Glades Road is an 11.115-mile (17.888 km) long east–west arterial boulevard in southern Palm Beach County , Florida . The majority of the road is signed as State Road 808 ( SR 808 ), but the westernmost 3.5 miles (5.63 km) is designated as County Road 808 . SR 808 begins at an intersection with US 441 – SR 7 in what was formerly Mission Bay (but is now unincorporated Boca Raton ; its eastern terminus is an intersection with Federal Highway ( US 1 and unsigned SR 5 ) in Boca Raton . The county-maintained segment proceeds west from US 441 / SR 7 and bends south to end at the western terminus of Palmetto Park Road ( CR 798 ).
73-750: Florida's Turnpike , designated as unsigned State Road 91 ( SR 91 ), is a controlled-access toll road in the U.S. state of Florida , maintained by Florida's Turnpike Enterprise (FTE). Spanning approximately 309 miles (497 km) along a northwest–southeast axis, the turnpike is in two sections. The SR 91 mainline runs roughly 265 miles (426 km), from its southern terminus at an interchange with Interstate 95 (I-95) in Miami Gardens to an interchange with I-75 in Wildwood at its northern terminus. The Homestead Extension of Florida's Turnpike (abbreviated HEFT and designated as unsigned SR 821) continues from
146-682: A barrier toll system was implemented from the Three Lakes toll plaza north to the terminus at I-75, and from Lantana south to I-95, in the 1990s. In 2015, the portion between the Golden Glades toll barrier and I-595 in Davie was converted to a cashless toll system . Additional projects to convert the turnpike to an electronic collection system were completed between I-595 and Lantana in 2019, and from SR 429 north to I-75 in Wildwood in 2020. The final stretch of
219-578: A commercial thoroughfare through Mission Bay and Boca West , and providing access to several gated communities. Two miles east of the western terminus, the road enters Boca Raton and has an interchange with Florida's Turnpike east of the actual road. East of the Turnpike, Glades Road acts as an access road for two gated communities before intersecting with the northern terminus of SR 845 (Powerline Road), which continues north as Jog Road. At St. Andrews Boulevard, Glades Road becomes commercial again, providing
292-486: A day, seven days a week. The system, consisting of closed-circuit television traffic cameras , dynamic message signs , highway advisory radio , and radar vehicle detection system, allow the TMC to see anything from congestion to crashes, to disabled vehicles that may pose a threat to the Turnpike's motorists. When necessary, the TMC will activate the dynamic message signs and highway advisory radio stations to alert motorists of
365-549: A four-lane highway as it goes through a less developed portion of Palm Beach County, crossing interchanges with Lake Worth Road , followed by the Lake Worth/West Palm Beach Service Plaza at mile marker 94. In West Palm Beach , the highway has interchanges with US 98 / SR 80 (Southern Boulevard), a SunPass -only interchange at Jog Road, followed by an interchange at Okeechobee Boulevard (exit 99) that heads directly into downtown West Palm Beach. North of
438-612: A hybrid numbering system, where adjacent exit numbers differed by 4 south of SR 60 (exit 60 at the time) and 5 north of SR 60. The Bureau of Public Roads approved an Interstate 95 alignment that used 41 miles (66 km) of the Turnpike from PGA Boulevard (SR 786) in Palm Beach Gardens north to SR 70 in Ft. Pierce in the 1950s. In the mid-1960s, the State Road Department authorized traffic counts be conducted to determine if
511-447: A mix of commercial and residential areas while heading towards the railroad tracks and the road's eastern terminus at US 1. SR 808 was established in 1945 in its current route. Prior to the 1945 renumbering , the road was known as SR 395. West of US 441, Glades Road continues and turns southward, terminating at Palmetto Park Road. According to maps published by Fort Lauderdale-based Dolph Map Company, an extension of
584-461: A move announced in November 2009. The staffed toll plazas were converted into electronic toll gantries, and the only ways to pay are either by SunPass transponders or a "toll-by-plate" program. The Turnpike mainline began its conversion to a cashless toll road with the Golden Glades toll barrier being converted into a toll gantry on January 25, 2014, and no longer accepts cash. The portion south of I-595
657-603: A northwestern direction, where hilly countryside becomes a part of the terrain for the remainder of the expressway while intersecting with Hancock Road (exit 278) in Minneola , an electronic toll interchange . At mile 285, it has a northbound exit/southbound entrance with US 27 , followed by the Leesburg electronic toll gantry at mile 288, and a southbound exit/northbound entrance with US 27 at mile 289. The last interchange in Lake County
