Misplaced Pages

Zefiro (train)

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

Zefiro is a family of high-speed passenger trains designed by Bombardier Transportation (now Alstom ) whose variants have top operating speeds of between 250 km/h (155 mph); 380 km/h (240 mph) and 400 km/h (250 mph).

#447552

68-594: The family consists of: the Zefiro 250 , which has a top operating speed of 250 km/h (155 mph) and is for the moment wholly manufactured in China; the Zefiro 300 , which has a top operating speed of 300 km/h (190 mph) but design speed up to 400 km/h (250 mph); and the Zefiro 380 , which has a top operating speed of 350 km/h (220 mph) and design speed up to 380 km/h (240 mph). As of 2024, Zefiro 250, 380 and Express have become part of

136-528: A break of gauge occurred, prior to an Act of Parliament the issue in 1846 by establishing one standard gauge of 4 ft  8 + 1 ⁄ 2  in ( 1,435 mm ). The early effort towards standardisation somewhat influenced railways aboard as well, however various other track gauges persisted and developed across the world; even through to the twenty first century, incompatible track gauges, let alone other issues, persisted to hinder interoperability efforts. Several key events happened during

204-450: A headphone jack which enables the passenger to listen to several on-board music and voice programmes as well as several radio stations. Some seats in the 1st class section (in some trains also in 2nd class) are equipped with video displays showing movies and pre-recorded infotainment programmes. Each train is equipped with special cars that feature in-train repeaters for improved mobile phone reception as well as designated quiet zones where

272-626: A line between Paris and Frankfurt/Stuttgart opened, jointly operated by ICE and SNCF 's TGV . A notable characteristic of the ICE trains is their colour design, which has been registered by the DB as an aesthetic model and hence is protected as intellectual property. The trains are painted in Pale Grey ( RAL 7035) with a Traffic Red (RAL 3020) stripe on the lower part of the vehicle. The continuous black band of windows and their oval door windows differentiate

340-639: A certification for running in Belgium and due to the competition of budget airlines the London service was cancelled. In 2020 Deutsche Bahn placed an order with Siemens for 30 trains, and options for another 60, of the Velaro design and based on the previously procured ICE Class 407. Referenced by Siemens as Velaro MS ("multi-system"), these trains are called ICE 3neo by Deutsche Bahn and classified as 408. The trains are designed for operation at 320 km/h and were deployed at

408-584: A line speed of 300 km/h (190 mph). Since only 3rd generation ICE trains can travel at this speed, the ICE line 41 , formerly running from Essen Hbf via Duisburg Hbf – Frankfurt Südbf to Nürnberg Hbf , was extended over the Nuremberg-Ingolstadt high-speed rail line and today the service run is Oberhausen Hbf – Duisburg Hbf – Frankfurt Hbf – Nürnberg Hbf – Ingolstadt Hbf – München Hbf . The ICE 3 runs at speeds up to 320 km/h (200 mph) on

476-610: A long train, similar to the ICE ;1. Only from 24 May 1998 were the ICE 2 units fully equipped with driving van trailers and could be portioned on their run from Hamm via either Dortmund Hbf – Essen Hbf – Duisburg Hbf – Düsseldorf Hbf or Hagen Hbf – Wuppertal Hbf – Solingen-Ohligs . In late 1998, the Hanover–Berlin high-speed railway was opened as the third high-speed line in Germany, cutting travel time on line 10 (between Berlin and

544-637: A series of trials in 1985 using the InterCityExperimental (also called ICE-V) test train. The IC Experimental was used as a showcase train and for high-speed trials, setting a new world speed record at 406.9 km/h (253 mph) on 1 May 1988. The train was retired in 1996 and replaced with a new trial unit, called the ICE S . After extensive discussion between the Bundesbahn and the Ministry of Transport regarding onboard equipment, length and width of

612-438: A special conference compartment whilst the ICE 3 features a compartment suitable for small children. The ICE 3 and ICE T omit the usual train manager's compartment and have an open counter named "ServicePoint" instead. An electronic display above each seat indicates the locations between which the seat has been reserved. Passengers without reservations are permitted to take seats with a blank display or seats with no reservation on

