Misplaced Pages

International Designator

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

The International Designator , also known as COSPAR ID , is an international identifier assigned to artificial objects in space. It consists of the launch year, a three-digit incrementing launch number of that year and up to a three-letter code representing the sequential identifier of a piece in a launch. In TLE format the first two digits of the year and the dash are dropped.

#514485

70-696: For example, 1990-037A is the Space Shuttle Discovery on mission STS-31 , which carried the Hubble Space Telescope ( 1990-037B ) into space. This launch was the 37th known successful launch worldwide in 1990. The designation system has been generally known as the COSPAR system, named for the Committee on Space Research (COSPAR) of the International Council for Science . COSPAR subsumed

140-524: A Northwest Passage . Other ships bearing the name have included HMS  Discovery of the 1875–1876 British Arctic Expedition to the North Pole, and RRS  Discovery , which carried the 1901–1904 Discovery Expedition to Antarctica , led by Captain Scott . Space Shuttle Discovery launched the Hubble Space Telescope and conducted the second and third Hubble service missions. It also launched

210-567: A crewed lunar landing by 1970 required an expansion of launch operations. On July 1, 1962, the Launch Operations Directorate was separated from MSFC to become the Launch Operations Center (LOC). Also, Cape Canaveral was inadequate to host the new launch facility design required for the mammoth 363-foot (111 m) tall, 7,500,000-pound-force (33,000 kN) thrust Saturn V rocket, which would be assembled vertically in

280-622: A large hangar and transported on a mobile platform to one of several launch pads. Therefore, the decision was made to build a new LOC site located adjacent to Cape Canaveral on Merritt Island . NASA began land acquisition in 1962, buying title to 131 square miles (340 km ) and negotiating with the state of Florida for an additional 87 square miles (230 km ). The major buildings in KSC's Industrial Area were designed by architect Charles Luckman . Construction began in November 1962, and Kennedy visited

350-405: A month. The frequent number of flights allowed for quick evolution of the vehicles, as engineers gathered data, learned from anomalies and implemented upgrades. In 1963, with the intent of KSC ELV work focusing on the ground support equipment and facilities, a separate Atlas/Centaur organization was formed under NASA's Lewis Center (now Glenn Research Center (GRC) ), taking that responsibility from

420-617: A museum. The line was costing $ 1.3 million annually to maintain. Launch Complex 39 (LC-39) was originally built for the Saturn V , the largest and most powerful operational launch vehicle until the Space Launch System , for the Apollo crewed Moon landing program . Since the end of the Apollo program in 1972, LC-39 has been used to launch every NASA human space flight, including Skylab (1973),

490-501: A science and technology display commemorating the U.S. Bicentennial . Concurrent with this event, the U.S. flag was painted on the south side of the VAB. During the late 1970s, LC-39 was reconfigured to support the Space Shuttle. Two Orbiter Processing Facilities were built near the VAB as hangars with a third added in the 1980s. KSC's 2.9-mile (4.7 km) Shuttle Landing Facility (SLF)

560-417: A single pad, the complex is capable of being expanded to two at a later date. As a part of promoting commercial space industry growth in the area and the overall center as a multi-user spaceport, KSC leases some of its properties. Here are some major examples: The Kennedy Space Center Visitor Complex, operated by Delaware North since 1995, has a variety of exhibits, artifacts, displays and attractions on

630-465: Is 34 miles (55 km) long and roughly six miles (9.7 km) wide, covering 219 square miles (570 km ). KSC is a major central Florida tourist destination and is approximately one hour's drive from the Orlando area. The Kennedy Space Center Visitor Complex offers public tours of the center and Cape Canaveral Space Force Station. From 1967 through 1973, there were 13 Saturn V launches, including

700-446: Is a retired American Space Shuttle orbiter . The spaceplane was one of the orbiters from NASA 's Space Shuttle program and the third of five fully operational orbiters to be built. Its first mission, STS-41-D , flew from August 30 to September 5, 1984. Over 27 years of service it launched and landed 39 times, aggregating more spaceflights than any other spacecraft to date. The Space Shuttle launch vehicle had three main components:

