Misplaced Pages

C25

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#573426

100-399: C25 or C-25 may refer to: Vehicles [ edit ] Aircraft Boeing VC-25 , an American aircraft operated as Air Force One Caudron C.25 , a French biplane Cierva C.25 , a British autogyro Lockheed C-25 Altair , an American military transport Automobiles BSA C25 Barracuda , a British motorcycle Carlsson C25 ,

200-527: A 3,200 nmi (5,900 km; 3,700 mi) range. A total of 154 Boeing 720s and 720Bs were built until 1967. Some 720s were later converted to the 720B specification. The 720 was succeeded by the Boeing 727 trijet. The 707-120 was the first production 707 variant, with a longer, wider fuselage, and greater wingspan than the Dash 80. The cabin had a full set of rectangular windows and could seat up to 189 passengers. It

300-406: A Dutch roll incident he experienced as a passenger on an early commercial 707 flight. As the aircraft's movements did not cease and most of the passengers became ill, he suspected a misrigging of the directional autopilot (yaw damper). He went to the cockpit and found the crew unable to understand and resolve the situation. He introduced himself and relieved the ashen-faced captain who immediately left

400-608: A German supercar Citroën C25 , a French van Ships and boats Catalina 25 , an American sailboat HMS  C25 , a C-class submarine of the Royal Navy Other uses [ edit ] C-25 highway (Spain) , in Catalonia C25 road (Namibia) Caldwell 25 , a globular cluster OMX Copenhagen 25 , an index on the Copenhagen Stock Exchange Pancreatic cancer Siemens C25 ,

500-656: A Russian airline. Before they could be delivered, the company filed for bankruptcy and was closed down; the two aircraft were stored at Southern California Logistics Airport in the Mojave Desert to prevent corrosion. On 27 February 2018, the White House announced a US$ 3.9 billion (~$ 4.66 billion in 2023) agreement with Boeing to modify the two unsold 747-8s to replace the current VC-25As. The new aircraft will be designated VC-25B. These aircraft are to be retrofitted with telecommunications and security equipment to bring them to

600-414: A convertible passenger–freight configuration, which became the most widely produced variant of the 707. The 707-320C added a strengthened floor and a new cargo door to the -320B model. The wing was fitted with three-section leading-edge flaps which allowed the removal of the underfin. A total of 335 of this variant were built, including some with JT3D-7 engines (19,000 lbf (85 kN) takeoff thrust) and

700-454: A demonstration flight over Lake Washington outside Seattle , on August 7, 1955, test pilot Tex Johnston performed a barrel roll in the 367-80 prototype. Although he justified his unauthorized action to Bill Allen , then president of Boeing, as selling the airplane with a 1 'g' maneuver he was told not to do it again. The 132 in (3,400 mm) wide fuselage of the Dash 80 was large enough for four-abreast (two-plus-two) seating like

800-644: A different locking mechanism for added security. Many of the VC-25's other capabilities are classified for security reasons. There has been at least one instance of a VC-25A carrying the president of the United States without using the Air Force One call sign, when President George W. Bush went on a secret flight (with the "Gulf Stream Five" call sign) to meet with troops in Iraq on Thanksgiving , on November 27, 2003. After

900-412: A dominant airliner manufacturer with its 7x7 series . The initial, 145-foot-long (44 m) 707-120 was powered by Pratt & Whitney JT3C turbojet engines. The shortened, long-range 707-138 and the more powerful 707-220 entered service in 1959. The longer-range, heavier 707-300/400 series has larger wings and is stretched slightly by 8 feet (2.4 m). Powered by Pratt & Whitney JT4A turbojets,

1000-484: A fuselage 55 feet (17 m) longer than the 707-320B, to 208.6 feet (63.6 m) in length. This second model would have carried 225 passengers in mixed-class configuration and 279 passengers in all-economy configuration. Like the 707-620, the 707-820 was also set to compete with the stretched DC-8-60 Super Series models. The design was being pitched to American, TWA, BOAC, and Pan Am at the time of its proposal in early 1965. The 707-820 would have cost US$ 10,000,000. Like

1100-648: A joint venture with Seven Q Seven (SQS) and Omega Air, selected the JT8D-219 low-bypass turbofan as a replacement powerplant for Boeing 707-based aircraft, calling their modified configuration a 707RE. Northrop Grumman selected the -219 to re-engine the US Air Force's fleet of 19 E-8 Joint STARS aircraft, which would allow the J-STARS more time on station due to the engine's greater fuel efficiency. NATO also planned to re-engine their fleet of E-3 Sentry AWACS aircraft. The -219

SECTION 10

#1732859064574

1200-463: A kink in the trailing edge to add area inboard. Takeoff weight was increased to 302,000 lb (137,000 kg) initially and to 312,000 lb (142,000 kg) with the higher-rated JT4As and center section tanks. Its first flight was on January 11, 1958; 69 turbojet 707-320s were delivered through January 1963, the first passengers being carried (by Pan Am) in August 1959. The 707-420 was identical to

