Misplaced Pages

HarbourFront MRT station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

Yeo Cheow Tong ( simplified Chinese : 姚照东 ; traditional Chinese : 姚照東 ; pinyin : Yáo Zhàodōng ; Pe̍h-ōe-jī : Iô Chiàu-tong ; born 22 June 1947) is a former Singaporean politician. A member of the governing People's Action Party (PAP), he served in the Cabinet from 1990 to 2006, and was a Member of Parliament (MP) of Hong Kah SMC from 12 December 1984 to 17 August 1988 and MP of Hong Kah GRC from 24 August 1988 to 19 April 2011 for almost 27 years.

#922077

97-654: HarbourFront MRT station is an underground Mass Rapid Transit (MRT) interchange station in Singapore . The termini of the North East line (NEL) and Circle line (CCL), the station serves the HarbourFront area and Sentosa . Surrounding retail and commercial developments include VivoCity and HarbourFront Centre , and the station is near HarbourFront Bus Interchange and the Singapore Cruise Centre . The NEL station

194-546: A circle-radial topology . Two more lines and 46 stations are currently under construction, in addition to ongoing extension works on existing lines. In total, this will schedule the network to double in length to about 460 km (290 mi) by 2040. Further studies are ongoing on potential new alignments and lines, as well as infill stations in the Land Transport Authority 's (LTA) Land Transport Masterplan 2040. The island-wide heavy rail network interchanges with

291-643: A Member of Parliament for Hong Kah constituency. In 1985, he was appointed a Minister of State at the Ministry of Health and Ministry of Foreign Affairs . In 1988, Yeo became the Acting Minister for Health , before becoming a full member of the Cabinet in 1990. He went on to hold a number of different Cabinet positions including Minister of Health (1990–94, 1997–99), Minister for Community Development (1991–94), Minister for Trade and Industry (1994–97), Minister for

388-607: A cumulative S$ 150 billion in 2021, making the network one of the world's costliest on both a per-kilometre and absolute basis. The system is managed in conformity with a semi-nationalised hybrid regulatory framework; construction and procurement fall under the purview of the Land Transport Authority (LTA), a statutory board of the government that allocates operating concessions to the for-profit private corporations SMRT and SBS Transit . These operators are responsible for asset maintenance on their respective lines, and also run bus services, facilitating operational synchronicity and

485-562: A few days of the weekend. The nightly closures are used for maintenance. During the COVID-19 pandemic across the country , train services ended earlier from 7 April 2020 to 1 June 2020 and service extensions on the eves of public holidays ceased from 7 April 2020 until 28 September 2024 except New Year's Eve. Train service extensions were reinstated back to before the pandemic began in 2020 as mentioned earlier. Train frequencies are 2 - 3 mins during peak hours and 5 - 6 mins during off-peak hours. If

582-668: A few paintings or sculptures representing the recent past of Singapore, mounted in major stations. The opening of the Woodlands Extension introduced bolder pieces of artwork, such as a 4,000 kg sculpture in Woodlands . With the opening of the North East Line in 2003, a series of artworks under a programme called "Art in Transit" were commissioned by the Land Transport Authority (LTA). Created by 19 local artists and integrated into

679-652: A later study in 1995, the planned NEL was extended to serve World Trade Centre. After plans for the new line were approved by the government in January 1996, the station, then tentatively named World Trade Centre, was among the 16 NEL stations announced by communications minister Mah Bow Tan in March 1996. The contract for constructing the station and tunnels was awarded to Hyundai Engineering & Construction at S$ 132.8 million ( US$ 143 million in 2022) in September 1997. The scope of

776-556: A plan to introduce dual speeds to escalators along the North–South and East–West lines, to make it safer for senior citizens using them. As a result, all escalators on the two lines, through a refurbishment programme, will be able to operate at a different speed of 0.5 m/s during off-peak hours, with completion being targeted for 2022. All stations constructed before 2001 initially lacked barrier-free facilities and wider AFC faregates such as lifts, ramps and tactile guidance systems for

873-671: A preference. The Land Transport Authority (LTA) had considered other naming methods in June 2007, whether by name, colour or numbers. After the survey, however, the naming scheme was retained and used for subsequent future MRT lines. Except for the partly at-grade Bishan MRT station ( North–South Line ), the entirety of the MRT is either elevated or underground. Most below-ground stations are deep and hardened enough to withstand conventional aerial bomb attacks and to serve as bomb shelters . Mobile phone, 3G, 4G and 5G services are available in every part of

970-565: A series of automated guideway transit networks localised to select suburban towns — collectively known as the Light Rail Transit (LRT) system — which, along with public buses , complement the mainline by providing a last mile link between MRT stations and HDB public housing estates . The MRT is the oldest, busiest, and most comprehensive metro system in Southeast Asia . Capital expenditure on its rail infrastructure reached

