Misplaced Pages

BCDA

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#656343

34-432: BCDA can refer to: Bases Conversion and Development Authority , a Philippine government agency Balochistan Coastal Development Authority , a provincial agency of Government of Pakistan Topics referred to by the same term [REDACTED] This disambiguation page lists articles associated with the title BCDA . If an internal link led you here, you may wish to change

68-586: A mode of payment in SCTEx since March 2018. The toll rates, by kilometer travelled and vehicle class are as follows: From 2016, the SCTEx has two service areas in Concepcion, Tarlac, north of the Sacobia River. One of the service areas is on the northbound lanes and the other one is on the southbound lanes. The northbound service area is composed of a PTT gas station and a 7-Eleven store. The southbound service area

102-439: A mostly straight route. The expressway then curves to the northeast before Floridablanca Exit. It curves toward the northwest and back to the northeast before Porac Exit. It then curves eastward and then northward near Clark Freeport and Clark International Airport . Clark South Exit, which serves those areas, lies near Mabalacat Interchange, with the exits being one kilometer (0.62 mi) apart from each other. The segment ends at

136-583: Is a government-owned and controlled corporation under the Office of the President of the Philippines . It is a government instrumentality vested with corporate powers under Republic Act 7227 (Bases Conversion and Development Act of 1992), signed into law by former President Corazon C. Aquino on March 13, 1992. The BCDA Charter was as amended by RA 7917 in 1995, and further amended by RA 9400 in 2007. The corporation

170-607: Is mandated to transform former US military bases into alternative productive civilian use. The Bases Conversion and Development Authority (BCDA) is a development corporation vested with corporate powers under Republic Act (RA) 7227 (Bases Conversion and Development Act of 1992), signed into law by former President Corazon C. Aquino on March 13, 1992. The BCDA Charter was amended by RA 7917 in 1995, and further amended by RA 9400 in 2007. BCDA engages in public-private partnerships to push forward public infrastructure such as tollways, airports, seaports, and major real estate developments. It

204-513: Is one of the key agencies driving "Build Build Build", the Philippine government's infrastructure plan. This infrastructure plan is intended to reduce congestion, create jobs and alleviate costs in the Philippines. During the first two years of the present administration under Philippine President Rodrigo Duterte, BCDA has contributed P8.2 billion to the modernization program of the Armed Forces of

238-574: The Holy Week exodus. Among the integration plans which costed ₱ 650 million are the reduction of toll collection stops, construction of additional toll plazas and the conversion of the electronic toll collection of the two expressways into a single system. Also, with the government's thrust towards toll road interoperability, Autosweep of the San Miguel Corporation which operates SLEX, Skyway, STAR Tollway, NAIAX, and TPLEX has been accepted as

272-678: The Toll Regulatory Board (TRB) On March 18, 2008, at exactly 1 p.m., President Gloria Macapagal Arroyo opened the Subic – Clark segment of the expressway for a Holy Week dry run. This helped motorists traveling to Zambales and Bataan for Holy Week. The dry run was free and available for class 1 vehicles only. The Holy Week dry run was from March 18, 1 p.m. to 5:30 p.m and March 19 to 24, 5:30 a.m. to 5:30 p.m.; operating hours were limited as no street lights were installed that time. On April 28, 2008, at exactly 12 noon, BCDA opened

306-553: The Agreement, the SCTEX can be considered as having been built at no cost to Government. The toll system of Subic–Clark–Tarlac Expressway is a closed road system that uses cards with magnetic strips , and from March 2016, electronic toll collection, using the Easytrip system by its concessionaire, Manila North Tollways Corporation (now NLEX Corporation ), is introduced, eventually integrating

340-922: The BCDA Group: The BCDA is the builder of the Subic-Clark-Tarlac Expressway , a four-lane tollway. It also constructed and manages Clark International Airport . Subic-Clark-Tarlac Expressway The Subic–Clark–Tarlac Expressway ( SCTEX ), signed as E1 and E4 of the Philippine expressway network , is a controlled-access toll expressway in the Central Luzon region of the Philippines . From its northern terminus in Tarlac City to its southern terminus at Tipo in Dinalupihan , Bataan ,

374-651: The BCDA and the Manila North Tollways Corporation (MNTC), and its holdings companies Metro Pacific Tollways Corporation (MPTC) and Metro Pacific Investments Corporation (MPIC), was signed July 25, 2011. Under the business and operating agreement, MNTC will operate and manage SCTEx for 33 years, while relieving BCDA of the heavy financial burden of paying the ₱34-billion debt to the Japan International Cooperation Agency (JICA). By virtue of

SECTION 10

#1732838058657

408-596: The BCDA is the Armed Forces of the Philippines (AFP). Of the Php57.215 billion generated through BCDA's Asset Disposition Program (ADP), 38.08% or P21.788 billion has been remitted to the National Treasury for the account of the AFP. This is broken down into Php12.292 billion for the AFP modernization program and Php9.496 billion for military replication expenses. As mandated by R.A.7227 and amended by R.A. 7917, other beneficiaries are