1300-422: A long corridor runs along the port (left) side. The aircraft also contains a conference room, originally designed as a situation room , but now used for meeting with staff while traveling. This room includes a 50-inch plasma screen television which can be used for teleconferencing. The aircraft has fully equipped office areas with telecommunication systems (including 87 telephones and 19 televisions). On board

1400-436: A longer fuselage and wing meant a painstaking redesign of the wing and landing-gear structures. Rather than spend money on upgrading the 707, engineer Joe Sutter stated the company "decided spending money on the 707 wasn't worth it". The project was cancelled in 1966 in favor of the newer Boeing 747. The 707-820 was a proposed intercontinental stretched variant of the 707-320B. This 412,000-pound MTOW (187,000 kg) variant

1500-420: A military command center in the event of an incident such as a nuclear attack. Operational modifications include aerial refueling capability and countermeasures against anti-aircraft missiles . The electronics on board are connected with approximately 238 miles (383 km) of wiring, twice that of a regular 747. All wiring is covered with heavy shielding for protection from a nuclear electromagnetic pulse in

1600-584: A mobile phone Vienna Game , a chess opening Waverly Municipal Airport , in Waverly, Iowa Isolate C25 of the bacterium Acidithrix ferrooxidans C25 gas, a gaseous mixture of 75% Argon and 25% Carbon Dioxide , commonly used in MIG welding . [REDACTED] Topics referred to by the same term This disambiguation page lists articles associated with the same title formed as a letter–number combination. If an internal link led you here, you may wish to change

1700-412: A presidential inauguration resulting in a change in office, the outgoing president is provided transport on a VC-25 aircraft to their home destination. The aircraft for this flight does not use the Air Force One call sign because it is not carrying the president in office. For both Presidents Bill Clinton and George W. Bush, the flight was known as Special Air Mission 28000 , where the number represents

1800-478: A private office, or the president's "Oval Office aboard Air Force One". If necessary, the president can address the nation from the office. This capability was added after the September 11 attacks , during which the aircraft had to land at Barksdale Air Force Base for President George W. Bush to address the nation. These offices, including the president's suite, are mostly located on the starboard (right) side, and

1900-594: A stronger structure to support a maximum takeoff weight increased by 19,000 lb (8,600 kg), along with modifications to the wing. The 707-320B series enabled nonstop westbound flights from Europe to the West Coast of the United States and from the US to Japan. The final 707 variant was the 707-320C, (C for "Convertible"), which had a large fuselage door for cargo. It had a revised wing with three-sectioned leading-edge flaps, improving takeoff and landing performance and allowing

2000-588: A takeoff weight of 335,000 lb (152,000 kg). Most -320Cs were delivered as passenger aircraft with airlines hoping the cargo door would increase second-hand values. The addition of two additional emergency exits, one on either side aft of the wing raised the maximum passenger limit to 219. Only a few aircraft were delivered as pure freighters. One of the final orders was by the Iranian Government for 14 707-3J9C aircraft capable of VIP transportation, communication, and in-flight refueling tasks. The 707-700

2100-580: A threat to the 757 and 767 programs. The information gathered from testing led to the eventual retrofitting of CFM56 engines to the USAF C-135/KC-135R models, and some military versions of the 707 also used the CFM56. The Douglas DC-8 "Super 70" series with CFM56 engines was developed and extended the DC-8's life in a stricter noise regulatory environment. As a result, significantly more DC-8s remained in service into

SECTION 20

#1732859064574

2200-442: A time. The president gets a personal menu. An area where guests sit is near the center of the aircraft, outside the "White House". There are separate quarters for guests, senior staff, Secret Service and Air Force security personnel assigned to the plane, and the news media located in the aft area of the main deck. Protocol states that one may wander aft of one's assigned seat, but not forward of it. Communications equipment and

2300-456: A viable option because the installation of larger, more powerful engines would need a larger undercarriage, which was not feasible given the design's limited ground clearance at takeoff. Boeing's answer to the problem was the first wide-body airliner—the Boeing 747 . The 707's first-generation engine technology was also rapidly becoming obsolete in the areas of noise and fuel economy, especially after

2400-517: A year. The only rival in intercontinental jet aircraft production at the time was the British de Havilland Comet. However, the Comet series had been the subject of fatal accidents (due to design flaws) early in its introduction and withdrawn from service; virtually redesigned from scratch, it was still smaller and slower than the 707 when reintroduced as version -4. In addition, airlines and their passengers at

2500-509: Is a military version of the Boeing 747 airliner, modified for presidential transport and commonly operated by the United States Air Force (USAF) as Air Force One , the call sign of any U.S. Air Force aircraft carrying the president of the United States. Only two examples of this aircraft type are in service; they are highly modified Boeing 747-200Bs, designated VC-25A and having tail numbers 28000 and 29000. Although technically

