Misplaced Pages

Christopher Hinton

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#173826

85-502: Christopher Hinton may refer to: Christopher Hinton, Baron Hinton of Bankside (1901–1983), nuclear engineer and supervisor of the construction of Britain's first commercial nuclear power station (Calder Hall) Chris Hinton (born 1961), American football player Christopher Hinton (animator) (born 1952), Canadian animator Christopher Hinton (American football) (born 2000), American football player [REDACTED] Topics referred to by

170-447: A 1946 paper that the reactor be encased in a pressure vessel. This would make it safer, and it would allow more heat to be obtained from a given core size. Another, by Risley engineers D. W. Ginns, H. H. Gott and J. L. Dickson, put forward a series of proposals to increase the efficiency of an air cooling system. These included adding fins to the aluminium cans containing the uranium fuel elements to increase their surface area; and having

255-665: A 30-mile (48 km) four-lane highway built in order to evacuate the Hanford area in an emergency. If such criteria were applied in the UK, all of England and Wales would have been ruled out, leaving only the north and west of Scotland. The possibility of building reactors in Canada was suggested by Chadwick and Cockcroft, and strongly supported by the Field Marshal Lord Wilson , the Chief of

340-551: A bluff overlooking the Calder River on the site. A single reactor was costed at £20   million, but two could be built for between £30   million and £35   million. The number needed depended on the number of bombs required. In their report to Attlee on 1 January 1946, the Chiefs of Staff recommended that two be built, but for the moment it was fixed at one reactor capable of producing 15 bombs per annum. In his address to

425-548: A build-up of potential energy. The British scientists were aware of this; it was one of the reasons for the choice of air-cooling over water cooling, as the water channels might have become blocked due to the expansion of the graphite. When Walter Zinn , the director of the Argonne National Laboratory , visited the UK in 1948, he provided additional information to the British scientists. The expansion, he informed them,

510-680: A close and successful partnership with Brigadier General Leslie R. Groves , the director of the Manhattan Project, and ensured that the British contribution to the Manhattan Project was complete and wholehearted. After the war ended the Special Relationship between Britain and the United States "became very much less special". The British government had trusted that America would continue to share nuclear technology, which it considered

595-421: A complete picture of the temperatures in the reactor, readable in the reactor control room, for monitoring both the graphite and the fuel elements. The best that could be done was to supply 66 thermocouples for graphite measurement during Wigner releases, and 20 for the uranium fuel elements. On 1 March 1955, the prime minister, Winston Churchill , publicly committed the UK to building a hydrogen bomb , and gave

680-456: A half years. To correct this, further design changes were mooted, but more tests at Chalk River indicated the expansion was not as great as that predicted from the American data, and on this basis Hinton decided to revert to the 1948 design. The graphite in each reactor was arranged in a 25-by-50-foot (7.6 by 15.2 m) octagonal stack weighing about 2,000 long tons (2,000 t). The reactor

765-489: A joint discovery, but little information was exchanged immediately after the war, and the Atomic Energy Act of 1946 (McMahon Act) officially ended technical cooperation. Its control of "restricted data" prevented the United States' allies from receiving any further research and development information. The British government saw this as a resurgence of United States isolationism akin to that which had occurred after

850-524: A large one for nuclear power . Hinton estimated that dispensing with the water would reduce the costs by 40 per cent; the design was simpler and the time to build it was less. He recommended to Portal that design work on water-cooled reactors be dropped and all work concentrated on air-cooled and pressurised gas-cooled designs, the latter being seen as the way of the future. Work on water-cooled designs ended in April 1947. The location criteria were now relaxed, and

935-557: A metallic sphere of pure uranium-235 , and found that as little as 1 to 10 kilograms (2.2 to 22.0 lb) might explode with the power of thousands of tons of dynamite. In response, the British government initiated an atomic bomb project, code-named Tube Alloys . The August 1943 Quebec Agreement merged Tube Alloys with the American Manhattan Project . As overall head of the British Mission, James Chadwick forged