442-788: The Clark Logistics interchange in Mabalacat, where it meets the Clark Spur Road that links SCTEX with North Luzon Expressway (NLEX) and crosses over MacArthur Highway (N2). Past the Clark Logistics interchange, its main destination changes to Tarlac City and Baguio . The roadway runs at the boundary of Clark Freeport and Mabalacat city proper, where the Philippine National Railways (PNR) North Main Line to Dagupan and San Fernando , La Union also lies. MacArthur Highway parallels

476-680: The Philippines (AFP), BCDA's major stakeholder. The amount represents 20 percent of the total P40 billion received members of the AFP from BCDA since the state-run agency was created in 1992. For the past 25 years, BCDA has already disposed a total of Php90.32 billion worth of assets. Since 1992, BCDA has generated Php57.215 billion in disposition proceeds from the sale, lease and/or joint venture development of former Metro Manila camps and their transformation into new premier mix-use economic districts. The biggest two are Fort Bonifacio and Villamor Air Base, which are now known as Bonifacio Global City and Newport City, respectively. The biggest stakeholder of

510-857: The SCTEX is built as a four-lane expressway mostly laid out on embankment , with some sections using cuts to traverse hilly areas. The expressway also crosses the four rivers in Central Luzon : the Dinalupihan River in Bataan , the Gumain River in Floridablanca and the Pasig–Potrero River in Porac , both in Pampanga , and the Sacobia River in Bamban, Tarlac . All exits require toll payment, and toll plazas are laid on

544-608: The SCTEX serves as one of the main expressways in Luzon. The expressway is also connected to the Central Luzon Link Expressway , North Luzon Expressway , Tarlac–Pangasinan–La Union Expressway , and the Subic Freeport Expressway . The SCTEX is the country's longest expressway at 93.77 kilometers (58.27 mi) until the completion of Toll Road 4 of South Luzon Expressway (SLEX). The Subic–Clark–Tarlac Expressway

578-721: The Subic-Clark segment, and a joint venture of Hazama, Taisei , and Nippon Steel for the Clark-Tarlac segment. Consultation was provided by a joint venture of Oriental Consultant, Katahira & Engineering International, and Nippon Koei Co. Ltd. (now ID&E Holdings) The total cost for the construction of the expressway is ₱34.957 billion . It was sourced through a loan from the Japan Bank for International Cooperation (JBIC) amounting to ¥ 41.93 billion or ₱23.06 billion with an interest rate of 0.95% per annum. ₱25.737 billion of

612-529: The Subic–Clark segment to all vehicles. BCDA said that travel time from Manila to Subic via North Luzon Expressway would now only take 1 hour and 40 minutes while the travel time from Clark to Subic would only take 40 minutes. The Dolores exit (formerly Clark North A exit) was also opened, which connects to MacArthur Highway. On July 25, 2008, the BCDA announced the opening of the Clark–Tarlac segment of

646-512: The administration of President Joseph Estrada with an original project cost of ₱ 15.73 billion . On September 14, 2001, the loan agreement was signed between the Philippines and Japan to finance and construct the expressway with a total cost of ₱17.84 billion (¥41.93 billion) during the state visit of President Gloria Macapagal Arroyo in Japan. Construction of the expressway commenced on April 5, 2005 which established its right-of-way that marked

680-575: The bases conversion program, the other major mandate under RA7227. After BCDA remits the money to the Bureau of Treasury, the utilization and distribution of the remittances become the responsibilities of the Department of Budget and Management in accordance with the approved fiscal program of the government and shall release the share of the beneficiary agencies pursuant to the budget execution guidelines. The following sites are currently owned and maintained by

714-585: The contiguous municipalities of Taguig, Pateros and Makati, and 14 other government beneficiary agencies, receiving shares amounting to Php462 million and Php7.272 billion, respectively. On the other hand, some Php619 million went to the replication of non-military facilities affected by the developments, Php4.373 billion for taxes, duties and fees and Php7.190 to direct expenses like construction of site development projects, relocation and housing of informal occupants, survey, appraisal and titling expenses, as well as administrative costs. Further, Php10.891 billion went to

SECTION 20

#1732838058657

748-515: The expressway started in 2005. Commercial operations then started on April 28, 2008, with the opening of the Subic–Clark Segment and Zone A of the portion of Clark-Tarlac Segment. The opening of Zones B and C of the remaining Clark–Tarlac Segment on July 25, 2008, signaled the full operations of SCTEX. The Subic–Clark–Tarlac Expressway (SCTEX) runs northwest from Bataan and runs through the provinces of Pampanga and Tarlac . The entirety of

