Misplaced Pages

California State Route 78

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

A state highway , state road , or state route (and the equivalent provincial highway , provincial road , or provincial route ) is usually a road that is either numbered or maintained by a sub-national state or province . A road numbered by a state or province falls below numbered national highways ( Canada being a notable exception to this rule) in the hierarchy (route numbers are used to aid navigation, and may or may not indicate ownership or maintenance).

#286713

111-519: State Route 78 ( SR 78 ) is a state highway in the U.S. state of California that runs from Oceanside east to Blythe , traversing nearly the entire width of the state. Its western terminus is at Interstate 5 (I-5) in San Diego County and its eastern terminus is at I-10 in Riverside County . The route is a freeway through the heavily populated cities of northern San Diego County and

222-612: A block before the business route turns east toward Blythe. SR 78 is designated as the Ronald Packard Parkway (after a former Congressman named Ronald Packard from the area) from I-5 in the city of Oceanside to I-15 in the city of Escondido, and Ben Hulse Highway (after a former state senator named Ben Hulse ) from SR 86 near Brawley to I-10 near the city of Blythe . The portion of SR 78 from SR 86 in Brawley to CR S3 near Anza-Borrego Desert State Park

333-424: A gold rush began in 1870, and eliminated the need to manually lower supplies to gold miners down a 1,000-foot (300 m) slope. The county bought the road from Horace Wilcox in 1874, and removed the toll. The road remained in service until 1925, and remained operational until a flood in the winter season of 1979–1980. By August 1874, a road from Valle de las Viejas to Julian was open and accessible for horse teams. In

444-429: A junction called Scissors Crossing ; CR S2 runs concurrently in a wrong-way concurrency . Shortly afterwards, SR 78 enters Anza-Borrego Desert State Park and is designated as a scenic highway for its length in the state park. Although this route travels many miles south of the town of Borrego Springs , it provides access to the town via CR S3 . SR 78 travels through the town of Ocotillo Wells before exiting

555-544: A lack of funding until 1980. However, in 1970, the community raised concerns about the number of buildings that would need to be destroyed, as the freeway would go through a dense urban area. Other routes, including routing SR 78 along I-15 south, were proposed. The majority of the Escondido City Council supported sending representatives to the upcoming California Coastal Commission meeting in January 1971 to expedite

666-591: A letter, postmiles were measured on the road as it was in 1964 , based on the alignment that existed at the time, and do not necessarily reflect current mileage. R reflects a realignment in the route since then, M indicates a second realignment, L refers to an overlap due to a correction or change, and T indicates postmiles classified as temporary ( for a full list of prefixes, see California postmile § Official postmile definitions ). Segments that remain unconstructed or have been relinquished to local control may be omitted. The numbers reset at county lines;

777-475: A named route branch) Trans-Canada route marker is co-signed with a numbered provincial sign, with the provincial route often continuing alone outside the Trans-Canada Highway section. However, in the western provinces, the two parallel Trans-Canada routes are consistently numbered with Trans-Canada route markers; as Highways 1 and 16 respectively. Canada also has a designated National Highway System , but

888-526: A population of at least 10,000 inhabitants are urban roads (type D and E) under the jurisdiction of the relevant municipalities. The state highway that cross towns or villages with a population of less than 10,000 inhabitants are urban roads (type D and E) under the jurisdiction of the municipality, subject to authorization from ANAS . State highways in India are numbered highways that are laid and maintained by state governments . Mexico 's State Highway System

999-578: A section of a continuous Highway 403, the new link was designated as a western extension of the tolled Highway 407, with the Mississauga section of Highway 403 planned to be renumbered as Highway 410. The renumbering to 410 never came to pass, and consequently Highway 403 was signed concurrently along the Queen Elizabeth Way in 2002, remedying the discontinuity. Nonetheless, many surface street signs referring to that section of freeway with

1110-433: A single mountain crossing or over a bridge, or through a major city, it is often economically and practically advantageous for them all to be accommodated on a single physical roadway. In some jurisdictions, however, concurrent numbering is avoided by posting only one route number on highway signs; other route numbers disappear at the start of the concurrency and reappear when it ends. However, any route that becomes unsigned in

1221-423: A single numbered route across each province (an exception being the switching of the designation between Nova Scotia Highways 104 and 105 ), or has branches that are signed exclusively as TCH routes. In Ontario and Quebec, The TCH follows a series of provincial highways, and also has branches that follow sections of others that have concurrencies with it, signed with TCH shields alongside the provincial number. In

SECTION 10

#1732856044287

1332-608: A three-digit number designation, preceded by D . Provincial roads ( Turkish : İl yolu ) are secondary roads, maintained by respective local governments with the support of the KGM. The roads have a four-digit numbering grouped as two pairs, pairs are separated by a dash. First pair represents the license number of that province . State highways are generally a mixture of primary and secondary roads, although some are freeways (for example, State Route 99 in California, which links many of

1443-639: A two-lane highway running through the Cuyamaca Mountains to Julian . In Imperial County , SR 78 travels through the desert near the Salton Sea and passes through the city of Brawley and the Algodones Dunes before turning north on the way to its terminus in Blythe. SR 78 was one of the original state highways designated in 1934, although portions of the route existed as early as 1900. However, it