2600-485: Is an early American long-range narrow-body airliner , the first jetliner developed and produced by Boeing Commercial Airplanes . Developed from the Boeing 367-80 prototype first flown in 1954, the initial 707-120 first flew on December 20, 1957. Pan Am began regular 707 service on October 26, 1958. With versions produced until 1979, the 707 is a swept wing quadjet with podded engines . Its larger fuselage cross-section allowed six-abreast economy seating, retained in

2700-558: Is publicized as being half the cost of the competing powerplant, the CFM International CFM56 , and is 40 dB quieter than the original JT3D engines. The first commercial orders for the 707 came on October 13, 1955, when leading global carrier Pan Am committed to 20 Boeing 707s, and 25 Douglas DC-8s, dramatically increasing their passenger capacity (in available revenue passenger seat-miles per hour/per day) over its existing fleet of propeller aircraft. The competition between

2800-480: The 1973 oil crisis . Operations of the 707 were threatened by the enactment of international noise regulations in 1985. Shannon Engineering of Seattle developed a hush kit with funding from Tracor, Inc , of Austin, Texas. By the late 1980s, 172 Boeing 707s had been equipped with the Quiet 707 package. Boeing acknowledged that more 707s were in service than before the hush kit was available. Trans World Airlines flew

2900-456: The 377 Stratocruiser , quickly faded with only 56 examples sold and no new orders as the 1940s drew to a close. That venture had netted the company a $ 15 million loss. During 1949 and 1950, Boeing embarked on studies for a new jet transport and saw advantages with a design aimed at both military and civilian markets. Aerial refueling was becoming a standard technique for military aircraft, with over 800 KC-97 Stratofreighters on order. The KC-97

3000-469: The Air Force One designation applies to the aircraft only while the president is on board, the term is commonly used to refer to the VC-25 in general. The two aircraft often operate in conjunction with Marine One helicopters, which ferry the president to airports whenever a vehicle motorcade would be inappropriate. Two new aircraft, based on the Boeing 747-8I and designated VC-25B, have been ordered by

3100-558: The DC-10 were in competition to be selected, with the Boeing entry the eventual winner. The fabrication of the current 747s began during the presidency of Ronald Reagan (1981–1989). The VC-25s were completed in 1986 and first flew in 1987. The interior designs were created by First Lady Nancy Reagan , who used designs reminiscent of the American Southwest . Problems with interior wiring for communication systems delayed delivery of

C25 - Misplaced Pages Continue

3200-423: The cockpit are on the upper deck. There are also secure and non-secure voice, fax and data communications facilities. While the aircraft's luggage capacity is adequate to carry the belongings of the passengers, the logistics train of the president means that the aircraft must fly preceded by an aerial convoy of several cargo transports, which carry the helicopters, motorcade vehicles, and other equipment required by

3300-488: The "20" part of the designation is Boeing's "customer number" for its development aircraft. Announced in July 1957 as a derivative for shorter flights from shorter runways, the 707-020 first flew on November 23, 1959. Its type certificate was issued on June 30, 1960, and it entered service with United Airlines on July 5, 1960. As a derivative, the 720 had low development costs, allowing profitability despite few sales. Compared to

3400-404: The -320 by adding a second inboard kink, a dog-toothed leading edge, and curved low-drag wingtips instead of the earlier blunt ones. These wingtips increased overall wingspan by 3.0 ft (0.9 m). Takeoff gross weight was increased to 328,000 lb (149,000 kg). The 175 707-320B aircraft were all new-build; no original -320 models were converted to fan engines in civilian use. First service

3500-409: The -320, but fitted with Rolls-Royce Conway 508 (RCo.12) turbofans (or by-pass turbojets as Rolls-Royce called them) of 18,000 lbf (80 kN) thrust each. The first announced customer was Lufthansa . BOAC 's controversial order was announced six months later, but the British carrier got the first service-ready aircraft off the production line. The British Air Registration Board refused to give

3600-560: The -320, but with Conway turbofan engines. Though initially fitted with turbojet engines, the dominant engine for the Boeing 707 family was the Pratt & Whitney JT3D , a turbofan variant of the JT3C with lower fuel consumption and higher thrust. JT3D-engined 707s and 720s were denoted with a "B" suffix. While many 707-120Bs and -720Bs were conversions of existing JT3C-powered machines, 707-320Bs were available only as newly built aircraft, as they had

3700-432: The 21st century than 707s. The 707-620 was a proposed domestic range-stretched variant of the 707-320B. The 707-620 was to carry around 200 passengers while retaining several aspects of the 707-320B. It would have been delivered around 1968 and would have also been Boeing's answer to the stretched Douglas DC-8 Series 60 . Had the 707-620 been built, it would have cost around US$ 8,000,000. However, engineers discovered that

3800-399: The 707 also led to the upgrading of air traffic control systems to prevent interference with military jet operations. As the 1960s drew to a close, the exponential growth in air travel led to the 707 being a victim of its own success. The 707 had become too small to handle the increased numbers of passengers on the routes for which it had been designed. Stretching the fuselage again was not

