The Potaro River is a river in Guyana that runs from Mount Ayanganna area of the Pakaraima Mountains for approximately 255 km (158 mi) before flowing into the Essequibo River , Guyana's largest river. The renowned Kaieteur Falls is on the Potaro.
48-563: Nine waterfalls are found on the Potaro River, most notable being Kaieteur Falls and Tumatumari Falls . Below Kaieteur Falls lie Amatuk Falls and Waratuk Falls. A 1930 Suspension bridge , the Garraway Stream Bridge crosses the river. As well, 'Two Islands' is found on the Potaro River. Placer gold and diamonds are extracted from the river in this mineral-rich area. Many thousands of ounces of placer gold have been recovered from
96-410: A cable-stayed bridge in which the deck is in compression. Cable-stayed bridges and suspension bridges may appear to be similar, but are quite different in principle and in their construction. In suspension bridges, large main cables (normally two) hang between the towers and are anchored at each end to the ground. The main cables, which are free to move on bearings in the towers, bear the load of
144-456: A 200 feet span (also termed Beose Bridge) was constructed near Sagar, India during 1828–1830 by Duncan Presgrave, Mint and Assay Master. The Clifton Suspension Bridge (designed in 1831, completed in 1864 with a 214 m central span), is similar to the Sagar bridge. It is one of the longest of the parabolic arc chain type. The current Marlow suspension bridge was designed by William Tierney Clark and
192-492: A bridge has a tendency to collapse simply because of the gravitational forces acting on the materials of which the bridge is made. Live load refers to traffic that moves across the bridge as well as normal environmental factors such as changes in temperature, precipitation, and winds. Dynamic load refers to environmental factors that go beyond normal weather conditions, factors such as sudden gusts of wind and earthquakes. All three factors must be taken into consideration when building
240-468: A bridge. Silver Bridge (USA) was an eyebar chain highway bridge, built in 1928, that collapsed in late 1967, killing forty-six people. The bridge had a low-redundancy design that was difficult to inspect. The collapse inspired legislation to ensure that older bridges were regularly inspected and maintained. Following the collapse a bridge of similar design was immediately closed and eventually demolished. A second similarly-designed bridge had been built with
288-757: A bridge. The principles of suspension used on a large scale also appear in contexts less dramatic than road or rail bridges. Light cable suspension may prove less expensive and seem more elegant for a cycle or footbridge than strong girder supports. An example of this is the Nescio Bridge in the Netherlands, and the Roebling designed 1904 Riegelsville suspension pedestrian bridge across the Delaware River in Pennsylvania. The longest pedestrian suspension bridge, which spans
336-403: A higher margin of safety and remained in service until 1991. The Tacoma Narrows Bridge , (USA), 1940, was vulnerable to structural vibration in sustained and moderately strong winds due to its plate-girder deck structure. Wind caused a phenomenon called aeroelastic fluttering that led to its collapse only months after completion. The collapse was captured on film. There were no human deaths in
384-538: A pedestrian suspension bridge over the Machchhu River in the city of Morbi, Gujarat, India collapsed, leading to the deaths of at least 141 people. Falsework Falsework consists of temporary structures used in construction to support a permanent structure until its construction is sufficiently advanced to support itself. For arches, this is specifically called centering . Falsework includes temporary support structures for formwork used to mold concrete in
432-641: A proposal by Robert Stevenson for a bridge over the River Almond near Edinburgh . Roebling's Delaware Aqueduct (begun 1847) consists of three sections supported by cables. The timber structure essentially hides the cables; and from a quick view, it is not immediately apparent that it is even a suspension bridge. The main suspension cables in older bridges were often made from a chain or linked bars, but modern bridge cables are made from multiple strands of wire. This not only adds strength but improves reliability (often called redundancy in engineering terms) because
480-538: A sequence generally described as follows. Depending on length and size, construction may take anywhere between a year and a half (construction on the original Tacoma Narrows Bridge took only 19 months) up to as long as a decade (the Akashi-Kaikyō Bridge's construction began in May 1986 and was opened in May 1998 – a total of twelve years). Suspension bridges are typically ranked by the length of their main span. These are
528-499: A temporary walkway. Poured sockets are used to make a high strength, permanent cable termination. They are created by inserting the suspender wire rope (at the bridge deck supports) into the narrow end of a conical cavity which is oriented in-line with the intended direction of strain. The individual wires are splayed out inside the cone or 'capel', and the cone is then filled with molten lead-antimony-tin (Pb80Sb15Sn5) solder. Most suspension bridges have open truss structures to support
SECTION 10
