104-714: The Akosombo Dam , also known as the Volta Dam , is a hydroelectric dam on the Volta River in southeastern Ghana in the Akosombo gorge and part of the Volta River Authority . The construction of the dam flooded part of the Volta River Basin and led to the subsequent creation of Lake Volta . Lake Volta is the largest man-made lake in the world by surface area. It covers 8,502 square kilometres (3,283 sq mi), which
208-737: A greenhouse gas . According to the World Commission on Dams report, where the reservoir is large compared to the generating capacity (less than 100 watts per square metre of surface area) and no clearing of the forests in the area was undertaken prior to impoundment of the reservoir, greenhouse gas emissions from the reservoir may be higher than those of a conventional oil-fired thermal generation plant. In boreal reservoirs of Canada and Northern Europe, however, greenhouse gas emissions are typically only 2% to 8% of any kind of conventional fossil-fuel thermal generation. A new class of underwater logging operation that targets drowned forests can mitigate
312-463: A low-head hydro power plant with hydrostatic head of few meters to few tens of meters can be classified either as an SHP or an LHP. The other distinction between SHP and LHP is the degree of the water flow regulation: a typical SHP primarily uses the natural water discharge with very little regulation in comparison to an LHP. Therefore, the term SHP is frequently used as a synonym for the run-of-the-river power plant . The largest power producers in
416-492: A sodium hydroxide solution at a temperature of 150 to 200 °C (300 to 390 °F). At these temperatures, the aluminium is dissolved as sodium aluminate (the Bayer process ). The aluminium compounds in the bauxite may be present as gibbsite (Al(OH) 3 ), boehmite (AlOOH) or diaspore (AlOOH); the different forms of the aluminium component will dictate the extraction conditions. The undissolved waste, bauxite tailings , after
520-421: A flood and fail. Changes in the amount of river flow will correlate with the amount of energy produced by a dam. Lower river flows will reduce the amount of live storage in a reservoir therefore reducing the amount of water that can be used for hydroelectricity. The result of diminished river flow can be power shortages in areas that depend heavily on hydroelectric power. The risk of flow shortage may increase as
624-402: A formidable challenge to water navigation and transportation. The presence of aquatic weed along the lake and within the tributaries has resulted in even greater detriment to local human health. The weeds provide the necessary habitat for black-fly, mosquitoes and snails, which are the vectors of water-borne illnesses such as bilharzia , river blindness and malaria . Since the installation of
728-538: A key element for creating secure and clean electricity supply systems. A hydroelectric power station that has a dam and reservoir is a flexible source, since the amount of electricity produced can be increased or decreased in seconds or minutes in response to varying electricity demand. Once a hydroelectric complex is constructed, it produces no direct waste, and almost always emits considerably less greenhouse gas than fossil fuel -powered energy plants. However, when constructed in lowland rainforest areas, where part of
832-809: A large natural height difference between two waterways, such as a waterfall or mountain lake. A tunnel is constructed to take water from the high reservoir to the generating hall built in a cavern near the lowest point of the water tunnel and a horizontal tailrace taking water away to the lower outlet waterway. A simple formula for approximating electric power production at a hydroelectric station is: P = − η ( m ˙ g Δ h ) = − η ( ( ρ V ˙ ) g Δ h ) {\displaystyle P=-\eta \ ({\dot {m}}g\ \Delta h)=-\eta \ ((\rho {\dot {V}})\ g\ \Delta h)} where Efficiency
936-451: A larger amount of methane than those in temperate areas. Like other non-fossil fuel sources, hydropower also has no emissions of sulfur dioxide, nitrogen oxides, or other particulates. Reservoirs created by hydroelectric schemes often provide facilities for water sports , and become tourist attractions themselves. In some countries, aquaculture in reservoirs is common. Multi-use dams installed for irrigation support agriculture with
1040-450: A moist slurry forms in the can, then there is a likelihood for the cargo to liquefy; although conversely, even if the sample remains dry it does not conclusively prove that it will remain that way, or that it is safe for loading. Bauxite is the main source of the rare metal gallium . During the processing of bauxite to alumina in the Bayer process , gallium accumulates in the sodium hydroxide liquor. From this it can be extracted by
1144-461: A petition against the mining of bauxite that was signed by 135 accomplished and well known "Intellectuals". This petition helped unite the scattered anti-bauxite movement into a unified opposition against the state. These acts of governmental defiance were met with repressive state actions. Many domestic online reporters were arrested, and legislative action was taken to repress scientific research. Most of India's bauxite ore reserves, which are among
SECTION 10
#17328553627751248-586: A positive risk adjusted return, unless appropriate risk management measures are put in place. While many hydroelectric projects supply public electricity networks, some are created to serve specific industrial enterprises. Dedicated hydroelectric projects are often built to provide the substantial amounts of electricity needed for aluminium electrolytic plants, for example. The Grand Coulee Dam switched to support Alcoa aluminium in Bellingham, Washington , United States for American World War II airplanes before it