1067-588: A ship hull. The station features three artworks as part of the Art-in-Transit programme. The NEL platforms and concourse display a series of line-drawings by Ian Woo, while the CCL platforms feature Commuting Waves by Jason Ong and a set of art seats entitled Matrix . In preliminary studies for the North East line (NEL) in 1986, it was planned for the line to terminate at Outram Park station , rather than HarbourFront. In

SECTION 10

#1732859491923

1164-496: A station interlocking system. The ATO drives the train in automatic mode, providing the traction and braking control demands to the train rolling stock system, adjusts its speed upon approaching the station, and provides the control of opening and closing of train and platform screen doors once the train has stopped at the station. The ATP ensures safe train separation by using the ATP track circuit status and by location determination, monitors

1261-513: A two-year contract for consultancy in November 1982. The Mass Rapid Transit Corporation (MRTC)—later renamed SMRT Corporation—was established on 14 October 1983 and took over the roles and responsibilities of the former provisional Mass Rapid Transit Authority. On 7 November 1987, the first section of the North–South Line started operations, consisting of five stations over six kilometres. Within

1358-485: A year, 20 more stations had been added to the network and a direct service existed between Yishun and Lakeside stations, linking up Central Singapore to Jurong in the west by the end of 1988. The direct service was eventually split into the North–South and East–West lines after the latter's completion of the eastern sector to Tanah Merah station. By the end of 1990, the Branch line has further linked Choa Chu Kang to

1455-436: Is a series of line-drawings depicting various sea creatures, ships and clouds in minimalist style. Painted on 60 blue vitreous enamel wall panels, the work was intended to reflect the station's maritime theme and its location near the port. With its "dream-like" quality, the figures are in fragments dispersed throughout the station, allowing commuters in the station to slowly perceive the artwork over time. A set of footprints on

1552-581: Is able to support bidirectional train operations on a single track, enabling trains to be diverted onto another track in the event of a fault on one track. The CBTC system also permits for improved braking performance in wet weather as compared to the original fixed-block ATC. All new MRT lines built since the North East Line in 2003 were equipped with CBTC from the outset, and have the capability to be completely driverless and automated, requiring no on-board staffing. Operations are monitored remotely from

1649-736: Is currently used for the Downtown line . While major operations were shifted to the main Gali Batu Depot in 2015, the Tai Seng Facility Building resumed stabling operations with the extension of the Downtown line in 2017. It currently operates independently from Kim Chuan Depot. Gali Batu Depot is the first MRT depot in Singapore to achieve the certification of Building and Construction Authority (BCA) Green Mark Gold. In August 2014, plans for

1746-491: Is planned to begin operations in 2026, adding an additional 2.2 kilometres (1.4 miles) and 2 stations to the line, terminating at Sungei Bedok and interchanging with the Thomson–East Coast Line. Upon opening, the entire line will be 44 kilometres (27 miles) long and have 37 stations in total. A proposal has been further mooted to extend the line from Bukit Panjang towards Sungei Kadut which will interchange with

1843-463: Is the closest MRT station to the tourist island of Sentosa . The station is also near HarbourFront Bus Interchange , Seah Im Food Centre, Singapore Cruise Centre and Mount Faber Park, along with the cultural sites of Temenggong Mosque and St James Power Station . The NEL station is designated as a Civil Defence (CD) shelter. It is designed to accommodate at least 7,500 people and can withstand airstrikes and chemical attacks. Equipment essential for

1940-471: Is the terminus of the NEL and CCL; its official station code is NE1/CC29. On the NEL, the adjacent station is Outram Park station. Trains turnaround by using the cripple siding on the west end of the station or the crossover on the east end of the station. The next stop on the CCL in the clockwise direction is Telok Blangah station . Trains turnaround on the CCL terminus by using crossovers located at both ends of

2037-591: The East Coast Integrated Depot , the world's first four-in-one train and bus depot were announced. It will be built at Tanah Merah beside the original Changi Depot site to serve the East–West , Downtown , and Thomson–East Coast lines. The new 36 ha depot can house about 220 trains and 550 buses and integrating the depot for both buses and trains will help save close to 66.12 acres (26.76 ha), or 60 football fields of land. The Tengah Depot for

SECTION 20

#1732859491923

2134-669: The Jurong Region Line will be situated at the western perimeter of Tengah , and an additional depot facility will be added near Peng Kang Hill station to support the operations of the JRL. Rolling stock for the Jurong Region Line will be stabled at both facilities. Tengah Depot will house the JRL Operations Control Centre and have a bus depot integrated with it to optimise land use. The Changi East Depot will serve