1554-536: A variety of concurrences which can occur. An example of this is the concurrency of Interstate 70 (I-70) and I-76 on the Pennsylvania Turnpike in western Pennsylvania . I-70 merges with the Pennsylvania Turnpike so the route number can ultimately continue east into Maryland; instead of having a second physical highway built to carry the route, it is combined with the Pennsylvania Turnpike and

1665-704: A winding mountain alignment through Witch Creek to Santa Ysabel where it meets SR 79 . SR 78 runs concurrently with SR 79 across the headwaters of the San Diego River and through the hamlet of Wynola , briefly entering Cleveland National Forest before reaching Julian and entering the town as Washington Street. The route, still concurrent with SR 79, turns east onto Main Street and travels through downtown Julian before SR 79 diverges south towards Cuyamaca and SR 78 heads northeast as Banner Road. The road intersects with County Route S2 (CR S2) at

1776-732: Is 100 km/h, with reductions when one passes through a densely populated area. The highways in New Zealand are all state highways, and the network consists of SH 1 running the length of both main islands, SH 2–5 and 10–58 in the North Island, and SH 6–8 and 60–99 in the South Island. National and provincial highways are numbered approximately north to south. State Highway 1 runs the length of both islands. Local highways ( Korean :  지방도 ; Hanja :  地方道 ; RR :  Jibangdo ; MR :  Chipangdo ) are

1887-496: Is a substantial section of highway passing through a "memorable landscape" with no "visual intrusions", where the potential designation has gained popular favor with the community; it gained this status in 1971. SR 78 from I-5 to I-15, and from the eastern junction with SR 86 to the eastern junction with SR 111 is part of the National Highway System (NHS), a network of highways that are considered essential to

1998-482: Is a system of urban and state routes constructed and maintained by each Mexican state. The main purpose of the state networks is to serve as a feeder system to the federal highway system. All states except the Federal District operate a road network. Each state marks these routes with a white shield containing the abbreviated name of the state plus the route number. New Zealand state highways are national highways –

2109-727: Is designated as part of the Juan Bautista de Anza National Historic Trail auto tour route, promoted by the National Park Service . An informal nickname for the road is "the Hops Highway," referring to the fact that the 60-mile (97 km) stretch of SR 78 from Oceanside to Julian passes by one-third of all the breweries in San Diego County . SR 78 is part of the California Freeway and Expressway System , although only

2220-424: Is divided into provinces and territories, each of which maintains its own system of provincial or territorial highways, which form the majority of the country's highway network. There is also the national transcontinental Trans-Canada Highway system, which is marked by distinct signs, but has no uniform numeric designation across the country. In the eastern provinces, for instance, an unnumbered (though sometimes with

2331-422: Is free to choose a different marker, and most states have. States may choose a design theme relevant to its state (such as an outline of the state itself) to distinguish state route markers from interstate, county, or municipal route markers. Wrong-way concurrency A concurrency in a road network is an instance of one physical roadway bearing two or more different route numbers . When two roadways share

SECTION 20

#1732856044287

2442-521: Is in downtown Athens, Georgia , between exits 4 and 8 of SR 10 Loop , where the highway is concurrent with US 29 , US 78 , US 129 , US 441 , SR 8 , SR 15 , and SR 422. In the United States, concurrencies are simply marked by placing signs for both routes on the same or adjacent posts. The federal Manual on Uniform Traffic Control Devices prescribes that when mounting these adjacent signs together that

2553-563: Is not a road class. The Strade Statali , abbreviated SS, is the Italian national network of state highways. The total length for the network is about 25.000 km (15.534 mi). The Italian state highway network are maintained by ANAS . From 1928 until 1946 state highways were maintained by Azienda Autonoma Statale della Strada (AASS). The next level of roads below Strada Statali is Strada Regionale ("regional roads"). The routes of some state highways derive from ancient Roman roads , such as

2664-554: Is officially designated " Daniel Interchange ", providing half of the possible interchange directions. It is a one-mile (1.6 km) segment consisting of eight lanes providing high-speed access between the two highways. Access from Highway 1 west to Highway 6 south and Highway 6 north to Highway 1 east is provided via Route 431 , while access between Highway 1 east to Highway 6 north and Highway 6 south to Highway 1 west are provided at Ben Shemen Interchange. The other movements are provided through

2775-595: Is signed) and Interstate 81 (which runs primarily northeast–southwest, but is also signed north–south). A vehicle might simultaneously be on I-77 northbound and I-81 southbound, while actually traveling due westbound. An unusual example of a three-directional concurrency occurs southeast of Rhinelander, Wisconsin , where US 8 westbound (the actual compass direction) converges with southbound Wisconsin Highway 17 and northbound Wisconsin Highway 47 , and vice-versa. Often when two routes with exit numbers overlap, one of

2886-547: Is used in its sense of a sovereign state or country. By this meaning a state highway is a road maintained and numbered by the national government rather than local authorities. Australia 's important urban and inter-regional routes not covered by the National Highway or National Route systems are marked under the State Route system. They can be recognised by blue shield markers. They were practically adopted in all states by

2997-406: Is vested in the federal states of Germany. Most federal states use the term Landesstraße (marked with 'L'), while for historical reasons Saxony and Bavaria use the term Staatsstraße (marked with 'S'). The appearance of the shields differs from state to state. The term Land-es-straße should not be confused with Landstraße , which describes every road outside built-up areas and