1352-545: A relatively constant water supply. Large hydro dams can control floods, which would otherwise affect people living downstream of the project. Managing dams which are also used for other purposes, such as irrigation , is complicated. In 2021 the IEA called for "robust sustainability standards for all hydropower development with streamlined rules and regulations". Large reservoirs associated with traditional hydroelectric power stations result in submersion of extensive areas upstream of
1456-526: A result of climate change . One study from the Colorado River in the United States suggest that modest climate changes, such as an increase in temperature in 2 degree Celsius resulting in a 10% decline in precipitation, might reduce river run-off by up to 40%. Brazil in particular is vulnerable due to its heavy reliance on hydroelectricity, as increasing temperatures, lower water flow and alterations in
1560-521: A result of controlled spillage of the dam was in 2010. On 15 September 2023, the Volta River Authority (VRA) initiated a controlled spillage of water from the Akosombo and Kpong dams situated in the Eastern Region. This controlled spillage led to flooding in communities located along the lower Volta Basin leading to power interruptions. Many victims lost their belongings and livelihood due to
1664-448: A small TV/radio). Even smaller turbines of 200–300 W may power a few homes in a developing country with a drop of only 1 m (3 ft). A Pico-hydro setup is typically run-of-the-river , meaning that dams are not used, but rather pipes divert some of the flow, drop this down a gradient, and through the turbine before returning it to the stream. An underground power station is generally used at large facilities and makes use of
1768-434: A smaller dam was built at Kpong , downstream from Akosombo, and further upgrades to Akosombo have become necessary for maintaining hydropower output. Increasing demands for power exceed what can be provided by the current infrastructure. Power demands, along with unforeseen environmental trends, have resulted in rolling blackouts and major power outages. An overall trend of lower lake levels has been observed, sometimes below
1872-455: A source of low-cost renewable energy. Alternatively, small hydro projects may be built in isolated areas that would be uneconomic to serve from a grid, or in areas where there is no national electrical distribution network. Since small hydro projects usually have minimal reservoirs and civil construction work, they are seen as having a relatively low environmental impact compared to large hydro. This decreased environmental impact depends strongly on
1976-414: A start-up time of the order of a few minutes. Although battery power is quicker its capacity is tiny compared to hydro. It takes less than 10 minutes to bring most hydro units from cold start-up to full load; this is quicker than nuclear and almost all fossil fuel power. Power generation can also be decreased quickly when there is a surplus power generation. Hence the limited capacity of hydropower units
2080-406: A steady decline in agricultural productivity along the lake and the associated tributaries. The land surrounding Lake Volta is not nearly as fertile as the formerly cultivated land residing underneath the lake, and heavy agricultural activity has since exhausted the already inadequate soils. Downstream agricultural systems are losing soil fertility without the periodic floods that brought nutrients to
2184-458: A temperature in excess of 1,000 °C (1,830 °F). This aluminium oxide is dissolved at a temperature of about 960 °C (1,760 °F) in molten cryolite . Next, this molten substance can yield metallic aluminium by passing an electric current through it in the process of electrolysis, which is called the Hall–Héroult process , named after its American and French discoverers. Prior to
SECTION 20
#17328553627752288-581: A total of 1,500 terawatt-hours (TWh) of electrical energy in one full cycle" which was "about 170 times more energy than the global fleet of pumped storage hydropower plants". Battery storage capacity is not expected to overtake pumped storage during the 2020s. When used as peak power to meet demand, hydroelectricity has a higher value than baseload power and a much higher value compared to intermittent energy sources such as wind and solar. Hydroelectric stations have long economic lives, with some plants still in service after 50–100 years. Operating labor cost
2392-499: A variety of methods. The most recent is the use of ion-exchange resin . Achievable extraction efficiencies critically depend on the original concentration in the feed bauxite. At a typical feed concentration of 50 ppm, about 15 percent of the contained gallium is extractable. The remainder reports to the red mud and aluminium hydroxide streams. Bauxite is also a potential source for vanadium . The social and environmental impacts of bauxite extraction are well documented. Most of
2496-480: A year's worth of rain fell within 24 hours (see 1975 Banqiao Dam failure ). The resulting flood resulted in the deaths of 26,000 people, and another 145,000 from epidemics. Millions were left homeless. The creation of a dam in a geologically inappropriate location may cause disasters such as 1963 disaster at Vajont Dam in Italy, where almost 2,000 people died. Bauxite Bauxite ( / ˈ b ɔː k s aɪ t / )
2600-650: A youth march. In 2020, A Rocha Ghana also sued the government over the drilling in the reserve after they failed to provide a statement explaining their actions. In early 2009, the Vietnamese Government proposed a plan to mine remote regions of the central highlands. This proposal was highly controversial and sparked a nationwide debate and the most significant domestic conflict since the Vietnam War . Government scientists, journalists, religious leaders, retired high level state officials, and General Võ Nguyên Giáp ,
2704-448: Is hydroelectric power on a scale serving a small community or industrial plant. The definition of a small hydro project varies but a generating capacity of up to 10 megawatts (MW) is generally accepted as the upper limit. This may be stretched to 25 MW and 30 MW in Canada and the United States. Small hydro stations may be connected to conventional electrical distribution networks as