730-509: A partial interchange between SR 417 and Florida's Turnpike in the late 2000s, after negotiations dating back to a 1991 field study. The interchange is being built in two phases. The first phase, built by CFX, added ramps from southbound SR 417 to southbound Florida's Turnpike and from northbound Florida's Turnpike to northbound SR 417. Construction on the first phase began in September 2013 and opened on January 26, 2015. The second phase, completing
803-562: A state or national emergency, most common being a hurricane watch , warrant rapid movement of the population. Eight service plazas are located along the turnpike, spaced about 45 miles (72 km) apart. All eight plazas are open 24 hours a day and located on the center median of the turnpike for access from both directions and offer gasoline, diesel fuel, internet access , travel and tourism info and tickets, picnic areas, TV news, gift shops offering Florida Lottery , family-friendly restrooms , and pay phones . A convenience store/gas station
SECTION 10
#1732848637899876-637: A true world leader", as the Legislature put it, Florida's Turnpike was designated by the Florida Legislature in 1998 as the Ronald Reagan Turnpike, with 20 signs throughout the turnpike showing the designation. In April 1999, SunPass was introduced to the public, with SunPass-only interchanges and lanes being introduced throughout the 2000s. The HEFT ceased cash toll collections on February 19, 2011, becoming an exclusive electronic toll road ,
949-759: A variety of reasons, and examples are found throughout the world. Depending on the policy of the agency that maintains the highway, and the reason for not signing the route, the route may instead be signed a different designation from its actual number, with small inventory markers for internal use, or with nothing at all. There are a variety of cases where roads are officially designated, but have no markings to show that designation. Many highway maintenance agencies assign some form of number to all highways, bridges, and other features they maintain for tracking and inventory purposes. However, policies vary regarding how and when to publicly post these assigned numbers. Several highway maintenance agencies have multiple numbering systems for
1022-498: Is a massive combined interchange with both US 17 / US 92 /US 441 ( Orange Blossom Trail ) and SR 528 (Beachline Expressway), which combines a series of partial cloverleaf interchanges with access ramps from side roads. The turnpike then intersects with Consulate Drive (southbound exit 255) and SR 482 (Sand Lake Road) (future exit 257). After passing the I-4 interchange (exit 259) near many of Orlando's theme parks, connecting directly with
1095-557: Is considered one of the most congested roads in Palm Beach County. The entirety of Glades Road has a posted speed limit of 45 miles per hour (72 km/h). Glades Road proper begins at the western terminus of Palmetto Park Road ( CR 798 ) in western unincorporated Boca Raton. It begins traveling north, passing the Waters Edge Elementary School and West Boca Raton Community High School . The right-of-way curves to
1168-467: Is funded for the 2024 fiscal year. The Turnpike Enterprise is also studying a possible developer-funded future interchange at County Road 468 (mile marker 300, servicing The Villages and Lady Lake ). This project is neither funded nor scheduled for construction at this time. There has been discussion of creating a northern extension. North of the HEFT–Mainline interchange, the mainline continues
1241-670: Is located at the Snapper Creek plaza on the Homestead Extension of the turnpike, while the remaining seven are full-service plazas, featuring a selection of franchised fast food restaurants. Three of the service plazas (Pompano, Port St. Lucie/Fort Pierce, Turkey Lake) also provide E85 ethanol . The Turkey Lake, Ft. Drum plaza, Canoe Creek, Okahumpa, Port St. Lucie, West Palm Beach, and Pompano Beach plazas also have Tesla Superchargers for Tesla electric vehicles. The operation of Sunshine State Parkway gas stations and service centers
1314-686: Is of little value to the general public. There are numerous cases in the United States where the same physical roadbed has designations in the Interstate Highway System , U.S. Highway system and the state route system. In many cases one or more of the official designations is omitted. Florida State Road 808 Glades Road is a major commuter route connecting the four major north–south arteries of Palm Beach County: US 441 / SR 7, Florida's Turnpike ( SR 91 ), Interstate 95 ( SR 9 ), and US 1 (SR 5), and
1387-582: Is with County Road 470 (exit 296), which does not provide cash. At mile marker 299, the turnpike passes through the final service plaza, the Okahumpka service plaza. Between US 301 (exit 304) and the northern terminus (mile 309) there is no toll. The turnpike ends with an interchange with I-75 in Wildwood , about 20 miles (32 km) south of Ocala . Exit 307 at SR 44 provides access to southbound I-75 through that interstate's exit 329, while northbound I-75 travelers (and bidirectional SR 44 travelers) can access