3900-461: The 707 and DC-8 was fierce. Pan Am ordered these planes when and as they did so that they would be the operators of the "first-off" production line for each aircraft type. Once the initial batch of the aircraft had been delivered to them and put into operation, Pan Am would have the distinction of being not only the "Launch Customer" for both transcontinental American jets, but the exclusive operator of American intercontinental jet transports for at least

4000-425: The 707's width again to compete, this time to 148 in (3,760 mm). The first flight of the first-production 707-120 took place on December 20, 1957, and FAA certification followed on September 18, 1958. Both test pilots Joseph John "Tym" Tymczyszyn and James R. Gannett were awarded the first Iven C. Kincheloe Award for the test flights that led to certification. A number of changes were incorporated into

4100-501: The 707-120, it has a length reduced by 9 feet (2.7 m), a modified wing and a lightened airframe for a lower maximum takeoff weight . Powered by four Pratt & Whitney JT3C turbojets, the initial 720 could cover a 2,800 nmi (5,200 km; 3,200 mi) range with 131 passengers in two classes. Powered by JT3D turbofans, the 720B first flew on October 6, 1960, and entered service in March 1961. It could seat 156 passengers in one class over

C25 - Misplaced Pages Continue

4200-472: The 707-320 entered service in 1959, and the 707-420 with Rolls-Royce Conway turbofans in 1960. The 720, a lighter short-range variant, was also introduced in 1960. Powered by Pratt & Whitney JT3D turbofans, the 707-120B debuted in 1961 and the 707-320B in 1962. The 707-120B typically flew 137 passengers in two classes over 3,600 nautical miles [nmi] (6,700 km; 4,100 mi), and could accommodate 174 in one class. With 141 passengers in two classes,

4300-648: The 707-320/420 could fly 3,750 nmi (6,940 km; 4,320 mi) and the 707-320B up to 5,000 nmi (9,300 km; 5,800 mi). The 707-320C convertible passenger-freighter model entered service in 1963, and passenger 707s have been converted to freighter configurations. Military derivatives include the E-3 Sentry airborne reconnaissance aircraft and the C-137 Stratoliner VIP transport. In total, 865 Boeing 707s were produced and delivered, not including 154 Boeing 720s. During and after World War II, Boeing

4400-650: The Air Force posted online an amendment to its Air Force One contract authorizing Boeing to begin preliminary design activities. This version of the contract synopsis confirmed that the government will buy two modified 747-8 aircraft. Boeing was awarded a contract in January 2016 to identify cost reduction opportunities in areas including maintenance, aerial refueling and communications. On 15 July 2016, Boeing received another contract for pre-engineering and manufacturing development (EMD) risk-reduction to address "system specification,

4500-501: The B-47 and B-52, and had developed the yaw damper system on the B-47 that would be applied to later swept-wing configurations like the 707. However, many pilots new to the 707 had no experience with this instability as they were mostly accustomed to flying straight-wing propeller-driven aircraft such as the Douglas DC-7 and Lockheed Constellation . On one customer-acceptance flight, where

4600-568: The Boeing 707. After suspending its scheduled passenger service in April 2013, Saha continued to operate a small fleet of 707s on behalf of the Iranian Air Force . As of 2019, only a handful of 707s remain in operation, acting as military aircraft for aerial refueling, transport, and AWACS missions. Although certified as Series 100s, 200s, 300s, etc., the different 707 variants are more commonly known as Series 120s, 220s, 320s, and so on, where

4700-460: The DC-8, such as United , Delta , and Eastern , were left without jets until September and lost market share on transcontinental flights. Qantas was the first non-US airline to use the 707s, starting in 1959. The 707 quickly became the most popular jetliner of its time. Its success led to rapid developments in airport terminals, runways, airline catering, baggage handling, reservations systems, and other air transport infrastructure. The advent of

4800-542: The Stratocruiser. Answering customers' demands and under Douglas competition, Boeing soon realized this would not provide a viable payload, so it widened the fuselage to 144 in (3,660 mm) to allow five-abreast seating and use of the KC-135's tooling. Douglas Aircraft had launched its DC-8 with a fuselage width of 147 in (3,730 mm). The airlines liked the extra space and six-abreast seating, so Boeing increased

4900-557: The U.S. presidency and its powers; with the White House and presidential seal , it is among the most recognized presidential symbols. Air Force One has often appeared in popular culture and fiction, including the setting of the 1997 action movie Air Force One where the aircraft had an escape pod and a parachute ramp, unlike the actual presidential aircraft. Related development Aircraft of comparable role, configuration, and era Boeing 707#Military The Boeing 707

5000-465: The US Air Force notice, as assembling only three airplanes in the US would not make financial sense. This made Boeing the only aircraft manufacturer interested in supplying the replacement aircraft, and was reported to be exploring a 787 option also. On 28 January 2015, the Air Force announced the selection of the Boeing 747-8 to replace the aging VC-25A for presidential transport. On 10 May 2016,