2808-477: Is 3.6% of Ghana's land area. With a volume of 148 cubic kilometers, Lake Volta is the world's third largest man-made lake by volume; the largest being Lake Kariba which contains 185 cubic kilometers of water. The primary purpose of the Akosombo Dam was to provide electricity for the aluminium industry. The Akosombo Dam was called "the largest single investment in the economic development plans of Ghana." The dam
2912-478: Is 400 km (250 mi) long. Maximum lake level is 84.73 m (278.0 ft) and minimum is 73.15 m (240.0 ft). On the east side of the dam are two adjacent spillways that can discharge about 34,000 m/s (1,200,000 cu ft/s) of water. Each spillway contains six 11.5-metre (38 ft)-wide and 13.7-metre (45 ft)-tall steel floodgates . The dam's power plant contains six 170-megawatt (230,000 hp) Francis turbines . Each turbine
3016-414: Is 660 m (2,170 ft) long and 114 m (374 ft) high, comprising a high rock-fill embankment dam . It has a base width of 366 m (1,201 ft) and a structural volume of 7,900,000 m (10,300,000 cu yd). The reservoir created by the dam, Lake Volta , has a capacity of 148 km (120,000,000 acre⋅ft) and a surface area of 8,502 km (3,283 sq mi). The lake
3120-572: Is a sedimentary rock with a relatively high aluminium content. It is the world's main source of aluminium and gallium . Bauxite consists mostly of the aluminium minerals gibbsite ( Al(OH) 3 ), boehmite (γ-AlO(OH)) and diaspore (α-AlO(OH)), mixed with the two iron oxides goethite (FeO(OH)) and haematite ( Fe 2 O 3 ), the aluminium clay mineral kaolinite ( Al 2 Si 2 O 5 (OH) 4 ) and small amounts of anatase ( TiO 2 ) and ilmenite ( FeTiO 3 or FeO·TiO 2 ). Bauxite appears dull in luster and
3224-627: Is also usually low, as plants are automated and have few personnel on site during normal operation. Where a dam serves multiple purposes, a hydroelectric station may be added with relatively low construction cost, providing a useful revenue stream to offset the costs of dam operation. It has been calculated that the sale of electricity from the Three Gorges Dam will cover the construction costs after 5 to 8 years of full generation. However, some data shows that in most countries large hydropower dams will be too costly and take too long to build to deliver
Akosombo Dam - Misplaced Pages Continue
3328-466: Is highest in the winter when solar energy is at a minimum. Pico hydro is hydroelectric power generation of under 5 kW . It is useful in small, remote communities that require only a small amount of electricity. For example, the 1.1 kW Intermediate Technology Development Group Pico Hydro Project in Kenya supplies 57 homes with very small electric loads (e.g., a couple of lights and a phone charger, or
3432-445: Is initially produced during construction of the project, and some methane is given off annually by reservoirs, hydro has one of the lowest lifecycle greenhouse gas emissions for electricity generation. The low greenhouse gas impact of hydroelectricity is found especially in temperate climates . Greater greenhouse gas emission impacts are found in the tropical regions because the reservoirs of power stations in tropical regions produce
3536-462: Is not an energy source, and appears as a negative number in listings. Run-of-the-river hydroelectric stations are those with small or no reservoir capacity, so that only the water coming from upstream is available for generation at that moment, and any oversupply must pass unused. A constant supply of water from a lake or existing reservoir upstream is a significant advantage in choosing sites for run-of-the-river. A tidal power station makes use of
3640-452: Is not generally used to produce base power except for vacating the flood pool or meeting downstream needs. Instead, it can serve as backup for non-hydro generators. The major advantage of conventional hydroelectric dams with reservoirs is their ability to store water at low cost for dispatch later as high value clean electricity. In 2021, the IEA estimated that the "reservoirs of all existing conventional hydropower plants combined can store
3744-410: Is often higher (that is, closer to 1) with larger and more modern turbines. Annual electric energy production depends on the available water supply. In some installations, the water flow rate can vary by a factor of 10:1 over the course of a year. Hydropower is a flexible source of electricity since stations can be ramped up and down very quickly to adapt to changing energy demands. Hydro turbines have
3848-449: Is one of the only two upland evergreen forests in Ghana, and makes up a significant portion of the remaining 20% of forested habitat left in Ghana. The Atewa range falls under the jurisdiction of Akyem Abuakwa Traditional Area and is overseen by the king known as Okyenhene. In 2013, an NGO called A Rocha Ghana held a summit with the forestry and water resource commission, the minister of lands,
3952-506: Is reddish-brown, white, or tan. In 1821, the French geologist Pierre Berthier discovered bauxite near the village of Les Baux in Provence , southern France . Numerous classification schemes have been proposed for bauxite but, as of 1982 , there was no consensus. Vadász (1951) distinguished lateritic bauxites (silicate bauxites) from karst bauxite ores (carbonate bauxites): In
4056-489: Is significant for providing the majority of both Togo and Benin 's electricity, although the construction of the Adjarala Dam (on Togo's Mono River ) hopes to reduce these countries' reliance on imported electricity. The dam's original electrical output was 912 megawatts (1,223,000 hp), which was upgraded to 1,020 megawatts (1,370,000 hp) in a retrofit project that was completed in 2006. The flooding that created
4160-403: Is supplied with water via a 112–116-metre (367–381 ft) long and 7.2-metre (24 ft) diameter penstock with a maximum of 68.8 m (226 ft) of hydraulic head afforded. The final proposal outlined the building of an aluminum smelter at Tema , a dam constructed at Akosombo to power the smelter, and a network of power lines installed through southern Ghana. The aluminum smelter
