68-561: The R68A is a B Division New York City Subway car order consisting of 200 cars built between 1988 and 1989 by Kawasaki Railcar Company in Kobe, Japan , with final assembly done at the Kawasaki plant in Yonkers, New York . A total of 200 cars were built, arranged in four-car sets. The R68A was the fourth and final R-type contract to be built with 75-foot (22.86 m) cars (the previous three being
136-527: A cross-platform interchange between local and express services. Some four-track lines with express service have two tracks each on two levels and use both island and side platforms. Since the majority of the system was built before 1990, the year the Americans with Disabilities Act (ADA) went into effect, many New York City Subway stations were not designed to be accessible to all. Since then, elevators have been built in newly constructed stations to comply with
204-494: A Vignelli-style interactive subway map, "The Weekender", an online map that provides information about any planned work, from late Friday night to early Monday morning. In October 2020, the MTA launched a digital version of the map showing real-time service patterns and service changes, designed by Work & Co . Several privately produced schematics are available online or in printed form, such as those by Hagstrom Map . Out of
272-619: A few stretches of track run at ground level; 40% of track is above ground. Many lines and stations have both express and local services. These lines have three or four tracks. Normally, the outer two are used by local trains, while the inner one or two are used by express trains. As of 2018 , the New York City Subway's budgetary burden for expenditures was $ 8.7 billion, supported by collection of fares, bridge tolls, and earmarked regional taxes and fees, as well as direct funding from state and local governments. Alfred Ely Beach built
340-764: A letter or a number and "lines" have names. Trains display their route designation. There are 28 train services in the subway system, including three short shuttles . Each route has a color and a local or express designation representing the Manhattan trunk line of the service. New York City residents seldom refer to services by color (e.g., "blue line" or "green line") but out-of-towners and tourists often do. The 1 , C , G , L , M , R , and W trains are fully local and make all stops. The 2 , 3 , 4 , 5 , A , B , D , E , F , N , and Q trains have portions of express and local service. J , Z , 6 , and 7 trains vary by direction, day, or time of day. The letter S
408-529: A public authority presided by New York City, was created in 1953 to take over subway, bus, and streetcar operations from the city, and placed under control of the state-level Metropolitan Transportation Authority in 1968. Organized in 1934 by transit workers of the BRT, IRT, and IND, the Transport Workers Union of America Local 100 remains the largest and most influential local of the labor unions. Since
476-482: A station, passengers may use station booths (formerly known as token booths) or vending machines to buy their fare, which is currently stored in a MetroCard or OMNY card. Each station has at least one booth, typically located at the busiest entrance. After swiping the card at a turnstile, customers enter the fare-controlled area of the station and continue to the platforms. Inside fare control are "Off-Hours Waiting Areas", which consist of benches and are identified by
544-528: A total of 850 miles (1,370 km) including non-revenue trackage . Of the system's 28 routes or "services" (which usually share track or "lines" with other services), 25 pass through Manhattan, the exceptions being the G train, the Franklin Avenue Shuttle , and the Rockaway Park Shuttle . Large portions of the subway outside Manhattan are elevated, on embankments , or in open cuts , and
612-505: A train of eight 75-foot (22.86 m) cars have led to increased boarding and dwelling times. As a result, subsequent B Division subway car orders have returned to the previous length of 60 feet (18.29 m), the first being the R143 order in 2001. The R68As are currently based out of the Coney Island Yard and are assigned to the B , N , and W , and occasionally run on the Q . Like
680-489: A yellow sign. A typical subway station has waiting platforms ranging from 480 to 600 feet (150 to 180 m) long. Some are longer. Platforms of former commuter rail stations—such as those on the IND Rockaway Line , are even longer. With the many different lines in the system, one platform often serves more than one service. Passengers need to look at the overhead signs to see which trains stop there and when, and at
748-480: Is approximately 8 feet 9 inches (2.67 m) wide and 51 feet 4 inches (15.65 m) long, whereas B Division equipment is about 10 feet (3.05 m) wide and either 60 feet 6 inches (18.44 m) or 75 feet (22.86 m) long. The different lengths for the B Division fleet are necessary because 75-foot cars can not be used over the BMT Eastern Division . Cars purchased by
SECTION 10