SECTION 10

#1732852643174

1020-569: A proposal from Hinton that the second reactor be a pressurised-gas one. Plans for a third reactor were dropped in 1949 under American pressure to reduce the demand for uranium. The site was divided into three areas: a reactor area; a service area containing offices, boiler rooms , workshops, a fire station and other amenities; and a chemical area where the plant for separating plutonium was located, along with laboratories and other supporting infrastructure. Work commenced in September 1947. At its peak,

1105-436: A reactor, there are three key choices to be made: that of the fuel, the moderator , and the coolant. The first choice, that of fuel, was a Hobson's choice : the only fuel available was natural uranium, since there were no enrichment plants to produce uranium-235, and no reactors to produce plutonium or uranium-233 . This restricted the choice of moderators to heavy water and graphite . Although ZEEP had used heavy water, this

1190-772: A redesign of the reactors. All went well until late 1948, when the quality of the graphite from both companies suddenly and precipitously declined. Both sourced high grade petroleum coke from Sarnia, Ontario , where it was produced from the exceptional pure crude oil from the Loudon Oil Field in Illinois. Hinton flew to Canada and visited the refinery in Sarnia, where it was determined that the Loudon oil had not been properly segregated from oil from other fields. The graphite had to be cut into blocks and arranged so that there were channels through

1275-479: A rise in temperature was observed in Pile No. 1 while it was shut down. This time, smoke was observed coming from the core, which suggested that the graphite or fuel elements might be smouldering. The obvious means of cooling the core was to start the blowers, but forcing air into it could start a fire. In the end, it was decided to start the blowers. The temperature dropped, and the pile cooled without any conflagration. In

1360-455: A uranium-235 bomb would require ten times the fissile material as one using plutonium to produce half the TNT equivalent . Estimates of the cost of nuclear reactors varied, but were about half that of a gaseous diffusion plant. Thus, a gaseous diffusion plant would cost ten times as much to produce the same number of atomic bombs each year. The decision was therefore taken in favour of plutonium. Part of

1445-453: Is different from Wikidata All article disambiguation pages All disambiguation pages Christopher Hinton, Baron Hinton of Bankside Christopher Hinton, Baron Hinton of Bankside OM KBE FRS FREng (12 May 1901 – 22 June 1983) was a British nuclear engineer, and supervisor of the construction of Calder Hall , the world's first large-scale commercial nuclear power station. Hinton

1530-534: Is presented to the Power Station judged to have reached the highest attainment in economy and efficiency of operation and maintenance with particular reference to attractiveness and good housekeeping'. The cup was first won by Meaford A power station in 1959 and was last won by West Burton Power Station prior to the divestment of the Central Electricity Generating Board . The Hinton Trophy

1615-800: The British Joint Staff Mission , and the Americans, but was rejected by the British government. Canada was outside the sterling area and construction costs could only be met by further borrowing from Canada. Under the circumstances, the reactors would be owned and controlled by the Canadian government, and this the British government could not accept. A consulting engineer firm was brought in to advise on possible locations. Two were suggested: Harlech in Wales and Arisaig in Scotland. Hinton opposed Harlech on

1700-660: The Chiefs of Staff Committee recommended that Britain acquire nuclear weapons. They estimated that 200 bombs would be required by 1957. The 8 January 1947 meeting of the Gen 163 Committee, a subcommittee of the Gen 75 Committee, agreed to proceed with the development of atomic bombs, and endorsed Portal's proposal to place William Penney , the Chief Superintendent Armament Research (CSAR) at Fort Halstead in Kent, in charge of

1785-575: The First World War . This raised the possibility that Britain might have to fight an aggressor alone. It also feared that Britain might lose its great power status, and therefore its influence in world affairs. The Prime Minister of the United Kingdom , Clement Attlee , set up a cabinet sub-committee , the Gen 75 Committee (known informally as the "Atomic Bomb Committee"), on 10 August 1945 to examine