4264-528: The Boké Region of Guinea have caused in 35 conflicts which include movements of revolts and road blockades. These conflicts have resulted in the loss of human life, the destruction of heavy machinery, and damage to government buildings. The Atewa range in Ghana, classified as an ecologically important forest reserve with an area of 17,400 hectares (43,000 acres), has been is a recent site of conflict and controversy surrounding baxuite mining. The forest reserve
Akosombo Dam - Misplaced Pages Continue
4368-578: The Boké Region of Guinea, there has been a significant increase in bauxite mining pressure on the local population. This has resulted in potable water issues, air pollution, food contamination, and land expropriation disputes due to improper compensation. Bauxite mining has led to protests, civil unrest, and violent conflicts in Guinea, Ghana, Vietnam, and India. Guinea has a long history of mining related conflicts between communities and mining companies. Between 2015 and 2018, new bauxite mining operations in
4472-657: The Bonneville Dam in 1937 and being recognized by the Flood Control Act of 1936 as the premier federal flood control agency. Hydroelectric power stations continued to become larger throughout the 20th century. Hydropower was referred to as "white coal". Hoover Dam 's initial 1,345 MW power station was the world's largest hydroelectric power station in 1936; it was eclipsed by the 6,809 MW Grand Coulee Dam in 1942. The Itaipu Dam opened in 1984 in South America as
4576-510: The Ghana Integrated Bauxite and Aluminium Development Authority Act that would create the legal framework required to develop and establish an integrated bauxite industry. In may of that year, the government began drilling deep holes in the reserve. These actions sparked several protests, including a 95-kilometre (59 mi) march from the reserve to the presidential palace, an informational billboard campaign led by A Rocha Ghana, and
4680-533: The Industrial Revolution would drive development as well. In 1878, the world's first hydroelectric power scheme was developed at Cragside in Northumberland , England, by William Armstrong . It was used to power a single arc lamp in his art gallery. The old Schoelkopf Power Station No. 1 , US, near Niagara Falls , began to produce electricity in 1881. The first Edison hydroelectric power station,
4784-778: The International Exhibition of Hydropower and Tourism , with over one million visitors 1925. By 1920, when 40% of the power produced in the United States was hydroelectric, the Federal Power Act was enacted into law. The Act created the Federal Power Commission to regulate hydroelectric power stations on federal land and water. As the power stations became larger, their associated dams developed additional purposes, including flood control , irrigation and navigation . Federal funding became necessary for large-scale development, and federally owned corporations, such as
4888-539: The International Federation of Surveyors has indicated that the dam has had a significant impact on the shoreline erosion of the barrier separating the Keta Lagoon from the sea. Dr. Isaac Boateng has calculated the reduction of fluvial sediment as being from 71 million cubic metres per year to as little as 7 million cubic metres per year. Until 2023, the last time Akosombo dam community experienced flooding as
4992-527: The Kariba Dam , won the contract. In 1961, the Volta River Authority (VRA) was established by Ghana's Parliament through the passage of the Volta River Development Act. The VRA's fundamental operations were structured by six Board members and Nkrumah as chairman. The VRA's primary task is to manage the development of the Volta River Basin, which included the construction and supervision of the dam,
5096-605: The Tennessee Valley Authority (1933) and the Bonneville Power Administration (1937) were created. Additionally, the Bureau of Reclamation which had begun a series of western US irrigation projects in the early 20th century, was now constructing large hydroelectric projects such as the 1928 Hoover Dam . The United States Army Corps of Engineers was also involved in hydroelectric development, completing
5200-569: The Vulcan Street Plant , began operating September 30, 1882, in Appleton, Wisconsin , with an output of about 12.5 kilowatts. By 1886 there were 45 hydroelectric power stations in the United States and Canada; and by 1889 there were 200 in the United States alone. At the beginning of the 20th century, many small hydroelectric power stations were being constructed by commercial companies in mountains near metropolitan areas. Grenoble , France held
5304-702: The World Bank , the United States, and the United Kingdom. Impreglio carried out the dredging of the river bed and dewatering of the channel, and completed the dam a month earlier than scheduled despite flooding of the Volta River in 1963 which delayed work over three months. Between 1961 and 1966, 28 workers of Impregilo died during the construction of the dam. Memorials in Akosombo township and St. Barbara Catholic Church have been put up in their honor. The construction of
SECTION 50
#17328553627755408-456: The free surface effect can cause the cargo to shift rapidly inside the hold and make the ship unstable, potentially sinking the ship. One vessel suspected to have been sunk in this way was the MS Bulk Jupiter in 2015. One method which can demonstrate this effect is the "can test", in which a sample of the material is placed in a cylindrical can and struck against a surface many times. If
5512-506: The potential energy of dammed water driving a water turbine and generator . The power extracted from the water depends on the volume and on the difference in height between the source and the water's outflow. This height difference is called the head . A large pipe (the " penstock ") delivers water from the reservoir to the turbine. This method produces electricity to supply high peak demands by moving water between reservoirs at different elevations. At times of low electrical demand,
