The Wipkingen Tunnel ( German : Wipkingertunnel ) is a railway tunnel in the Swiss city of Zürich . The tunnel runs from the northern end of Wipkingen station to a portal to the south of Oerlikon station . It carries twin standard gauge ( 1,435 mm or 4 ft  8 + 1 ⁄ 2  in ) tracks electrified at 15 k V AC 16 2/3 Hz using overhead catenary . Since 1902, the line has been part of the Swiss Federal Railways (SBB).

#195804

36-589: The tunnel was opened in 1856 to complete the Schweizerische Nordostbahn (NOB) line from Zürich Hauptbahnhof to Winterthur via Wallisellen , which had opened from Oerlikon to Winterthur the previous year. In addition to the tunnel, a bridge, over the River Limmat , was constructed to the south of Wipkingen station, in order to access the throat of the Hautbahnhof station via a descending embankment. In

72-596: A second rail link between Lake Geneva and Lake Constance to compete with the existing railway companies from 1872. As a defense measure, the NOB and SCB extended their existing networks between 1873 and 1882. The two companies founded the Aargau Southern Railway ( Aargauische Südbahn ) and the Bötzberg Railway ( German : Bötzbergbahn ) with equal shareholdings. The former was built and opened between 1873 and 1882

108-501: A shipping service on Lake Constance in 1855. The train ferry service between Romanshorn and Friedrichshafen (Germany) was established in 1869. This led the NOB to expand the railway facilities and to construct the largest of the ports on Lake Constance (measured by area), which required the shore to be raised. The NOB started work on the Winterthur–Schaffhausen railway in 1856 and it was opened on 16 April 1857. The line of

144-449: A stop signal. The train from Wettingen was pushed back from Seebach over the junction on the open track towards Zurich. The accident caused seven casualties and major property damage. An NOB passenger train hit a group of Central Railway workers, which had been busy with track work, at the southern exit from Gütsch tunnel near Lucerne on 30 May 1898. Seven railway workers were killed immediately and four seriously injured. On 4 June 1899,

180-788: The Spanisch-Brötli-Bahn ), and the Zürich-Lake Constance Railway ( Zürich-Bodenseebahn ). The originally planned continuation of the Northern Railway from Baden to Basel initially failed due to the different interests of the cantons of Zürich , Aargau and Basel . The main initiator of the merger were the Zürich-based businessman Alfred Escher , who previously headed the Zürich-Lake Constance Railway, and economist Bruno Hildebrand . They advocated

216-555: The Aargau - Solothurn canton border, meaning that Zürich was now connected with Basel. On 18 August 1859, the NOB was able to complete a direct connection with a foreign country with the opening of the Turgi–Waldshut line . This completed the main network of Northeastern Railway. The most important northern gateway to Switzerland was Basel, but it was controlled by the SCB. Freight transport

252-587: The Lake Zürich right-bank line , which it had begun in 1873, had to be discontinued because of the financial crisis. The important Lake Zürich left-bank railway to Ziegelbrücke, however, was opened in 1875. The NOB could not pay dividends for years from 1877. The price of its shares collapsed from Swiss Francs (CHF) 670 in 1871 to CHF 53 in 1879. An investigation commissioned by the General Assembly found grave mistakes in corporate governance. On 2 March 1877,

288-628: The Rupperswil–Immensee railway line with a branch line from Hendschiken to Brugg, connecting the network of the NOB and the SCB with the Gotthard Railway in 1882. The Bötzberg Railway, operated by the NOB, opened the Brugg–Pratteln railway in 1875, which together with the existing lines of the NOB and the SCB created a direct connection from Zurich to Basel. In addition, the NOB under the new CEO Friedrich Peyer im Hof , tried to eliminate

324-741: The Thurgau and the Stadt Zürich in 1855. The NOB merged with the Schweizerischen Dampfboot-Aktiengesellschaft für den Rhein und Bodensee (Swiss Steamboat Corporation for the Rhine and Lake Constance) on 1 January 1857. It was founded in 1850 in Schaffhausen as a cantonal enterprise and in the following four years put into service the steamships Stadt Schaffhausen , Rhein , Stadt St. Gallen and Bodan . In 1863, shipping operations on

360-515: The Zürich–Zug–Lucerne Railway (ZZL), which was finished on 1 June 1864. The NOB—like other railway companies at the time—aimed at short-term profit maximisation for private bankers. The bankers took offices in management and the board of directors to secure their profits. The rights of the other shareholders was undermined by the use of common stock. They gained exemption from tax and subsidies through political influence. Alfred Escher

396-580: The 1890s, the embankment was replaced by the Aussersihl Viaduct , which carried the Winterthur line over several streets and the railway yards and line to Baden . The footprint of the older embankment route is today occupied by Röntgenstrasse . As built, the tunnel was 959 metres (3,146 ft) long, with a southern portal close to the Rosengartenstrasse . In the 1990s, the tunnel was extended to