680-519: A transformer and its own power supply. Typically, the end cars of each 4-car unit have powered bogies, with the two middle cars being unpowered. The pantograph is located on one of the unpowered cars. The specifications for all current designs (2009) describe asynchronous three-phase motors, with forced air cooling. However, Bombardier also offers the option of permanent-magnet synchronous motors (which it groups in its "ECO4" energy-saving technologies), which were tested on modified Regina trains in 2008 on

748-548: A wide (3.4 m or 11 ft 2 in) widths. In December 2021 Alstom announced plans to transfer the intellectual property and business activities associated with the Zefiro V300 to Hitachi Rail . This was a condition of Alstom's acquisition of Bombardier put in place by the European Commission in order to remain compliant with EU competition law . The transaction was completed on 1 July 2022. The Zefiro trainset

SECTION 10

#1732859241448

816-624: Is "to promote rail transport at world level and meet the challenges of mobility and sustainable development." The UIC's main objectives are to: When founded in 1922 the UIC had 51 members from 29 countries, including Japan and China . They were soon joined by members from the Soviet Union , the Middle East and North Africa. As of February 2024, the UIC has 223 members (include suspended) across five continents. Of these there are: On 12 November 2010,

884-824: Is a high-speed rail system in Germany . It also serves destinations in Austria, France, Belgium, Switzerland and the Netherlands as part of cross-border services. It is the flagship of the German state railway, Deutsche Bahn . ICE fares are fixed for station-to-station connections, on the grounds that the trains have a higher level of comfort. Travelling at speeds up to 300 km/h (190 mph) within Germany and 320 km/h (200 mph) when in France, they are aimed at business travellers and long-distance commuters and marketed by Deutsche Bahn as an alternative to flights. The ICE 3 also has been

952-423: Is a conventional (non-inter-coach articulated) single-deck electrical-multiple-unit high-speed train. It consists of powered and unpowered cars, with motorized power cars at either end. Car bodies are constructed of aluminium, with the exception of the wide-bodied Zefiro 250 trains, which have stainless steel bodies. They have customisable open-plan layouts. Trains are made up of 4-car units, each of which contains

1020-590: Is a polycentric network. Connections are offered in either 30-minute, hourly or bi-hourly intervals. Furthermore, additional services run during peak times, and some services call at lesser stations during off-peak times. Unlike the French TGV or the Japanese Shinkansen systems, the vehicles, tracks and operations were not designed as an integrated whole; rather, the ICE system has been integrated into Germany's pre-existing system of railway lines instead. One of

1088-504: Is an international rail transport industry body. The railways of Europe had originated during the nineteenth century as many separate concerns across numerous nations; this led to disparate and conflicting standards emerging and thus onto incompatibility. One prominent example was the British Gauge War , during which different railway companies were laying different track gauges across Great Britain , causing inefficiency wherever

1156-453: Is estimated at €1.3 billion. Under China Railways' use these trains have been designated CRH1C (8-car set) and CRH1D (16-car set). which was in December 2010 revised to CRH380C and CRH380CL and once again to CRH380D (8-car set) & CRH380DL (16-car set) according to the new numbering system. As of September 2012, the order has been amended to include only seventy 8-car sets, designated as

1224-487: Is greater than 0.6 m/s (1.3 mph/s), with a 16-car train weight of 859  t (845 long tons ; 947 short tons ) and an axle load of 16.5 t (16.2 long tons; 18.2 short tons), bogie type is that found on the Regina with 2.7 m (8 ft 10 in) wheelbase with 63% of axles motorized. In July 2010, the Ministry of Railways ordered 40 more 8-car 250 km/h (155 mph) CRH1E Zefiro high-speed trains from

1292-521: Is intended for European operations, with a UIC profile , and capable of being fitted for use on all four European electrification schemes (1.5 & 3 kV DC, 15 & 25 kV AC). Bogies are FLEXX type with a 2.85 m (9 ft 4 in) wheelbase, 50% of which are motorized. Starting acceleration is greater than 0.60 m/s (1.3 mph/s). It has an axle load of approximately 17  t (16.7 long tons ; 18.7 short tons ). Two 8-car sets can be joined together to form one longer train. A variant of