770-560: Is also a Visitor Complex on site that is open to the public. Since 1949, the military had been performing launch operations at what would become Cape Canaveral Space Force Station . In December 1959, the Department of Defense transferred 5,000 personnel and the Missile Firing Laboratory to NASA to become the Launch Operations Directorate under NASA's Marshall Space Flight Center . President John F. Kennedy 's 1961 goal of

SECTION 10

#1732852676515

840-516: Is among the longest runways in the world. On October 28, 2009, the Ares I-X launch from Pad 39B was the first uncrewed launch from KSC since the Skylab workshop in 1973. Beginning in 1958, NASA and military worked side by side on robotic mission launches (previously referred to as unmanned), cooperating as they broke ground in the field. In the early 1960s, NASA had as many as two robotic mission launches

910-613: Is now on display at the Steven F. Udvar-Hazy Center of the Smithsonian National Air and Space Museum . The name Discovery was chosen to carry on a tradition based on ships of exploration, primarily HMS  Discovery , one of the ships commanded by Captain James Cook during his third and final major voyage from 1776 to 1779, and Henry Hudson 's Discovery , which was used in 1610–1611 to explore Hudson Bay and search for

980-637: The Challenger and Columbia disasters: STS-26 in 1988, STS-114 in 2005, and STS-121 in 2006. Discovery flew the ante-penultimate mission of the Space Shuttle program, STS-133 , having launched on February 24, 2011. Endeavour flew STS-134 and Atlantis performed STS-135 , NASA's last Space Shuttle mission. On February 24, 2011, Space Shuttle Discovery launched from Kennedy Space Center's Launch Complex 39-A to begin its final orbital flight. ‡ Longest shuttle mission for Discovery – shortest shuttle mission for Discovery The Flow Director

1050-558: The Ulysses probe and three TDRS satellites. Twice Discovery was chosen as the "Return To Flight" Orbiter, first in 1988 after the loss of Challenger in 1986, and then again for the twin "Return To Flight" missions in July 2005 and July 2006 after the Columbia disaster in 2003. Project Mercury astronaut John Glenn , who was 77 at the time, flew with Discovery on STS-95 in 1998, making him

1120-470: The Apollo , Skylab and Space Shuttle programs were carried out from Kennedy Space Center Launch Complex 39 and managed by KSC. Located on the east coast of Florida, KSC is adjacent to Cape Canaveral Space Force Station (CCSFS). The management of the two entities work very closely together, share resources, and operate facilities on each other's property. Though the first Apollo flights and all Project Mercury and Project Gemini flights took off from

1190-624: The Apollo–Soyuz Test Project (1975), and the Space Shuttle program (1981–2011). Since December 1968, all launch operations have been conducted from launch pads A and B at LC-39. Both pads are on the ocean, 3 miles (4.8 km) east of the VAB. From 1969 to 1972, LC-39 was the "Moonport" for all six Apollo crewed Moon landing missions using the Saturn V, and was used from 1981 to 2011 for all Space Shuttle launches. Human missions to

1260-659: The Commercial Space Launch Act of 1984 , after which NASA only coordinated its own and National Oceanic and Atmospheric Administration (NOAA) ELV launches. Companies were able to "operate their own launch vehicles" and utilize NASA's launch facilities. Payload processing handled by private firms also started to occur outside of KSC. Reagan's 1988 space policy furthered the movement of this work from KSC to commercial companies. That same year, launch complexes on Cape Canaveral Air Force Force Station started transferring from NASA to Air Force Space Command management. In

1330-619: The Intracoastal Waterway ; and its southern latitude, which gives a velocity advantage to missions launched in easterly near-equatorial orbits. Disadvantages included: its inability to safely launch military missions into polar orbit , since spent boosters would be likely to fall on the Carolinas or Cuba; corrosion from the salt air; and frequent cloudy or stormy weather. Although building a new site at White Sands Missile Range in New Mexico