SECTION 10

#1732859231196

432-619: The Lake Zurich right bank line) was extended. An agreement with the canton of Glarus set the date for the completion of the Glarus–Linthal line at 1 May 1879. The payment of dividends was suspended from 1880 to 1883. On 25 October 1887, the Federal Council instructed the NOB to begin construction of the Lake Zurich right bank line. The deadlines for the remaining moratorium lines were set on 27 June 1888. The ruinous competitive project of

468-508: The NOB decided in 1867 to transport railway wagons by train ferry . A steam ferry known as " steam ferry I " was used on the Friedrichshafen–Romanshorn route. This over 70 metre-long ferry was able to accommodate 18 freight wagons, but had a horrendous rate of coal consumption. It was retired in 1882 and subsequently scrapped. A second ferry known as "steam ferry II" started operating between Lindau and Romanshorn in 1874. In 1884,

504-455: The NOB opened the line from Romanshorn to Winterthur on 16 May 1855. The Zürich–Winterthur extension was opened in two stages from Winterthur to Oerlikon on 27 December 1855 and to Zürich on 26 June 1856; this gave a connection to the former Northern Railway between Zürich and Baden. The arrival of the railway caused the village of Romanshorn to grow into one of the most important transport hubs in eastern Switzerland. The NOB started

540-527: The NOB requested that the Federal Council release it from its obligations to build railways. On 14 February 1878, the Federal Assembly confirmed an agreement that the construction obligations would be maintained, but would be deferred until the completion of the NOB's financial restructuring. The construction period for the so-called "moratorium lines" ( Thalwil–Zug , Etzwilen–Schaffhausen , Bülach–Schaffhausen , Koblenz–Stein , Dielsdorf–Niederweningen and

576-448: The NOB. The railway crisis had caused many domestic shareholders to sell their securities to major foreign shareholders. Railway shares played a major role in speculation on the stock exchange . A financial group led by Adolf Guyer was able to secure a majority of votes at a general meeting of the company, allowing it to select the board of directors and replace it with people who would cooperate with its interests. The vast majority of

612-567: The National Railway ended in insolvency . The participating towns and municipalities had to suffer decades of debt. The NOB took over the network of its rival for a fraction of its construction cost on 1 October 1880. The Zofingen–Suhr section was resold to the SCB. The situation of the NOB slowly improved again after 1880. Increasing traffic led to the extension of stations and the procurement of additional rolling stock. After Alfred Escher's death in 1882, Adolf Guyer-Zeller became head of

648-588: The Rhine were discontinued and the four steamships were relocated to Romanshorn. On 11 March 1861 the steamer Stadt Zürich rammed and sank the Bavarian steamer Ludwig . Three persons survived, 13 were killed. On 12 February 1864 the Bavarian steamer Jura was also rammed and sunk by the Stadt Zürich . In order to avoid the reloading of goods, the Bavarian and the Württemberg steamship administration together with

684-772: The Weinberg or Käferberg tunnels. However to ensure that Wipkingen station is still served, the half-hourly S-Bahn service S24 uses the Wipkingen Tunnel. As there is no rail access from the Wipkingen route to the Hauptbahnhof's low-level through platforms, this necessitates that the S24 reverses in the high-level terminal platforms, making it the only remaining S-Bahn service to do so. Schweizerische Nordostbahn The Swiss Northeastern Railway ( Schweizerische Nordostbahn ; NOB)

720-571: The Zurich– Geneva night express of the NOB ran past a designated stopping point in Aarau and ran into two stationary Central Railway locomotives. The accident caused two deaths and three serious injuries. Labour regulations and the wage demands of railway workers, which the other private railways acceded to in 1896, met with resistance from the profit-oriented NOB. This led to a labour dispute with NOB staff in 1897. In Zurich, masses of passengers wrote in

756-477: The commissioning of the Lake Zürich left bank railway ( Linksufrige Zürichseebahn ), the NOB took over the entire shipping fleet in 1875. The NOB curtailed operations immediately so rival companies formed. When the Zürich–Meilen–Rapperswil railway started operation in 1894, the existing fleet of six ships: Helvetia , Concordia , Lukmanier , St. Gotthard , Taube and Schwalbe was reduced. With

SECTION 20

#1732859231196

792-400: The competition in advance by an accelerated expansion of its own network. It secured concessions for various railway lines and entered into commitments with cantons and founding committees for the construction of these unprofitable lines. This forced the NOB to borrow money, which led to massive indebtedness. The financial difficulties brought the NOB to the brink of collapse. The construction of

828-586: The complaints book. At times, milk was scarce. The 5000 employees were able to enforce their claims after 41 hours of strikes. The industrial action at the NOB contributed to the holding of a referendum in 1898 , which approved the nationalisation of the largest private railways. The NOB with a route network of 853 km and the Swiss Lake Constance fleet passed into the possession of the Swiss Federal Railways (SBB) on 1 January 1902. Shipping

864-513: The flat-deck steamer Stadt Zürich was converted into the semi-private steamer Zürich . In 1887, the NOB put the newly built saloon steamer Helvetia III into service, which caused a sensation with its clipper bow and bowsprit . In 1892, the mixed steam/sailing ship Säntis replaced the Stadt Schaffhausen . The mixed steam/sailing ship St. Gotthard was similarly replaced by the flat-deck steamer Stadt St. Gallen in 1897. In 1902, with

