The Egyptian Museum and Papyrus Collection of Berlin (German: Ägyptisches Museum und Papyrussammlung ) is home to one of the world's most important collections of ancient Egyptian artefacts, including the Nefertiti Bust . Since 1855, the collection is a part of the Neues Museum on Berlin's Museum Island , which reopened after renovations in 2009.

#380619

45-702: The James Simon Gallery (German: James-Simon-Galerie ) is an art gallery located between the reconstructed Neues Museum and the Kupfergraben arm of the Spree river on Museum Island in Berlin, Germany. It opened in 2019. Designed by architect David Chipperfield , the gallery is named in honour of the art patron Henri James Simon (1851–1932) who brought worldwide fame to the Berlin State Museums with his lavish donations, including important artwork and artifacts. As

90-459: A steam engine was used for the first time in construction in Berlin. Among other things, it was used to ram pilings into the building ground. The soft, spongy soil around the River Spree means that buildings in the central area of Berlin require deep foundations. It was built between 1843 and 1855 according to plans by Friedrich August Stüler , a student of Karl Friedrich Schinkel . The museum

135-400: A 300-seat auditorium, with concrete walls cast in pleated acoustic folds; a media centre; a 600 sq metre space for temporary exhibitions; a bookstore; shops; cafés and restaurants for all of Museum Island. 52°31′14″N 13°23′52″E  /  52.52056°N 13.39778°E  / 52.52056; 13.39778 Neues Museum The Neues Museum (New Museum) is a listed building on

180-556: A form of cultural destruction. By contrast, the design was acknowledged in 2011 when David Chipperfield Architects in collaboration with Julian Harrap were awarded the European Union Prize for Contemporary Architecture . The museum houses the Egyptian museum and papyrus collection with its famous bust of Queen Nefertiti and other works of art from the time of the king Akhenaten . Portions of another major collection, artifacts from

225-563: Is not lifted by the end of the year, the "Cube" cannot be completed in time. After the consolidation of the foundations and walls, the Neues building was reconstructed. This work was done within the framework of the Masterplan for Berlin's Museum Island, with a cost of approximately €295 million for the Neues Museum. The northwest wing and the south-east façade, which were completely destroyed in

270-528: Is thus the "original source" of the collections in the Egyptian Museum of Berlin and the Ethnological Museum of Berlin . Moreover, the Neues Museum is an important monument in the history of construction and technology. With its various iron constructions, it is the first monumental building of Prussia to consistently apply new techniques made possible by industrialization. As a further innovation,

315-528: The East German government, but it was halted after the fall of the Berlin Wall and German reunification . In the process historical parts of the building were lost. For instance, the last remnants of the Egyptian courtyard were eliminated. In 1997, planning for the reconstruction project was resumed and English architect David Chipperfield was officially appointed for the project. Sections and fragments of

360-616: The Museum Island in the historic centre of Berlin , Germany. Built from 1843 to 1855 by order of King Frederick William IV of Prussia in Neoclassical and Renaissance Revival styles , it is considered as the major work of Friedrich August Stüler . After suffering damage in World War II and decay in East Germany , it was restored from 1999 to 2009 by David Chipperfield . Currently,

405-645: The Stone Age and later prehistoric eras from the Museum of Pre- and Early History, are on display. Thus the collections of two Berlin museums have returned to their place of origin. The museum becomes part of the archaeological promenade: an underground passageway connecting all the buildings on the Museum Island, with the exception of the Alte Nationalgalerie . This includes the Neues Museum as an important part of

450-405: The pediments , and also started cleaning the interiors, building the marble stairway steps and began work on the flooring. This work had progressed well in 1847 and the costly interior fittings could begin. The March revolution of 1848 led to delays in the construction work, which was however not completely interrupted at any time. As soon as the respective areas were completed, the installation of

495-576: The 18th century from the royal art collection of the Hohenzollern kings of Prussia . Alexander von Humboldt had recommended that an Egyptian section be created, and the first objects were brought to Berlin in 1828 under King Friedrich Wilhelm III . Initially housed in Monbijou Palace , the department was headed by the Trieste merchant Giuseppe Passalacqua (1797–1865), whose extensive collections formed