SECTION 20

#1732852643174

1870-469: The Windscale fire on 10 October 1957. Nuclear decommissioning operations commenced in the 1980s and are estimated to last beyond 2040. Visible changes have been seen as the chimneys were slowly dismantled from top-down; Pile 2's chimney being reduced to the height of adjacent buildings in the early 2000s. However, the demolition of pile 1 chimney has taken much longer as it was significantly contaminated after

1955-523: The 1957 fire. The reactor cores still remain to be dismantled. The 1938 discovery of nuclear fission by Otto Hahn and Fritz Strassmann , and its explanation by Lise Meitner and Otto Frisch , raised the possibility that an extremely powerful atomic bomb could be created. During the Second World War , Frisch and Rudolf Peierls at the University of Birmingham calculated the critical mass of

2040-606: The Americans had, it was doubtful whether the cash-strapped post-war British economy could afford the money or the skilled manpower that this would require. The scientists who had remained in Britain favoured uranium-235, which could be enriched with gaseous diffusion, and a final electromagnetic step. However, those who had been working at the Los Alamos Laboratory in America were strongly in favour of plutonium. They estimated that

2125-680: The CEGB as the Hinton Heavies. A first for 500MW power station design the stations are listed below in the order that the CEGB released them for construction. The 500 MW standard unit design was subsequently slightly scaled up to 660 MW, using the same main and reheat steam conditions. These larger units were constructed from 1967 onwards at Drax , Grain and Littlebrook power stations. Similar 660 MW turbogenerators were also installed at all of Britain's AGR nuclear power stations, albeit with radically different steam-raising plant. The 660 MW units were

2210-528: The Electro-Metallurgical Company in Welland, Ontario . The latter had a great deal of technical information about manufacturing pure graphite that it was willing to share. Orders were placed with Welland for 5,000 long tons (5,100 t) and with Acheson for 1,000 long tons (1,000 t). In 1948, Welland rose to an urgent request for another 800 long tons (810 t) for Windscale resulting from

2295-476: The House exactly what will be the future cost. The programme of work already approved will cost something like £30 million, but the programme is being kept constantly under review, and it may well be that expenditure on a far greater scale may be necessary if we are to play our proper part. With the decision to switch to air cooling, the Gen 75 Committee authorised the construction of two air-cooled reactors, turning down

2380-568: The House of Commons on 8 October 1946, Attlee referred indirectly to the decision to build the piles: As the House knows, the Government have already set up a large research establishment, and we are arranging for the production of fissile material for that establishment, and for other purposes; and the responsibility has been placed with the Minister of Supply; and this Bill will give him the necessary powers to discharge that responsibility. I cannot tell

2465-640: The International Executive Committee of the World Energy Conference , 1962–68. He was created Baron Hinton of Bankside, of Dulwich in the County of London, a life peer , on 28 January 1965, and served as Chancellor of the University of Bath 1966 – 1979. He was appointed to the Order of Merit in 1976. The English architectural critic Reyner Banham dubbed the first 500MW units ordered by

2550-545: The Montreal Laboratory designed the British Experimental Pile Zero (BEPO). Risley handled the engineering and construction. Hinton designated James Kendall as the engineer in charge of reactor design, both BEPO and the production reactors. His team worked closely with the scientists at Harwell, in particular J. V. Dunworth, F. W. Fenning and C. A. Rennie. For an experimental reactor like BEPO, air cooling

2635-572: The Research Division gave a party at which a birthday cake was equipped with 80 candles. These were so closely spaced that when he lit the central candle, the flame spread rapidly to all of the others – Sir Christopher had initiated his last chain reaction! In 1965 he worked for six months in the Ministry of Transport and afterwards became a special adviser to the World Bank . He served as Chairman of

Christopher Hinton - Misplaced Pages Continue

2720-544: The United States, Cockcroft found that uranium oxide particles had been detected in the vicinity. He was alarmed enough to order that air filters be installed, as they had been in the Graphite Research Reactor at the Brookhaven National Laboratory . While management at Risley took this calmly, the engineers were unimpressed. The logical place to put air filters was at the bottom of a chimney, but