5100-513: The USAF to replace the aging VC-25As. By 1985, the pair of Boeing 707 -based VC-137s used as the presidential aircraft had been in service for 23 and 13 years respectively, and the USAF began searching for an eventual replacement. The Request for Proposal issued stated that the aircraft to be selected should have at least three engines and an unrefueled range of at least 6,000 miles (9,700 km). Both Boeing with its 747 and McDonnell Douglas with

SECTION 50

#1732859064574

5200-437: The VC-25 has two main decks and a cargo area, like a regular Boeing 747, its 4,000 square feet (370 m ) of floor space has been reconfigured for presidential duties. Its lowest level is mostly cargo space, carrying luggage and the onboard food supply. The main passenger area is on the second floor or main deck. The upper deck contains the cockpit and the communications center. Typically, the president boards and disembarks from

5300-429: The VC-25 is a medical annex, which includes a fold-out operating table, emergency medical supplies, and a well-stocked pharmacy. George W. Bush had a treadmill added to Air Force One during his term in office. Every flight is staffed by a doctor and nurse. The aircraft is self-sufficient, such as carrying all the food it will need. Meals are prepared in two galleys , which together are equipped to feed up to 100 people at

5400-423: The aircraft a certificate of airworthiness, citing insufficient yaw control, excessive rudder forces, and the ability to over-rotate on takeoff, stalling the wing on the ground (a fault of the de Havilland Comet 1). Boeing responded by adding 40 in (100 cm) to the vertical stabilizer, applying full instead of partial rudder boost, and fitting an underfin to prevent over-rotation. These modifications except to

5500-475: The aircraft's tail number. The VC-25As have also been used to transport deceased former presidents, as the guest area aft of "the White House" has chairs and tables that can be removed and the casket laid in their place. The bodies of Ronald Reagan, Gerald Ford , and George H.W. Bush were transported to Washington for their state funerals, and then on to their final resting places. Colonel Mark Tillman, pilot for President George W. Bush, said, "We'll take care of

5600-444: The arrival of the turbofan-powered 707-120B. The 707-320 Intercontinental is a stretched version of the turbojet-powered 707-120, initially powered by JT4A-3 or JT4A-5 turbojets producing 15,800 lbf (70.3 kN) each (most eventually got 17,500 lbf (77.8 kN) JT4A-11s). The interior allowed up to 189 passengers, the same as the -120 and -220 series, but improved two-class capacity due to an 80-in fuselage stretch ahead of

5700-416: The cockpit feeling ill. Johnston disconnected the faulty autopilot and manually stabilized the plane "with two slight control movements". Johnston recommended Boeing increase the height of the tail fin , add a boosted rudder as well as add a ventral fin . These modifications were aimed at mitigating Dutch roll by providing more directional stability in yaw . The initial 145-foot-long (44 m) 707-120

5800-448: The design constraints imposed by limitations of late-1940s jet engines, developing a robust, safe, and high-capacity jet aircraft was within reach for Boeing. Boeing studied numerous wing and engine layouts for its new transport/tanker, some of which were based on the B-47 and C-97, before settling on the 367-80 "Dash 80" quadjet prototype aircraft. Less than two years elapsed from project launch in 1952 to rollout on May 14, 1954, with

5900-470: The development process has been hit by multiple "production mishaps", including the discovery of empty tequila mini-bottles on one of the aircraft, and the use of jacks that were not rated to support the weight of the aircraft. While the jacking did not result in damage to the planes, "the Pentagon's contractor-management agency formally requested Boeing improve its operations." While the initial delivery date

6000-444: The environmental control system, the aircraft interior, the electrical and power system and sustainment and maintenance approaches" to reduce development risks and life-cycle costs. On 1 August 2017, Defense One reported that in an effort to pay less for the replacement program, the USAF entered into a contract to purchase two 747-8 Intercontinental (747-8I) jets from Boeing, which had originally been ordered in 2011 by Transaero ,

6100-533: The event of a nuclear attack. The aircraft also has electronic countermeasures (ECMs) (AN/ALQ-204 Matador) to jam enemy radar, flares to avoid heat-seeking missiles, and chaff to avoid radar-guided missiles. All small arms and ammunition stores not in the physical possession of the Secret Service and Air Force security personnel on board the VC-25s are stowed and secured in separate locked compartments, each with

SECTION 60

#1732859064574

6200-513: The fin under the tail became standard on all 707 variants and were retrofitted to all earlier 707s. The 37 -420s were delivered to BOAC, Lufthansa, Air-India , El Al , and Varig through November 1963; Lufthansa was the first to carry passengers, in March 1960. The 707-320B had the application of the JT3D turbofan to the Intercontinental, but with aerodynamic refinements. The wing was modified from

6300-478: The first Dash 80 flying on July 15, 1954. The prototype was a proof-of-concept aircraft for both military and civilian use. The United States Air Force was the first customer, using it as the basis for the KC-135 Stratotanker aerial refueling and cargo aircraft. Whether the passenger 707 would be profitable was far from certain. At the time, nearly all of Boeing's revenue came from military contracts. In