1360-458: The GSM-R radio telecommunication system was formulated as an international interoperability specification covering voice and signalling systems for railway communications. GSM-R, which is built on GSM technology, was designed to be a cost efficient digital replacement for various existing incompatible in-track cable and analogue railway radio networks. The specification for GSM-R is maintained via

1428-596: The HS2 rolling stock tender for its first phase, for which it was awarded the contract for 54 trainsets. In September 2009, Bombardier announced an order for eighty Zefiro 380 high-speed trains by the Chinese Ministry of Railways (MOR) to be produced at Bombardier's joint venture Sifang (Qingdao) Transportation Ltd . The order of twenty 8-car sets and sixty 16-car sets was estimated to be worth 27.4 billion RMB (approx €2.7 billion or $ 4 billion). The value of Bombardier's share

SECTION 20

#1732859241448

1496-507: The Intercity network and with IC tariffs. In 1993, the ICE line 6 's terminus was moved from Hamburg to Berlin (later, in 1998, via the Hanover-Berlin line and the former IC line 3 from Hamburg-Altona via Hannover Hbf – Kassel-Wilhelmshöhe – Fulda – Frankfurt Hbf – Mannheim Hbf – Karlsruhe Hbf – Freiburg Hbf to Basel SBB was upgraded to ICE standards as a replacement). From 1997,

1564-571: The LGV Est railway Strasbourg – Paris in France. A new generation ICE 3, Class 407 , is part of the Siemens Velaro family with the model designation Velaro D. It currently runs on many services in Germany and through to other countries like France. Initially this train type was meant to execute the planned Deutsche Bahn services through the Channel Tunnel to London. As the trains had not received

1632-633: The Ruhr valley ) by 2½ hours. The ICE 1 and ICE 2 trains' loading gauge exceeds that recommended by the international railway organisation UIC . Even though the trains were originally to be used only domestically, some units are licensed to run in Switzerland and Austria. Some ICE 1 units have been equipped with an additional smaller pantograph to be able to run on the different Swiss overhead wire geometry. All ICE 1 and ICE 2 trains are single-voltage 15 kV AC , which restricts their radius of operation largely to

1700-545: The Sifang (Qingdao) Transportation Ltd joint venture. In September 2012, based on a modified contract with Bombardier, the MOR ordered an additional 106 8-car trains, 60 of which are to be a new variant, designated the Zefiro 250NG. This variant is an evolution of the original, and will utilize different materials in order to provide weight savings and more efficient operation. The Zefiro 300

1768-517: The Velaro by their manufacturer, Siemens . Just like the ICE 2, the ICE 3 and the ICE 3M were developed as short trains (when compared to an ICE 1), and are able to travel in a system where individual units run on different lines, then being coupled to travel together. Since the ICE 3 trains are the only ones able to run on the Köln-Frankfurt high-speed line with its 4.0% incline at

1836-470: The "Green Train" ( Swedish : Gröna Tåget ). The first variant of the Zefiro concept to be produced was a series of twenty 16-car EMU sleeper trains produced by Bombardier's joint venture Sifang Power (Qingdao) Transportation (BSP), which were delivered from 2009. These trains were the first high-speed train licensed to be manufactured in China as well as the fastest sleeper trains in the world. China Railways designated them as CRH1E. Starting acceleration

1904-674: The Avelia Stream high speed train family. Bombardier Transportation and its predecessor companies produced a variety of high-speed trainsets, as part collaborations with other conglomerates, such as the Intercity-Express family of locomotives (Germany), AVE Class 102 , RENFE class 130 (Spain), ICN (Switzerland), the Acela express (USA), and parts of the TGV Duplex , Eurostar , Thalys , and ETR 500 trainsets (Europe various). Additionally

1972-583: The CRH380D and additional 46 Zefiro 250 and 60 Zefiro 250NG. All the 85 trainsets have been delivered and are currently operated by Shanghai Railway Bureau & Chengdu Railway Bureau. In 2018, Swedish regional transport authority Västtrafik ordered 40 new trains (originally designated during tendering as EMU200, now designated as X80 ) in 2018, later increased to 45 trains, of a new model capable of 200 km/h (125 mph). They have three cars and are around 80 metres (262 ft 6 in) long. First delivery