3108-570: The American Association of State Highway and Transportation Officials for permission to truncate US 27 at Fort Wayne, Indiana . In 2002, Michigan removed the US ;27 designation from I-69 and extended the US ;127 designation from Lansing to Grayling. MDOT's stated reason for the modification was to "reduce confusion along the US 27/US 127 corridor". After US 27's signage

3219-494: The Interstate Highway System in 1985, but this was determined unlikely to succeed by state senator William Craven. In September, the state government agreed to pay $ 7.5 million (about $ 18 million in 2023 dollars) for the widening between Oceanside and Escondido, but the county and the five cities the route ran through would have to pay for the rest of the cost. The San Diego County Board of Supervisors endorsed

3330-584: The Oklahoma – Arkansas state line. At the northern end of this border Oklahoma State Highway 20 runs concurrently with Arkansas Highway 43 and the two highways run north–south along the boundary. Concurrencies are also found in Canada. British Columbia Highway 5 continues east for 12 kilometres (7.5 mi) concurrently with Highway 1 and Highway 97 , through Kamloops . This stretch of road, which carries Highway 97 south and Highway 5 north on

3441-609: The Strada statale 7 Via Appia , which broadly follows the route of the Roman road of the same name . Other examples are the Strada statale 1 Via Aurelia ( Via Aurelia ) and the Strada statale 4 Via Salaria ( Via Salaria ). Since the reforms following the birth of the Kingdom of Italy in 1861, the State took charge of the construction and maintenance of a primary network of roads for connections between

California State Route 78 - Misplaced Pages Continue

3552-544: The bidding process . The next year, the project began to wind down, with bidding on the final part of the work between Nordahl Road and I-15. The widening was complete by the beginning of 1994. Several projects took place following the completion of the widening project. A realignment project took place in 1994 to remove one of the curves in the San Pasqual Valley, at a cost of $ 2.5 million (about $ 4.66 million in 2023 dollars). The San Marcos Boulevard interchange

3663-499: The concurrency of I-75 and I-85 in Atlanta, Georgia —where I-75 is dominant—the exit numbers range from 242 to 251, while I-85's highest independent mile marker in Georgia is 179. Some brief concurrencies in the past have been eliminated by reassigning the designations along the roadways. This can involve scaling back the terminus of one designation to the end of a concurrent section. At

3774-570: The Czech Republic, the European route numbers are only additional, and they are always concurrent with the state route numbering, usually highways or first-class roads. In the state numbering system, concurrences exist only in first-class and second-class roads; third class roads do not have them. The local term for such concurrences is peáž (from the French word péage ). In the road register, one of

3885-656: The Escondido city limits and enters the San Pasqual Valley as it provides access to the San Diego Zoo Safari Park and San Pasqual Battlefield State Park . After leaving the San Pasqual Valley, the road follows a serpentine alignment, heading south to enter the community of Ramona as Pine Street. In Ramona, SR 78 intersects SR 67 and makes a turn east onto Main Street, going through downtown Ramona. The highway leaves Ramona as Julian Road, which continues on

3996-603: The I-76 designation. The longest Interstate Highway concurrency is I-80 and I-90 for 278 miles (447 km) across Indiana and Ohio . There are at least two examples of eight-way concurrencies. The first example is in Indianapolis, between exits 46 and 47 of the 53-mile (85 km) I-465 beltway , where the highway is concurrent with I-69 , U.S. Highway 31 (US 31), US 36 , US 40 , US 52 , US 421 , and State Road 67 . The second example

4107-628: The Imperial Valley to the Palo Verde Valley. According to an Imperial County official, the road was predicted to be more busy than US 80 and to bring traffic to San Diego directly from Needles and US 66. The Glamis road opened in August 1958, and the road from Glamis to Palo Verde was under construction at that time; the part of the road that was already open was dedicated in October. In 1959,

4218-523: The Jefferson Street and Emerald Drive interchanges as a priority. In August 1968, the state allocated $ 750,000 (about $ 5.02 million in 2023 dollars) for building the Jefferson Street interchange. Further funding difficulties were encountered due to US 395 being given priority, but both interchanges had funding by August 1970. The construction of the Emerald Drive interchange was scheduled for

4329-570: The Jefferson Street interchange began in early 1972; the section from I-5 east to Melrose Drive (along the routing of the Vista Way Freeway) had been upgraded to full freeway standards as of 1973. Plans to construct a road from Brawley to Glamis date from 1953; the road would provide improved access to two newer state parks. The ceding of the Chocolate Mountains to the U.S. Navy had closed a north–south road traversing Imperial County, and

4440-616: The Navy to give to Imperial County to construct it in February 1956. The House Appropriations Committee bundled it with 616 other projects, however, which President Dwight Eisenhower vetoed in mid-July. The allocation was eventually approved by both Congress and Eisenhower a few weeks later. The San Diego Union and the Evening Tribune (later merged to form the Union-Tribune ) were recognized by