#1732858738796816-641: Is broken down into two subdivisions, B1 (BMT) and B2 (IND), for chaining purposes. The two former systems are still sometimes referred to as the BMT Division and IND Division . The following lines are part of the B Division (services shown in parentheses; lines with colors next to them are trunk lines ): The oldest line to become part of the B Division was the BMT Lexington Avenue Line , opened in 1885. A large system of elevated railways in Brooklyn
884-406: Is no nightly system shutdown for maintenance, tracks and stations must be maintained while the system is operating. This work sometimes necessitates service changes during midday, overnight hours, and weekends. When parts of lines are temporarily shut down for construction purposes, the transit authority can substitute free shuttle buses (using MTA Regional Bus Operations bus fleet ) to replace
952-427: Is smaller than the peak of the system. In addition to the demolition of former elevated lines, which collectively have resulted in the demolition of over a hundred stations, other closed stations and unused portions of existing stations remain in parts of the system. Many stations in the subway system have mezzanines . Mezzanines allow for passengers to enter from multiple locations at an intersection and proceed to
1020-547: Is used for three shuttle services: Franklin Avenue Shuttle , Rockaway Park Shuttle , and 42nd Street Shuttle . Though the subway system operates on a 24-hour basis , during late night hours some of the designated routes do not run, run as a shorter route (often referred to as the "shuttle train" version of its full-length counterpart) or run with a different stopping pattern. These are usually indicated by smaller, secondary route signage on station platforms. Because there
1088-567: The 142nd Street and Myrtle Avenue junctions, whose tracks intersect at the same level, as well as the same-direction pairs of tracks on the IRT Eastern Parkway Line at Rogers Junction . The 7,700 workers who built the original subway lines were mostly immigrants living in Manhattan. More recent projects use tunnel boring machines , which increase the cost. However, they minimize disruption at street level and avoid already existing utilities. Examples of such projects include
1156-600: The 472 stations , 470 are served 24 hours a day. Underground stations in the New York City Subway are typically accessed by staircases going down from street level. Many of these staircases are painted in a common shade of green, with slight or significant variations in design. Other stations have unique entrances reflective of their location or date of construction. Several station entrance stairs, for example, are built into adjacent buildings. Nearly all station entrances feature color-coded globe or square lamps signifying their status as an entrance. The current number of stations
1224-532: The 63rd Street Lines , opened in 1989. The new South Ferry station was built and connected to the existing Whitehall Street–South Ferry station in 2009. The one-stop 7 Subway Extension to the west side of Manhattan, consisting of the 34th Street–Hudson Yards station, was opened in 2015, and three stations on the Second Avenue Subway in the Upper East Side were opened as part of Phase 1 of
1292-684: The Chicago "L" plans all stations to be accessible in the 2030s, the Toronto subway will be fully accessible by 2025, and Montreal Metro plans all stations to be accessible by 2038. Both the Boston and Chicago systems are as old or older than the New York City Subway, though all of these systems have fewer stations than the New York City Subway. Newer systems like the Washington Metro and Bay Area Rapid Transit have been fully accessible from their opening in
1360-625: The Franklin Avenue and Rockaway Park Shuttles . These lines and services were operated by the Brooklyn–Manhattan Transit Corporation (BMT) and city-owned Independent Subway System (IND) before the 1940 city takeover of the BMT. B Division rolling stock is wider, longer, and heavier than those of the A Division , measuring 10 or 9.75 ft (3,048 or 2,972 mm) by 60 or 75 ft (18.29 or 22.86 m). The B Division
1428-531: The IND Sixth Avenue Line was completed in 1940, the city went into great debt , and only 33 new stations have been added to the system since, nineteen of which were part of defunct railways that already existed. Five stations were on the abandoned New York, Westchester and Boston Railway , which was incorporated into the system in 1941 as the IRT Dyre Avenue Line . Fourteen more stations were on
SECTION 20
#17328587387961496-697: The IRT Broadway–Seventh Avenue Line , which ran directly underneath the World Trade Center . Sections of the tunnel, as well as the Cortlandt Street station, which was directly underneath the Twin Towers, were severely damaged. Rebuilding required the suspension of service on that line south of Chambers Street. Ten other nearby stations were closed for cleanup. By March 2002, seven of those stations had reopened. Except for Cortlandt Street,