2040-511: The German-speaking countries of Europe. ICE 2 trains can run at a top speed of 280 km/h (174 mph). To overcome the restrictions imposed on the ICE 1 and ICE 2, their successor, the ICE 3, was built to a smaller loading gauge to permit usability throughout the entire European standard gauge network, with the sole exception being the UK's domestic railway network. Unlike their predecessors,

2108-447: The ICE 2 and seven-car ICE T (Class 411) are equipped with a full restaurant car. The five-car ICE T (Class 415) and ICE 3 however, have been designed without a restaurant, they feature a bistro coach instead. Since 1 October 2006, smoking is prohibited in the bistro coaches, similar to the restaurant cars, which have always been non-smoking. All trains feature a toilet for disabled passengers and wheelchair spaces. The ICE 1 and ICE 2 have

Zefiro (train) - Misplaced Pages Continue

2176-542: The ICE 3 units are built not as trains with separate passenger and power cars, but as electric multiple units with underfloor motors throughout. This also reduced the load per axle and enabled the ICE 3 to comply with the pertinent UIC standard. Initially two different classes were developed: the Class 403 (domestic ICE 3) and the Class 406 (ICE 3M), the M standing for Mehrsystem ( multi-system ). Later came Class 407 and Class 408. The trains were labelled and marketed as

2244-513: The ICEs from any other DB train. The ICE 1 and ICE 2 units originally had an Orient Red (RAL 3031) stripe, accompanied by a Pastel Violet stripe below (RAL 4009, 26 cm wide). These stripes were repainted with the current Traffic Red between 1998 and 2000, when all ICE units were being checked and repainted in anticipation of the EXPO 2000 . The "ICE" lettering uses the colour Agate Grey (RAL 7038),

2312-462: The UIC has formed various partnerships and cooperative frameworks with other multinational railway authorities, such as the European Union Agency for Railways . The UIC has played a leading role in the development of Technical Specifications for Interoperability (TSIs), which have gradually taken over from older standards developed by various national railway entities. During the 1990s,

2380-482: The UIC opened an African regional office in Tunis , Tunisia with the support of SNCFT . On 9 March 2022, the UIC suspended all member companies from Russia and Belarus, following Russian invasion of Ukraine . In order to provide a common understanding and reduce potential confusion, the UIC has established standard international railway terminology and a trilingual (English-French-German) thesaurus of terms. The thesaurus

2448-602: The UIC project European Rail Traffic Management System (ERTMS). By June 2023, GSM-R had been implemented across roughly 130,000km of track, along with 90,000 cab radios and 20,000 datalink radio units. A more capable next-generation radio, the Future Railway Mobile Communication System (FRMCS) program, is under development as of 2023. In addition to eventually replacing GSM-R, it will provide new capabilities that require more rapid data exchange, such as live video transmission. The UIC's mission

2516-504: The Zefiro 300 was offered by Bombardier in association with AnsaldoBreda to Trenitalia , the Italian national railway service, as part of a bid for 50 new high-speed trainsets in 2010. Trenitalia selected this bid as the winner on 5 August 2010. These entered service in 2015 and are designated Frecciarossa 1000 . An evolution of the Zefiro 300 platform was also offered by a joint venture between Bombardier (later Alstom) and Hitachi Rail for

2584-473: The allowed maximum speed of 300 km/h, they are used predominantly on services that utilise this line. In 2009 Deutsche Bahn ordered another 16 units – worth € 495 million – for international traffic, especially to France. The Erfurt–Leipzig/Halle high-speed railway , which opened in December 2015, is one of three lines in Germany (the others being the Nuremberg-Ingolstadt high-speed rail line and Cologne–Frankfurt high-speed rail line ) that are equipped for

2652-439: The audio and video entertainment systems were removed and electronic seat reservation indicators were added above the seats. The ICE 2 trains have been undergoing the same procedure since 2010. ICE 2 trains feature electric sockets at selected seats, ICE 3 and ICE T trains have sockets at nearly every seat. The ICE 3 and ICE T are similar in their interior design, but the other ICE types differ in their original design. The ICE 1,