2231-643: The National Fire Protection Association in the United States . Full-height platform screen doors were already installed in underground stations since 1987, supplied by Westinghouse . There were calls for platform screen doors to be installed at elevated stations after several incidents in which passengers were killed by oncoming trains when they fell onto the railway tracks at elevated stations. The authorities initially rejected such calls by casting doubts over functionality and concerns about

2328-482: The forested core and the rural northwestern region – in accordance with Singapore's aim of developing a comprehensive rail network as the backbone of the country's public transportation system , averaging a daily ridership of 3.45 million in 2023. The MRT network encompasses approximately 241 km (150 mi) of grade-separated route on standard gauge . As of 2024, there are currently 141 operational stations dispersed across six operational lines arrayed in

2425-405: The initialism MRT , is a rapid transit system in Singapore and the island country's principal mode of railway transportation . The system commenced operations in November 1987 after two decades of planning with an initial 6 km (3.7 mi) stretch consisting of five stations. The network has since grown to span the length and breadth of the country's main island – with the exception of

2522-421: The CCL platforms, Platform A of the NEL station was closed on 30 October 2005. Trains on the NEL from Punggol station terminated at Outram Park station, while a special shuttle train was launched for services between Outram Park and HarbourFront. In December 2009, structure works for the CCL station were completed, with backfilling in progress. As announced by transport minister Lui Tuck Yew during his visit to

2619-411: The CCL. The graphs had to be transformed into sculptures that are "aesthetically pleasing". The protrusion and spacing of each "fin" were dependent on the passenger traffic and train frequency respectively. Using phase shift, a concept by minimalist composer Steve Reich , the data lines were spaced out from the original graphs. Each alternating frequency was split into different layers that spread across

2716-512: The CCL4 and 5 stations on 1 August 2011, the CCL platforms began revenue service on 8 October that year. On 17 January 2013, transport minister Lui Tuck Yew announced that the CCL would be extended from HarbourFront station to Marina Bay station as part of CCL Stage 6. Tunnelling works between this station and Keppel station began on 25 July 2019, and were completed in August 2020. HarbourFront station

2813-476: The Christmas and New Year's Eve falls on the weekday, train frequencies will remain the same as weekdays only during morning peak whereas it will become 5 - 6 mins until 3pm and standardised to 5 min frequency throughout the whole period until the last train. Early stages of the MRT's construction paid scant attention to station design, with an emphasis on functionality over aesthetics. This is particularly evident in

2910-756: The East–West Line with its own maintenance facility, while Mandai Depot services trains for the Thomson–East Coast line. The underground Kim Chuan Depot houses trains for the Circle and Downtown lines, now jointly managed by the two MRT operators. SBS Transit has three depots: Sengkang Depot houses trains for the North East line , the Sengkang LRT line , and the Punggol LRT line . Tai Seng Facility Building , connected to and located east of Kim Chuan Depot ,

3007-579: The Environment (1997–99), Minister for Communications and Information Technology (1999–2001), and Minister for Transport (2001–06). In June 2006, Yeo resigned from the Cabinet to return to the private sector. He continued to serve as a Member of Parliament for the Hong Kah Group Representation Constituency until 2011, when he retired from politics. He was succeeded by Alex Yam in the 2011 Singaporean general election . Yeo

HarbourFront MRT station - Misplaced Pages Continue

3104-493: The Founders' Memorial in 2028. In addition, this line and Canberra MRT station were the first to use top-up kiosks (TUK) that only allows cashless payments, while GTMs were retained for traditional modes of payment. In addition to the previously announced alignment of the Thomson–East Coast Line, an extension has been proposed to connect it to Changi Airport , with the line passing through Terminal 5 , and eventually absorbing

3201-529: The Marina Bay Extension on 14 January 2012. Stage 1 of Downtown line opened on 22 December 2013 with its official opening made on 21 December 2013 by Prime Minister Lee Hsien Loong . Stage 2 opened on 27 December 2015, after being officially opened on 26 December by Prime Minister Lee. The Tuas West Extension of the East–West Line, consisting of Gul Circle , Tuas Crescent , Tuas West Road , and Tuas Link stations, opened on 18 June 2017. Stage 3,

3298-567: The Marina Line Architectural Design Competition, which was jointly organised by the Land Transport Authority and the Singapore Institute of Architects. The competition did not require any prior architectural experience from competitors and is acknowledged by the industry as one of the most impartial competitions held in Singapore to date. The winner of both stations was WOHA . In 2009, "Best Transport Building"