6400-663: The first deviation from the Raymond Loewy livery scheme since it was introduced in 1962 on the VC-137C which was first used as Air Force One during the Kennedy administration . The Biden administration abandoned the new design, citing "additional engineering, as well as increased time and cost." A modified version of the traditional scheme was announced in March 2023. The 747s began undergoing modification work at Boeing's San Antonio facility in 2020. According to The Wall Street Journal ,

6500-668: The first in 2027, and the second in 2028. The VC-25A aircraft are aging and have become less cost-effective to operate. The USAF Air Mobility Command investigated possible replacements, with early press coverage suggesting that the USAF would consider the Boeing 747-8 and the Airbus A380 . On 7 January 2009, Air Force Materiel Command issued a new Sources Sought notice for a replacement aircraft to enter service by 2017 with an additional two aircraft to follow in 2019 and 2021. On 28 January 2009, EADS North America representing EADS and its Airbus division confirmed it would not respond to

6600-661: The front, main deck entrance using a mobile stairway , while journalists and other passengers enter at the rear door of the main deck. However, the aircraft also has built-in airstairs that lead to the lower deck, typically used when security concerns make the use of a mobile stairway impractical. The front section of the aircraft is informally called the "White House", a reference to the president's official residence in Washington, D.C. The president's executive suite includes sleeping quarters with two couches that can be converted into beds, lavatory and shower, vanity, double sink, and

6700-408: The initial 707's wing to help increase range and payload, giving birth to the 707-320. Pan Am inaugurated 707 service with a christening at National Airport on October 17, 1958, attended by President Eisenhower , followed by a transatlantic flight for VIPs (personal guests of founder Juan Trippe ) from Baltimore's Friendship International Airport to Paris. The aircraft's first commercial flight

6800-499: The jets would bear 700-series numbers, and the first would be the 707. The marketing personnel at Boeing chose 707 because they thought it was more appealing than 700. The project was enabled by the Pratt & Whitney JT3C turbojet engine, the civilian version of the J57 that yielded much more power than the previous generation of jet engines and was proving itself with the B-52. Freed from

6900-622: The last new-build 707 airframes built as E-3 and E-6 aircraft. Traces of the 707 are still found in the 737 , which uses a modified version of the 707's fuselage, as well as the same external nose and cockpit configurations as those of the 707. These were also used on the previous 727 , while the 757 also used the 707 fuselage cross-section. The 707's wings are swept back at 35°, and like all swept-wing aircraft, display an undesirable " Dutch roll " flying characteristic that manifests itself as an alternating combined yawing and rolling motion. Boeing already had considerable experience with this on

7000-428: The last scheduled 707 flight for passengers by a US carrier on October 30, 1983, although 707s remained in scheduled service by airlines from other nations for much longer. Middle East Airlines of Lebanon flew 707s and 720s in front-line passenger service until the end of the 1990s. Since LADE of Argentina removed its 707-320Bs from regular service in 2007, Saha Airlines of Iran was the last commercial operator of

7100-479: The later 720 , 727 , 737 , and 757 models. Although it was not the first commercial jetliner in service, the 707 was the first to be widespread, and is often credited with beginning the Jet Age . It dominated passenger air-transport in the 1960s, and remained common through the 1970s, on domestic , transcontinental , and transatlantic flights , as well as cargo and military applications. It established Boeing as

7200-531: The later JT3D-3 version giving 18,000 lbf (80 kN). (This thrust did not require water injection, eliminating both the system and 5000–6000 lb of water.) The -120B had the wing modifications introduced on the 720 and a longer tailplane; a total of 72 were built, 31 for American and 41 for TWA, plus six short-bodied -138Bs for Qantas. American had its 23 surviving -123s converted to -123Bs, but TWA did not convert its 15 -131s. The only other conversions were Pan Am's five surviving -121s and one surviving -139,

7300-459: The launch order for 20 707-121 aircraft by Pan Am and an American Airlines order for 30 707-123 aircraft. The first revenue flight was on October 26, 1958; 56 were built, plus seven short-bodied -138s; the last -120 was delivered to Western in May 1960. The 707-138 was a -120 with a fuselage 10 ft (3.0 m) shorter than the others, with 5 ft (1.5 m) (three frames) removed ahead and behind

7400-401: The link to point directly to the intended article. Retrieved from " https://en.wikipedia.org/w/index.php?title=C25&oldid=1211787999 " Category : Letter–number combination disambiguation pages Hidden categories: Short description is different from Wikidata All article disambiguation pages All disambiguation pages Boeing VC-25 The Boeing VC-25

7500-404: The maximum takeoff weight the same as that of the -120 (247,000 lb (112 t)), the -138 was able to fly the longer routes that Qantas needed. Braniff International Airways ordered the higher-thrust version with Pratt & Whitney JT4 A engines, the 707-220. The final major derivative was the 707-320, which featured an extended-span wing and JT4A engines, while the 707-420 was the same as