#1732852007860576-547: A type of bridge in which the deck is hung below suspension cables on vertical suspenders. The first modern examples of this type of bridge were built in the early 1800s. Simple suspension bridges , which lack vertical suspenders, have a long history in many mountainous parts of the world. Besides the bridge type most commonly called suspension bridges, covered in this article, there are other types of suspension bridges . The type covered here has cables suspended between towers , with vertical suspender cables that transfer
624-627: Is considered the last remaining Inca rope bridge and is rebuilt annually. The first iron chain suspension bridge in the Western world was the Jacob's Creek Bridge (1801) in Westmoreland County, Pennsylvania , designed by inventor James Finley . Finley's bridge was the first to incorporate all of the necessary components of a modern suspension bridge, including a suspended deck which hung by trusses. Finley patented his design in 1808, and published it in
672-797: The Mahakam River , located in Kutai Kartanegara Regency , East Kalimantan district on the Indonesia island of Borneo , was built in 1995, completed in 2001 and collapsed in 2011. Dozens of vehicles on the bridge fell into the Mahakam River . As a result of this incident, 24 people died and dozens of others were injured and were treated at the Aji Muhammad Parikesit Regional Hospital. Meanwhile, 12 people were reported missing, 31 people were seriously injured, and 8 people had minor injuries. Research findings indicate that
720-448: The live and dead loads of the deck below, upon which traffic crosses. This arrangement allows the deck to be level or to arc upward for additional clearance. Like other suspension bridge types, this type often is constructed without the use of falsework . The suspension cables must be anchored at each end of the bridge, since any load applied to the bridge is transformed into tension in these main cables. The main cables continue beyond
768-606: The self-anchored suspension bridge , must be supported during construction, either by the use of cantilever or suspension methods or by support from below. Support from below was used in the construction of the main span of the eastern span replacement of the San Francisco–Oakland Bay Bridge , using parallel prefabricated truss spans. Cast in place concrete bridges must also be supported during construction. The new Sixth Street Viaduct in Los Angeles, California
816-741: The Philadelphia journal, The Port Folio , in 1810. Early British chain bridges included the Dryburgh Abbey Bridge (1817) and 137 m Union Bridge (1820), with spans rapidly increasing to 176 m with the Menai Bridge (1826), "the first important modern suspension bridge". The first chain bridge on the German speaking territories was the Chain Bridge in Nuremberg . The Sagar Iron Suspension Bridge with
864-483: The Potaro area. Illegal dredging is a constant issue, and the remoteness makes monitoring difficult. The mineral Potarite is named for the river where it was first discovered by Sir John B. Harrison. Villages along the Potaro include Micobie , Tumatumari , Chenapau (south of Kaieteur Falls), and Menzies Landing , a 20-minute walk upriver from Kaieteur Falls, is the main staging area for up river travel. Up river from
912-542: The River Paiva, Arouca Geopark , Portugal, opened in April 2021. The 516 metres bridge hangs 175 meters above the river. Where such a bridge spans a gap between two buildings, there is no need to construct towers, as the buildings can anchor the cables. Cable suspension may also be augmented by the inherent stiffness of a structure that has much in common with a tubular bridge . Typical suspension bridges are constructed using
960-488: The area's stream gravels, residual placers and saprolites. In the first half of the 20th century, small-scale artisanal miners, known as pork-knockers , recovered significant quantities of gem-quality diamonds from the area's rivers and streams. In fact, the two largest gem-quality diamonds recovered in Guyana to date – 56.75 carats (11.35 g) from Little Uewang River and 25.67 carats (5.134 g) from Maple Creek – were recovered in
1008-432: The bridge deck. Before the deck is installed, the cables are under tension from their own weight. Along the main cables smaller cables or rods connect to the bridge deck, which is lifted in sections. As this is done, the tension in the cables increases, as it does with the live load of traffic crossing the bridge. The tension on the main cables is transferred to the ground at the anchorages and by downwards compression on
SECTION 20
#17328520078601056-484: The chains are not attached to abutments as is usual, but instead are attached to the main girders, which are thus in compression. Here, the chains are made from flat wrought iron plates, eight inches (203 mm) wide by an inch and a half (38 mm) thick, rivetted together. The first wire-cable suspension bridge was the Spider Bridge at Falls of Schuylkill (1816), a modest and temporary footbridge built following
1104-623: The collapse of James Finley's nearby Chain Bridge at Falls of Schuylkill (1808). The footbridge's span was 124 m, although its deck was only 0.45 m wide. Development of wire-cable suspension bridges dates to the temporary simple suspension bridge at Annonay built by Marc Seguin and his brothers in 1822. It spanned only 18 m. The first permanent wire cable suspension bridge was Guillaume Henri Dufour 's Saint Antoine Bridge in Geneva of 1823, with two 40 m spans. The first with cables assembled in mid-air in