4551-586: The Oceanside City Council decided to cancel these plans in 2005, despite studies suggesting that this move would be detrimental to the traffic in the region. The city council reinstated those plans in September ;2012. There are also plans to improve the interchange with I-5, which currently involves a traffic signal connecting Vista Way and SR 78 with the ramps to I-5 southbound. Plans call for adding more lanes to I-5 and SR 78 as well as for

California State Route 78 - Misplaced Pages Continue

4662-676: The QEW/Highway ;403 concurrency still only use the highway's original designation of QEW, although the MTO has updated route markers on the QEW to reflect the concurrency. At the national level, the Trans-Canada Highway , which does not bear a uniform number in the eastern provinces, follows various provincial highways. In the Atlantic Provinces the main designated TCH route either follows

4773-451: The Riverside county line, the route was designated as Route 146 in 1959. By 1947, US 395 ran concurrently along the portion of SR 78 from Vista to Escondido before continuing along Santa Fe Avenue to Bonsall and Fallbrook and rejoining its alignment during the 1970s. At this time, all of SR 78 that existed had been paved. Before the present-day freeway was built, SR 78

4884-554: The Ronald Packard Parkway in 2000. The House Public Works and Transportation Subcommittee allocated $ 12 million (about $ 17.7 million in 2023 dollars) in a bill during June 1986. The Senate raised an issue over the 65-mile-per-hour (105 km/h) speed limit in October, which made the outcome dubious. The House and Senate eventually settled on a version of the bill in March 1987, only to have President Ronald Reagan veto

4995-603: The San Diego county supervisors for their role in winning congressional support for the funding. There was a brief delay in approving the money in February 1957 when there was a proposal to move the gunnery range. However, at the end of the month, the United States Navy obtained ownership from Imperial County of the old Niland–Blythe road running through the Chocolate Mountain Aerial Gunnery Range for

5106-883: The UK, the existence of these concurrencies is purely theoretical. In Sweden and Denmark, the most important highways use only the European route numbers that have cardinal directions. In Sweden the European route E6 and E20 run concurrently for 280 kilometres (170 mi). In Denmark the E47 and E55 run concurrently for 157 kilometres (98 mi). There are more shorter concurrencies. There are two stretches in Sweden and Denmark where three European routes run concurrently; these are E6, E20 and E22 in Sweden, and E20, E47, and E55 in Denmark. Along all these concurrencies, all route numbers are posted with signs. In

5217-615: The United Kingdom, routes do not run concurrently with others. Where this would normally occur, the roadway takes the number of only one of the routes (usually, but not always, the most important route), while the other routes are considered to have a gap and are signed in brackets (the equivalent of "to" signs in North America). An example is the meeting of the M60 and the M62 northwest of Manchester :

5328-524: The average commuter encountered a delay of 10 minutes on the portion from I-5 to I-15. After passing the Centre City Parkway ( I-15 Business ) interchange, the freeway abruptly ends at the intersection with Broadway. SR 78 then makes a turn south onto Broadway and continues through downtown Escondido by turning east onto Washington Avenue and south onto Ash Street, which becomes San Pasqual Valley Road. Turning east once again, SR 78 leaves

5439-524: The bill due to "pork barrel" spending. Congress passed the bill in April 1987, overriding Reagan's veto, in the same legislation that allowed for rural Interstates to have a speed limit of up to 65 miles per hour (105 km/h). The bill authorized $ 15 million (about $ 34.5 million in 2023 dollars) in federal funding, and the cities of Oceanside, Carlsbad, Vista, San Marcos, and Escondido agreed to pay $ 6 million (about $ 13.8 million in 2023 dollars);

5550-619: The cities of the Central Valley , Route 128 in Massachusetts, or parts of Route 101 in New Hampshire). Each state has its own system for numbering and its own marker. The default marker is a white circle containing a black sans serif number (often inscribed in a black square or slightly rounded square), according to the Manual on Uniform Traffic Control Devices (MUTCD). However each state

5661-455: The concurrency. Since highways in the United States and Canada are usually signed with assigned cardinal directions based on their primary orientation, it is possible for a stretch of roadway shared between two highways to be signed with conflicting, even opposite, cardinal directions in a wrong-way concurrency . For example, near Wytheville, Virginia , there is a concurrency between Interstate 77 (which runs primarily north–south, as it

SECTION 50

#1732856044287

5772-507: The construction of a new ramp from SR 78 westbound to I-5 southbound and from I-5 southbound to SR 78 eastbound. The nearby lagoon has served as an obstacle in constructing additional ramps. In 2002, the I-5 northbound to SR 78 eastbound ramp was widened to two lanes to ease congestion. At a 2015 meeting, the Oceanside community expressed concerns about a potential "flyover" ramp design for

5883-632: The country's economy, defense, and mobility by the Federal Highway Administration . In 2013, SR 78 had an annual average daily traffic (AADT) of 670 between the San Diego–Imperial county line and the western SR 86 junction, and 163,000 between Twin Oaks Valley Road and Nordahl Road, the latter of which was the highest AADT for the highway. The Old Banner Toll Road connected the towns of Julian and Banner in 1871, after

5994-430: The current alignment of SR 78. A Swedish company began construction on this bypass in April 2008; the first phase consisted of the portion of the bypass that is solely SR 111. The second phase of the bypass, from the western junction with SR 111 to the eastern junction with SR 78, lasted from February 2008 to June 2011. On the third phase of the project, from the junction with SR 86 west of Brawley to