SECTION 10

#1732851192381

540-612: The Neues Museum is home to the Egyptian Museum ( Ägyptisches Museum ), the Papyrussammlung  [ de ] , the Museum für Vor- und Frühgeschichte and parts of the Antikensammlung. As part of the Museum Island complex, the museum was inscribed on the UNESCO World Heritage List in 1999 because of its outstanding architecture and testimony to the evolution of museums as a cultural phenomenon. The Neues Museum

585-663: The Neues Museum that was previously inaccessible. The architectural dialogue between the two buildings is now evident, representing the culmination of a process that began when the Neues Museum reopened in 2009. The contemporary architectural plan for the James Simon Galerie was also designed by David Chipperfield. 1)  Greek Courtyard 2)  Egyptian Courtyard 3)  Main Vestibule 4)  Patriotic Room 5)  South Vestibule 6)  Vaulted Room 7)  Ethnographic Room 8)  Room behind

630-570: The Neues Museum was heavily damaged by strategic bombing , the collections were divided between East and West Berlin . The main part remained in East Berlin and was displayed at the Bode Museum , while those artifacts evacuated to West Germany , including the Nefertiti Bust, returned to West Berlin. From 1967 to 2005, these items were housed vis-à-vis Charlottenburg Palace . The whole collection

675-495: The adjacent areas of the ground floor, suspended ceilings were added to produce modern, neutral display rooms by covering the original decorations. The museum was closed at the beginning of World War II in 1939. The destruction in the war followed these internal destructions of the original museum layout. In the bombardments on 23 November 1943, the central stairway and its frescos were burned, along with other great treasures of human history. In February 1945, Allied bombs destroyed

720-558: The basis. A Prussian expedition to Egypt and Nubia led by Karl Richard Lepsius in 1842–45 brought additional pieces to Berlin. In 1850, the collections moved to its present-day home in the Neues Museum, built according to plans designed by Friedrich August Stüler . The Nefertiti Bust, discovered during the excavations by Ludwig Borchardt in Amarna , was donated to the museum by the entrepreneur Henri James Simon in 1920; it quickly became its best-known exhibit. After World War II, during which

765-407: The building site and the new technical devices. On 6 April 1843 when the ceremony of laying the cornerstone took place, the foundations, including the cellars , were already built. Construction of the walls was completed at the end of 1843, so that by 1844, the cornice and roof of the museum were completed. In 1845, iron constructions, the construction of flat vaulted ceilings and brick-lining of

810-485: The building were taken out and put in storage. In June 2003 the Federal Government Commissioner for Cultural and Media Affairs  [ de ] , Christina Weiss  [ de ] , said on the occasion of the ceremony for the commencement of reconstruction of the museum that the master plan had "nearly squared the circle: to emphasize the buildings as a historical inheritance, to logically direct

855-677: The classical and ornate interiors of the Glyptothek and of the Alte Pinakothek in Munich were destroyed in World War II, the partly destroyed interior of the Neues Museum ranks among the last remaining examples of interior museum layout of this period in Germany. Construction of the Neues Museum began on 19 June 1841, under the auspices of a committee established by Frederick William IV , which included

900-492: The collection began, until the museum was finally opened in 1855 to the public, although work on parts of the interior decoration, in particular the wall frescos in the stairway, continued until 1866. When the Neues Museum opened, there were the Egyptian, patriotic and ethnographic collections in the ground floor, while the collections of the plaster casts of Greek and Roman sculptures from antiquity and Byzantine , Romanesque , Gothic , Renaissance and Classic art works occupied

945-511: The connecting gallery to the Altes Museum were completed. An auxiliary railway transported building materials from the street just west across the River Spree , Am Kupfergraben , to the steam engine-driven elevator. On the individual floors of the museum, rails were also used to transport construction materials. In 1846, the workers began work on the building's façade, apart from the sculptures in

SECTION 20

#1732851192381

990-472: The curator of the Royal Museums, Ignaz von Olfers, as well as Friedrich August Stüler. The king, with his cabinet, had already ordered that the construction project be assigned to Stüler on 8 March 1841. The poor quality of the ground at the building site became apparent quickly, when the workers discovered deposits of diatomaceous earth just below the surface. Therefore, a pile structure was necessary under

1035-509: The ensemble's sixth building, the gallery has a prominent position at the site of the former Packhof designed by Karl Friedrich Schinkel , which was demolished in 1938, and its design is inspired by the construction history of Museum Island. Chipperfield's first designs for the James Simon Gallery featured plain cubes with a hull of satin glass and steel, causing various protests. In 2004, an official panel recommended to Parliament that