3395-650: The Mass Rapid Transit (MRT) were derived from a forecast by the country's planners back in 1967 which stated the need for a rail-based urban transport system by 1992. In 1972, a study was conducted by the American firms Wilbur Smith and Associates, Parsons Brinckerhoff, Tudor, and Bechtel, which was accounted for by the World Bank on behalf of the United Nations Development Programme . The study

3492-546: The North–South Line. The extension is expected to be completed by the mid-2030s. Stage 5 from Bedok South to Sungei Bedok is planned to be operational by 2026. The northern terminus of Woodlands North is expected to interchange with the Johor Bahru–Singapore Rapid Transit System for greater connectivity between Johor Bahru and Woodlands , while Founders' Memorial station is an infill station along Stage 4, scheduled to open in tandem with

3589-523: The Telok Blangah Road was being upgraded with a new vehicular overpass being constructed. Hence, the LTA's road and rail project teams had to coordinate to maximise the efficiency of both projects. The rail project team had constructed 10 viaduct foundations for the road section that crosses the station site. At the same time, the contractor had to maintain the traffic flow in the area – not just for visitors to

3686-492: The World Trade Centre, but to prevent delays and disruptions to port operations nearby. The traffic was diverted to temporary steel decking that ran over the construction site. The roads were diverted at least 30 times for the station's construction. The contractors ( Shimizu Corporation , Koh Brothers and Dillingham Construction International ) for the 2.16-kilometre (1.34-mile) of tunnelling works between this station and

3783-524: The adjacent Outram Park station had to monitor for any ground movement for the shophouses and ensure operations for the Malaysian rail service was not affected. A dual-mode tunnel boring machine was used to deal with the varying soil conditions along the tunnel route. HarbourFront station opened on 20 June 2003 with the rest of the NEL stations. In October 2012, the LTA announced that the NEL overrun tunnel would be extended by 50 metres (160 ft). Completed at

3880-472: The amount of saltwater and groundwater at the site. The contractor initially considered rerouting the drainage system that channelled water to the sea but that was financially unfeasible. Instead, the culverts that crossed the site were cut open and diverted into temporary steel culverts or pipes that did not obstruct the works. Due to the limited space, two of the World Trade Centre's exhibition halls were demolished to facilitate construction works. Concurrently,

3977-442: The area, the contractor used silent pilers when driving steel piles into the ground. These pilers created less noise and vibrations compared to conventional pilers. The station was constructed near the seashore. In order to prevent water seepage into the site, the contractors injected cement into the soil surrounding the station site via jet grouting . Sheet piles were installed around the site, and tests were conducted to determine

HarbourFront MRT station - Misplaced Pages Continue

4074-528: The assets owned by the Land Transport Authority , a statutory board of the Government of Singapore . The network was planned to be constructed and opened in stages, even as plans had already indicated the decision for two main arterial lines. The North–South Line was given priority because it passed through the Central Area that has a high demand for public transport. De Leuw Cather was appointed to undertake

4171-435: The communications minister, announced that the Circle line (CCL) will serve the HarbourFront area. On 12 December 2003, the LTA confirmed that HarbourFront station will interchange with the CCL and the new platforms would be constructed as part of CCL Stage 5 (CCL5). This segment consisted of five stations from West Coast station to this station. The contract for the fitting out works for the CCL station and connecting tunnels

4268-531: The contract included the widening of a section of Telok Blangah Road. The new station was expected to boost retail and residential developments in the Telok Blangah area, which was known for the Keppel Harbour and associated industries. The Port of Singapore Authority (PSA) had cooperated with the Land Transport Authority (LTA) officials on redevelopment plans for the area. To minimise impact on businesses in

4365-418: The deaths of four workers. On 15 November 2017, two trains, one being empty, collided at low speed at Joo Koon station due to a malfunction with the communications-based train control (CBTC). Prior to the 2020 circuit breaker measures during the early stages of the COVID-19 pandemic , the public transport operators and LTA were criticised by some commuters for its delayed actions of crowd control and

4462-511: The doors and are operational. These doors prevent suicides and unauthorised access to restricted areas. There were a few major incidents in the history of the MRT, which opened in 1987. On 5 August 1993, two trains collided at Clementi station because of an oil spillage on the track, which resulted in 132 injuries. During the construction of the Circle Line on 20 April 2004, a tunnel being constructed under Nicoll Highway collapsed and led to

4559-663: The early network is elevated above ground on concrete viaducts , with a small portion running at-grade; newer lines are largely subterranean, incorporating several of the lengthiest continuous subway tunnel sections in the world. A number of underground stations double as purpose-built air raid shelters under the operational authority of the Singapore Civil Defence Force (SCDF); these stations incorporate deep-level station boxes cast with hardened concrete and blast doors fashioned out of reinforced steel to withstand conventional aerial and chemical ordnance. The origins of