6105-438: The early twentieth century. This road roughly followed the current routing of SR 78 from Escondido to the east of Brawley, although it traveled along a different routing from Westmorland into Brawley. No road connected Brawley with Glamis in 1919; it was necessary to travel north through Calipatria to reach Blythe. East of the Sand Hills, there was a road from Glamis passing by Smith Well into Palo Verde, which roughly follows

6216-430: The end of the 1980s, and in some states, some less important National Routes were downgraded to State Routes. Each state has or had its own numbering scheme, but do not duplicate National Route numbers in the same state, or nearby routes in another state. As with the National Routes and National Highways, State Routes are being phased out in most states and territories in favour of alphanumeric routes. However, despite

6327-434: The fact that Victoria has fully adopted alphanumeric routes in regional areas, state route numbers are still used extensively within the city of Melbourne as a part of its Metropolitan Route Numbering Scheme . Brazil is another country that is divided into states and has state highways. For example, the longest highway in the state of São Paulo , the Rodovia Raposo Tavares , is designated as SP-270 and SP-295 . Canada

6438-430: The first project adding two lanes between San Marcos Boulevard and I-15. Additional funding was secured with a local sales tax increase in 1987, providing $ 80 million (about $ 171 million in 2023 dollars), and an additional $ 7.8 million (about $ 16.7 million in 2023 dollars) from the California Transportation Commission. By March 1991, another part of the project from College Boulevard to Melrose Drive began

6549-412: The freeway connecting Rancho Santa Fe Road to the Vista portion opened in February 1963, at a cost of $ 3.9 million (about $ 29.7 million in 2023 dollars). The opening of the freeway was credited with helping to bring 315 jobs to San Marcos in 1963. The rest of the freeway between Nordahl Road and US 395 opened on December 21, 1964, providing a four-lane highway from Escondido to Oceanside;

6660-548: The freeway due to increasing congestion in the region. SR 78 begins in Oceanside as a continuation of Vista Way. As it encounters a traffic signal and crosses over I-5, the route becomes a suburban freeway traveling east through Oceanside. The freeway loosely parallels Buena Vista Creek before entering the city of Vista . Turning southeast, SR 78 continues into the city of San Marcos near California State University San Marcos and enters Escondido, where it has an interchange with I-15 . A 2011 Caltrans study estimated that

6771-413: The freeway from Vista to Escondido was one of the top priorities for highway construction in the county as early as 1960. The center portion of the Vista Way Freeway opened in April 1962, but the western part of the route was not entirely access controlled , as an expressway. The section of the SR 78 freeway from Rancho Santa Fe Road in San Marcos to Nordahl Road was completed in April 1962. The part of

SECTION 60

#1732856044287

6882-505: The government needed to restore a corridor for local residents to use, as the road was closed during the day for five days a week. However, in August, the Riverside Chamber of Commerce opposed the construction, even though it would replace the Niland–Blythe road. The chamber reversed its stance in December, as the road would mostly be constructed in Imperial County. To construct the road, the House Armed Services Committee voted to allocate $ 660,000 (about $ 5.47 million in 2023 dollars) for

6993-421: The highway makes a sharp turn east onto 32nd Avenue before turning north on Rannels Boulevard. It makes a right on 28th Avenue before turning north on South Neighbours Boulevard and passing through Ripley . SR 78 continues north for a few more miles to its terminus at I-10, approximately seven miles (11 km) west of the Arizona border. North of I-10, Neighbours Boulevard becomes Interstate 10 Business for

7104-468: The interchange at Nordahl Road was also improved, and extra lanes were to be added between Nordahl Road and I-15; construction commenced in early 2012, and the new bridge opened in November. The project cost $ 41 million. In the late 2000s, planning began for a bypass around the downtown portion of the city of Brawley. An expressway would carry the routing of SR 78 north and east of the city, with an interchange at SR 111, before intersecting with

7215-429: The main cities; in 1865 the Lanza law introduced the classification of roads between national, provincial and municipal (see Annex F, art.10) and the Royal Decree of 17 November 1865, n. 2633 listed the first 38 national roads. Italian state highways are identified by a number and a name. In road signs and maps the number is preceded by the acronym SS, an acronym for strada statale ("state road"). The nomenclature of

7326-475: The meantime, the City of Oceanside began discussions regarding a road east from Oceanside through the San Marcos valley. Efforts to realign the road from Ramona to Julian began in 1892, when a county surveyor examined the prospect of shifting the road away from the Graves hill. Before the designation of SR 78, a road known as the Brawley-Westmorland-Julian-Oceanside Highway (connecting Oceanside, Escondido, Ramona, Julian, Westmorland, and Brawley) existed during

7437-407: The metropolitan section of SR 78 is a freeway . The section of SR 78 from the western junction of SR 79 to the western junction with SR 86 is designated by the California State Legislature as eligible by law for the State Scenic Highway System ; however, only the section in Anza-Borrego Desert State Park has officially been designated by Caltrans as being part of the system, meaning that it

7548-579: The middle of the concurrency will still be signed on most maps and road atlases. Most concurrencies are simply a combination of at least two route numbers on the same physical roadway. This is often practically advantageous as well as economically advantageous; it may be better for two route numbers to be combined into one along rivers or through mountain valleys. Some countries allow for concurrencies to occur, however, others specifically do not allow it to happen. In those nations which do permit concurrencies, it can become very common. In these countries, there are