1564-717: The IRT subway debuted in 1904, the typical tunnel construction method was cut-and-cover . The street was torn up to dig the tunnel below before being rebuilt from above. Traffic on the street above would be interrupted due to the digging up of the street. Temporary steel and wooden bridges carried surface traffic above the construction. Contractors in this type of construction faced many obstacles, both natural and human made. They had to deal with rock formations and groundwater, which required pumps. Twelve miles of sewers, as well as water and gas mains, electric conduits, and steam pipes had to be rerouted. Street railways had to be torn up to allow
1632-603: The R142 , R142A , R143 , R160 , R179 and R188 were placed into service. These cars are collectively known as New Technology Trains (NTTs) due to modern innovations such as LED and LCD route signs and information screens, as well as recorded train announcements and the ability to facilitate Communication-Based Train Control (CBTC) . As part of the 2017–2020 MTA Financial Plan, 600 subway cars will have electronic display signs installed to improve customer experience. Riders pay
1700-523: The R44 , R46 , and R68 ). The contract had been given to Kawasaki because the manufacturers of the base R68 order, the joint venture Westinghouse-Amrail Company, had experienced significant integration issues that led to performance problems with the R68s. The first R68A train entered service on May 18, 1988. The R68As are scheduled to remain in service until at least 2025–2030. The R68As are numbered 5001–5200. They were
1768-523: The boroughs of Manhattan , Brooklyn , Queens , and the Bronx . It is owned by the government of New York City and leased to the New York City Transit Authority , an affiliate agency of the state-run Metropolitan Transportation Authority (MTA). Opened on October 27, 1904, the New York City Subway is one of the world's oldest public transit systems, one of the most-used, and the one with
1836-423: The eleventh-busiest rapid transit rail system in the world. The subway carried 2,027,286,000 unlinked, non-unique riders in 2023. Daily ridership has been calculated since 1985; the record, over 6.2 million, was set on October 29, 2015. The system is also one of the world's longest. Overall, the system contains 248 miles (399 km) of routes, translating into 665 miles (1,070 km) of revenue track and
1904-626: The extension of the IRT Flushing Line and the IND Second Avenue Line . Since the opening of the original New York City Subway line in 1904, multiple official and planning agencies have proposed numerous extensions to the subway system. One of the more expansive proposals was the " IND Second System", part of a plan to construct new subway lines in addition to taking over existing subway lines and railroad rights-of-way. The most grandiose IND Second Subway plan, conceived in 1929,
1972-410: The 1970s. In November 2016, the New York City Subway had 6712 cars on the roster. A typical New York City Subway train consists of 8 to 11 cars, although shuttles can have as few as two, and the train can range from 150 to 600 feet (46 to 183 m) in length. The system maintains two separate fleets of cars, one for the A Division routes and another for the B Division routes. A Division equipment
2040-450: The 1980s, make the current fleet of subway cars graffiti-free, as well as order 1,775 new subway cars. By the early 1990s, conditions had improved significantly, although maintenance backlogs accumulated during those 20 years are still being fixed today. Entering the 21st century, progress continued despite several disasters. The September 11 attacks resulted in service disruptions on lines running through Lower Manhattan, particularly
2108-415: The 2020–2024 Capital Program. This would allow one of every two to four stations on every line to be accessible, so that all non-accessible stops would be a maximum of two stops from an accessible station. In 2022, the MTA agreed in a settlement to make 95 percent of subway and Staten Island Railway stations accessible by 2055. By comparison, all but one of Boston's MBTA subway stations are accessible,
R68A (New York City Subway car) - Misplaced Pages Continue
2176-521: The ADA. (Most grade-level stations required little modification to meet ADA standards.) Many accessible stations have AutoGate access. In addition, the MTA identified "key stations", high-traffic and/or geographically important stations, which must conform to the ADA when they are extensively renovated. Under plans from the MTA in 2016, the number of ADA accessible stations would go up to 144 by 2020. As of May 2024 , there were 145 ADA-accessible stations. Over
2244-552: The BMT and IND trackage was not connected. The early joint services using these connections operated similarly to trackage rights ; it was not until the Chrystie Street Connection opened in 1967 that the ex-BMT and IND systems were consolidated operationally. Beginning in 1924, BMT services were designated by number. The city assigned letters (J and up)—generally following the IND pattern of double letters for local services—in
2312-540: The City of New York since the inception of the IND and the other divisions beginning in 1948 are identified by the letter "R" followed by a number; e.g.: R32 . This number is the contract number under which the cars were purchased. Cars with nearby contract numbers (e.g.: R1 through R9 , or R26 through R29 , or R143 through R179 ) may be relatively identical, despite being purchased under different contracts and possibly built by different manufacturers. From 1999 to 2019,