5616-447: The river's delta , and this has led to continuing coastal erosion. The changes in the river hydrology have altered the local heat budget which has caused microclimatic changes such as decreasing rain and higher mean monthly temperatures. All of these larger scale environmental impacts will all further compound the problems surrounding disruptions to local economic activities and associated, difficult human welfare conditions. A case study by
5720-400: The water frame , and continuous production played a significant part in the development of the factory system, with modern employment practices. In the 1840s, hydraulic power networks were developed to generate and transmit hydro power to end users. By the late 19th century, the electrical generator was developed and could now be coupled with hydraulics. The growing demand arising from
5824-517: The 1940s. The development of the Volta River Basin was proposed in 1949, but because funds were insufficient, the American company Volta Aluminum Company (Valco) lent money to Ghana so that the dam could be constructed. President Kwame Nkrumah adopted the Volta River hydropower project and commissioned Australian architect Kenneth Scott to design a residence for him overlooking the dam. The dam
5928-421: The Akosombo Dam resulted in the flooding of part of the Volta River Basin and its upstream fields, and in the creation of Lake Volta which covers 3.6% of Ghana's total land area. Lake Volta was formed between 1962 and 1966 and necessitated the relocation of about 80,000 people, who represented 1% of the population. People of 700 villages were relocated into 52 resettlement villages two years prior to
6032-463: The IEA released a main-case forecast of 141 GW generated by hydropower over 2022–2027, which is slightly lower than deployment achieved from 2017–2022. Because environmental permitting and construction times are long, they estimate hydropower potential will remain limited, with only an additional 40 GW deemed possible in the accelerated case. In 2021 the IEA said that major modernisation refurbishments are required. Most hydroelectric power comes from
6136-506: The Lake Volta reservoir displaced many people and had a significant impact on the local environment, including seismic activity that led to coastal erosion ; a changed hydrology caused microclimatic changes with less rain and higher temperatures. The soil surrounding the lake is less fertile than the soil under it, and heavy agricultural use has required the use of fertilizers, which in turn has led to eutrophication , which caused, among others,
6240-460: The Volta River's development. The extensive human migration and degradation of natural resources within the Volta-basin area, are the products of poverty in conjunction with population pressure. Reservoir-induced seismicity has been recorded because of the crustal re-adjustments from the added weight of the water within Lake Volta. There is an eastward shift of the river's mouth from the changes to
6344-464: The ability to transport particles heavier than itself downstream. This has a negative effect on dams and subsequently their power stations, particularly those on rivers or within catchment areas with high siltation. Siltation can fill a reservoir and reduce its capacity to control floods along with causing additional horizontal pressure on the upstream portion of the dam. Eventually, some reservoirs can become full of sediment and useless or over-top during
SECTION 60
#17328553627756448-410: The aluminium compounds are extracted contains iron oxides , silica , calcia , titania and some un-reacted alumina . After separation of the residue by filtering, pure gibbsite is precipitated when the liquid is cooled, and then seeded with fine-grained aluminium hydroxide . The gibbsite is usually converted into aluminium oxide , Al 2 O 3 , by heating in rotary kilns or fluid flash calciners to
6552-595: The balance between stream flow and power production. Micro hydro means hydroelectric power installations that typically produce up to 100 kW of power. These installations can provide power to an isolated home or small community, or are sometimes connected to electric power networks. There are many of these installations around the world, particularly in developing nations as they can provide an economical source of energy without purchase of fuel. Micro hydro systems complement photovoltaic solar energy systems because in many areas water flow, and thus available hydro power,
6656-631: The case of Jamaica , recent analysis of the soils showed elevated levels of cadmium , suggesting that the bauxite originates from Miocene volcanic ash deposits from episodes of significant volcanism in Central America. Australia is the largest producer of bauxite, followed by Guinea and China . Bauxite is usually strip mined because it is almost always found near the surface of the terrain , with little or no overburden . Increased aluminium recycling , which requires less electric power than producing aluminium from ores, may considerably extend
6760-461: The contraction of HIV and has since led to its heightened prevalence within Volta Basin communities. The districts of Manya Krobo and Yilo Krobo, which lie within the southwest portion of the Volta Basin, are predominantly indigenous communities that have attained a disproportionate prevalence of HIV. The situation underlines the strength of the local factors upon these districts. Commercial sex work
6864-404: The daily rise and fall of ocean water due to tides; such sources are highly predictable, and if conditions permit construction of reservoirs, can also be dispatchable to generate power during high demand periods. Less common types of hydro schemes use water's kinetic energy or undammed sources such as undershot water wheels . Tidal power is viable in a relatively small number of locations around