1400-655: The Mars Science Laboratory have been processed at KSC before being transferred to a launch pad on Cape Canaveral Space Force Station. On 16 November 2022, at 06:47:44 UTC the Space Launch System (SLS) was launched from Complex 39B as part of the Artemis I mission. As the International Space Station modules design began in the early 1990s, KSC began to work with other NASA centers and international partners to prepare for processing before launch onboard

1470-511: The Moon required the large three-stage Saturn V rocket, which was 363 feet (111 meters) tall and 33 feet (10 meters) in diameter. At KSC, Launch Complex 39 was built on Merritt Island to accommodate the new rocket. Construction of the $ 800 million project began in November 1962. LC-39 pads A and B were completed by October 1965 (planned Pads C, D and E were canceled), the VAB was completed in June 1965, and

SECTION 20

#1732852676515

1540-585: The National Aeronautics and Space Administration . Kennedy Space Center The John F. Kennedy Space Center ( KSC , originally known as the NASA Launch Operations Center ), located on Merritt Island , Florida , is one of the National Aeronautics and Space Administration 's (NASA) ten field centers . Since 1968, KSC has been NASA's primary launch center of American spaceflight, research, and technology. Launch operations for

1610-529: The Smithsonian Institution 's National Air and Space Museum for public display and preservation, after a month-long decontamination process, as part of the national collection. Discovery replaced Enterprise , which was in the Smithsonian's display at the Steven F. Udvar-Hazy Center until 2011. Discovery was transported to Washington Dulles International Airport on April 17, 2012, and

1680-556: The Space Shuttle orbiter , a single-use central fuel tank, and two reusable solid rocket boosters . Nearly 25,000 heat-resistant tiles cover the orbiter to protect it from high temperatures on re-entry. Discovery became the third operational orbiter to enter service, preceded by Columbia and Challenger . After the Challenger and Columbia accidents, Discovery became the oldest surviving orbiter. It embarked on its final mission, STS-133 , on February 24, 2011, and touched down for

1750-669: The Space Station Processing Facility . The following are current programs and initiatives at Kennedy Space Center: The KSC Industrial Area, where many of the center's support facilities are located, is 5 miles (8 km) south of LC-39 . It includes the Headquarters Building , the Operations and Checkout Building and the Central Instrumentation Facility . The astronaut crew quarters are in

1820-515: The Wayback Machine or through their more up-to-date Flickr gallery . A new Headquarters Building was completed in 2019 as part of the Central Campus consolidation. Groundbreaking began in 2014. The center operated its own 17-mile (27 km) short-line railroad . This operation was discontinued in 2015, with the sale of its final two locomotives. A third had already been donated to

1890-554: The (first module of the) space station was launched in 1998. For example, the satellite GOMX-3, launched on an H-II Transfer Vehicle on August 19, 2015, from Tanegashima Space Center in Japan, is designated COSPAR ID 1998-067HA, because it first arrived on the International Space Station from where it was later launched. Space Shuttle Discovery Space Shuttle Discovery ( Orbiter Vehicle Designation : OV-103 )

1960-445: The 1990s, though KSC was not performing the hands-on ELV work, engineers still maintained an understanding of ELVs and had contracts allowing them insight into the vehicles so they could provide knowledgeable oversight. KSC also worked on ELV research and analysis and the contractors were able to utilize KSC personnel as a resource for technical issues. KSC, with the payload and launch vehicle industries, developed advances in automation of

2030-765: The 50th anniversary of the Apollo Program. NASA lists the following Historic Districts at KSC; each district has multiple associated facilities: There are 24 historic properties outside of these historic districts, including the Space Shuttle Atlantis , Vehicle Assembly Building , Crawlerway, and Operations and Checkout Building . KSC has one National Historic Landmark , 78 National Register of Historic Places (NRHP) listed or eligible sites, and 100 Archaeological Sites. Florida's peninsular shape and temperature contrasts between land and ocean provide ideal conditions for electrical storms, earning Central Florida