7600-462: The new jet service StarStream , launching its first jet service, between New York-Idlewild International Airport and San Francisco International Airport , on January 25, 1959. American Airlines was the first domestic airline to fly its own jets, on January 25, 1959. TWA started domestic 707-131 flights in March and Continental Airlines started 707-124 flights in June; airlines that had ordered only

7700-411: The outer port (number 1) engine mount is distinctly different from the other three, as this engine is not fitted with a turbocompressor. Later-model 707s typically had this configuration, although American Airlines had turbocompressors on engines 2 and 3 only. Early 707 models often had turbocompressor fairings on all four engines, but with only two or three compressors installed. Pratt & Whitney, in

7800-416: The president from basically when he's in office to when he lays in state." For the funeral of President Ronald Reagan in 2004, Tillman said that the crew converted the front of the aircraft to look the way it would have appeared when Reagan was president; President and Nancy Reagan 's Air Force One jackets were placed on the chairs to "make them feel at home". A specially designed hydraulic lifter (similar to

7900-720: The presidential entourage. The VC-25A replaced the VC-137C (a military version of the Boeing 707 ) as the mainstay of the Air Force One fleet. On some occasions, the VC-25s serve as transport for the US vice president, for which service they use the Air Force Two call sign. The VC-25A aircraft are maintained and operated as military operations by the Presidential Airlift Group, part of Air Mobility Command 's 89th Airlift Wing, based at Joint Base Andrews in Camp Springs, Maryland . The aircraft can also be operated as

8000-403: The production models from the prototype. A Krueger flap was installed along the leading edge between the inner and outer engines on early 707-120 and -320 models. This was in response to de Havilland Comet overrun accidents which occurred after over-rotating on take-off. Wing stall would also occur on the 707 with over-rotation so the leading-edge flaps were added to prevent stalling even with

8100-489: The required security level for the presidential aircraft. In April 2022, Boeing's CEO Dave Calhoun revealed that he expects the company to have a loss of $ 660 million on the VC-25B program, after the contract was renegotiated by President Trump. In June 2019, President Trump announced his plans to revamp the VC-25's livery from the traditional white and ultramarine shades to one of red, white, and blue. This would have been

8200-443: The tail dragging on the runway. The initial standard model was the 707-120 with JT3C turbojet engines. Qantas ordered a shorter-bodied version called the 707-138, which was a -120 with six fuselage frames removed, three in front of the wings, and three aft. The frames in the 707 were set 20 in (510 mm) apart, so this resulted in a shortening of 10 ft (3.0 m) to a length of 134 ft 6 in (41.0 m). With

8300-427: The three aircraft delivered to the USAF as -153s and the seven short-bodied Qantas -138s (making 13 total 707s delivered to Qantas between 1959 and 1964). The first flight of the -120B was on June 22, 1960, and American carried the first passengers in March 1961; the last delivery was to American in April 1969. Maximum weight was 258,000 lb (117,000 kg) for both the long- and short-bodied versions. The 707-220

8400-468: The time preferred the more established Douglas Aircraft as a maker of passenger aircraft, and several major carriers committed only to the Douglas DC-8, delayed by Douglas' decision to wait for the larger and more fuel efficient ( Pratt & Whitney JT4A ) turbojet to design a larger and longer range aircraft around. Anticipating this advantage, Boeing made a late and costly decision to redesign and enlarge

8500-429: The two aircraft until 1990, during the administration of George H. W. Bush . The Air Force reported that the operating cost for each VC-25A in 2014 was $ 210,877 (~$ 267,357 in 2023) per hour. The VC-25 is capable of flying 7,800 miles (12,600 km)—roughly one-third the distance around the world—without refueling. The VC-25A can accommodate more than 70 passengers. Each VC-25A cost approximately $ 325 million. While

8600-491: The type used by airline catering) with the presidential seal affixed to the sides lifts the casket up to the portside aft door to enter the VC-25A. The tradition of placing the caskets in the passenger cabin dates back to the assassination of John F. Kennedy , when the crew did not want the president's body placed in the cargo hold, and again during the state funeral of Lyndon B. Johnson . The two VC-25As are slated for retirement,

8700-402: The ventral fin to be removed (although the taller fin was retained). The 707-320Bs built after 1963 used the same wing as the -320C and were known as 707-320B Advanced aircraft. In total, 1,010 707s were built for civilian use between 1958 and 1978, though many of these found their way to military service. The 707 production line remained open for purpose-built military variants until 1991, with

8800-414: The wing (from 138 ft 10 in (42.32 m) to 145 ft 6 in (44.35 m) ), with extensions to the fin and horizontal stabilizer extending the aircraft's length further. The longer wing carried more fuel, increasing range by 1,600 miles (2,600 km) and allowing the aircraft to operate as true transoceanic aircraft. The wing modifications included outboard and inboard inserts, as well as