6968-551: The dam's completion; the resettlement program was under the direction of the VRA. Two percent of the resettlement population were riparian fishers, and most were subsistence farmers. The Eastern Region of Ghana and the populations incorporated within its districts were most subject to the project's effects. The dam provides electricity to Ghana and its neighboring West African countries, including Togo and Benin . Initially 20% of Akosombo Dam's electric output (serving 70% of national demand)
7072-408: The dam, these diseases have increased remarkably. In particular, resettlement villages have shown an increase in disease prevalence since the establishment of Lake Volta, and a village's likelihood of infection corresponds to its proximity to the lake. Children and fishermen have been especially hard hit by this rise of disease prevalence. Additionally, the degradation of aquatic habitat has resulted in
7176-505: The dams, sometimes destroying biologically rich and productive lowland and riverine valley forests, marshland and grasslands. Damming interrupts the flow of rivers and can harm local ecosystems, and building large dams and reservoirs often involves displacing people and wildlife. The loss of land is often exacerbated by habitat fragmentation of surrounding areas caused by the reservoir. Hydroelectric projects can be disruptive to surrounding aquatic ecosystems both upstream and downstream of
7280-475: The decline of shrimp and clam populations. The physical health of local communities has been diminished from this loss of shellfish populations, as they provided an essential source of dietary protein. Likewise, the rural and industrial economies have experienced the financial losses associated with the decimation of river aquaculture . Increased human migration within the area has been driven by poverty and unfavorable resettlement conditions. This migration enabled
7384-690: The effect of forest decay. Another disadvantage of hydroelectric dams is the need to relocate the people living where the reservoirs are planned. In 2000, the World Commission on Dams estimated that dams had physically displaced 40–80 million people worldwide. Because large conventional dammed-hydro facilities hold back large volumes of water, a failure due to poor construction, natural disasters or sabotage can be catastrophic to downriver settlements and infrastructure. During Typhoon Nina in 1975 Banqiao Dam in Southern China failed when more than
7488-399: The excess generation capacity is used to pump water into the higher reservoir, thus providing demand side response . When the demand becomes greater, water is released back into the lower reservoir through a turbine. In 2021 pumped-storage schemes provided almost 85% of the world's 190 GW of grid energy storage and improve the daily capacity factor of the generation system. Pumped storage
7592-461: The explosive growth of an invasive weed that renders water navigation and transportation difficult, and form a habitat for the vectors of water-borne illnesses such as bilharzia , river blindness and malaria . Resettlement of the displaced inhabitants proved complex and in some cases unsuccessful; traditional farming practices disappeared and poverty increased. The dam was conceived in 1915 by geologist Albert Kitson , but no plans were drawn until
7696-417: The flood gates at a reservoir elevation of 84.45 m (277 ft), and for several weeks, water was spilled from the lake, causing some flooding downstream. The Akosombo Dam benefited some industrial and economic activities from the addition of lake transportation, increased fishing, new farming activities along the shoreline, and tourism. In the time following the construction of the dam, there has been
7800-499: The floods. The losses included farmlands, houses and properties which were destroyed by the floods. Hydroelectricity Hydroelectricity , or hydroelectric power , is electricity generated from hydropower (water power). Hydropower supplies 15% of the world's electricity , almost 4,210 TWh in 2023, which is more than all other renewable sources combined and also more than nuclear power . Hydropower can provide large amounts of low-carbon electricity on demand, making it
7904-534: The forest is inundated, substantial amounts of greenhouse gases may be emitted. Construction of a hydroelectric complex can have significant environmental impact, principally in loss of arable land and population displacement. They also disrupt the natural ecology of the river involved, affecting habitats and ecosystems, and siltation and erosion patterns. While dams can ameliorate the risks of flooding, dam failure can be catastrophic. In 2021, global installed hydropower electrical capacity reached almost 1,400 GW,
8008-506: The highest among all renewable energy technologies. Hydroelectricity plays a leading role in countries like Brazil, Norway and China. but there are geographical limits and environmental issues. Tidal power can be used in coastal regions. China added 24 GW in 2022, accounting for nearly three-quarters of global hydropower capacity additions. Europe added 2 GW, the largest amount for the region since 1990. Meanwhile, globally, hydropower generation increased by 70 TWh (up 2%) in 2022 and remains
8112-483: The invention of this process, and prior to the Deville process , aluminium ore was refined by heating ore along with elemental sodium or potassium in a vacuum . The method was complicated and consumed materials that were themselves expensive at that time. This made early elemental aluminium more expensive than gold . As a bulk cargo , bauxite is a Group A cargo that may liquefy if excessively moist. Liquefaction and