2805-559: The United States, but in Britain as well, where ICI had designed a gaseous diffusion production plant, and a pilot plant to produce membranes for it was under construction. Least was known about the production of plutonium in nuclear reactors , or "piles" as they were often known at the time; only Chadwick had been permitted to visit the Manhattan Project's reactors. An early decision had to be taken as to whether High Explosive Research should concentrate on uranium-235 or plutonium. While everyone would have liked to pursue every avenue, like

2890-502: The age of 29. At Brunner Mond he met Lillian Boyer (d. 1973) whom he married in 1931. They had one daughter, Mary (1932–2014), who married Arthur Mole, son of Sir Charles Mole , director-general of the Ministry of Works . During World War II, Hinton was seconded to the Ministry of Supply and became Deputy Director General, running ordnance factory construction and in charge of the Royal Filling Factories . In 1946, Hinton

2975-399: The basis of its historic associations, and because too many people lived nearby. That left Arisaig, and the remoteness of the site foreshadowed difficulties with communications and finding skilled labour. At this point, Risley began reconsidering the technology of an air-cooled reactor. R. G. Newell, who had been the wartime head of the engineering section at the Montreal Laboratory, proposed in

3060-566: The channels took about 57 minutes. A burst cartridge could thereby be located. Considerable thought was given as to what would happen if one of the fuel cartridges were to break open. This would release highly radioactive fission produces, and oxidation of the uranium might cause a fire. With 70,000 cartridges, a failed one seemed inevitable. On a visit to the X-10 Graphite Reactor at the Oak Ridge National Laboratory in

3145-498: The chimneys a distinctive appearance, and were mocked as " Cockcroft's Follies " by the workers and engineers. It was later discovered that the uranium oxide at Oak Ridge had come from the chemical separation plant there, and not the reactor. Pile No. 1 went critical in October 1950, but its performance was about 30 per cent below its designed rating. Pile No. 2 went critical in June 1951, and

3230-419: The cooling air enter the reactor centrally so it could flow outwards instead of being pumped from one end to another. These changes allowed the cooling to be conducted with much less pumping power. Harwell engineers J. Diamond and J. Hodge conducted a series of tests which showed that with these innovations, air at atmospheric pressure would suffice for cooling a small reactor for plutonium production, although not

3315-438: The core converted the uranium into a variety of isotopes, including some plutonium, which was separated from the other materials using chemical processing. As this plutonium was intended for weapons purposes, the burnup of the fuel was kept low to reduce production of the heavier plutonium isotopes like plutonium-240 and plutonium-241 . As construction proceeded, Hinton received disturbing news from Cockcroft at Harwell that

3400-431: The core under gravity at the flick of a switch. They had more than enough neutron-absorbing capacity to shut down the reactor. Cooling was by convection through a 410-foot (120 m) tall chimney, which could create enough airflow to cool the reactor under normal operating conditions. The chimney was arranged so it pulled air through the channels in the core, cooling the fuel via fins on the cartridges. The first chimney

3485-405: The core, the speed of the blowers, the control rod positions, and there were various alarms. Static air sampling devices in the air ducts measured radioactive emissions. These could quickly detect, but not locate, a burst cartridge. Burst Cartridge Detector Gear (BCDG) was located at the rear face of each reactor. Each had 32 nozzles that could sample the air from 32 channels at a time. A sweep of all

Christopher Hinton - Misplaced Pages Continue

3570-404: The core. This was first carried out when Pile No. 2 was powered down on 9 January 1953. Thermocouples were installed to measure the temperature in the core, and the blowers were shut down at 23:15. The reactor power was then raised to 4   MW to heat the graphite. Two of the thermocouples indicated a sudden rise in temperate at 03:00 on 10 January, and the reactor was shut down. By 17:00 it