4656-403: The elderly and disabled. A retrofitting programme was completed in 2006, with every station provided with at least one barrier-free access route. Over the years, additional barrier-free facilities have been constructed in stations. Since 2020, newer MRT stations have been fitted with a minimum of two lifts. Operators and authorities have stated that numerous measures had been taken to ensure

4753-669: The end of 2014 at a cost of S$ 8.2 million (US$ 6.6 million), the extension is to facilitate quicker turnarounds for southbound trains. As part of a joint emergency preparedness exercise by the LTA and train operators SBS Transit and SMRT, security screenings were held at the station on 2 August 2019. The screening machines deployed for the exercise include mass screening devices and X-Ray machines to check for possible threat items like firearms. Such exercises were conducted to test established response protocols and maintain vigilance for quicker and more effective responses during emergencies and heightened security situations. In 2001, Yeo Cheow Tong ,

4850-484: The enforcement of social distancing on public transport. In response, the LTA rolled out a series of precautionary measures, such as social distancing measures and making the wearing of masks in public transport mandatory. Social distancing markers were progressively implemented in the MRT trains and stations which commuters must adhere to; enforced by auxiliary officers and transport ambassadors. The significant reduction of commuters as remote work increased resulted in

4947-421: The exception of selected periods, such as New Year's Eve , Chinese New Year , Deepavali , Hari Raya , Christmas , eves of public holidays and special occasions such as the state funeral of Lee Kuan Yew (2015), when most of the lines stay open throughout the night or extended till later (before the COVID-19 pandemic began in 2020). Additionally, some stretches of the line end earlier, open later and close on

SECTION 50

#1732859491923

5044-547: The existing Changi Airport branch on the East–West Line . With such an extension, there would be a direct connection between Changi Airport and the city. This extension is expected to start operating by 2040. Tunneling works are tendered out by the Land Transport Authority (LTA) Singapore and Shanghai Tunnel Engineering Corporation was awarded with the tunneling package for Terminal 5. Yeo Cheow Tong Yeo

5141-404: The factory to oversee the production process, Woo also gave further instructions and ensured the colours of the final product come out right. Displayed on the wall of the CCL platforms near the escalators, Commuting Waves by Jason Ong is a pair of sculptures depicting 3D waveforms. The waveforms were derived from commuter traffic at the station, with the positions of the glass 'fins' representing

5238-541: The final stage of the Downtown Line, opened on 21 October 2017 with its official opening made on 20 October 2017 by Coordinating Minister for Infrastructure and Minister for Transport Khaw Boon Wan . The second infill station, Canberra station opened on 2 November 2019. Stage 1 of the Thomson–East Coast Line opened on 31 January 2020. Stage 2 of the Thomson–East Coast Line opened on 28 August 2021, extending

5335-444: The fins into sets of six and used serialism to give each fin a different red "tone". The glass used were opaque edged, but as Ong did not like how it appeared, it was changed to transparent edged. An idea to create an illusion of wave moment was discarded due to various unresolved technical difficulties of getting the appropriate tone and colours for the illusion. The CCL platforms feature a set of "art seats" entitled Matrix . Though

5432-546: The first few stages of the North–South and East–West lines that opened between 1987 and 1988 from Yio Chu Kang to Clementi . An exception to this was Orchard , chosen by its designers to be a "showpiece" of the system and built initially with a domed roof. Architectural themes became more important only in subsequent stages, and resulted in such designs as the cylindrical station shapes on all stations between Kallang and Pasir Ris except Eunos , and west of Boon Lay , and

5529-577: The first line operated by SBS Transit, opened on 20 June 2003, is one of the first fully automated heavy rail lines in the world. On 15 January 2006, after intense two-and-a-half years lobbying by the public, Buangkok station was opened, followed by Woodleigh station much later on 20 June 2011. The Boon Lay Extension of the East–West Line, consisting of Pioneer and Joo Koon stations, opened on 28 February 2009. The Circle Line opened in four stages with Stage 3 on 28 May 2009, Stages 1 and 2 on 17 April 2010, Stages 4 and 5 on 8 October 2011 and

5626-528: The future Cross Island Line , and the depot is to be placed at the eastern end of the line. A Singapore Rail Test Centre (formerly known as Integrated Train Testing Centre) with several test tracks for different situations and workshops for maintenance and refurbishment is also to be built at Tuas by 2022, with the main function being to test trains and integrated systems robustly before they are deployed on operational lines. The following table lists

5723-570: The government's intentions for the future of the transport network in Singapore. The latest plan, the Land Transport Master Plan 2040, was announced on 25 May 2019, and provides for line extensions to the Downtown and Thomson–East Coast lines, a new MRT line under study, and 2 new stations on the North–South Line . Hume is an infill station between Hillview and Beauty World and expected to open by 2025. An extension from Expo