2100-628: The Cape Kennedy pads 34 and 37 used for the Saturn IB were decommissioned, so Pad 39B was modified to accommodate the Saturn IB, and used to launch three crewed missions to Skylab that year, as well as the final Apollo spacecraft for the Apollo–Soyuz Test Project in 1975. As the Space Shuttle was being designed, NASA received proposals for building alternative launch-and-landing sites at locations other than KSC, which demanded study. KSC had important advantages, including its existing facilities; location on

2170-637: The Center Director, library, film and photo archives, a print shop and security. When the KSC Library first opened, it was part of the Army Ballistic Missile Agency. However, in 1965, the library moved into three separate sections in the newly opened NASA headquarters before eventually becoming a single unit in 1970. The library contains over four million items related to the history and the work at Kennedy. As one of ten NASA center libraries in

International Designator - Misplaced Pages Continue

2240-605: The ELV launch and ground operations to enable competitiveness of U.S. rockets against the global market. In 1998, the Launch Services Program (LSP) formed at KSC, pulling together programs (and personnel) that already existed at KSC, GRC, Goddard Space Flight Center , and more to manage the launch of NASA and NOAA robotic missions. Cape Canaveral Space Force Station and VAFB are the primary launch sites for LSP missions, though other sites are occasionally used. LSP payloads such as

2310-616: The Launch Operations Center (aka KSC). Though almost all robotics missions launched from the Cape Canaveral Space Force Station (CCSFS), KSC "oversaw the final assembly and testing of rockets as they arrived at the Cape." In 1965, KSC's Unmanned Launch Operations directorate became responsible for all NASA uncrewed launch operations, including those at Vandenberg Space Force Base . From the 1950s to 1978, KSC chose

2380-890: The O&;C; before it was completed, the astronaut crew quarters were located in Hangar S at the Cape Canaveral Missile Test Annex (now Cape Canaveral Space Force Station ). Located at KSC was the Merritt Island Spaceflight Tracking and Data Network station (MILA), a key radio communications and spacecraft tracking complex. Facilities at the Kennedy Space Center are directly related to its mission to launch and recover missions. Facilities are available to prepare and maintain spacecraft and payloads for flight. The Headquarters (HQ) Building houses offices for

2450-608: The Space Center will experience 5 to 8 inches of sea level rise by the 2050s. Launch Complex 39A, the site of the Apollo 11 launch, is the most vulnerable to flooding, and has a 14% annual risk of flooding beginning in 2020. Since KSC's formation, ten NASA officials have served as directors, including three former astronauts (Crippen, Bridges and Cabana): In addition to being frequently featured in documentaries, Kennedy Space Center has been portrayed on film many times. Some studio movies have even gained access and filmed scenes within

2520-560: The Space Shuttles. KSC utilized its hands-on experience processing the 22 Spacelab missions in the Operations and Checkout Building to gather expectations of ISS processing. These experiences were incorporated into the design of the Space Station Processing Facility (SSPF), which began construction in 1991. The Space Station Directorate formed in 1996. KSC personnel were embedded at station module factories for insight into their processes. From 1997 to 2007, KSC planned and performed on

2590-564: The Udvar-Hazy Center, riding piggy-back on a modified Boeing 747 . After STS-105 , Discovery became the first of the orbiter fleet to undergo Orbiter Major Modification (OMM) period at the Kennedy Space Center. Work began in September 2002 to prepare the vehicle for Return to Flight. The work included scheduled upgrades and additional safety modifications. Discovery was decommissioned on March 9, 2011. NASA offered Discovery to

2660-457: The Visitor Complex to make room for an upcoming high-tech attraction entitled "Heroes and Legends". The attraction, designed by Orlando-based design firm Falcon's Treehouse, opened November 11, 2016. In March 2016, the visitor center unveiled the new location of the iconic countdown clock at the complex's entrance; previously, the clock was located with a flagpole at the press site. The clock

2730-454: The building to the elements. Damage occurred to the south and east sides of the VAB. The shuttle's Thermal Protection System Facility suffered extensive damage. The roof was partially torn off and the interior suffered water damage. Several rockets on display in the center were toppled. Further damage to KSC was caused by Hurricane Wilma in October 2005. The conservative estimate by NASA is that