1080-521: The first floor. The collection of etchings and engravings and the so-called art chamber ( Kunstkammer ), a collection of architectural models, furniture, clay, pottery and glass containers, and church articles shared the second floor, along with smaller works of art from the Middle Ages and modern times. The Ethnology Museum ( Völkerkundemuseum ), founded in 1873, moved to its own building in 1886 on Königgrätzer Straße (today Stresemannstraße; this building

1125-533: The flow of the host of visitors, and to make ready... a modern infrastructure." In January 2006, Chipperfield handed over his completed Museum of Modern Literature to the German Literature Archive in Marbach am Neckar ( Deutsches Literaturarchiv Marbach ). A new reception building for visitors to Museum Island, the "Cube", was also planned to be completed in 2009. The "Cube", which cost about €60 million,

1170-627: The government abandon plans for the entrance building, which led to an extensive revision in 2007. The design of the reception building consisted of a stone basement, framed by a modern continuation of Friedrich August Stüler 's colonnades at the Alte Nationalgalerie . Originally planned at a cost of $ 94 million, the $ 157 million project was completed in July 2019 and opened to the public after an opening ceremony on 13 July 2019. The gallery saw 26,000 visitors on its first opening day. It took over nine years to build and cost 134 million Euros, almost twice as much

1215-428: The ground floor housed the Egyptian collection again, while the areas in the first floor were occupied by the collection of etchings and engravings. From 1883 to 1887, an additional mezzanine level, which is not visible from the exterior, was added to the Neues Museum. The collection of plaster casts, a centerpiece of collections at the time of the construction, grew during the course of the 19th century to become one of

1260-408: The historical architectural context of the Museum Island. The building has been said to represent a lasting monument in stone for its first architect, Friedrich August Stüler, who wished that "the whole building should form a centre for the highest mental interests of the people, the likes of which no other capital would likely be able to exhibit." As originally built (see map below), the Neues Museum

1305-472: The most extensive and most comprehensive cast collections. However, because of a change in curatorial priorities in favour of original works of art, it was handed over between 1916 and 1920 (with the exception of the largest statues) to the Berlin University , where it was destroyed to a large extent during World War II. In the halls of the first floor, the vase collection of the antique museum, as well as

1350-642: The museum as "one of the most important museum buildings in European cultural history". However, Chipperfield's construction design has been a subject of debate by those who preferred a more traditional reconstruction of Friedrich August Stüler 's original 19th-century design. A group called the Society of Ancient Berlin requested UNESCO in 2008 to put the Museum Island on the list of World Heritage Sites that are at danger of losing their status, seeing Chipperfield's architectural concept involving complete reconstructions as

1395-472: The northwest wing as well as the connection to the Altes Museum and damaged the southwest wing as well as the south-east façade ( risalit ). In the post-war period, the ruin of the Neues Museum in the Soviet-occupied part of the city was left decaying for a long period of time. Other museums on Museum Island used the least damaged areas of the building for storage. Reconstruction work was started in 1986 by

James Simon Gallery - Misplaced Pages Continue

1440-476: The papyrus collection of the Egyptian museum were installed. Changes in the ground floor, from 1919 to 1923, led for the first time to substantial changes in the original building. In the Greek courtyard, the apse was removed, the courtyard covered with a glass roof, and a new floor at the same height as the ground floor was added. Thus several rooms and cabinets for the display of the Amarna collection were created. In

1485-505: The planned budget of 71 million Euros. Similar in function to the Louvre Pyramid , the James Simon Gallery is designed to receive the visitors for the island, offer them orientation, and direct them to the exhibits featured on the main circuit. A broad staircase leads up in three flights to an elevated plateau with a line of 70 white concrete columns that stand almost nine metres high but less than 30 centimetres thick. The building provides

1530-693: The stairs 9)  Historical Room 10)   Hypostyle 11)  Egyptian Tombs Room 12)  Mythological Room   13)  Main Stairs 14 )  Bacchus Room 15)  Roman Room 16)  South Cupola Room 17)  Connection to Altes Museum 18)  Room of the Middle Ages 19)   Bernward Room 20)  Modern Room 21)  Greek Room 22)  Cabinet of Laocoön 23)  Apollo Room 24)  North Cupola Room 25)  Nubian Room Egyptian Museum of Berlin The museum originated in