1152-519: The collapse was largely caused by the construction failure of the vertical hanging clamp. It was also found that poor maintenance, fatigue in the cable hanger construction materials, material quality, and bridge loads that exceed vehicle capacity, can also have an impact on bridge collapse. In 2013 the Kutai Kartanegara Bridge rebuilt the same location and completed in 2015 with a Through arch bridge design. On 30 October 2022, Jhulto Pul ,
1200-517: The collapse; several drivers escaped their cars on foot and reached the anchorages before the span dropped. Yarmouth suspension bridge (England) was built in 1829 and collapsed in 1845, killing 79 people. Peace River Suspension Bridge (Canada), which was completed in 1943, collapsed when the north anchor's soil support for the suspension bridge failed in October 1957. The entire bridge subsequently collapsed. Kutai Kartanegara Bridge (Indonesia) over
1248-588: The construction industry including to support slab formwork, wall formwork, trench sheeting and falsework. Materials from which falsework systems are manufactured have also diversified from traditional steel and timber to aluminium components. In the UK, BS 5975 gives recommendations for the design and use of falsework on construction sites. It was first introduced by the British Standards Institute in March 1982 and
1296-519: The construction of buildings, bridges, and elevated roadways. The British Standards of practice for falsework, BS 5975:2008, defines falsework as "Any temporary structure used to support a permanent structure while it is not self-supporting." Falsework has been employed in bridge and viaduct construction since ancient times. The Romans were renowned for its use, as at the Limyra Bridge in Turkey. Until
1344-571: The failure of a few flawed strands in the hundreds used pose very little threat of failure, whereas a single bad link or eyebar can cause failure of an entire bridge. (The failure of a single eyebar was found to be the cause of the collapse of the Silver Bridge over the Ohio River .) Another reason is that as spans increased, engineers were unable to lift larger chains into position, whereas wire strand cables can be formulated one by one in mid-air from
1392-638: The falls, the Potaro Plateau stretches out to the distant escarpment of the Pakaraima Mountains . In the mid-1950s, the first hydropower plant was built at the Tumatumari falls by British Guiana Consolidated Goldfields Limited. Its purpose was to power the dredges of their gold mining operations, however a prolonged workers' strike led to closure. In 1976 the Guyana National Service put one of
1440-504: The formwork for a post-tensioned reinforced concrete flyover connector for the eastern span replacement of the San Francisco-Oakland Bay Bridge . When the supports are complete, wood beams and plywood or reusable metal forms will be placed, reinforcing and tenon conduits added, and concrete poured. After curing and any tenon tensioning, wedges will be removed and forms and falsework disassembled. A certain type of bridge,
1488-432: The highway, which may be supported by suspender cables or their own trusswork . In cases where trusswork supports the spans, there will be very little arc in the outboard main cables. The earliest suspension bridges were ropes slung across a chasm, with a deck possibly at the same level or hung below the ropes such that the rope had a catenary shape. The Tibetan siddha and bridge-builder Thangtong Gyalpo originated
Potaro River - Misplaced Pages Continue
1536-400: The interior. The population of Potaro Landing and surrounding area was 112 people in 2012. Potaro Landing is located at 5°21′23″N 59°07′07″W / 5.3565°N 59.1185°W / 5.3565; -59.1185 5°21′48″N 58°54′24″W / 5.36333°N 58.90667°W / 5.36333; -58.90667 Suspension bridge A suspension bridge is
1584-530: The live loads. In an underspanned suspension bridge, also called under-deck cable-stayed bridge, the main cables hang entirely below the bridge deck, but are still anchored into the ground in a similar way to the conventional type. Very few bridges of this nature have been built, as the deck is inherently less stable than when suspended below the cables. Examples include the Pont des Bergues of 1834 designed by Guillaume Henri Dufour ; James Smith's Micklewood Bridge; and
1632-684: The modern method was Joseph Chaley 's Grand Pont Suspendu in Fribourg , in 1834. In the United States, the first major wire-cable suspension bridge was the Wire Bridge at Fairmount in Philadelphia, Pennsylvania. Designed by Charles Ellet Jr. and completed in 1842, it had a span of 109 m. Ellet's Niagara Falls suspension bridge (1847–48) was abandoned before completion. It was used as scaffolding for John A. Roebling 's double decker railroad and carriage bridge (1855). The Otto Beit Bridge (1938–1939)
1680-406: The pillars to deck-level supports, and further continue to connections with anchors in the ground. The roadway is supported by vertical suspender cables or rods, called hangers. In some circumstances, the towers may sit on a bluff or canyon edge where the road may proceed directly to the main span. Otherwise, the bridge will typically have two smaller spans, running between either pair of pillars and
1728-413: The railing and the walking layer of Gyalpo's bridges used wires. The stress points that carried the screed were reinforced by the iron chains. Before the use of iron chains it is thought that Gyalpo used ropes from twisted willows or yak skins. He may have also used tightly bound cloth. The Inca used rope bridges , documented as early as 1615. It is not known when they were first made. Queshuachaca