2800-500: The center's 144,000 acres (580 km ). Among the unique facilities at KSC are the 525-foot (160 m) tall Vehicle Assembly Building for stacking NASA's largest rockets, the Launch Control Center , which conducts space launches at KSC, the Operations and Checkout Building , which houses the astronauts' dormitories and suit-up area, a Space Station factory , and a 3-mile (4.8 km) long Shuttle Landing Facility . There

2870-439: The country, their collection focuses on engineering, science, and technology. The archives contain planning documents, film reels, and original photographs covering the history of KSC. The library is not open to the public but is available for KSC, Space Force, and Navy employees who work on site. Many of the media items from the collection are digitized and available through NASA's KSC Media Gallery Archived December 6, 2020, at

International Designator - Misplaced Pages Continue

2940-477: The designators. While UNOOSA uses COSPAR ID, many NSSDC Master Catalog (NMC) entries are created before launches so they are not always bound to a COSPAR ID. Below are examples: Spacecraft which do not complete an orbit of the Earth, for example launches which fail to achieve orbit, are not assigned IDs. Satellites launched from the International Space Station are assigned a COSPAR ID beginning with "1998-067", because

3010-413: The entire mission. Additionally, the center manages launch of robotic and commercial crew missions and researches food production and in-situ resource utilization for off-Earth exploration. Since 2010, the center has worked to become a multi-user spaceport through industry partnerships, even adding a new launch pad ( LC-39C ) in 2015. There are about 700 facilities and buildings grouped throughout

3080-450: The first Moon landing on July 20. The Apollo 11 launch included crewmembers Neil Armstrong , Michael Collins , and Buzz Aldrin , and attracted a record-breaking 650 million television viewers. Apollo 12 followed four months later. From 1970 to 1972, the Apollo program concluded at KSC with the launches of missions 13 through 17. On May 14, 1973, the last Saturn V launch put the Skylab space station in orbit from Pad 39A. By this time,

3150-448: The first designation system, devised at Harvard University . That system used letters of the Greek alphabet to designate artificial satellites. This was based on the scientific naming convention for natural satellites. For example, Sputnik 1 was designated 1957 Alpha 2. The launch vehicle, which was brighter in orbit, was designated 1957 Alpha 1. Brighter objects in the same launch were given

3220-454: The gates of the space center. If extras are needed in those scenes, space center employees are recruited (employees use personal time during filming). Films with scenes at KSC include: The location appears as a major plot point in the finale of Stone Ocean , the 6th part of the manga and anime series JoJo's Bizarre Adventure . KSC is also one of the two primary settings of the 1965–1970 television series I Dream Of Jeannie (along with

3290-538: The ground integration tests and checkouts of station modules : three Multi-Element Integration Testing (MEIT) sessions and the Integration Systems Test (IST). Numerous issues were found and corrected that would have been difficult to nearly impossible to do on-orbit. Today KSC continues to process ISS payloads from across the world before launch along with developing its experiments for on orbit. The proposed Lunar Gateway would be manufactured and processed at

3360-603: The history and future of human and robotic spaceflight. Bus tours of KSC originate from here. The complex also includes the separate Apollo/Saturn V Center , north of the VAB and the United States Astronaut Hall of Fame , six miles west near Titusville . There were 1.5 million visitors in 2009. It had some 700 employees. It was announced on May 29, 2015, that the Astronaut Hall of Fame exhibit would be moved from its current location to another location within

3430-445: The infrastructure by late 1966. The complex includes: Launch Complex 48 (LC-48) is a multi-user launch site under construction for small launchers and spacecraft. It will be located between Launch Complex 39A and Space Launch Complex 41 , with LC-39A to the north and SLC-41 to the south. LC-48 will be constructed as a "clean pad" to support multiple launch systems with differing propellant needs. While initially only planned to have

3500-417: The last time at Kennedy Space Center on March 9, having spent a cumulative total of nearly a full year in space. Discovery performed both research and International Space Station (ISS) assembly missions, and also carried the Hubble Space Telescope into orbit among other satellites. Discovery was the first operational shuttle to be retired, followed by Endeavour and then Atlantis . The shuttle