2380-603: The MTA proposed mid-life technological upgrades for the R68As, including LED destination signs and automated announcements. These upgrades were not implemented. In June 2023, the MTA released a document advertising an RFP for the R262 and R268 models, the latter of which is likely to replace the R68 and R68A. In September 2024, the MTA further indicated that a handful of R68 and R68A cars would be retired by R211 cars. The MTA also wanted to replace
2448-527: The abandoned LIRR Rockaway Beach Branch (now the IND Rockaway Line ), which opened in 1955. Two stations ( 57th Street and Grand Street ) were part of the Chrystie Street Connection , and opened in 1968; the Harlem–148th Street terminal opened that same year in an unrelated project. Six were built as part of a 1968 plan : three on the Archer Avenue Lines , opened in 1988, and three on
2516-526: The arriving train to identify it. There are several common platform configurations. On a double track line, a station may have one center island platform used for trains in both directions, or two side platforms , one for each direction. For lines with three or four tracks with express service, local stops will have side platforms and the middle one or two tracks will not stop at the station. On these lines, express stations typically have two island platforms, one for each direction. Each island platform provides
2584-410: The complexity of the system (Manhattan being the smallest borough, but having the most services), but they do show major city streets as an aid to navigation. The newest edition took effect on June 27, 2010, and makes Manhattan bigger and Staten Island smaller, with minor tweaks happening to the map when more permanent changes occur. Earlier diagrams of the subway, the first being produced in 1958, had
2652-425: The correct platform without having to cross the street before entering. Inside mezzanines are fare control areas, where passengers physically pay their fare to enter the subway system. In many older stations, the fare control area is at platform level with no mezzanine crossovers. Many elevated stations also have platform-level fare control with no common station house between directions of service. Upon entering
2720-567: The early 1960s to prepare for the 1967 Chrystie Street Connection . Only Southern Division routes (1–4 or N–T) were labeled on maps, but all services except remnants of the old els were assigned letters: * Unofficially signed as "M", or sometimes "S". In 1967, the Culver and Franklin Shuttles became SS —the standard shuttle designation—and the Myrtle Local ("Myrtle (Jay)"), discontinued in 1969)
2788-602: The first demonstration for an underground transit system in New York City in 1869 and opened it in February 1870. His Beach Pneumatic Transit only extended 312 feet (95 m) under Broadway in Lower Manhattan operating from Warren Street to Murray Street and exhibited his idea for an atmospheric railway as a subway. The tunnel was never extended for political and financial reasons. Today, no part of this line remains as
R68A (New York City Subway car) - Misplaced Pages Continue
2856-482: The five-cent fare of the time, or 10¢ ($ 3 in 2023 dollars ). In 1940, the city bought the two private systems. Some elevated lines ceased service immediately while others closed soon after. Integration was slow, but several connections were built between the IND and BMT. These now operate as one division, called the B Division . Since the former IRT tunnels are narrower, have sharper curves, and shorter station platforms, they cannot accommodate B Division cars, and
2924-400: The former IRT remains its own division, the A Division . Many passenger transfers between stations of all three former companies have been created, allowing the entire network to be treated as a single unit. During the late 1940s, the system recorded high ridership, and on December 23, 1946, the system-wide record of 8,872,249 fares was set. The New York City Transit Authority (NYCTA),
2992-544: The hurricane included the restoration of the new South Ferry station from 2012 to 2017; the full closure of the Montague Street Tunnel from 2013 to 2014; and the partial 14th Street Tunnel shutdown from 2019 to 2020. Annual ridership on the New York City Subway system, which totaled nearly 1.7 billion in 2019, declined dramatically during the COVID-19 pandemic and did not surpass one billion again until 2022. When
3060-460: The last cars to be built with a length of 75 feet (22.86 m) (the previous three being the R44, R46, and R68). While the 75-foot (22.86 m) length allows more room for sitting and standing passengers per car than the 60-foot (18.29 m) length that was previously used, these cars suffer from clearance issues and cannot run on the BMT Eastern Division . Additionally, the reduced number of doors on