8216-519: The largest renewable energy source, surpassing all other technologies combined. Hydropower has been used since ancient times to grind flour and perform other tasks. In the late 18th century hydraulic power provided the energy source needed for the start of the Industrial Revolution . In the mid-1700s, French engineer Bernard Forest de Bélidor published Architecture Hydraulique , which described vertical- and horizontal-axis hydraulic machines, and in 1771 Richard Arkwright 's combination of water power ,
8320-731: The largest, producing 14 GW , but was surpassed in 2008 by the Three Gorges Dam in China at 22.5 GW . Hydroelectricity would eventually supply some countries, including Norway , Democratic Republic of the Congo , Paraguay and Brazil , with over 85% of their electricity. In 2021 the International Energy Agency (IEA) said that more efforts are needed to help limit climate change . Some countries have highly developed their hydropower potential and have very little room for growth: Switzerland produces 88% of its potential and Mexico 80%. In 2022,
8424-511: The loss of their primary economic activities from fishing and agriculture, loss of their homes, loss of their family grave sites, loss of community stability, and the eventual loss of important social values. The resettlement program demonstrated the social complexities involved in establishing "socially cohesive and integrated" communities. Insufficient planning resulted in the relocation of communities into areas that were not capable of providing for their former livelihoods and traditions. The loss of
8528-462: The military leader of anti-colonial revolution, were among the many people across Vietnamese society who opposed the governments plans. In an attempt to stop the spread of information across the globe, the government banned domestic reporters from reporting on bauxite mining. However, reporters turned to Vietnamese language websites and blogs where the reporting and discussion continued. On April 12, 2009, several well-respected Vietnamese scholars started
8632-401: The minister of the environment, and other important stakeholders. They came to the conclusion that no future government should mine bauxite in the region because the reserve is environmentally and culturally significant. In 2016, the government along with NGO's began the process of upgrading the reserved to a national park. However, that year an election took place, and before it became official,
8736-481: The naturally fertile soils beneath Lake Volta essentially led to the loss of traditional farming practices. The poor living conditions provided within the resettlement villages has been demonstrated by population reductions since resettlement. One resettlement village in particular experienced a greater than 50% population reduction in the 23 years following relocation. Increased economic risks and experiences of poverty are associated with those communities most impacted by
8840-483: The newly elected National Patriotic Party (NPP) rejected the plan. In 2017, the government of Ghana signed a Memorandum of Understanding with China to develop new bauxite mining infrastructure in Ghana. Although there was no official plan to mine the Atewa Forest Reserve, tensions between local communities, NGO and the government began to rise. In 2019, tensions began to reach a peak when the government presented
8944-633: The plant site. Generation of hydroelectric power changes the downstream river environment. Water exiting a turbine usually contains very little suspended sediment, which can lead to scouring of river beds and loss of riverbanks. The turbines also will kill large portions of the fauna passing through, for instance 70% of the eel passing a turbine will perish immediately. Since turbine gates are often opened intermittently, rapid or even daily fluctuations in river flow are observed. Drought and seasonal changes in rainfall can severely limit hydropower. Water may also be lost by evaporation. When water flows it has
9048-520: The power station and the power transmission network. The VRA is responsible for the reservoir impounded by the dam, fishing within the lake, lake transportation and communication, and the welfare of those surrounding the lake. The dam was built between 1961 and 1965. Its development was undertaken by the Ghanaian government and funded 25% by the International Bank for Reconstruction and Development of
9152-450: The rainfall regime, could reduce total energy production by 7% annually by the end of the century. Lower positive impacts are found in the tropical regions. In lowland rainforest areas, where inundation of a part of the forest is necessary, it has been noted that the reservoirs of power plants produce substantial amounts of methane . This is due to plant material in flooded areas decaying in an anaerobic environment and forming methane,
9256-410: The requirement for operation of the dam. In the beginning of 2007, concerns were expressed over the electricity supply from the dam because of low water levels in the Lake Volta reservoir. During the latter half of 2007, much of this concern was abated when heavy rain fell in the catchment area of Volta River. In 2010, the highest-ever water level was recorded at the dam. This necessitated the opening of
9360-450: The soil before the natural river flow was halted by the dam. The growth of commercially intensive agriculture has produced a rise in fertilizer run-off into the river. This, along with run-off from nearby cattle stocks and sewage pollution, has caused eutrophication of the river waters. The nutrient enrichment, in combination with the low water movement, has allowed for the invasion of aquatic weeds ( Ceratophyllum ). These weeds have become
9464-706: The strip mining process, the biodiversity and habitat once present in the area is completely lost and the hydrological and soil characteristics in the region are permanently altered. Other environmental impacts of bauxite mining include soil degradation , air pollution , and water pollution . Red mud is a highly alkaline sludge, with a high pH around 13, that is a byproduct of the Bayer process . It contains several elements such as sodium aluminoscilicate , calcium titanate , monohydrate aluminium, and trihydrate aluminium that do not break down in nature. When improperly stored, red mud can contaminate soil and water, which can result in local extinction of all life. Red mud