3655-439: The core. This required tolerances of 1 ⁄ 1000 inch (0.025 mm). It was important that no impurities would be picked up from dust while the graphite was being machined, so a special facility was established, with a clean environment. The workers wore special clothing. Graphite is dense and quickly wore out the cutting tools. A tungsten tool was developed for the purpose. Similar practices were followed while assembling

3740-470: The critical mass of No. 1 Pile was greater than first thought. No. 2 Pile was in better shape, owing to the use of higher quality graphite. To improve the situation, the amount of neutron-absorbing aluminium was reduced by trimming a 1 ⁄ 16 -inch (1.6 mm) strip off the fins on every fuel cartridge. A million fins were clipped on site in August and September 1950 by a team led by Tom Tuohy . Reactivity

3825-518: The deficit of technical knowledge was addressed by the Montreal Laboratory in Canada, where the ZEEP reactor went critical on 5 September 1945, and the Americans had supplied some irradiated fuel rods for experiments with plutonium separation there. The British scientists were aware that the choices they made at this point might influence British reactor design for many years to come. In designing

3910-435: The development effort, which was codenamed High Explosive Research . Penney contended that "the discriminative test for a first-class power is whether it has made an atomic bomb and we have either got to pass the test or suffer a serious loss of prestige both inside this country and internationally." Through their participation in the wartime Tube Alloys and Manhattan Project, British scientists had considerable knowledge of

3995-612: The directorship of John Cockcroft . Christopher Hinton agreed to oversee the design, construction and operation of the new nuclear weapons facilities, which included a uranium metal plant at Springfields in Lancashire , and nuclear reactors and plutonium processing facilities at Windscale in Cumbria . He established his headquarters in a former Royal Ordnance Factory (ROF) at Risley in Lancashire on 4 February 1946. In July 1946,

4080-618: The feasibility of a renewed nuclear weapons programme. The Tube Alloys Directorate was transferred from the Department of Scientific and Industrial Research to the Ministry of Supply on 1 November 1945, and Lord Portal was appointed Controller of Production, Atomic Energy (CPAE), with direct access to the Prime Minister. An Atomic Energy Research Establishment (AERE) was established on 29 October 1945 at RAF Harwell , south of Oxford , under

4165-423: The first 70 feet (21 m) of the chimney of No. 1 Pile had already been built. They therefore had to go on the top. D. Dick, the structural engineer at the Ministry of Works, produced a design. Construction involved the materials to build them, which included 200 long tons (200 t) of structural steel, plus bricks, concrete and equipment, being hoisted to the top of the 400-foot (120 m) chimneys. They gave

4250-431: The first two or three, but afterwards it was left to the operators. Wigner releases were not experiments—they were crucial to the continued operation of the reactors—but they were far from routine either; each was different, and over time releases of Wigner energy became harder to achieve, requiring higher temperatures. The assistant manager, J. L. Phillips, asked Risley if sufficient thermocouples could be supplied to give

4335-413: The former ROF Drigg site on the coast of Cumberland was selected. One complication was that Courtaulds planned to use the old plant at nearby ROF Sellafield to produce rayon . Considering that the labour market in the area could not sustain two large projects, Courtaulds withdrew, and relinquished the 300-acre (120 ha) site. It was considered a more suitable location for a reactor. The use

SECTION 50

#1732852643174

4420-430: The graphite to crack before then. Harwell physicist William Marley, who had worked at the Manhattan Project's Los Alamos Laboratory during the war, had warned of the possibility of a fire in a control rod being exacerbated by the release of Wigner energy, and when Edward Teller visited Harwell in 1948, he warned that a Wigner energy release might ignite a fuel rod. The British scientists, however, remained certain that

4505-410: The investigations that followed the incident, it was determined that the smoke came from lubricating oil from the bearings in the blowers, which was sucked into the core and charred by the heat. The investigations also determined that the sudden bursts of heat must have been caused by the spontaneous release of Wigner energy. This worried the operators, but decommissioning the reactors would mean there