3570-520: The lower integer number, and Alpha was given since it was the first launch of the year. The Harvard designation system continued to be used for satellites launched up to the end of 1962, when it was replaced with the modern system. The first satellite to receive a new-format designator was Luna E-6 No.2 , 1963-001B, although some sources, including the NSSDC website, retroactively apply the new-format designators to older satellites, even those no longer in orbit at

SECTION 50

#1732852676515

3640-481: The middle starboard window where there should have been white tiles. It is unknown if this was the result of a harmless manufacturing mishap or done intentionally to give a distinctive look to the shuttle. This feature has been called 'teardrop' and allowed Discovery to be told apart from the rest of the fleet without looking at its name, although often unnoticed by the uninitiated. The spacecraft weighed roughly 6,870 lb (3,120 kg) less than Columbia when it

3710-403: The oldest person to go into space at that time in history. Had plans to launch United States Department of Defense payloads from Vandenberg Air Force Base gone ahead, Discovery would have become the dedicated US Air Force shuttle. Its first West Coast mission, STS-62-A , was scheduled for 1986, but canceled in the aftermath of the Challenger disaster . On May 27, 1999, Discovery

3780-542: The orbiter underwent a nine-month Orbiter Maintenance Down Period (OMDP) in Palmdale, California . This included outfitting the vehicle with a 5th set of cryogenic tanks and an external airlock to support missions to the International Space Station . As with all the orbiters, it could be attached to the top of specialized aircraft and did so in June 1996 when it returned to the Kennedy Space Center, and later in April 2012 when sent to

3850-498: The reputation as "lightning capital of the United States". This makes extensive lightning protection and detection systems necessary to protect employees, structures and spacecraft on launch pads. On November 14, 1969, Apollo 12 was struck by lightning just after lift-off from Pad 39A, but the flight continued safely. The most powerful lightning strike recorded at KSC occurred at LC-39B on August 25, 2006, while shuttle Atlantis

3920-443: The rocket and payload processing facilities for all robotic missions launching in the U.S., overseeing their near launch processing and checkout. In addition to government missions, KSC performed this service for commercial and foreign missions also, though non-U.S. government entities provided reimbursement. NASA also funded Cape Canaveral Space Force Station launch pad maintenance and launch vehicle improvements. All this changed with

3990-508: The site twice in 1962, and again just a week before his assassination on November 22, 1963. On November 29, 1963, the facility was named by President Lyndon B. Johnson under Executive Order 11129 . Johnson's order joined both the civilian LOC and the military Cape Canaveral station ("the facilities of Station No. 1 of the Atlantic Missile Range") under the designation "John F. Kennedy Space Center", spawning some confusion joining

4060-492: The ten remaining Apollo missions after Apollo 7. The first of two uncrewed flights, Apollo 4 (Apollo-Saturn 501) on November 9, 1967, was also the first rocket launch from KSC. The Saturn V's first crewed launch on December 21, 1968, was Apollo 8 's lunar orbiting mission. The next two missions tested the Lunar Module : Apollo 9 (Earth orbit) and Apollo 10 (lunar orbit). Apollo 11 , launched from Pad A on July 16, 1969, made

4130-653: The then-Cape Canaveral Air Force Station, the launches were managed by KSC and its previous organization, the Launch Operations Directorate. Starting with the fourth Gemini mission, the NASA launch control center in Florida ( Mercury Control Center , later the Launch Control Center ) began handing off control of the vehicle to the Mission Control Center in Houston , shortly after liftoff; in prior missions it held control throughout

4200-557: The time of its introduction. Designators are assigned to objects by the United States Space Command along with satellite catalog numbers as they are discovered in space. The United Nations Office for Outer Space Affairs (UNOOSA) and the National Space Science Data Center (NSSDC), part of NASA , maintain two catalogs that provide additional information on the launchers and payloads associated with