1460-698: The Floridan Hotel near the capitol. Only four votes against the turnpike were entered at the end of the session's roll call, and the Legislature granted permission to build with a $ 70 million bond issue in June 1955. A Turnpike bridge in Stuart bears his name to honor his contributions. Construction on the Parkway began on July 4, 1955, starting at what is now the Golden Glades Interchange. In October 1956, all work on
1533-617: The Pulitzer Prize for Public Service in 1964, the first for the newspaper, and led to changes in the way the state of Florida managed highway construction projects. For just over 11 years, the road was known as the Sunshine State Parkway (SSP). On April 12, 1968, the road was renamed to its current name of Florida's Turnpike, to identify that the toll road was located in Florida and to avoid confusion from other Florida landmarks such as
SECTION 20
#17328486378991606-604: The Sunshine Skyway Bridge . The Sunshine State Parkway moniker was commonly used for the next decade, and remnants of the name can be seen on several Turnpike maintenance buildings. The Florida Department of Transportation was created in July 1969, with the Florida State Turnpike Authority becoming a part of the new FDOT. On September 1, 1971, the Turnpike switched from a sequential exit numbering system to
1679-575: The Venezuelan government, under President Hugo Chávez , nationalized Citgo, and in 2006, political controversy resulted in a movement to remove the brand from the turnpike. In 2009, Areas U.S.A. signed a 30-year contract for operation of food and retail concessions, taking over operations from Martin Petroleum and HMSHost . Florida Turnpike Services, L.L.C., Areas' partner, replaced the Citgo brand with Shell ,
1752-414: The "Florida Turnpike Act", which Governor Dan McCarty signed into law on July 11, 1953, as well as the Florida State Turnpike Authority, which had the ability to plan, design, and construct bond-financed toll roads, in whose creation Costar was instrumental, to be repaid through the collection of tolls from Turnpike customers. Thomas B. Manuel , known as the "Father of the Turnpike", served as chairman of
1825-661: The 1960s, preliminary studies began for expanding portions of the Turnpike to six lanes in South Florida and additional north–south highways in that area. Dade County and the State Road Department developed a plan for the West Dade Expressway (now known as the Homestead Extension of Florida's Turnpike), beginning at the Turnpike near the Dade County/Broward County line, turning westward and southward, and terminating at Florida City in southern Dade County. In 1967,
1898-486: The Bee Line Connector and Homestead Extension of Florida's Turnpike would be financed by revenue bond issues as extensions of Florida's Turnpike. The Beeline Expressway opened in 1973 and the Homestead Extension opened in 1974 as a part of the Turnpike mainline. Between 1974 and 1986, the turnpike experienced little change other than maintenance as the original bonds on the road were being paid off. During this period,
1971-499: The Cypress Creek and Lantana toll plazas were built as part of this project. Coin baskets were installed in 1994 after years of delays. The portion of road north of Kissimmee was converted to a coin drop system on August 20, 1995. On July 7, 1995, the Leesburg toll barrier was opened. at this point, the existing Three Lakes toll plaza and Wildwood toll plazas were closed. Because he "was one of America's most beloved presidents and
2044-406: The Florida State Turnpike Authority from January 1955 to January 1961. Manuel debated with state legislature members opposed to tollways, emphasizing the need for a good highway system in a tourism-driven state. During the 1955 legislative session, many small-county legislators and others opposed to the Parkway formed a "kill the 'Pike'" coalition; Manuel won over the legislators at his headquarters in
2117-576: The Florida State Turnpike Authority was authorized to perform engineering and feasibility studies on the West Dade Expressway and the Bee Line Connector extension, now known as the Martin Andersen Beachline Expressway. The results of the studies came in December 1968, but due to an uncertain bond market and an unknown future for the toll authority, decisions on the roads were delayed. In 1969, FDOT and Orange and Dade County officials agreed
2190-682: The HEFT at the Miami-Dade/Broward County line 4 miles (6 km) from Golden Glades, continuing the HEFT's mile marker. The highway goes through the inland suburbs of Miramar , Hollywood , and Davie , with an exit at Hollywood Boulevard ( SR 820 ) at mile 50, and passing west of the Seminole Hard Rock Hotel & Casino Hollywood just south the Griffin Road ( SR 818 ) interchange (exit 53). In Davie, about 8 miles (13 km) north of