782-401: The expressway up to Tarlac City. Leaving Clark Freeport, Clark North Exit comes before the expressway, where it curves and then crosses MacArthur Highway at Barangay Dolores, where a half-partial cloverleaf interchange, serving only northbound traffic, connects the two. Approaching Tarlac, the expressway crosses over the Sacobia River through a bridge mentioned before. The first service areas on

816-403: The expressway, one serving northbound traffic, and the other serving southbound traffic, apart by one kilometer, comes before Concepcion Exit. The expressway passes near the poblacion of Concepcion, then over agricultural land of Tarlac City . Hacienda Luisita Exit, that serves Hacienda Luisita as well as connecting MacArthur Highway and serving barangays along its connecting road, comes before

850-456: The expressway. Travel time from Clark to Tarlac was reduced to only 25 minutes and to travel the entire length of the SCTEX would only take about 1 hour. At the same time, the travel time from Manila to Tarlac City via NLEx and the SCTEX would only take 1 hour and 25 minutes. In 2015, the BCDA awarded the operations and maintenance of the expressway to the Manila North Tollways Corporation (MNTC, now NLEX Corporation ). The operator took over

884-523: The link to point directly to the intended article. Retrieved from " https://en.wikipedia.org/w/index.php?title=BCDA&oldid=1164666564 " Category : Disambiguation pages Hidden categories: Short description is different from Wikidata All article disambiguation pages All disambiguation pages Bases Conversion and Development Authority The Bases Conversion and Development Authority ( BCDA ; Filipino : Pangasiwaan sa Pangkaunlarang Kumbersiyon ng mga Base )

918-640: The management of the toll road on October 27. The seamless integration, which replaced the old tolling system with demolished toll plazas, was completed in March 2016 to merge the two expressways into one system. The expressway is part of the Bases Conversion and Development Authority's Subic–Clark–Tarlac Expressway Project or SCTEP, which aims to connect the ecozones of Subic and Clark. The joint-venture of First Philippine Infrastructure Development Corporation (FPIDC), Tollways Management Corporation and Egis Projects,

952-418: The northern end of the expressway at Tarlac City Exit. A new toll plaza built on the main route serves Tarlac City Exit, whose toll gates are removed with its opening. The exit serves an interchange with the Central Luzon Link Expressway (CLLEX). Past Tarlac City Exit, SCTEX becomes Tarlac–Pangasinan–La Union Expressway (TPLEX) northward. The Subic–Clark–Tarlac Expressway or SCTEx Project was initiated under

986-639: The same concessionaires of the North Luzon Expressway , would handle all the operations and maintenance of the expressway. The First Philippine Infrastructure Development Corporation is a subsidiary of First Philippine Holdings, a holding company under the Lopez Group of Companies with core investments in power and tollways, and strategic initiatives in property and manufacturing. The FPIDC was eventually sold to Metro Pacific Investments Corporation in 2008. The SCTEX business and operating agreement between

1020-448: The start of the expressway's existence. The expressway is the longest in the country, covering 93 kilometers (58 mi). The original project for the expressway is divided into two segments: the 50.5-kilometer (31.4 mi) Subic-Clark segment and the 43.27-kilometer (26.89 mi) Clark-Tarlac segment. The contractors for the project are a joint venture of Kajima , Obayashi , JFE Engineering , and Mitsubishi Heavy Industries for

1054-725: The termini of the expressway. SCTEX starts at Tipo Interchange, its intersection with the Subic Freeport Expressway (SFEX) in Dinalupihan , near Barangay Tipo in Hermosa, Bataan . The expressway initially traverses the Roosevelt Protected Landscape and is built parallel to the Jose Abad Santos Avenue (N3) until Dinalupihan Exit, where the expressway curves northward and tracks the Angeles-Porac-Floridablanca-Dinalupihan Road as it follows

BCDA - Misplaced Pages Continue

1088-412: The toll system of the expressway with North Luzon Expressway 's. Before March 2016, the toll system is completely independent, with toll collection from NLEx and vice versa being done at a toll plaza on Clark Spur Road in Mabalacat, until the structure's demolition following the toll system integration. In March 2016, the integration of the North Luzon Expressway and the SCTEX was completed, in time for

1122-405: The total project cost represents direct costs such as expenses incurred for the construction of the SCTEX. The indirect costs of ₱7.146 billion include land acquisition, consultancy services, project management expenses and taxes and duties. Financing costs of ₱2.074 billion include the Department of Finance guarantee fee and JBIC loan interest during the construction period. Toll Fees are approved by

1156-584: Was constructed to provide a more efficient transport corridor between Subic Bay Freeport , Clark , and the Central Techno Park in Tarlac, foster development on the municipalities served, and connect major infrastructures such as the Subic Seaport and Clark International Airport . Built by the Bases Conversion and Development Authority (BCDA), a government owned and controlled corporation , construction of

#656343