4270-703: The two in the public mind. NASA Administrator James E. Webb clarified this by issuing a directive stating the Kennedy Space Center name applied only to the LOC, while the Air Force issued a general order renaming the military launch site Cape Kennedy Air Force Station . Located on Merritt Island, Florida , the center is north-northwest of Cape Canaveral on the Atlantic Ocean, midway between Miami and Jacksonville on Florida's Space Coast , due east of Orlando . It

SECTION 60

#1732852676515

4340-503: The white LRSI tiles on the fuselage, and the use of graphite epoxy instead of aluminum for the payload bay doors and some of the wing spars and beams. Upon its delivery to the Kennedy Space Center in 1983, Discovery was modified alongside Challenger to accommodate the liquid-fueled Centaur-G booster, which had been planned for use beginning in 1986 but was cancelled in the wake of the Challenger disaster. Beginning in late 1995,

4410-529: Was being prepared for STS-115 . NASA managers were initially concerned that the lightning strike caused damage to Atlantis , but none was found. On September 7, 2004, Hurricane Frances directly hit the area with sustained winds of 70 miles per hour (110 km/h) and gusts up to 94 miles per hour (151 km/h), the most damaging storm to date. The Vehicle Assembly Building lost 1,000 exterior panels, each 3.9 feet (1.2 m) x 9.8 feet (3.0 m) in size. This exposed 39,800 sq ft (3,700 m ) of

4480-429: Was brought into service due to optimalizations determined during the construction and testing of Enterprise , Columbia and Challenger . Discovery weighs 6 pounds (2.7 kg) heavier than Atlantis and 363 pounds (165 kg) heavier than Endeavour after further weight-saving adjustments were made. Part of the Discovery weight optimizations included the greater use of quilted AFRSI blankets rather than

4550-431: Was launched on STS-96 , the first shuttle mission to dock with the International Space Station . Discovery was retired after completing its final mission, STS-133 on March 9, 2011. The spacecraft is now on display in Virginia at the Steven F. Udvar-Hazy Center , an annex of the Smithsonian Institution 's National Air and Space Museum . During its construction, Discovery was fitted with several black tiles near

4620-399: Was originally built and installed in 1969 and listed with the flagpole in the National Register of Historic Places in January 2000. In 2019, NASA celebrated the 50th anniversary of the Apollo program , and the launch of Apollo 10 on May 18. In summer of 2019, Lunar Module 9 (LM-9) was relocated to the Apollo/Saturn V Center as part of an initiative to rededicate the center and celebrate

4690-476: Was responsible for the overall preparation of the shuttle for launch and processing it after landing, and remained permanently assigned to head the spacecraft's ground crew while the astronaut flight crews changed for every mission. Each shuttle's Flow Director was supported by a Vehicle Manager for the same spacecraft. Space Shuttle Discovery' s Flow Directors were: [REDACTED]  This article incorporates public domain material from websites or documents of

4760-430: Was seriously considered, NASA announced its decision in April 1972 to use KSC for the shuttle. Since the Shuttle could not be landed automatically or by remote control, the launch of Columbia on April 12, 1981 for its first orbital mission STS-1 , was NASA's first crewed launch of a vehicle that had not been tested in prior uncrewed launches. In 1976, the VAB's south parking area was the site of Third Century America,

4830-416: Was the orbiters' primary end-of-mission landing site, although the first KSC landing did not take place until the tenth flight, when Challenger completed STS-41-B on February 11, 1984; the primary landing site until then was Edwards Air Force Base in California, subsequently used as a backup landing site. The SLF also provided a return-to-launch-site (RTLS) abort option, which was not utilized. The SLF

4900-525: Was transferred to the Udvar-Hazy on April 19 where a welcome ceremony was held. Afterwards, at around 5:30 pm, Discovery was rolled to its "final wheels stop" in the Udvar Hazy Center. By its last mission, Discovery had flown 149 million mi (240 million km) in 39 missions, completed 5,830 orbits, and spent 365 days in orbit over 27 years. Discovery flew more flights than any other Orbiter Shuttle, including four in 1985 alone. Discovery flew both "return to flight" missions after

#514485