5820-400: The government's intentions to greatly expand the system. It called for the expansion of the 67 kilometres of track in 1995 to 360 in 2030. It was expected that daily ridership in 2030 would grow to 6.0 million from the 1.4 million passengers at that time. New lines and extensions are mostly announced as part of the Land Transport Master Plan, which is announced every five years and outlines

5917-421: The high installation costs. Nevertheless, the LTA reversed its decision and made plans to install half-height platform screen doors in all elevated stations on 25 January 2008. The first platform screen doors by ST Electronics were installed at Jurong East , Pasir Ris , and Yishun stations in 2009 under trials to test their feasibility. By 14 March 2012, all elevated stations have been retrofitted with

SECTION 60

#1732859491923

6014-421: The horizontal integration of the broader public transportation network. The MRT is fully automated and has an extensive driverless rapid transit system . Asset renewal works are periodically carried out to modernise the network and ensure its continued reliability; all stations feature platform screen doors , Wi-Fi connectivity , lifts , climate control , and accessibility provisions, among others. Much of

6111-494: The initial construction of the system. An MRT System Designs Option Study was also conducted to refine the technical details and the recommended measures for the MRT system - these include: Singapore's MRT infrastructure is built, operated, and managed in accordance with a hybridised quasi- nationalised regulatory framework called the New Rail Financing Framework (NRFF), in which the lines are constructed and

6208-497: The introduction of the Light Rail Transit (LRT) lines connecting with the MRT network. On 6 November 1999, the first LRT trains on the Bukit Panjang LRT went into operation. The Expo and Changi Airport stations were opened on 10 January 2001 and 8 February 2002 respectively. The very first infill station of the MRT network to be built on an existing line, Dover station opened on 18 October 2001. The North East Line ,

6305-699: The judges who awarded it the top prize. There is a heritage themed mural in the CCL station created by local artists Monica Lim, Kevin Lee, and Chris Lim as a part of SMRT's Comic Connect display. The mural features landmarks such as the Tang Gah Beo Taoist Temple, Catholic Church of St Teresa, Singapore Cruise Centre , and the Keppel terminal of the Port of Singapore . Mass Rapid Transit (Singapore) [REDACTED] The Mass Rapid Transit system, locally known by

6402-418: The length of the station platform. This complements a smaller 40-metre reflective stainless-steel disc overlapping the titanium ellipse and visually floats over a glass elevator shaft and the main entrance. The other station with similar architecture is Dover . Changi Airport station, the easternmost station on the MRT network, has the widest platform in any underground MRT station in Singapore. In 2011, it

6499-469: The line from Woodlands South to Caldecott. Stage 3 of the Thomson–East Coast Line opened on 13 November 2022, extending the line from Caldecott to Gardens by the Bay. On 23 June 2024, the line was extended eastwards terminating at Bayshore. The lines are named based on their directions and/or locations. The names were envisioned to be user-friendly, as shown in a survey in which 70% of the respondents expressed such

6596-405: The major ones, have additional amenities and services, such as retail shops and kiosks, supermarkets, convenience stores, automatic teller machines, and self-service automated kiosks for a variety of services. Most heavy-duty escalators at stations carry passengers up or down at a rate of 0.75 m/s, which is 50% faster than conventional escalators. The Land Transport Authority (LTA) announced

6693-544: The network while the inauguration of Boon Lay station on 6 July 1990 marked the completion of the initial system two years ahead of schedule. The MRT has been continuously expanded ever since. On 10 February 1996, a S$ 1.2 billion expansion of the North–South Line into Woodlands was completed, merging the Branch Line into the North–South Line and joining Yishun and Choa Chu Kang stations. The concept of having rail lines that bring people almost directly to their homes led to

6790-417: The network. Underground stations and trains are air-conditioned, while above-ground stations have ceiling fans installed. Every station is equipped with Top Up Kiosk (TUKs), a Passenger Service Centre and LED or plasma displays that show train service information and announcements. All stations are equipped with restrooms and payphones; some restrooms are located at street level. Some stations, especially

6887-437: The operations control centre of the respective lines. Trains are equipped with intercoms to allow passengers to communicate with staff during emergencies. SMRT Corporation has six train depots: Bishan Depot is the central maintenance depot for the North–South Line with train overhaul facilities, while Changi Depot and Ulu Pandan Depot inspect and house trains overnight. The newer Tuas Depot , opened in 2017, provides