2720-644: The bundling of many ICE lines in that region. When considering all traffic (freight, local and long-distance passenger), the busiest line carrying ICE traffic is the Munich–Augsburg line , carrying about 300 trains per day. The network's main backbone consists of six north–south lines: (Also applies to trains in the opposite directions, taken from 2024 network map) Furthermore, the network has three main east–west thoroughfares: International Union of Railways The International Union of Railways ( French : Union internationale des chemins de fer , UIC )

2788-510: The company has independently produced high-speed trainsets for specific markets, such as CRH1 , "Xinshisu" (China), X 2000 , Regina (Sweden) and Class 71 (Norway). In November 2005 Bombardier launched its general solution, the Zefiro single-deck train for high-speed rail lines, available in 4-, 8-,12- or 16-car sets, capable of being configured for a variety of supply voltages, and produced in either standard (2.9 m or 9 ft 6 in) or

Zefiro (train) - Misplaced Pages Continue

2856-412: The contract for the ten car sets was modified in 2013 to expand the trainset length to twelve vehicles. The name ICx was used for the trains during the initial stages of the procurement; in late 2015 the trains were rebranded ICE 4 , at the unveiling of the first trainset, and given the class designation 412 by Deutsche Bahn. Two pre-production trainsets were manufactured and used for testing prior to

2924-486: The current section. The maintenance schedule of the trains is divided into seven steps: Maintenance on the ICE trains is carried out in special ICE workshops located in Basel, Berlin, Cologne, Dortmund, Frankfurt, Hamburg, Leipzig and Munich. The train is worked upon at up to four levels at a time and fault reports are sent to the workshops in advance by the on-board computer system to minimize maintenance time. The ICE system

2992-432: The design for the now discontinued InterRegio trains in the mid-1980s. The first ICE trains were the trainsets of ICE 1 (power cars: Class 401), which came into service in 1989. The first regularly scheduled ICE trains ran from 2 June 1991 from Hamburg-Altona via Hamburg Hbf – Hannover Hbf – Kassel-Wilhelmshöhe – Fulda – Frankfurt Hbf – Mannheim Hbf and Stuttgart Hbf toward München Hbf at hourly intervals on

3060-748: The development base for the Siemens Velaro family of trainsets which has subsequently been exported to RENFE in Spain ( AVE Class 103 ), which are certified to run at speeds up to 350 km/h (220 mph), as well as versions ordered by China for the Beijing–Tianjin intercity railway link ( CRH 3 ) and by Russia for the Moscow– Saint Petersburg and Moscow– Nizhny Novgorod routes ( Velaro RUS ) with further customers being Eurostar as well as Turkey and Egypt . The Deutsche Bundesbahn started

3128-533: The early twentieth century; in the aftermath of the First World War and the Treaty of Versailles , numerous border changes were enacted across Europe, which greatly impacted several formerly united national railway networks while compelling several others together in some cases. It was early into the interwar period that the UIC was established on 17 October 1922 with the principal aim of standardising practices across

3196-520: The effects of this is that the ICE 3 trains can reach a speed of 300 km/h (186 mph) only on some stretches of line and cannot currently reach their maximum allowed speed of 330 km/h on German railway lines (though a speed of 320 km/h is reached by ICE 3 in France). The line most heavily utilised by ICE trains is the Mannheim–Frankfurt railway between Frankfurt and Mannheim due to

3264-455: The end of 2007, ICE-TD trains were put into revenue service for the lines between Hamburg and Copenhagen as well as Hamburg and Aarhus. A large part of the Danish railway network had not been electrified so DSB (Danish State Railways) used the diesel-powered trains. When DSB ordered the new IC4 train sets, the company did not anticipate the long delay with the delivery and the technical issues with

3332-515: The end of 2022 on routes that use the Cologne – Frankfurt high speed line which is designed for operation at 300 km/h. After a production time of only 12 months including trial runs the first train was presented to journalists in February of 2022. At that occasion the order was increased by 43 trainsets, with all 73 trains supposed to be in service by early 2029. In May of 2023 Deutsche Bahn announced that it