3128-463: The line at the beginning of 2017. Many rapid transit systems run relatively static routings, so that a train "line" is more or less synonymous with a train "route". In New York City, routings change often, for various reasons. Within the nomenclature of the subway , the "line" describes the physical railroad track or series of tracks that a train "route" uses on its way from one terminal to another. "Routes" (also called "services") are distinguished by
3196-403: The lines and leased them to the companies. The first line of the city-owned and operated Independent Subway System (IND) opened in 1932. This system was intended to compete with the private systems and allow some of the elevated railways to be torn down but stayed within the core of the city due to its small startup capital. This required it to be run 'at cost', necessitating fares up to double
3264-620: The modern-day New York City Subway system were already in service by then. The oldest structure still in use opened in 1885 as part of the BMT Lexington Avenue Line in Brooklyn and is now part of the BMT Jamaica Line . The oldest right-of-way, which is part of the BMT West End Line near Coney Island Creek , was in use in 1864 as a steam railroad called the Brooklyn, Bath and Coney Island Rail Road . The first underground line of
3332-518: The most stations, with 472 stations in operation (423, if stations connected by transfers are counted as single stations). The system has operated 24/7 service every day of the year throughout most of its history, barring emergencies and disasters. By annual ridership, the New York City Subway is the busiest rapid transit system in both the Western Hemisphere and the Western world , as well as
3400-489: The opening of the first line in 1932. Six letters—A to F—were assigned to the major services, sorted by the north terminal and midtown line, and express services had single letters, while local services had double letters. G and H were assigned to lesser services, which did not enter Manhattan. The following labels were used from 1940 to 1967: Until 1954 and 1955, when the Culver Ramp and 60th Street Tunnel Connection opened,
3468-404: The perception of being more geographically inaccurate than the diagrams today. The design of the subway map by Massimo Vignelli , published by the MTA between 1972 and 1979, has become a modern classic but the MTA deemed the map flawed due to its placement of geographical elements. A late night-only version of the map was introduced on January 30, 2012. On September 16, 2011, the MTA introduced
SECTION 50
#17328587387963536-570: The previous R68 order, the R68As were originally single units, with a full-width cab on one end and a half-width cab on the other end. They were eventually linked into four-car sets and continue to run in this configuration. The first R68A cars were delivered to New York on April 12, 1988, and transferred to TA facilities the following day. The cars replaced all of the remaining R10s , R27s , and unrebuilt R30s , all of which were retired between 1989 and 1993. The R68As were built with American and Japanese parts. The R68As' first entry to revenue service
3604-526: The rest of the R68 and R68A fleet with 355 new 60-foot-long (18 m) cars, thereby retiring the last remaining 75-foot-long (23 m) cars in the New York City Subway system's revenue fleet. [REDACTED] Media related to R68A (New York City Subway car) at Wikimedia Commons B Division (New York City Subway) The New York City Subway 's B Division consists of the lines that operate with lettered services ( A , B , C , D , E , F , G , J , L , M , N , Q , R , W , and Z ), as well as
3672-499: The rest reopened in September 2002, along with service south of Chambers Street. Cortlandt Street reopened in September 2018. In October 2012, Hurricane Sandy flooded several underwater tunnels and other facilities near New York Harbor , as well as trackage over Jamaica Bay . The immediate damage was fixed within six months, but long-term resiliency and rehabilitation projects continued for several years. The recovery projects after
3740-468: The routes proposed over the decades have never seen construction, discussion remains strong to develop some of these lines, to alleviate existing subway capacity constraints and overcrowding, the most notable being the proposals for the Second Avenue Subway . Plans for new lines date back to the early 1910s, and expansion plans have been proposed during many years of the system's existence. After
3808-403: The routes that would normally run on these lines. The Transit Authority announces planned service changes through its website, via placards that are posted on station and interior subway-car walls, and through its Twitter page. Current official transit maps of the New York City Subway are based on a 1979 design by Michael Hertz Associates . The maps are not geographically accurate due to
3876-727: The subway opened on October 27, 1904, almost 36 years after the opening of the first elevated line in New York City (which became the IRT Ninth Avenue Line ). The 9.1-mile (14.6 km) subway line, then called the "Manhattan Main Line", ran from City Hall station northward under Lafayette Street (then named Elm Street) and Park Avenue (then named Fourth Avenue) before turning westward at 42nd Street . It then curved northward again at Times Square , continuing under Broadway before terminating at 145th Street station in Harlem . Its operation