6984-571: The operations in the CD shelter is mounted on shock absorbers to prevent damage during a bombing. When electrical supply to the shelter is disrupted, there are backup generators to keep operations going. The shelter has dedicated built-in decontamination chambers and dry toilets with collection bins that will send human waste out of the shelter. The NEL and CCL platforms are wheelchair-accessible. A tactile system , consisting of tiles with rounded or elongated raised studs, guides visually impaired commuters through

7081-435: The passenger volume and train frequencies. The work is intended to reflect the rhythm and flow of human activities, which linked the work to the station's location, human values and the MRT system. The work was created through indeterminacy, inspired by experimental music of John Cage . The inspiration came when Ong was researching soundwaves (waveforms being a distinctive element of the waterfront area), and intended to create

7178-531: The perched roofs at Boon Lay, Lakeside , Chinese Garden , Bukit Batok , Bukit Gombak , Choa Chu Kang , Khatib , Yishun , and Eunos stations. Expo station , located on the Changi Airport branch of the East–West Line , is adjacent to the 100,000-square-metre Singapore Expo exhibition facility. Designed by Foster and Partners and completed in January 2001, the station features a large, pillarless, titanium-clad roof in an elliptical shape that sheathes

7275-608: The platform seats are intended to be works of art, they are designed to remain functional and practical. This work by Lui Honfay and Yasmine Chan, along with Rain , was selected through the International Art Seats Design Competition in 2006. Matrix consists of a series of benches engraved with the station name in a dot-matrix style on the seat surface. The dot-matrix system was adopted as it was flexible enough to be mass-produced for use in many stations. The intriguing combination of signage and seat "impressed"

7372-418: The programme due to financial grounds and concerns of jobs saturation in the construction industry. Dr Goh instead endorsed the idea of an all-bus system recommended by Harvard University specialists, who argued this would reduce the cost by 50% compared to the proposed MRT system. Public opinion was split on the matter: several expressed concerns about the high cost while others were more focused on increasing

7469-400: The safety of passengers, and SBS Transit publicised the safety precautions on the driverless North East Line before and after its opening. Safety campaign posters are highly visible in trains and stations, and the operators frequently broadcast safety announcements to passengers and to commuters waiting for trains. Fire safety standards are consistent and equivalent with the guidelines of

7566-597: The signalling system on the MRT is the automatic train control (ATC) system, which in turn is made up of two sub-systems: the automatic train operation (ATO) and automatic train protection (ATP). The ATC has trackside and trainborne components working together to provide safe train separation by using train detection, localisation, and end of authority protection. It also provides safe train operation and movement by using train speed determination, monitoring, over-speed protection and emergency braking. The safety of alighting and departing passengers will also be provided by using

7663-430: The speed of the train to maintain safe braking distance, and initiate emergency braking in the event of overspeed. The MRT also uses an automatic train supervision system to supervise the overall operation of the train service according to a prescribed timetable or train interval. The oldest lines, the North–South Line and East–West Line , were the only lines running with fixed block signalling . The North–South Line

7760-403: The standard of living. Following a debate on whether a bus-only system would be more cost-effective, Communications Minister Ong Teng Cheong came to the conclusion that an all-bus system would be inadequate, as it would have to compete for road space in a land-scarce country. Ong was an architect and town planner by training and through his perseverance and dedication became the main figure behind

7857-410: The station's design. Although Woo was used to working independently, he learnt to articulate his thoughts and intentions with the architectural team, with the help of NEL art coordinator Constance Sheares. The collaboration allowed Woo and the architectural team to have deeper insights into each other's works. While retaining his creative freedom over the work, Woo ensured that the work was compatible with

7954-418: The station, with dedicated tactile routes that connect the station entrances to the platforms or between either line's platforms. The station displays four artworks; three as part of the MRT network's Art-in-Transit programme – a showcase of public artworks on the MRT network and one as part of SMRT's Comic Connect display, a public art display of heritage-themed murals. Enigmatic Appearances by Ian Woo

8051-568: The station. With the completion of CCL6, the subsequent station in the counterclockwise direction will be Keppel . Designed by Architects61, the station concourse has an elliptical motif resembling a ship hull, alongside floor patterns and the artwork that reflects the station's location by the Singapore Strait . The station is underneath Telok Blangah Road and has five entrances. HarbourFront station serves various commercial and retail developments including HarbourFront Centre and VivoCity . It

8148-422: The stations' interior architecture, these works aim to promote the appreciation of public art in high-traffic environments. The artwork for each station is designed to suit the station's identity. Subsequently, all stations on the North East, Circle and Downtown lines have taken part in this programme during their construction, with additional artworks installed at stations on other MRT lines. A key component of