7659-416: The motorways coincide for the seven miles (11 km) between junctions 12 and 18 but the motorway between those points is only designated as the M60 (although in this case the same junction numbers would also apply to the M62). European route numbers as designated by UNECE may have concurrencies (for instance E15 and E30 around Greater London ), but since the E-route numbers are unsigned and unused in

7770-423: The new interchange. The project is scheduled for completion in the late 2020s. A 2011 Caltrans report proposed adding two high-occupancy vehicle lanes to the freeway portion of SR 78 between I-5 and I-15 to accommodate increased traffic. In early 2016, the mayor of San Marcos stated that there were plans to add another lane in each direction to SR 78 through parts of the city. Except where prefixed with

7881-427: The next important roads under the National highways . The number has two, three, or four digits. Highways with two-digit numbers routes are called State-funded local highways. State roads ( Turkish : Devlet yolu ) are primary roads, mostly under the responsibility of General Directorate of Highways (KGM) except in metropolitan city centers where the responsibility falls into the local government. The roads have

7992-469: The numbers will be arranged vertically or horizontally in order of precedence. The order to be used is Interstate Highways , U.S. Highways , state highways , and finally county roads , and within each class by increasing numerical value. Several states do not officially have any concurrencies, instead officially ending routes on each side of one. There are several circumstances where unusual concurrencies exist along state borders. One example occurs along

8103-583: The paving over the designation. Chambers of commerce in the Imperial Valley generally agreed with Witter, proposing that the El Centro–Calexico road be made a part of the state highway system, and the Kane Springs–Julian road be given second priority for inclusion. In June 1930, an agreement was made between the county and the state to share in the construction and maintenance on the road to Kane Springs from Julian; prison crews were to make up some of

8214-449: The process of construction. A month later, an environmental study was conducted that focused on the possibilities of rerouting the proposed freeway. In April 1972, the majority of voters supported a referendum that halted plans to build the SR ;78 freeway through the city of Escondido. The city then turned its focus to widening Lincoln Avenue and Ash Street instead, and also requested that

8325-407: The project that month, in order to have the best chance at getting federal funding. A spike in accidents during that year led to Representative Ron Packard proposing a way to split the costs between the governments; there were 387 accidents from January to August 1985, a sharp increase from 234 in 1984. In recognition for his work obtaining funding, SR 78 between Oceanside and Escondido was named

8436-684: The project with $ 5.1 million (about $ 8.99 million in 2023 dollars) in April 1997. However, in June 1998, the California Transportation Commission approved the funding after the San Diego Association of Governments officially requested it. Construction began in August 1999, and was scheduled to end in 2001. A new interchange with Vista Village Drive was opened in 1998, and the College Boulevard interchange in Oceanside

8547-483: The prospect of the road to Julian being improved, and included in the state highway system. In 1928, state assembly member Myron Witter wrote a letter to the San Diego County Board of Supervisors to suggest that the highway be incorporated as a second entrance to the county from the east, and that it would not detract from the progress of the other highway from El Centro ; however, the county wanted to prioritize

8658-491: The province's only concurrency between two 400-series highways . The concurrency was not in the original plan which intended for both the QEW and Highway 403 to run parallel to each other, as the Hamilton–Brantford and Mississauga sections of Highway 403 were initially planned to be linked up along a corridor (later planned to be tolled ) now occupied by Highway 407 . To avoid forcing drivers to pay tolls to use

8769-574: The rest of the current routing of SR 78 between Brawley and Palo Verde was added to the state highway system as SR 195 and Legislative Route 146. The state legislature added the portion of SR 78 from SR 115 to the Riverside County line in the 1964 state highway renumbering, also naming the road the Ben Hulse Highway. In March 1964, the Ben Hulse Highway leading to Palo Verde was dedicated, and state senator Hulse's efforts to have

8880-585: The rest of the road between Ballena (near Ramona) and Julian as a concrete road. The work to pave the road from Santa Ysabel to Julian was nearing completion in September 1920. Grading was completed by August 1921, and paving work continued, as well as grading on the Santa Ysabel and Julian grades. In 1922, the Automobile Club of Southern California scouting expedition reported that the road from Ramona to Julian

8991-533: The road built were recognized. Following this, in 1965, the newly constructed section was signed as CR S78. The section from Palo Verde to Blythe shows up as part of SR 78 on maps as early as 1965, and the section from southwest of Midway Well to Palo Verde is shown as part of SR 78 as early as 1966. In 1969, plans to extend the freeway portion of SR 78 east from the Broadway interchange through Escondido were delayed by Caltrans director Jacob Dekema due to

9102-472: The roads is considered the main ("source") road and the others as the péaging (guest) roads. The official road map enables a maximum of five concurrent routes of the intrastate numbering system. Cycling routes and hiking routes are often concurrent. In Israel, two freeways , the Trans-Israel Highway (Highway 6), and Highway 1 run concurrently just east of Ben Shemen Interchange . The concurrency