3400-666: The fleet will operate, including temperatures as low as -40 degrees Celsius and snow drifts up to 80cm deep. They are equipped with a winter package including an uprated propulsion system, a single-axle drive and enhanced slip-slide regulation. The bodyshells were manufactured by Bombardier Sifang (Qingdao) Transportation Ltd in China with final fit-out of all other components performed at the Hennigsdorf works in Germany. The trains have been thoroughly temperature tested already, and will be tested further in Sweden during winter 2022. In 2023, it

3468-521: The frame is painted in Quartz Grey (RAL 7039). The plastic platings in the interior all utilise the Pale Grey (RAL 7035) colour tone. Originally, the ICE 1 interior was designed in pastel tones with an emphasis on mint, following the DB colour scheme of the day. However, ICE 1 trains were refurbished in the mid-2000s and now follow the same design as the ICE 3, which makes heavy usage of indirect lighting and wooden furnishings. The distinctive ICE design

SECTION 50

#1732859241448

3536-410: The introduction of the main series. Simultaneously with the ICE 3, Siemens developed trains with tilting technology, using much of the ICE 3 technical design. The class 411 (seven cars) and 415 (five cars) ICE T EMUs and class 605 ICE TD DMUs (four cars) were built with a similar interior and exterior design. They were specially designed for older railway lines not suitable for high speeds, for example

3604-445: The later refurbishment. The ICE 3 trains feature touch screen terminals in some carriages, enabling travellers to print train timetables. The system is also located in the restaurant car of the ICE 2. The ICE 1 fleet saw a major overhaul between 2005 and 2008, supposed to extend the lifetime of the trains by another 15 to 20 years. Seats and the interior design were adapted to the ICE 3 design, electric sockets were added to every seat,

3672-680: The name ICE-T to class 411/415, the T originally did not stand for tilting , but for Triebwagen (railcar), as DB's marketing department at first deemed the top speed too low for assignment of the InterCityExpress brand and therefore planned to refer to this class as IC-T (InterCity-Triebwagen). The trainsets of the T series were manufactured in 1999. The tilting system has been provided by Fiat Ferroviaria , now part of Alstom . ICE T trains can run at speeds of up to 230 km/h (143 mph). Deutsche Bahn ordered 20 units of ICE-T with diesel engines in 2001, called Class 605 ICE-TD. The ICE-TD

3740-552: The new ICE line 6 . The Hanover-Würzburg line and the Mannheim-Stuttgart line , which had both opened the same year, were hence integrated into the ICE network from the very beginning. Due to the lack of trainsets in 1991 and early 1992, the ICE line 4 ( Bremen Hbf – Hannover Hbf – Kassel-Wilhelmshöhe – Fulda – Würzburg Hbf – Nürnberg Hbf – München Hbf ) could not start operating until 1 June 1992. Prior to that date, ICE trainsets were used when available and were integrated in

3808-683: The railway industry and expanding international cooperation in the sector. The UIC has introduced numerous classification systems over the decades. During the 1970s, the UIC Franc currency equivalent was established for the purpose of easing international ticket revenue sharing; it was replaced by the European Currency Unit on 1 January 1990. UIC classification and UIC Country Codes allowed precise determination of rolling stock capabilities and ownership; furthermore, wagons have been assigned their own unique UIC wagon numbers . Over time,

3876-504: The successor, the ICE ;2 trains pulled by Class 402 powerheads, was put into service. One of the goals of the ICE 2 was to improve load balancing by building smaller train units which could be coupled or detached as needed. These trainsets were used on the ICE line 10 Berlin-Cologne/Bonn. However, since the driving van trailers of the trains were still awaiting approval, the DB joined two portions (with one powerhead each) to form

3944-408: The train and the number of trainsets required, a first batch of 41 units was ordered in 1988. The order was extended to 60 units in 1990, with German reunification in mind. However, not all trains could be delivered in time. The ICE network was officially inaugurated on 29 May 1991 with several vehicles converging on the newly built station Kassel-Wilhelmshöhe from different directions. In 2007,