900-574: The former Northern Railway between Zürich and Baden was extended to the west. The section of the Baden–Aarau railway from Baden to Brugg with the bridge over the Reuss was opened on 29 September 1856. The rest of the line to Aarau was opened on 15 May 1858 where the network of NOB connected with the network of the Swiss Central Railway ( Schweizerische Centralbahn ; SCB) at Wöschnau on

936-588: The funding of the railways by private investors instead of public funds and suggested the founding of Schweizerische Kreditanstalt to meet the large capital requirements of the railways. The NOB endeavored to establish connections with foreign countries to generate freight traffic. It first opened a direct connection from Zürich to Lake Constance . Thus it became a direct competitor of the United Swiss Railways ( Vereinigte Schweizerbahnen ; VSB) based in St. Gallen .

972-541: The left bank transshipment port of Wollishofen to the right bank Uetikon was used practically exclusively for traffic to/from the local CU Chemie Uetikon chemical factory. Operations were discontinued with the opening of the Zürich–Meilen–Rapperswil railway in the autumn of 1894. In 1882, the company owned 142 locomotives , 488 passenger cars and 2400 freight cars . Oerlikon (Z%C3%BCrich) Too Many Requests If you report this error to

1008-648: The nationalisation of the NOB in 1903, shipping operations were outsourced. All public shipping services were taken over by the Zürichsee-Schifffahrtsgesellschaft (Lake Zürich Navigation Company; ZDG) in 1902. The paddle-wheel and screw steamers taken over from the NOB were replaced by more modern ships, with the exception of the Helvetia . A train ferry operated on Lake Zurich only for a short time. The NOB put an unnamed train ferry built by Escher, Wyss & Cie. into operation in 1885. The traffic from

1044-605: The nationalisation of the NOB the entire shipping company was transferred to the Swiss Federal Railways (SBB). In 1864, the Dampfbootgesellschaft linkes Ufer (Left Bank Steamboat Company) was established in Horgen . In 1868, it merged with the older Zürichsee-Walensee-Gesellschaft AG (Lake Zürich-Walensee Company) to form the Dampfbootgesellschaft für den Zürichsee (Steamboat Company for Lake Zürich). Shortly before

1080-436: The shares were in foreign hands, the majority of the bonds belonged to Swiss owners. At the time, the interest rate was 4% for secure Swiss rail bonds. In order to increase the return of the shares, bonds were converted into shares with an interest rate of 3½%. This reduced the company's interest burden and increased profits. On 8 January 1885, a Winterthur – Zürich train ran into a train coming from Wettingen after passing

1116-605: The south of Oerlikon station. Like the Wipkingen Tunnel, the Käferberg Tunnel (opened in 1969) connects to the Hauptbahnhof's western approaches, whilst the Weinberg Tunnel (opened in 2014) accesses the Hauptbahnhof's lower level through platforms from the east. Since the opening of the Weinberg Tunnel, use of the Wipkingen Tunnel is largely confined to long distance trains, with most Zürich S-Bahn services using either

Wipkingen Tunnel - Misplaced Pages Continue

1152-406: The south, by covering the existing railway cutting , so that the new southern portal was immediately to the north of Wipkingen station. As a result of the extension, the tunnel is now 1,200 metres (3,900 ft) in length. The Wipkingen Tunnel is now one of three different routes from Oerlikon to Hauptbahnhof, each of which tunnels through the intermediate ridge and emerges from adjacent portals to

1188-524: Was NOB's most important business segment, which initially enjoyed good returns. The NOB was involved with other railway companies. After the Schweizerische Ostwestbahn (Swiss East West Railway, OWB), which had been founded in 1861, had become bankrupt in an attempt to build a line from La Neuveville via Bern and Lucerne to Zürich, the NOB together with the cantons of Zürich, Zug and Lucerne , took over part of its line and completed it as

1224-661: Was an early railway company in Switzerland. It also operated shipping on Lake Constance ( Bodensee ) and Lake Zürich . Until the merger of the Western Swiss Railways into the Jura–Simplon Railway (JS) in 1890/91, it was the largest Swiss railway company. The Swiss Northeast Railway was created on 1 July 1853 by the merger of the Swiss Northern Railway ( Schweizerische Nordbahn —SNB— informally known as

1260-680: Was not only Chairman of the NOB and Chairman of Kreditanstalt , but also a member of the Executive Council of Zürich and, for 34 years, the National Council . Maintenance was neglected and the assets of the railway company were run down. This had already created a crisis in 1857, which was intensified in 1867. The behavior of the Zürich railway barons led the Swiss National Railway ( Schweizerische Nationalbahn ; SNB) to attempt to build

1296-479: Was the natural continuation of the railway lines that ended at the lakes. The transport of the passengers was not difficult. The transport of goods, however, was much more complicated and expensive because the goods had to be reloaded twice. The Lake Constance ( Bodensee ) route was the most important trade route for traffic between Switzerland and Germany. The Rhine only became navigable to Basel in 1904. The NOB started operating shipping services on Lake Constance with