4590-521: The largest generating plant, and the last pure steam-cycle plant, ever constructed by the CEGB before its break-up and privatisation in the 1990s. During his time at the Central Electricity Generating Board he commissioned the Hinton Cup, a piece of silverware that would be presented annually to the power station that displayed good housekeeping in the workplace. The citation to go with the cup reads 'This cup

4675-433: The neutron moderator had to be as pure as possible, as even the smallest impurities could act as neutron poisons that would impede the reactor's operation. Normal industrial graphite would not do. The British had been excluded from the work the Manhattan Project had done in this field, but Union Carbide , the Americans' principal supplier of graphite, had subsidiaries in Britain and Canada, British Acheson at Sheffield , and

4760-407: The north-west coast of England. The two reactors, referred to at the time as "piles", were built as part of the British post-war atomic bomb project and produced weapons-grade plutonium for use in nuclear weapons . Windscale Pile No. 1 became operational in October 1950 followed by Pile No. 2 in June 1951. They were intended to last five years, but operated for seven until shut down following

4845-644: The other side, where they fell into a skip . From there they were taken to a service pond where they were held until the most radioactive fission products decayed. From there they were sent to the separation plant for decanning and processing. The power level in the core was regulated by 24 control rods made from boron steel . Boron is a powerful neutron absorber; the steel was for strength. Twenty of these were coarse control rods and four for fine tuning. They could be moved individually or in groups. In case of emergency, there were also sixteen vertical fail safe rods held above by electromagnets that could drop down into

4930-460: The production of fissile materials. The Americans had created two kinds: uranium-235 and plutonium , and had pursued three different methods of uranium enrichment to produce the former. British scientists had been most heavily involved with the electromagnetic isotope separation process, but it was recognised that it might be uneconomical in peacetime. They also knew a great deal about the gaseous diffusion process through work done not just in

5015-509: The reactor, with the workers wearing special clothes, and the air inside the biological shield filtered to remove dust. The British had little experience with the behaviour of graphite when exposed to neutrons. The Hungarian-American physicist Eugene Wigner had discovered while working at the Manhattan Project's Metallurgical Laboratory in Chicago that graphite, when bombarded by neutrons, suffers dislocations in its crystalline structure, causing

5100-419: The risk was slight compared to that of a water-cooled reactor. The core of the reactors consisted of a large block of graphite with horizontal channels drilled through it for the fuel cartridges. Each cartridge consisted of a uranium rod about 30 centimetres (12 in) long encased in an aluminium canister to protect it from the air, as uranium becomes highly reactive when hot and can catch fire. The cartridge

5185-412: The same term This disambiguation page lists articles about people with the same name. If an internal link led you here, you may wish to change the link to point directly to the intended article. Retrieved from " https://en.wikipedia.org/w/index.php?title=Christopher_Hinton&oldid=1221069060 " Category : Human name disambiguation pages Hidden categories: Short description

SECTION 60

#1732852643174

5270-511: The scientists a tight schedule in which to do so. This was then hastened after the US and USSR began working on a test ban and possible disarmament agreements which would begin to take effect in 1958. To meet this deadline there was no chance of building a new reactor to produce the required tritium (codenamed AM), so the Windscale Piles produced tritium through irradiation of lithium - magnesium ,

5355-451: The site employed a construction workforce of over 5,000 men, along with 300 professional staff such as architects, engineers and surveyors. It was difficult to find sufficient labour locally, so workers were lured to the site from other areas with the promise of high wages and overtime . Hutted camps were established for them with canteens and other amenities. Engineers were no less hesitant about moving to Windscale. The post of site engineer

5440-416: The telephone any morning to hear the news that one of the piles had gone up." To minimise this risk, the Americans had established strict siting criteria. The reactors were to be located 50 miles (80 km) from any town with a population of over 50,000, 25 miles (40 km) from one of over 10,000, and 5 miles (8.0 km) from one of over 1,000, and were to be built 5   miles apart. Groves also had