2263-638: The Homestead Extension interchange, it intersects with I-595 , providing direct access to Alligator Alley and Ft. Lauderdale International Airport . After two more interchanges, one with Sunrise Boulevard ( SR 838 ) in Plantation and Commercial Boulevard ( SR 870 ) in Tamarac , it crosses the Cypress Creek Toll Plaza in North Lauderdale , the second on the mainline. Just 1 mile (1.6 km) north of
Florida's Turnpike - Misplaced Pages Continue
2336-572: The I-4 express lanes to and from the east along I-4, the Turnpike moves in a northwest direction, first passing by the Turkey Lake Service Plaza at mile marker 263, where the FDOT district headquarters of the Turnpike are located. The Turnpike has the next two interchanges with Orlando area tollways, SR 408 (East-West Expressway) at exit 265 and SR 429 (Western Expressway) at exit 267A, where in between
2409-575: The Office of Florida's Turnpike was formed, with $ 220 million worth of revenue bonds being sold in April 1989 to renovate the toll plazas, service centers and improve the road with the reduction of urban congestion. Fifteen new interchanges were planned in the early 1990s, with four of them opened by July 1991. The section between the Golden Glades Plaza and Lantana was converted to a coin drop toll in 1990,
2482-798: The Port St. Lucie-Fort Pierce service plaza at mile marker 144. The turnpike intersects I-95 one last time just south of SR 70 (exit 152) in Fort Pierce , as I-95 continues to head up the east coast of Florida and the turnpike curves inland towards Orlando. North of the SR 70 interchange, the turnpike enters a rural area, with cattle farms and orange groves lining the road for most of the section between Fort Pierce and Kissimmee , with only one interchange: SR 60 in Yeehaw Junction (exit 193). There are two service plazas in this area, one at Fort Drum at mile marker 184 and
2555-562: The State Road 70 exit (exit 152) and from SR 50 (exit 272) to U.S. 27 (northbound exit 285) from four to eight lanes. In Miami-Dade County , several widening projects including new through lanes are underway. There are plans to widen the Turnpike from Kissimmee Park Road (exit 240) to US 192 (exit 242) and from Neptune Road to just north of Osceola Parkway (exit 249) all from four to eight lanes. A new diverging diamond interchange will be constructed at Nolte Road during this process. Construction
2628-538: The Sunshine State Parkway north of Ft. Pierce was abandoned and plans for a state-long turnpike were shelved due to passage of the National Interstate and Defense Highways Act , which provided for construction of limited-access highways in the corridors that had been under study for the Parkway Extension. One was Interstate 95 , which was slated to connect Jacksonville with Miami in a similar alignment to
2701-658: The Thomas B. Manuel Bridge over the St. Lucie Canal, crossing I-95 without an interchange just south of the SR 714 interchange, the only exit in Martin County. I-95 heads west towards the western fringes of St. Lucie County development, while the turnpike takes a path through the central areas of the county. The turnpike has two interchanges in Port St. Lucie, one at Becker Road (exit 138), the third SunPass-only exit, and SR 716 (exit 142), followed by
2774-459: The board authorized a study for the Parkway Extension to Orlando, and connecting the Interstate routes in Florida. In 1961, Governor Collins approved the sale of $ 80 million in bonds to finance the parkway extension from Fort Pierce to Wildwood , adding another 156 miles (251 km) of roadway and shifting Interstate 75's route 6 miles (10 km) eastward from its original alignment. The extension
2847-455: The current brand for gas stations along the turnpike. Many of the restaurant brands were also changed over, with Dunkin' Donuts replacing Starbucks locations as well as KFC , Pizza Hut , Villa Pizza and Wendy's replacing most Popeyes and Burger King locations. The reconstruction and renovation of six of the service plazas began on November 1, 2010, to be completed in 2012. The Okahumpka and Ft. Pierce plazas will begin reconstruction when
2920-429: The different classes of routes they maintain (freeways, expressways, rural roads, etc.). In such cases, one or more class of numbers may be reserved for minor routes and these may or may not be signed. Often roads that serve as a connector to a major highway are signed to show the connection to the major road, rather than the road's actual designation. Some highways are not signed to avoid multiple designations, such as when
2993-482: The east after intersecting access roads to Burt Aaronson South County Regional Park, and serves as the main road to the many gated communities and golf clubs in the area. At an intersection with US 441 / SR 7 , the route transitions to SR 808. SR 808 begins at the intersection of US 441 (SR 7) in Mission Bay, meeting with several shopping centers. SR 808 heads east on Glades Road, serving as