9568-529: The support of the Export-Import Bank of the United States . However, Valco did not invest without first requiring insurances from Ghana's government, such as company exemptions from taxes on trade and discounted purchases of electricity. The estimated total cost of the project was $ 258 million. In May 1960, the Ghana government called for tenders for construction of the hydroelectric dam. In 1961, an Italian consortium, Impregilo which had just completed
9672-460: The terrestrial and aquatic ecosystems. Historically, the Indigenous peoples living on these lands have shown resistance to development, and oppose any new bauxite mining projects in the area. This has led to violent conflicts between Indigenous communities and police. On December 16, 2000, police killed three Indigenous protestors and wounded over a dozen more during a protest over a bauxite project in
9776-401: The top ten largest in the world, are located on tribal land. These tribal lands are densely populated and home to over 100 million Indigenous Indian peoples. The mountain summits located on these lands act as a source of water and greatly contribute to the regions fertility. The Indian bauxite industry is interested in developing this land for aluminum production, which poses great risk to
9880-419: The vast majority of additional capacity in Akosombo used to service growing domestic demand. Initially, the dam's power production capabilities greatly overreached the actual demand; while the demand since the dam's inception has resulted in the doubling of hydropower production. Ghana's industrial and economic expansion triggered a higher demand for power, beyond the Akosombo's power plant capabilities. By 1981,
9984-524: The world are hydroelectric power stations, with some hydroelectric facilities capable of generating more than double the installed capacities of the current largest nuclear power stations . Although no official definition exists for the capacity range of large hydroelectric power stations, facilities from over a few hundred megawatts are generally considered large hydroelectric facilities. Currently, only seven facilities over 10 GW ( 10,000 MW ) are in operation worldwide, see table below. Small hydro
10088-436: The world's bauxite deposits can be found within 1 to 20 metres (3 ft 3 in to 65 ft 7 in) of the earths surface. Strip mining is the most common technique used for extracting shallow bauxite. This process involves removing the vegetation, top soil, and overburden to expose the bauxite ore. The overlying soil is typically stockpiled in order to rehabilitate the mine once operations have finished. During
10192-401: The world's bauxite reserves. As of 2010 , approximately 70% to 80% of the world's dry bauxite production is processed first into alumina and then into aluminium by electrolysis . Bauxite rocks are typically classified according to their intended commercial application: metallurgical, abrasive, cement, chemical, and refractory. Bauxite ore is usually heated in a pressure vessel along with
10296-539: The world. The classification of hydropower plants starts with two top-level categories: The classification of a plant as an SHP or LHP is primarily based on its nameplate capacity , the threshold varies by the country, but in any case a plant with the capacity of 50 MW or more is considered an LHP. As an example, for China, SHP power is below 25 MW, for India - below 15 MW, most of Europe - below 10 MW. The SHP and LHP categories are further subdivided into many subcategories that are not mutually exclusive. For example,
10400-573: Was allowed to provide irrigation and power to citizens (in addition to aluminium power) after the war. In Suriname , the Brokopondo Reservoir was constructed to provide electricity for the Alcoa aluminium industry. New Zealand 's Manapouri Power Station was constructed to supply electricity to the aluminium smelter at Tiwai Point . Since hydroelectric dams do not use fuel, power generation does not produce carbon dioxide . While carbon dioxide
10504-412: Was established in response to the thousands of male workers that were in the area for building the dam. Ten percent of the child-bearing females from these two districts migrated out of their districts during this time. In 1986, "90% of AIDS victims in Ghana were women, and 96% of them had recently lived outside the country". The loss of land experienced by the 80,000 people forcibly relocated meant
10608-483: Was expected to eventually provide the revenue necessary for establishing local bauxite mining and refining, which would allow aluminum production without importing foreign alumina. Development of the aluminum industry within Ghana was dependent upon the proposed hydroelectric power. The proposed project's aluminum smelter was overseen by the American company Kaiser Aluminum and is operated by Valco. The smelter received its financial investment from Valco shareholders, with
10712-461: Was provided to Ghanaians in the form of electricity, the remaining 80% was generated for Valco. The Ghana government was compelled, by contract, to pay for over 50% of the cost of Akosombo's construction, but the country was allowed only 20% of the power generated. Some commentators are concerned that this is an example of neocolonialism . In recent years the production from the Valco plant has declined with
10816-564: Was responsible for killing all life in the Marcal River in Hungary after a spill occurred in 2010. When red mud dries, it turns into dust that can cause lung disease, cancer and birth defects. In the tropical regions of Asia, central Africa, South America and northern Australia, there has been an increase of bauxite mines on traditional and indigenous lands. This has resulted in a number of negative social impacts on local and indigenous peoples. In