5525-462: The tubes holding the uranium fuel rods. Because water absorbed neutrons, a loss of cooling water would not only mean a rise in temperature, but would also trigger an increase in the number of neutrons in the reactor, creating more fissions and increasing the temperature further, possibly resulting in a nuclear meltdown and the release of radioactive fission products . Groves confided to the British in 1946 that he "would not be surprised to be called to

5610-407: Was also improved by reducing the size of the channels through which the cooling air was forced. New graphite soles were fabricated for the graphite shoes that held the fuel cartridges. The graphite block was pierced by 3,440 fuel channels, arranged in groups of four. Each was loaded with a string of 21 finned aluminium cartridges containing uranium. The cartridges were discharged by pushing them out

5695-578: Was appointed Deputy Controller of Production, Atomic Energy, and in 1954 when the Atomic Energy Authority was formed, was appointed Member for Engineering and Production as managing director of 'Industrial Group Risley' which comprised the Risley headquarters and laboratories at Culcheth , Capenhurst , Windscale , Springfields and Dounreay plus factories at Springfields, Capenhurst, Windscale, Calder, Dounreay and Chapelcross . Hinton's department

5780-742: Was born on 12 May 1901 at Tisbury, Wiltshire . He attended school in Chippenham where his father was a schoolmaster, and left school at 16 to become an engineering apprentice with the Great Western Railway at Swindon . At 22 he was awarded the William Henry Allen scholarship of the Institution of Mechanical Engineers to Trinity College, Cambridge , where he graduated with a first class honours degree. Hinton then worked for Brunner Mond , later part of ICI , where he became Chief Engineer at

5865-399: Was built in the winter of 1950–51. Additional cooling was provided by eight larger blowers, arranged with four in each of two blower houses outside the biological shield. There were also two auxiliary booster fans, and four shutdown fans that were used when the reactor was not running to remove residual heat. Instrumentation included devices for measuring the temperature and neutron flux in

5950-477: Was consistent with planning proposals for the Lake District National Park ; water was available from Wast Water without engineering works; and the site already had a railway siding and some office and service buildings, which saved construction time and effort. To avoid confusion with the nuclear fuel production site at Springfields , the name was changed to Windscale, which was actually the name of

6035-472: Was decided that each reactor would sit atop a reinforced concrete slab 200 feet (61 m) wide, 100 feet (30 m) long and 10 feet (3.0 m) thick. To avoid any chance of it shrinking, the ratio of water to cement was carefully controlled, and the order in which the concrete was poured was done so as to maximise drying time. The structure above had to be sited with a tolerance of 1 ⁄ 2 inch (13 mm) in 100 feet (30 m). The graphite for

6120-490: Was encased in a biological shield of concrete 7-foot (2.1 m) thick, which was lined with steel plates that provided a thermal shield. Given the certainty of the Wigner energy buildup, Hinton estimated that the lifetime of the reactors would be about five years—ten at the most. The scientists were more optimistic, predicting a lifetime of fifteen to thirty-five years, but conceded that Wigner energy-induced expansion might cause

6205-463: Was finned, allowing heat exchange with the environment to cool the fuel rods while they were in the reactor. Rods were pushed in the front of the core, the "charge face", with new rods being added at a calculated rate. This pushed the other cartridges in the channel towards the rear of the reactor, eventually causing them to fall out the back, the "discharge face", into a water filled channel where they cooled and could be collected. The chain reaction in

6290-413: Was given to W. Davies from Harwell, with T. G. Williams and A. Young as his assistants. The reactors and their surrounding structures each weighed 57,000 long tons (58,000 t), and it was extremely important that they not shift owing to ground movement. To determine the load bearing properties of the underlying soil and rock, holes were drilled at various points. On the basis of the results of this, it

6375-484: Was no plutonium for the nuclear weapons programme, delaying it by up to four years. They turned to the only viable solution, heating the reactor core on a regular basis at shutdown in a process known as annealing . When graphite is heated above 250 °C (482 °F) it becomes plastic, and the Wigner dislocations can relax into their natural state. This process was gradual and caused a uniform release which spread throughout