9213-434: The routes has its exit numbers dominate over the other and can sometimes result in having two exits of the same number, albeit far from each other along the same highway. An example of this is from the concurrency of I-94 and US 127 near Jackson , Michigan. The concurrent section of freeway has an exit with M-106 , which is numbered exit 139 using I-94's mileage-based numbers. US 127 also has another exit 139 with

9324-488: The routing of SR 78 be moved to Broadway, Washington Avenue, and Ash Street from Grand Avenue to improve traffic flow. Five years later, signs were installed on eastbound SR 78, directing traffic headed for the San Diego Zoo Safari Park to use I-15 south to Via Rancho Parkway instead of continuing eastbound, to bypass the Escondido traffic. City officials expressed a desire to have SR 78 included in

9435-526: The routing of SR 78. At this time, when the road from the west into Julian had been approved, many in the community began discussing a road east into the Imperial Valley. There were many proposed alignments besides the one east of Julian through Banner, including through the San Felipe Valley, and the Montezuma Valley. The plan was to construct the Santa Ysabel grade portion as a gravel road, and

9546-429: The same right-of-way , it is sometimes called a common section or commons . Other terminology for a concurrency includes overlap , coincidence , duplex (two concurrent routes), triplex (three concurrent routes), multiplex (any number of concurrent routes), dual routing or triple routing . Concurrent numbering can become very common in jurisdictions that allow it. Where multiple routes must pass between

9657-734: The same roadway (and vice versa), is the only wrong-way concurrency in British Columbia. Concurrencies are also very common in Quebec . Most notably, the Samuel-de-Champlain Bridge features a concurrency with three Autoroutes: A-10 , A-15 , and A-20 . Another example is A-55 , which runs concurrently with A-10, A-20, and A-40 , all of which are major highways. In Ontario , the Queen Elizabeth Way and Highway 403 run concurrently between Burlington and Oakville , forming

9768-652: The same time, there could be an extension of another highway designation that is used to replace the newly shortened designation with another one. Between states, US 27 in Michigan previously ran concurrently with I-69 from the Michigan–Indiana state line to the Lansing, Michigan , area. From there it turned northwards to its terminus at Grayling . In 1999, the Michigan and Indiana departments of transportation petitioned

9879-525: The segment cost $ 1,865,000 (about $ 14.2 million in 2023 dollars). SR 78 was officially designated in the 1964 state highway renumbering . The San Diego Chamber of Commerce and the San Diego Highway Development Association urged for the conversion of SR 78 west of Vista, a length of 5.6 miles (9.0 km), from an expressway to a freeway in April 1967. The College Boulevard diamond interchange on this western segment

9990-608: The small community of Glamis , the road turns northeast and eventually north towards Blythe, passing near the Chocolate Mountain Naval Reserve . As it nears the Colorado River and the Arizona border, SR 78 briefly passes through Cibola National Wildlife Refuge before entering the community of Palo Verde , where the river turns away from the highway and SR 78 enters Riverside County . As it nears Blythe,

10101-460: The south towards El Centro . SR 78 continues north onto the Brawley Bypass, a freeway that passes to the north of downtown Brawley. SR 111 runs concurrently with SR 78 for a short duration before the latter exits from the freeway and continues east. Then, SR 78 intersects with SR 115 east of Alamorio , running concurrently with it for a brief distance. Shortly after passing through

10212-586: The southern end of the US 127 business loop in Mount Pleasant , Michigan. (US 127's mile markers in Michigan reflect the cumulative distance north of the Ohio state line; the numbers resume north of the I-94 overlap and reflect the distance accumulated on that concurrency.) However, there are also instances where the dominant exit number range is far more than the secondary route's highest exit number, for example

10323-509: The specified amount. The county then used this money to fund the construction of the Glamis Road, which Ben Hulse predicted would become a state highway. This portion of the road was specifically designed to address the challenges of building it through sand dunes. The engineers routed the highway according to the terrain and made cuts in the sand up to 80 feet (24 m) deep. The routing roughly followed an old Native American trail that went from

10434-400: The start and end postmiles in each county are given in the county column. State highway Roads maintained by a state or province include both nationally numbered highways and un-numbered state highways. Depending on the state, "state highway" may be used for one meaning and "state road" or "state route" for the other. In some countries such as New Zealand , the word "state"

10545-631: The state highways managed by ANAS generally follows the SS n scheme, where n is a number ranging from 1 ( Aurelia ) up to 700 (of the Royal Palace of Caserta ) depending on the date of establishment of the state highway. Newly built ANAS roads, not yet classified, are identified by the acronym NSA, an acronym for nuova strada ANAS ("new ANAS road"). State highways can be technically defined as main extra-urban roads (type B road) or as secondary extra-urban roads (type C road). State highways that cross towns with

10656-433: The state park and entering Imperial County . In Imperial County, SR 78 intersects with SR 86 , running concurrently with it southwest of the Salton Sea and northwest of San Felipe Creek. SR 78 passes through the desert community of Elmore Desert Ranch before entering the city of Westmorland . The route, still concurrent with SR 86, enters into the city of Brawley as Main Street, where SR 86 splits to

10767-462: The system is completely unsigned, aside from the Trans-Canada routes. This makes Canada unique in that national highway designations are generally secondary to subnational routes. In Germany , state roads ( Landesstraßen or Staatsstraßen ) are a road class which is ranking below the federal road network ( Bundesstraßen ). The responsibility for road planning, construction and maintenance