Florida's Turnpike - Misplaced Pages Continue
3066-409: The entire route runs concurrent with other highways. There are several instances where a route has officially been given a name by government agencies, and is signed with that name, but the route is also assigned a number by the highway maintenance agencies as to fit in their maintenance and inventory systems. Another common reason to not sign a highway is where the highway is government maintained, but
3139-498: The gift shop and gas stations at all service plazas, as well as Walgreens , Publix , and CVS stores statewide. Since 2021, E-ZPass , which is used primarily in the Midwest and Northeast U.S., has also been accepted on Florida's Turnpike. As the Turnpike and its system of roads are primary routes for emergency evacuations , tolls may be suspended, in cooperation with the state's emergency operations center and county governments, when
3212-726: The interchange, the highway enters stretch of sparse development between this point and Port St. Lucie , intersecting with the Beeline Highway , another SunPass only interchange before leaving West Palm Beach. Just north of the SR 786 interchange in Palm Beach Gardens (exit 109), I-95 parallels the Turnpike to the east for about 20 miles (32 km), with I-95 visible from the turnpike as it has an interchange with SR 706 (exit 116) in Jupiter and into Martin County . It breaks off as it crosses
3285-562: The interchange, was built by the Turnpike Enterprise. After a series of delays, construction began in 2017 and the completed interchange was fully opened on May 21, 2021. As part of the project, the turnpike mainline was widened from four to eight lanes between Osceola Parkway (exit 249) and the Beachline Expressway (SR 528, exit 255). Reconstruction of the northern end of the Turnpike at its junction with Interstate 75 improved
3358-599: The longest of any US expressway. It then passes exit 240 located at Clay Whaley Road, a partial interchange featuring a northbound on- and southbound off-ramp only. After interchanges with US 192 / US 441 (exit 242 northbound, exit 244 southbound) and the Osceola Parkway (exit 249), the turnpike enters Orange County and Orlando , expanding to eight lanes north of the latter interchange and quickly intersecting SR 417 (Central Florida GreeneWay) (exit 251). Exit 254 in Sky Lake
3431-439: The mileage from mile 47 from the HEFT. The spur of the mainline south of the HEFT to the Golden Glades Interchange assumes an alternate numbering system that suffixes an X to each exit number. Unsigned highway An unsigned highway is a highway that has been assigned a route number , but does not bear road markings that would conventionally be used to identify the route with that number. Highways are left unsigned for
3504-481: The newspaper's coverage of unchecked spending by the Florida Turnpike Authority that led to estimated costs quadrupling from initial estimates of $ 100 million. Waldron received a tip about excessive spending by John Hammer, chairman of the Florida Turnpike Authority, which included expensive hotels and meals, corsages for his secretary and overcharging for a chartered plane. His coverage earned the newspaper
3577-519: The northern boundary of the Boca Town Center . East of the mall, SR 808 intersects with Butts Road, providing access to Military Trail; east of there, Glades Road provides access to many business parks until its interchange with I-95. East of the interchange, the highway continues as a commercial road, providing access to Boca Raton Airport 's terminal via Airport Road and the main campus of Florida Atlantic University . East of FAU, SR 808 serves
3650-665: The northern end of the Golden Glades Interchange in Miami Gardens as a six-lane highway, and passes through the Golden Glades Toll Barrier, a cashless toll point, similar to the ones on the HEFT. About 2 miles (3 km) north of the toll gantry, it passes by Hard Rock Stadium , home to the Miami Dolphins of the National Football League , to the west before intersecting with the northern end of
3723-501: The other plaza projects are complete. Total renovation costs are estimated at $ 160 million. Florida's Turnpike Enterprise operates with intelligent transportation systems (ITS), used to detect and manage incidents on their roadways. The ITS are managed by two traffic management centers (TMCs), one in Pompano Beach and the other in Ocoee , operated by Florida's Turnpike Enterprise 24 hours
SECTION 50
#17328486378993796-455: The other, Canoe Creek, at mile marker 229. Between Fort Pierce and Yeehaw Junction, the turnpike travels in a nearly east-west direction heading inland, with a 40.5-mile (65.2 km) gap between the two exits, the second longest of any US expressway. Between Yeehaw Junction and Kissimmee, the turnpike, returning to a north-northwest direction towards Orlando, has a 48.9-mile (78.7 km) (47 miles (76 km) southbound) stretch without an exit,