6460-421: Was not available in the UK. The choice therefore narrowed to graphite. The first nuclear reactor in the UK, a small 100 kW research reactor known as GLEEP , went critical at Harwell on 15 August 1947. This was fine for some experimental work, but the production of radioactive isotopes required a more powerful 6,000 kW reactor with a higher neutron flux . For this, British scientists and engineers at

6545-506: Was perpendicular and not parallel to the axes of extrusion. When the engineers at Risley recalculated the expansion of the graphite using the data provided by Zinn, they discovered that their reactor design would not work. This was disappointing, as it was already under construction, and the graphite blocks were already being machined. A redesign was called for, and they came up with an ingenious solution. The graphite blocks were laid on end so there would be no vertical expansion, and each block

6630-419: Was provided with clearance so it could expand horizontally. The blocks were secured in the horizontal plane by lattices of graphite slats cut from the blocks along the axis of extrusion. In March 1949 Harwell reported that British graphite behaved slightly differently to American graphite, and did expand slightly along the horizontal axis. This had the potential to reduce the lifetime of the reactor to just two and

6715-673: Was reckoned that the accumulated Wigner energy had been released, and the shutdown fans, and then the main blowers, were switched on to cool the core in preparation for restarting. From then on, there were periodic anneals to release Wigner energy. Initially, they were carried out every 20,000   MWhr. This was subsequently increased to every 30,000   MWhr, and then every 40,000   MWhr. Between August 1953 and July 1957, eight annealings were carried out on Pile No. 1, and seven on Pile No. 2. The maximum graphite temperatures recorded were between 310 °C (590 °F) and 420 °C (788 °F). Scientists from Harwell were on hand for

6800-478: Was responsible for the design and construction of most of Britain's major nuclear plants, including Windscale , Capenhurst , Springfields and Dounreay . In 1957, Hinton became the first chairman of the Central Electricity Generating Board (CEGB). He retired in 1964 but right up until the time of his death the CEGB kept an office for him at their headquarters in Paternoster Square. For his 80th birthday

6885-483: Was soon operating at 90 per cent of its designed power. The piles had been designed to produce 90 kg of plutonium annually. The first irradiated fuel rods were sent for processing in January 1952, and Tom Tuohy retrieved the first sample of British plutonium on 28 March 1952. Enough Windscale plutonium for an atomic bomb was delivered to the weapons division at Aldermaston in August, and Britain's first nuclear device

6970-617: Was successfully detonated in the Operation Hurricane test in the Monte Bello Islands in Western Australia on 3 October 1952. Wigner energy , if allowed to accumulate, could escape spontaneously in a powerful rush of heat. On 7 May 1952, Pile No. 2 experienced a mysterious rise in core temperature despite the fact that the pile had been shut down. The blowers were started, and the pile cooled down. Then, in September 1952,

7055-561: Was that they would differ from BEPO in that they would be water cooled. It was known that this was the approach that the Americans had taken at the Hanford Site , although only Portal was allowed to visit it, and not being a scientist, had not brought back much useful information. It was estimated that a water-cooled reactor the size of the B Reactor at Hanford required about 30 million imperial gallons (140 megalitres) of water per day, and it had to be exceptionally pure lest it corrode

7140-641: Was the equivalent award for the best Transmission District. Because of the miners' strike there was no competition in 1984–85. To commemorate the thirty years of awarding the cup and trophy a presentation plate was manufactured by Gladstone Pottery Museum in Stoke-on-Trent . Windscale Piles The Windscale Piles were two air-cooled graphite-moderated nuclear reactors on the Windscale nuclear site in Cumberland (now known as Sellafield site , Cumbria ) on

7225-455: Was the obvious choice. The resulting reactor was thus quite similar to the Manhattan Project's X-10 Graphite Reactor in both design and purpose. BEPO went critical on 5 July 1948. Much was learned from the design and construction of BEPO, which ran continuously until it was decommissioned in December 1968. When it came to the design of the much larger production reactors, the initial assumption

#173826