8245-516: The technical aspects of the station design. After the architects and the Art Review Panel approved his line drawings, the figures were painted and enlarged. This process took place across two weeks, with some revisions made due to the artist's dissatisfaction with some of the enlarged figures. The black-and-white figures were then coloured in blue at a vitreous enamel factory in England. Travelling to

8342-492: The transport operators reducing train frequencies and closing stations earlier from 17 April. However, train frequencies were shortly reverted to normal upon review and feedback from the public. Since June 2020, the MRT system has resumed pre-circuit breaker operations. Regulations for social distancing on public transport are no longer applicable by law. Social distancing stickers on seats have been removed. MRT lines operate from 5:30   am to 1:00   am daily, with

8439-454: The upcoming lines and stations that have been officially announced: The MRT system relied on its two main lines, the North–South and East–West lines, for more than a decade until the opening of the North East Line in 2003. While plans for these lines as well as those currently under construction were formulated long before, the Land Transport Authority's publication of a White Paper titled " A World Class Land Transport System " in 1996 galvanised

8536-416: The walls at the end of the NEL platforms references the station's role as the terminus of the NEL. Inspirations for the artwork were derived from what Woo captured in his visit to the HarbourFront area. In addition to taking photos of the area, he wrote about his experiences during his trip. Creating the work required him to co-operate with the station's architects, since the LTA intended to integrate art with

8633-443: The walls. The eventual shapes of the waveforms were derived from the freehand outlines of the graphs. These outlines were also mirrored to produce the shapes. The sculptures are in red, which not only reflects the human rhythm but also complements the CCL station's theme, contrasting with the NEL's blue theme. While initially planned to use metal shapes, upon seeing the portfolio of the production team, Ong changed to glass. Ong grouped

8730-414: The waveforms based on the station's environment. Two assistants recorded the train frequency and passenger traffic on a randomly selected weekday and weekend. The artist noted that the data was only derived from commuters on the NEL, since the CCL was not yet operational when the work was created. Nevertheless, he concluded that the graph shapes would remain similar if he were to include passenger numbers from

8827-525: Was awarded to SembCorp Engineers & Constructors Pte Ltd (SembCorp E&C) at S$ 335.38 million (US$ 198.7 million) in October 2004. The contract include civil, architectural and building works for the West Coast, Pasir Panjang, Alexandra and Telok Blangah stations, alongside 3.4 kilometres (2.1 miles) of twin bored tunnels and 640 metres (700 yd) of cut and cover tunnels. To facilitate construction works for

8924-527: Was awarded to the designers at WOHA Architects at the World Architecture Festival for their design of Bras Basah station. Many MRT stations have specially commissioned artworks in a wide variety of art styles and mediums, including sculptures, murals and mosaics. With over 300 art pieces across 80 stations, it is Singapore's largest public art programme. In the early stages of the MRT, artworks were seldom included; primarily consisting of

9021-461: Was educated at Anglo-Chinese School , before receiving a Colombo Plan Scholarship in 1967 to study at the University of Western Australia , where he received a Bachelor of Engineering (Mechanical) degree. He worked for Singapore's Economic Development Board (EDB) from 1972 to 1975, before entering the private sector. He entered politics in 1984. At the 1984 general election , Yeo was elected

9118-444: Was first announced as World Trade Centre MRT station in March 1996 as one of the line's 16 stations. Its construction involved several road diversions and the opening of the drainage culverts. The NEL station was completed on 20 June 2003. The CCL platforms opened on 8 October 2011 along with Stages 4 and 5 of the line. Reflecting the station's location by the Singapore Strait , the station concourse has an elliptical motif resembling

9215-477: Was rated 10 out of 15 most beautiful subway stops in the world by BootsnAll. Various features have been incorporated into the design to make the station aesthetically pleasing to travellers. The station is designed by architectural firm Skidmore, Owings and Merrill , featuring a large interior space and an illuminated 150-metre (490 ft) link bridge spanning over the island platform. Two Circle Line stations— Bras Basah and Stadium —were commissioned through

9312-460: Was undertaken for eight years, including the phases of the study in 1974 and 1977. In 1979, to prepare the third phase of the study, Halcrow , a British firm, was appointed to craft the system; meanwhile, a third phase of the study was published in 1981. However, opposition from the government on the feasibility of the MRT from prominent ministers, among them Finance Minister Goh Keng Swee and Trades and Industry Minister Tony Tan , nearly shuttered

9409-567: Was upgraded to moving block / CBTC in 2017, and the East–West line upgraded in 2018. As of 27 May 2018, all MRT lines use the CBTC/moving block system in normal daily operations and from 2 January 2019, the old signalling system ceased operations. In comparison to the original fixed block system, the CBTC can reduce train intervals from 120 seconds to 100 seconds, allowing for a 20% increase in capacity and