up to five minutes. Alternate F trains would operate express in both directions between Jay Street and Church Avenue , stopping at Seventh Avenue ; as a result of this service change, G trains would be cut back from its southern terminal at Smith–Ninth Streets and originate and terminate at Bergen Street to prevent delays in express service. This service change would have been implemented in October 1991, pending approval from

16884-726: Was designated GG because the IND used double letters to indicate local service. Starting on April 24, 1937, GG trains were extended to Forest Hills–71st Avenue during rush hours, serving as the Queens Boulevard local while E trains ran express west of 71st Avenue. The entire IND Crosstown Line was completed on July 1, 1937, including the connection to the IND Culver Line (then the South Brooklyn Line) at Bergen Street . Although some retrospective accounts have intimated that GG service initially ran at all times between Forest Hills–71st Avenue and Church Avenue before being truncated,

17018-457: Was discontinued on June 3, 2011, when an in-system transfer opened at the corner of 23rd Street and 45th Road, which made only the Flushing Line station ADA-accessible. The MTA provided $ 17 million in funding for making the Crosstown Line accessible as part of the 2015–2019 Capital Program. The MTA also agreed to extend the G to Forest Hills–71st Avenue during evenings and weekends (when

17152-446: Was eliminated and GG service was cut back to Smith–Ninth Streets. On January 24, 1977, as part of a series of NYCTA service cuts to save $ 13 million, many subway lines began running shorter trains again during middays. As part of the change, GG trains began running with four cars between 9:30 a.m. and 1:30 pm. On August 27, 1977, GG service was cut back to Queens Plaza during late nights, and local service along Queens Boulevard

17286-497: Was extended to Church Avenue during rush hours to allow for the introduction of F express service on the IND Culver Line. Since riders at local stations complained about the loss of direct service to Manhattan , F trains to and from Kings Highway began making local stops. All peak-direction F trains began running local on January 19, 1976. On August 30, 1976, due to budget cuts, remaining F express service north of Church Avenue

17420-560: Was leased to the Interborough Rapid Transit Company (IRT), and over 150,000 passengers paid the 5-cent fare ($ 2 in 2023 dollars ) to ride it on the first day of operation. By the late 1900s and early 1910s, the lines had been consolidated into two privately owned systems, the IRT and the Brooklyn Rapid Transit Company (BRT, later Brooklyn–Manhattan Transit Corporation , BMT). The city built most of

17554-416: Was not enough rolling stock available to allow G trains to be lengthened without decreasing frequencies. Weekend frequencies on the G route were increased in July 2023. In December 2022, the MTA announced that it would award a $ 368 million design–build contract to Crosstown Partners, a joint venture between Thales Group and TC Electric LLC, to install communications-based train control (CBTC) along

17688-448: Was provided by the F . Effective May 6, 1985, use of double letters to indicate local service was discontinued, so the GG was relabeled G. Afterwards, as part of the New York City Transit Authority's proposed service plan to serve the new Archer Avenue Line upper level, the G would have been extended to Jamaica Center during weekends and evenings when N trains terminated at 71st Avenue or 57th Street–Seventh Avenue . During late nights,

17822-450: Was rejected by the MTA due to the long walking distance between the two stations, as well as the fact that there is a transfer to Manhattan-bound A and ​ C trains at Hoyt–Schermerhorn Streets . A temporary transfer between Broadway and Hewes Street or Lorimer Street (along the BMT Jamaica Line ) was reinstated in April 2019 due to L train service changes associated with

17956-410: Was to be part of the city-operated IND, and was to comprise almost 1 ⁄ 3 of the current subway system. By 1939, with unification planned, all three systems were included within the plan, which was ultimately never carried out. Many different plans were proposed over the years of the subway's existence, but expansion of the subway system mostly stopped during World War II . Though most of

#785214