3869-420: The planned Sunshine State Parkway Coastal Route. This resulted in completion of a truncated 110-mile (180 km) highway that ran from Miami to Fort Pierce, opening on January 25, 1957. In January 1959, Governor LeRoy Collins , favoring a Parkway extension from Fort Pierce to Orlando, stated that building the Parkway north of Orlando would be unnecessary due to the interstate highway system. In late May 1959,
3942-455: The portion between I-4 and SR 408 being finished in 2010, SR 408 to Beulah Road (at the north end of the SR 429 interchange) opened in March 2011, and the portion between Beulah Road and SR 50 (exit 272) was completed in 2012. In 2007, legislation was passed in Florida to index toll rates across the state to the national Consumer price index (CPI), to be enacted by the end of June 2012. As a result,
4015-529: The potential situation, as well as AMBER / Silver Alerts . The Road Rangers Safety Patrol offers free roadside assistance on Florida's Turnpike mainline and Homestead Extension. Utility and tow trucks patrol 12 designated zones looking for stranded motorists to provide services such as fuel, tire changes, and use of a cellular phone; and also watching out for crashes and road debris . The Traffic Management Center dispatches them to accidents, debris removal, disabled vehicles, or anything that may potentially affect
4088-402: The primary method of paying tolls on the turnpike, with 80% of customers using the system as of October 2009. SunPass can be used on most Florida toll roads, in conjunction with other electronic toll collection systems in Florida ( E-Pass and LeeWay). SunPass users benefit from an average of a 25% discount on tolls and access to SunPass-only exit ramps. SunPass transponders are available at
4161-768: The road is no longer illuminated by streetlights but rather only at interchanges, near service plazas, and some urban areas (like near Orlando ). It then enters Deerfield Beach with an interchange with the Sawgrass Expressway in Coconut Creek (exit 71), the final interchange in Broward County. The Turnpike then enters Palm Beach County , with one interchange each in Boca Raton ( Glades Road , exit 75), Delray Beach ( Atlantic Avenue , exit 81) and Boynton Beach ( Boynton Beach Boulevard , exit 86). The turnpike narrows to
4234-479: The same through at least 2014. Toll rate increases were scheduled for every five years, and mid-2017 was the next scheduled date for such an increase. However, a combination of a low inflation rate and problems within the relevant state authorities caused multiple cancellations and changes in schedule for the next increase. The final projected date for an increase in tolls was eventually set for October 29, 2017. The Turnpike Enterprise and OOCEA (now CFX) agreed to build
4307-537: The separation of Interstate 95 from the Turnpike was feasible, with arguments that using a concurrent alignment was costing Florida money for federal highway funding, but not without the concern of losing toll revenue. Over time, the interstate adopted a route closer to U.S. Route 1 , including parallel between Stuart and Palm Beach Gardens, with the turnpike being removed from the I-95 alignment in 1973, and I-95 being completed in 1987. With Florida still growing in population in
4380-527: The small segment of University Drive (as the very end portion of the road is designated on some maps, though other maps show it as Glades Road all the way through) has been proposed to connect to the present-day University Drive (State Road 817) in Broward County . No indication is given of whether the extension would be a state or county road or what number designation it would have if any. Road extension plans were abandoned in 2009 to appease resident concerns about traffic. An isolated area of Palm Beach County
4453-455: The southern end of the mainline for another 48 miles (77 km) to US Highway 1 (US 1) in Florida City . The slogan for the road is "The Less Stressway". The mainline opened in stages between 1957 and 1964, while the extension was completed in 1974. The turnpike runs through Miami , Fort Lauderdale , and West Palm Beach , where it parallels I-95, and through Orlando , where it crosses I-4 . The main section of Florida's Turnpike begins at
SECTION 60
#17328486378994526-475: The toll plaza, it intersects with the Pompano Beach Service Plaza, the first of seven full-service plazas on the mainline, and where the Turnpike's operations center is located. Still in Pompano Beach, it has a northbound-only exit (and southbound-only entrance) at Atlantic Boulevard ( SR 814 ), followed by full interchanges with Coconut Creek Parkway/Dr. Martin Luther King Jr. Boulevard (County Road 912) (exit 67) and Sample Road ( SR 834 ) (exit 69). North of exit 69,