4012-566: The train sets. To compensate for the shortage of available trains, DSB leased the ICE-TD while the delivery and technical issues with IC4 were being addressed. The operating cost was much lower due to the lower fuel tax in Denmark. After the issues with IC4 were resolved, the ICE-TD fleet was removed from revenue service and stored. Deutsche Bahn retired the entire ICE TD fleet in 2018. While every car in an ICE train has its own unique registration number,

4080-400: The trains usually remain coupled as fixed trainsets for several years. For easier reference, each has been assigned a trainset number that is printed over each bogie of every car. These numbers usually correspond with the registration numbers of the powerheads or cab cars. The ICE trains adhere to a high standard of technology: all cars are fully air-conditioned and nearly every seat features

4148-464: The twisting lines in Thuringia . ICE-TD has diesel traction. ICE-T and ICE-TD can be operated jointly, but this is not done routinely. A total of 60 class 411 and 11 class 415 have been built so far (units built after 2004 belong to the modified second generation ICE-T2 batch). Both classes work reliably. Austria's ÖBB purchased three units in 2007, operating them jointly with DB. Even though DB assigned

SECTION 60

#1732859241448

4216-408: The use of mobile phones is discouraged. The newer ICE 3 trains also have larger digital displays in all coaches, displaying, among other things, Deutsche Bahn advertising, the predicted arrival time at the next destination and the current speed of the train. The ICE 1 was originally equipped with a passenger information system based on BTX , however this system was eventually taped over and removed in

4284-460: Was calling the last 17 trains from the option, bringing the total order up to 90 trains. Procurement of ICx trainsets started c. 2008 as replacements for locomotive hauled InterCity and EuroCity train services - the scope was later expanded to include replacements for ICE 1 and ICE 2 trainsets. In 2011 Siemens was awarded the contract for 130 seven car intercity train replacements, and 90 ten car ICE train replacements, plus further options -

4352-494: Was developed by a team of designers around Alexander Neumeister in the early 1980s and first used on the InterCityExperimental (ICE V). The team around Neumeister then designed the ICE 1, ICE 2, and ICE 3/T/TD. The interior of the trains was designed by Jens Peters working for BPR-Design in Stuttgart . Among others, he was responsible for the heightened roof in the restaurant car and the special lighting. The same team also developed

4420-551: Was intended for certain routes without electric overhead cables such as Dresden-Munich and Munich-Zürich lines. However, the Class 605 trains (ICE-TD) experienced many technical issues and unanticipated escalation in operating cost due to the diesel fuel being fully taxed in Germany. They were taken off revenue service shortly after delivery. During the 2006 FIFA World Cup , the ICE-TD trains were pressed temporarily into supplementary service for transporting fans between cities in Germany. At

4488-531: Was planned at end of 2021, but the coronavirus pandemic has delayed the production and test runs of the new trains. Västtrafik then expected that the first train set will arrive in Västerås in April 2022, and that another four train sets will be delivered to Sweden during the spring. The first vehicles were due to be operating in the traffic in spring 2024 The trains are designed for the colder weather conditions under which

4556-788: Was reported that the delivery would be further delayed to 2025, due to adjustments needed to indoor climate control following intensive winter tests. In 2021, the Swedish train operator SJ decided to buy 25 new Bombardier Zefiro trains, expected to come into service in 2026. The top speed is 250 km/h (155 mph). The trains will have 363 seats, and designed to handle running at temperatures of -40 degrees Celsius. Train systems are designed to operate in both Sweden and Denmark, as well being certified to operate in Norway. Intercity-Express Intercity Express (commonly known as ICE ( German pronunciation: [iːtseːˈʔeː] ))

4624-569: Was the result of cooperation with the European Conference of Ministers of Transport (ECMT/ CEMT ) and was published in 1995. The UIC has established systems for the classification of locomotives and their axle arrangements , coaches and goods wagons . UIC plays an important role in standardization of railway parts, data and terminology, though the degree to which its standards have been adopted by its members varies. Therefore, UIC codes (also known as UIC leaflet ) are developed since

#447552