1575-510: The war, have been reconstructed according to Chipperfield's plan, in a manner close to their original layout in the museum building. In March 2009, the museum briefly reopened to the public with its empty building; artifacts had not been installed at that time. On 16 October 2009, the museum officially reopened. At the reopening ceremony, the Chancellor of Germany Angela Merkel described Chipperfield's work as "impressive and extraordinary" and

1620-414: The war. The artifacts it houses include the iconic bust of the Egyptian queen Nefertiti . Both as a part of the Museum Island complex and as an individual building, the museum testifies to the neoclassical architecture of museums in the 19th century. With its new industrialized building procedures and its use of iron construction, the museum plays an important role in the history of technology . Since

1665-500: The whole building, consisting of 2344 wooden foundation piles between 6.9 and 18.2 meters (23 and 60 ft) long. To ram the piles in, a 5-horsepower (3.7 kW) steam engine was used, whose power could be increased if necessary to 10 hp (7.5 kW). It drove the pumps that drained the building site, the elevators, and the mortar mixing machines. The newsletter of the Berlin Architecture Association reported on

1710-592: Was closed at the beginning of World War II in 1939, and was heavily damaged during the bombing of Berlin . The rebuilding was overseen by the English architect David Chipperfield . The museum officially reopened in October 2009 and received a 2010 RIBA European Award and the 2011 European Union Prize for Contemporary Architecture . Exhibits include the Egyptian and Prehistory and Early History collections, as it did before

1755-606: Was destroyed in World War II). Connected with this were the removal of the Ethnographic collection, the collection of the patriotic antiquities, and part of the "art chamber" collection. The newly founded Museum of Arts and Crafts ( Kunstgewerbemuseum ) took possession of the remaining nearly 7,000 objects of the "art chamber" in 1875, and also moved to its own building, the Martin Gropius Bau , in 1881. The areas thus freed in

1800-477: Was located in the center of the building, which was the highest section (31 m or 102 ft tall). The three main wings surround two interior courtyards, the Greek courtyard and the Egyptian courtyard. The northern Egyptian courtyard was covered with a glass ceiling from the beginning, but the southern Greek courtyard was first covered with a glass ceiling between 1919 and 1923. The James Simon Gallery , located on Museum Island, provides access to an area near

1845-509: Was moved from Charlottenburg to the Altes Museum in 2005 and was rehoused within the newly reconstructed Neues Museum on Berlin's Museum Island in October 2009. The museum is home to at least 23 mummified ancient Egyptians. In the 2020s the CT scans were performed on the mummies as part of a study into the mummification of hearts. At the same time the CT scans were examined to try and establish

James Simon Gallery - Misplaced Pages Continue

1890-614: Was nearly rectangular, with the long axis of the building (105 m or 344 ft) oriented north to south, parallel to Am Kupfergraben (the street to the west, across the River Spree), and a width of 40 meters (130 ft). The building is nearly perpendicular to the Altes Museum, with the Bodestraße between them. The bridge connecting the two museums (destroyed during World War II) was 6.9 m (23 ft) wide, 24.5 m (80 ft) long, and supported by three arches. The main stairway

1935-517: Was reunited again after the Reunification of Germany , when it returned to Museum Island. The collection contains artefacts dating from between 4000 BC (the Predynastic era ) to the period of Roman rule , though most date from the rule of Akhenaten (around 1340BC). The most famous piece on display is the exceptionally well preserved and vividly coloured bust of Queen Nefertiti . The collection

1980-427: Was the second museum to be built on Museum Island and was intended as an extension to house collections which could not be accommodated in the Altes Museum. Among these were collections of plaster casts , ancient Egyptian artifacts, the prehistoric and early historic collections ( Museum der vaterländischen Altertümer ), the ethnographic collection, and the collection of prints and drawings ( Kupferstichkabinett ). It

2025-478: Was under a planning freeze, which Chipperfield saw as endangering progress on the Neues Museum, according to ZDF , the Second German Television channel. In view of the total cost of the Museum Island master plan, estimated to be €1.5 billion, the controversy over the €60 million for the "Cube" appeared disproportionate not only to the architect. A March 2006 report on ZDF commented, "if the planning freeze