4599-476: The toll rates on roads on Florida's Turnpike Enterprise were raised on June 24, 2012, an increase of 11.7% to reflect the previous five years. The legislation allows for SunPass rates to be raised slightly each year, with cash rates going up every five years, with SunPass rates staying about a quarter cheaper than cash rates. In keeping with the legislation, SunPass and toll-by-plate rates were raised again on July 1, 2013 by 2.1%, with cash toll rates projected to stay
4672-407: The traffic merge pattern between I-75 and SR 44 with new flyover ramps and additional traffic lanes. The northbound off-ramp to SR 44 was completed on September 19, 2019, while southbound on-ramp construction was completed in early November 2019, and the project overall was completed in early January 2020. Plans are in the works to widen the Turnpike from the Lake Worth Road interchange (exit 93) to
4745-489: The traveling public; they also assist the Florida Highway Patrol with traffic maintenance during incidents involving blockage of lanes. In the years following World War II , Florida was experiencing unprecedented growth in population and tourism, along with a revitalized citrus industry recovering from a harsh freeze early in the decade; the increased traffic load quickly burdened the state's highway system. South Florida businessman and accounting firm owner Charles B. Costar
4818-415: The turnpike at this exit. Tolls on the turnpike are an average of 6.7 cents per mile (4.2 ¢/km) for cars and other two- axle vehicles using SunPass . A trip on the entire turnpike (not including the Homestead Extension) would cost $ 22.59 with Toll-by-Plate, and $ 17.45 with SunPass. The turnpike was originally entirely on the ticket system , but due to congestion in the Miami and Orlando metro areas,
4891-412: The turnpike experienced the first of five toll hikes on February 15, 1979, when the cost of a trip from Golden Glades to Wildwood increased to $ 5.90 from $ 4.80, the road's original toll. In 1989, the Turnpike switched its exit numbering system to the mile-log system, starting from the south end of the Homestead Extension, 13 years before Florida's interstates integrated it into their system. In 1988,
4964-456: The turnpike to use the ticket system ran between what are now electronic toll gantries at Lantana (mile 89.4 in Palm Beach County) and Three Lakes (mile 236.5 in Osceola County). This section was converted to a cashless system on November 8, 2021, removing the final cash-based toll collections and converting the entire length of the turnpike to electronic toll collection. The SunPass electronic toll collection system, in use since 1999, has become
5037-414: The two exits, the turnpike expands to become a twelve-lane highway, and reverting to an eight-lane highway north of the SR 429 interchange. The last two Orange County interchanges are with SR 50 five miles apart at exit 267B and 272, with the turnpike becoming a four-lane highway north of exit 272, and staying that way for the rest of its northward journey. The Turnpike then enters Lake County , heading in
5110-426: Was concerned that a trip down the east coast of Florida would take days on the available road network, passing through every small beachside town and siphoning off the traffic before visitors reached South Florida. After driving on the Pennsylvania Turnpike during a vacation there, he envisioned a similar high-speed turnpike in Florida. In 1953, Costar led a lobbying group that resulted in the state legislature creating
5183-418: Was converted on August 29, 2015. Between 2005 and 2012, the Turnpike spent $ 380 million doubling the number of lanes from SR 528 to the northernmost interchange with SR 50 west of Winter Garden (exit 272). Most of the section was expanded from four to eight lanes, with the section between SR 408 and SR 429 being expanded from six to twelve lanes. The portion between SR 528 and Interstate 4 opened in 2008, with
5256-525: Was opened in three stages: a 61-mile (98 km) section between Yeehaw Junction and Orlando opened on July 17, 1963, a section linking Fort Pierce and Yeehaw Junction opened on November 22, 1963, and the section between Orlando and the northern terminus of I-75 opened on July 24, 1964, completing the mainline. With the St. Petersburg Times in 1963, a team led by Martin Waldron wrote a total of 150,000 words as part of
5329-432: Was originally bid out under separate contracts, and as a result, differing petroleum brands operated concurrently along the parkway, with varying levels of service and pricing. This practice was discontinued in 1995 when all service center operations were combined to improve supply and continuity of service; with Martin Petroleum, a Florida corporation, operating the stations with Citgo brand fuel at its stations. Since then,
#898101