3944-508: The subway system runs on surface or elevated tracks, including steel or cast-iron elevated structures , concrete viaducts , embankments , open cuts and surface routes. As of 2019 , there are 168 miles (270 km) of elevated tracks. All of these construction methods are completely grade-separated from road and pedestrian crossings, and most crossings of two subway tracks are grade-separated with flying junctions . The sole exceptions of at-grade junctions of two lines in regular service are
4012-407: The tunnel was completely within the limits of the present-day City Hall station under Broadway. The Great Blizzard of 1888 helped demonstrate the benefits of an underground transportation system. A plan for the construction of the subway was approved in 1894, and construction began in 1900. Even though the underground portions of the subway had yet to be built, several above-ground segments of
4080-535: The union's founding, there have been three union strikes over contract disputes with the MTA: 12 days in 1966 , 11 days in 1980 , and three days in 2005 . By the 1970s and 1980s, the New York City Subway was at an all-time low. Ridership had dropped to 1910s levels, and graffiti and crime were rampant. Maintenance was poor, and delays and track problems were common. Still, the NYCTA managed to open six new subway stations in
4148-717: The work. The foundations of tall buildings often ran near the subway construction, and in some cases needed underpinning to ensure stability. This method worked well for digging soft dirt and gravel near the street surface. Tunnelling shields were required for deeper sections, such as the Harlem and East River tunnels, which used cast-iron tubes. Rock or concrete-lined tunnels were used on segments from 33rd to 42nd streets under Park Avenue ; 116th to 120th Streets under Broadway ; 145th to Dyckman Streets (Fort George) under Broadway and St. Nicholas Avenue ; and 96th Street and Broadway to Central Park North and Lenox Avenue . About 40% of
SECTION 60
#17328587387964216-538: The years, the MTA has been involved in a number of lawsuits over the lack of accessibility in its stations. The Eastern Paralyzed Veterans Association filed what may have been the first of these suits in 1979, based on state law. The lawsuits have relied on a number of different legal bases, but most have centered around the MTA's failure to include accessibility as a part of its plans for remodeling various stations. As of January 2022 , ADA-accessibility projects are expected to be started or completed at 51 stations as part of
4284-425: Was created by the city in the 1920s and 1930s as a third system, operated by the city, competing with the BMT and Interborough Rapid Transit Company (IRT). The city took over operations of the BMT and IRT in 1940, consolidating ownership of the three systems into one. Since the original IRT tunnels were smaller, it has remained a separate division to this day. IND services were labeled on maps and signs starting with
4352-609: Was formed by 1908 by the Brooklyn Rapid Transit Company (BRT), crossing the Brooklyn Bridge and Williamsburg Bridge to Manhattan terminals. With the Dual Contracts , signed in 1913, the BRT acquired extensions outward into Queens , as well as through Lower and Midtown Manhattan . The BRT became the Brooklyn–Manhattan Transit Corporation in 1923 after a bankruptcy . The Independent Subway System (IND)
4420-528: Was labeled MJ . The 1967 opening of the Chrystie Street Connection resulted in a number of changes. The following services have been operated since then: New York City Subway July 3, 1868 ; 156 years ago ( 1868-07-03 ) (first elevated, rapid transit operation) [REDACTED] The New York City Subway is a rapid transit system in New York City serving
4488-534: Was leased to the Interborough Rapid Transit Company (IRT), and over 150,000 passengers paid the 5-cent fare ($ 2 in 2023 dollars ) to ride it on the first day of operation. By the late 1900s and early 1910s, the lines had been consolidated into two privately owned systems, the IRT and the Brooklyn Rapid Transit Company (BRT, later Brooklyn–Manhattan Transit Corporation , BMT). The city built most of
4556-611: Was on May 18, 1988, on the Bronx and Manhattan half of the divided D train with the first fleet consisting of the consist 5010-5001-5006-5008-5009-5007-5004-5005. Originally, the R68A order was supposed to be a second option order of the R68. However, due to poor performance from the R68 cars produced by Westinghouse-Amrail, along with other issues, the MTA gave the order to Kawasaki , with an offer of $ 958,000 per car versus Westinghouse-Amrail's offer of $ 1,012,200 per car. The R68As are scheduled to remain in service until at least 2025–30. In 2010,
4624-410: Was to be part of the city-operated IND, and was to comprise almost 1 ⁄ 3 of the current subway system. By 1939, with unification planned, all three systems were included within the plan, which was ultimately never carried out. Many different plans were proposed over the years of the subway's existence, but expansion of the subway system mostly stopped during World War II . Though most of
#795204