10878-441: The total cost was $ 30 million (about $ 69 million in 2023 dollars). Caltrans predicted that without the widening project, traffic speeds on SR 78 would be as low as 15 miles per hour (24 km/h) by the year 2000 because of congestion. A public relations campaign had begun to garner public support for the project, including bumper stickers saying "I hate 78". The widening project began construction on April 14, 1989, with

10989-506: The western end of the completed bypass, construction began in late 2010. This project was identified in August 2010 as a project that could be affected by California state budget cuts. The Brawley Bypass, as it was known, opened on October 30, 2012. The western portion of SR 78 in North County is currently slated for several improvements. There were plans to construct an additional interchange at Rancho Del Oro Road in Oceanside; however,

11100-518: The word "state" in this sense means "government" or "public" (as in state housing and state schools ), not a division of a country. New Zealand's state highway system is a nationwide network of roads covering the North Island and the South Island . As of 2006, just under 100 roads have a "State Highway" designation. The NZ Transport Agency administers them. The speed limit for most state highways

11211-490: The workforce. Vista Way opened on November 26, 1930. By 1932, the road from Escondido to Ramona was a gravel road, and the portion from Julian to U.S. Route 99 (US 99), which is currently designated as SR 86, was still a dirt road. That year, the cost was predicted to be $ 176,000 (about $ 3.2 million in 2023 dollars). SR 78 was originally formed along with the originally signed state highways in California (Sign Routes) in 1934; however, it only extended to what

11322-460: The year 1971. While the El Camino Real interchange was already a diamond interchange, the state planned to add traffic signals to the ramps to accommodate more congestion from the nearby mall. The Emerald Drive interchange was completed in September, and the rest of the project was to be completed by the end of the year, leaving Jefferson Drive as the only remaining traffic signal. Construction on

11433-703: Was "in excellent condition" though the pavement was poor from Ballena to Santa Ysabel, and under construction just east of Santa Ysabel. A road from Julian to Kane Springs was completed in 1925. Efforts to include this road extending to Brawley into the state highway system date back from 1927, in order to receive state funding for the road. Plans for a cross-country road through Borrego Springs were being discussed by county government officials in 1927, as there were no east–west state highways in between Mountain Springs and Riverside. Those living in Calipatria and Westmorland supported

11544-448: Was listed as a priority by local officials. The road was known for its curves, even though it went over relatively flat terrain; this reduced its efficiency. The 3.5-mile (5.6 km) portion of the SR 78 freeway in Oceanside opened to traffic on February 11, 1954. This highway was extended to Vista in May 1955, at a cost of $ 1,159,000 (about $ 10.3 million in 2023 dollars). The part of

11655-485: Was not designated east of Brawley until 1959. The freeway section in the North County of San Diego that connects Oceanside and Escondido was built in the middle of the twentieth century in several stages, including a transitory stage known as the Vista Way Freeway, and has been altered several times. An expressway bypass of the city of Brawley was completed in 2012. There are many projects slated to add capacity to

11766-540: Was removed, the highway north of the Lansing area was renumbered US 127, and the US 27 designation was removed from I-69. Some consolidation schemes involve the use of incorporating two single-digit numbers onto one marker, as along the US 1/9 concurrency in northern New Jersey . In the mid-20th century, California had numerous concurrencies, but the California Legislature removed most of them in

11877-401: Was renovated beginning in late 1996, but encountered difficulties in the land acquisition process. Work resumed in 1999, and was expected to be finished by 2000, at a cost of $ 10 million; the benefits of decreased congestion came into effect once the new westbound offramp was opened. The Twin Oaks Valley Road interchange was another subject of contention, as the state Assembly refused to fund

11988-508: Was revised along westbound SR 78, at a cost of $ 5.5 million (about $ 9.59 million in 2023 dollars). In addition to this, a new interchange was constructed at Las Posas Road in San Marcos, which opened in 2006. According to the U-T San Diego (the renamed San Diego Union-Tribune), SR 78 at Barham Drive was the worst "traffic bottleneck" in the county between 2010 and 2012. Thus,

12099-433: Was routed on the Vista Way Freeway (which was an expressway) from Oceanside east to downtown Vista. After this, it followed Santa Fe Avenue and Mission Road east (now signed as CR S14 ), continuing onto Grand Avenue in Escondido. Following the intersection with US 395, SR 78 turned south on Ash Street and rejoined the current alignment of the highway. In 1949, the rerouting of SR 78 from US 395 to US 99

12210-414: Was scheduled to open to traffic on October 24, 1967, and connected the recently relocated MiraCosta College to the freeway. The interchange, previously an at-grade intersection , improved traffic flow to the college by removing the left turn across the highway needed to access it. The construction of the interchange cost $ 800,941 (about $ 5.59 million in 2023 dollars). May 1968 saw the state designating

12321-466: Was then US 99 near Kane Springs . In the North County, SR 78 was legislatively designated as Route 196 from then- US 101 (present-day I-5) to Vista, and as Route 77 from Vista to US 395 in Escondido. SR 78 was legally known as Route 197 from Escondido to Ramona, and Route 198 from Ramona to US 99, which is now SR 86. From the eastern junction of SR 86 to

#286713