8900-768: The wing, giving increased range. Maximum takeoff weight was the same 247,000 lb (112,000 kg) as the standard version. It was a variant for Qantas, thus had its customer number 38. To allow for full-load takeoffs at the midflight refueling stop in Fiji, the wing's leading-edge slats were modified for increased lift, and the allowable temperature range for use of full takeoff power was increased by 10°F (5.5°C). Seven -138s were delivered to Qantas between June and September 1959, and they first carried passengers in July of that year. The 707-120B had Pratt & Whitney JT3D-1 turbofan engines, which were quieter, more powerful, and more fuel-efficient, rated at 17,000 lbf (75.6 kN), with

9000-499: The yaw damper was turned off to familiarize the new pilots with flying techniques, a trainee pilot's actions violently exacerbated the Dutch roll motion and caused three of the four engines to be torn from the wings. The plane, a brand new 707-227, N7071 , destined for Braniff, crash-landed on a river bed north of Seattle at Arlington, Washington , killing four of the eight occupants. In his autobiography, test pilot Tex Johnston describes

9100-484: Was June 1962, with Pan Am. The 707-320B Advanced is an improved version of the -320B, adding the three-section leading-edge flaps already seen on the -320C. These reduced takeoff and landing speeds and altered the lift distribution of the wing, allowing the ventral fin found on earlier 707s to be removed. From 1965, -320Bs had the uprated -320C undercarriage allowing the same 335,000 lb (152,000 kg) MTOW. These were often identified as 707-320BA-H. The 707-320C has

9200-488: Was a test aircraft used to study the feasibility of using CFM International CFM56 engines on a 707 airframe and possibly retrofitting existing aircraft with the engine. After testing in 1979, N707QT , the last commercial 707 airframe, was restored to 707-320C configuration and delivered to the Moroccan Air Force as a tanker aircraft via a "civilian" order. Boeing abandoned the retrofit program, since they felt it would be

9300-452: Was designed for hot and high operations with more powerful 15,800 lbf (70.3 kN) Pratt & Whitney JT4A-3 turbojets. Five of these were produced, but only four were ultimately delivered, with one being lost during a test flight. All were for Braniff International Airways and carried the model number 707-227; the first entered service in December 1959. This version was made obsolete by

9400-459: Was designed for transcontinental routes, and often required a refueling stop when flying across the North Atlantic. It had four Pratt & Whitney JT3C-6 turbojets, civilian versions of the military J57, initially producing 13,000 lbf (57.8 kN) with water injection . Maximum takeoff weight was 247,000 lb (112,000 kg) and first flight was on December 20, 1957. Major orders were

9500-464: Was from Idlewild Airport , New York, to Le Bourget , Paris, on October 26, 1958, with a fuel stop in Gander, Newfoundland . In December, National Airlines operated the first US domestic jet airline flights between New York/Idlewild and Miami, using 707s leased from Pan Am. In February 1956, rival global giant Trans World Airlines' then-President Howard Hughes ordered eight new Boeing 707-120, dubbing

9600-486: Was known for its military aircraft. The company had produced innovative and important bombers, from the B-17 Flying Fortress and B-29 Superfortress to the jet-powered B-47 Stratojet and B-52 Stratofortress , but its commercial aircraft were not as successful as those from Douglas Aircraft and other competitors. As Douglas and Lockheed dominated the postwar air transport boom, the demand for Boeing's offering,

9700-482: Was not ideally suited for operations with the USAF's new fleets of jet-powered fighters and bombers; this was where Boeing's new design would win military orders. As the first of a new generation of American passenger jets, Boeing wanted the aircraft's model number to emphasize the difference from its previous propeller-driven aircraft, which bore 300-series numbers. The 400-, 500- and 600-series were already used by their missiles and other products, so Boeing decided that

9800-543: Was powered by Pratt & Whitney JT3C turbojet engines. The JT3D-3B engines are readily identifiable by the large gray secondary-air inlet doors in the nose cowl. These doors are fully open (sucked in at the rear) during takeoff to provide additional air. The doors automatically close with increasing airspeed. The 707 was the first commercial jet aircraft to be fitted with clamshell-type thrust reversers . The 707 uses engine-driven turbocompressors to supply compressed air for cabin pressurization . On many commercial 707s,

9900-465: Was set to 2024, the Pentagon expects the jets to be two to three years late, with the Air Force projecting delivery of the first VC-25B in 2027, and the other in 2028, as of a 2023 press release. Once the new aircraft are delivered, the VC-25As will be retired and placed in museums. Data from Boeing BDS General characteristics Performance The VC-25 "Air Force One" is a prominent symbol of

10000-582: Was to be powered by four 22,500-pound-force thrust (100 kN) Pratt & Whitney JT3D-15 turbofan engines, and it would have had a nearly 10-foot (3.0 m) extension in wingspan, to 155.5 feet (47.4 m). Two variations were proposed, the 707-820(505) model and the 707-820(506) model. The 505 model would have had a fuselage 45 feet (14 m) longer than the 707-320B, for a total length of 198.6 feet (60.5 m). This model would have carried 209 passengers in mixed-class configuration and 260 passengers in all-economy configuration. The 506 model would have had

#573426