1776-592: The roadbed, particularly owing to the unfavorable effects of using plate girders, discovered from the Tacoma Narrows Bridge (1940) bridge collapse. In the 1960s, developments in bridge aerodynamics allowed the re-introduction of plate structures as shallow box girders , first seen on the Severn bridge , built 1961–1966. In the picture of the Yichang Bridge , note the very sharp entry edge and sloping undergirders in
1824-401: The suspension bridge shown. This enables this type of construction to be used without the danger of vortex shedding and consequent aeroelastic effects, such as those that destroyed the original Tacoma Narrows bridge. Three kinds of forces operate on any bridge: the dead load, the live load, and the dynamic load. Dead load refers to the weight of the bridge itself. Like any other structure,
1872-508: The ten bridges with the longest spans, followed by the length of the span and the year the bridge opened for traffic: (Chronological) Broughton Suspension Bridge (England) was an iron chain bridge built in 1826. One of Europe's first suspension bridges, it collapsed in 1831 due to mechanical resonance induced by troops marching in step. As a result of the incident, the British Army issued an order that troops should "break step" when crossing
1920-434: The third version was published in 2008 with Amendment 1 in 2011. The new revisions bring the code up to date with methodology developed in the new CDM 2007 regulations and also the requirements of the new European codes EN 12811-1:2003 Temporary works equipment - Part 1: scaffolds , and EN 12812:2004, falsework - performance requirements and general design. The illustrations are of modern pipe-column falsework, used to support
1968-489: The towers. In cable-stayed bridges, the towers are the primary load-bearing structures that transmit the bridge loads to the ground. A cantilever approach is often used to support the bridge deck near the towers, but lengths further from them are supported by cables running directly to the towers. By design, all static horizontal forces of the cable-stayed bridge are balanced so that the supporting towers do not tend to tilt or slide and so must only resist horizontal forces from
Potaro River - Misplaced Pages Continue
2016-514: The turbines to use for supplying power to its administrative centre until 1987. The Potaro River is navigable up to Potaro Landing. Further upstream, rapids and waterfalls make travel by boat impossible. In 1933, the Denham Suspension Bridge opened near Potaro Landing to shorten the access to the gold fields of the interior. There was a daily steamer service from Tumatumari Landing to Potaro Landing to transport passenger and freight to
2064-503: The turn of the 20th century almost all falsework was constructed from timber . To compensate for timber shortages in different regions and to rationalize labor and material usage, new systems were developed. The major developments include the design of connection devices (coupler), transitions to other spanning beams such as steel pipes or profiles or reusable timber beams, and adjustable steel props. In 1935 W.A. de Vigier designed an adjustable steel prop which revolutionized many aspects of
2112-554: The use of iron chains in his version of simple suspension bridges . In 1433, Gyalpo built eight bridges in eastern Bhutan . The last surviving chain-linked bridge of Gyalpo's was the Thangtong Gyalpo Bridge in Duksum en route to Trashi Yangtse , which was finally washed away in 2004. Gyalpo's iron chain bridges did not include a suspended-deck bridge , which is the standard on all modern suspension bridges today. Instead, both
2160-423: The weight of the cables is small compared to the weight of the deck. One can see the shape from the constant increase of the gradient of the cable with linear (deck) distance, this increase in gradient at each connection with the deck providing a net upward support force. Combined with the relatively simple constraints placed upon the actual deck, that makes the suspension bridge much simpler to design and analyze than
2208-643: Was built between 1829 and 1832, replacing a wooden bridge further downstream which collapsed in 1828. It is the only suspension bridge across the non-tidal Thames. The Széchenyi Chain Bridge , (designed in 1840, opened in 1849), spanning the River Danube in Budapest, was also designed by William Clark and it is a larger-scale version of Marlow Bridge. An interesting variation is Thornewill and Warham 's Ferry Bridge in Burton-on-Trent , Staffordshire (1889), where
2256-652: Was cast on falsework and then hung on its network tied arch cables. The release of the falsework will coincide with the tensioning of the arch cables. Soffit: Plywood sheeting for walking platform and surface to pour bridge against, typically on top of 4×4 lumber at specified spacing of 12". Camber: Plywood strips that compensate for beam deflection Stringer: Steel beam that ties caps together Top cap: Steel Beam Post: steel pipe or 12×12 lumber. Bottom cap: steel beam Wedge pack: 4×4 lumber cut into wedges for falsework adjustment, various lumber sizes include 2×6s and plywood Corbel: distribute load to pads. Typical material
2304-404: Was the first modern suspension bridge outside the United States built with parallel wire cables. Two towers/pillars, two suspension cables, four suspension cable anchors, multiple suspender cables, the bridge deck. The main cables of a suspension bridge will form a catenary when hanging under their own weight only. When supporting the deck, the cables will instead form a parabola , assuming
#859140