A compartmentalisation dam is a dam that divides a body of water into two parts. A typical use of such a dam is the regulation of water levels separately in different sections of a basin . One application of a compartmentalisation dam is to facilitate closures of areas with multiple tidal inlets , such as in the case of the Delta Works .
30-698: The Zandkreekdam is a compartmentalisation dam located approximately 3 kilometres north of the city of Goes in The Netherlands , which connects Zuid-Beveland with Noord-Beveland , and separates the Oosterschelde from the Veerse Meer . A navigation lock in the dam permits shipping connections to Middelburg and Vlissingen , via the Veerse Meer and the Walcheren navigation channel. The Zandkreekdam
60-528: A box caisson with pinpoint accuracy. An open caisson is similar to a box caisson, except that it does not have a bottom face. It is suitable for use in soft clays (e.g. in some river-beds), but not for where there may be large obstructions in the ground. An open caisson that is used in soft grounds or high water tables, where open trench excavations are impractical, can also be used to install deep manholes, pump stations and reception/launch pits for microtunnelling , pipe jacking and other operations. A caisson
90-655: A closure at the Oosterschelde estuary, the plan was revised to include a storm surge barrier, the Oosterscheldekering . This shift affected the dams' intended functions. Initially, the Oosterschelde dam was to transform the area into a vast freshwater body, dubbed the Zeeland Lake, to ensure a tide-free route from Antwerp to Rotterdam. This would have involved lock complexes at both the Volkerakdam and Kreekrakdam. Due to
120-433: A lock to permit navigation. Construction began in the spring of 1957, with dredging undertaken to form a foundation trench 6.5 metres below Amsterdam Ordnance Datum ( Normaal Amsterdams Peil , N.A.P.). Weak soils including soft clay and peat were removed and replaced with approximately 160,000 cubic metres of sand, and excavation depths up to 14 metres below N.A.P. were realised. Unit caissons were used to construct
150-424: A suitable foundation material is encountered. While bedrock is preferred, a stable, hard mud is sometimes used when bedrock is too deep. The four main types of caisson are box caisson , open caisson , pneumatic caisson and monolithic caisson . A box caisson is a prefabricated concrete box (with sides and a bottom); it is set down on prepared bases. Once in place, it is filled with concrete to become part of
180-596: A suitable sub-foundation. These piles are connected by a foundation pad upon which the column pier is erected. Caisson engineering has been used since at least the 19th century, with three prominent examples being the Royal Albert Bridge (completed in 1859), the Eads Bridge (completed in 1874), and the Brooklyn Bridge (completed in 1883). To install a caisson in place, it is brought down through soft mud until
210-668: Is 830 metres in length, and was the first compartmentalisation dam to be constructed as part of the Delta Works , having been proposed by Johan van Veen as part of the Drie-Eilanden Plan ( English : Three Islands Plan) which originated in the 1930s . It was the second project constructed under the Delta Works Plan, after the Stormvloedkering Hollandse IJssel which was completed in 1958. The construction of
240-514: Is a significant disparity in water quality across different basins, where separation is used to address undesirable conditions. Such structures play a crucial role in water management by creating physical barriers between bodies of water with differing qualities. Noteworthy examples include the following compartmentalisation dams in the Netherlands : In regions with tidal influences where closure dams are essential and multiple tidal inlets are present,
270-428: Is a watertight retaining structure used, for example, to work on the foundations of a bridge pier , for the construction of a concrete dam , or for the repair of ships . Caissons are constructed in such a way that the water can be pumped out, keeping the work environment dry. When piers are being built using an open caisson, and it is not practical to reach suitable soil, friction pilings may be driven to form
300-559: Is excavated by clamshell excavator bucket on crane. The formation level subsoil may still not be suitable for excavation or bearing capacity . The water in the caisson (due to a high water table) balances the upthrust forces of the soft soils underneath. If dewatered, the base may "pipe" or "boil", causing the caisson to sink. To combat this problem, piles may be driven from the surface to act as: H-beam sections (typical column sections, due to resistance to bending in all axis) may be driven at angles "raked" to rock or other firmer soils;
330-495: Is notably easier in areas over a wantij , a Dutch term denoting a shallow part or tidal divide in a delta system where two tidal currents meet. At these junctures, the converging tides neutralise each other, creating an area with minimal current, facilitating easier dam construction despite the rapid movement of adjacent waters. The wantij serves as a critical navigational feature, offering shelter from strong currents or presenting challenges for vessels with deeper drafts. After
SECTION 10
#1732859545309360-458: Is required. Shallow caissons may be open to the air, whereas pneumatic caissons (sometimes called pressurized caissons ), which penetrate soft mud , are bottomless boxes sealed at the top and filled with compressed air to keep water and mud out at depth. An airlock allows access to the chamber. Workers, called sandhogs in American English, move mud and rock debris (called muck ) from
390-520: Is sunk by self-weight, concrete or water ballast placed on top, or by hydraulic jacks. The leading edge (or cutting shoe ) of the caisson is sloped out at a sharp angle to aid sinking in a vertical manner; it is usually made of steel. The shoe is generally wider than the caisson to reduce friction, and the leading edge may be supplied with pressurised bentonite slurry, which swells in water, stabilizing settlement by filling depressions and voids. An open caisson may fill with water during sinking. The material
420-564: The Brouwersdam and Oosterscheldekering . Johan van Veen had been developing his Three Islands Plan since the 1930s, in which he considered land reclamation around the islands of Walcheren, Nord-Beveland and Zuid-Beveland and proposed the closure of two bodies of water : the Veerse Gat and the Zandkreek. In combination with the effects of the previously-constructed Sloedam , this would shorten
450-679: The Storm Surge of 1953 , it was decided to close the main inlets in the South-West of the Netherlands: the Oosterschelde, the Brouwershavenische Gat, and the Haringvliet. As these basins are connected to each other, and it is not possible to simply close them one-by-one, prior separation is required. Some notable examples of compartmentalisation dams used to implement such separation as part of
480-555: The pressurized environment of the caisson must decompress at a rate that allows symptom-free release of inert gases dissolved in the body tissues if they are to avoid decompression sickness , a condition first identified in caisson workers, and originally named "caisson disease" in recognition of the occupational hazard. Construction of the Brooklyn Bridge , which was built with the help of pressurised caissons, resulted in numerous workers being either killed or permanently injured by caisson disease during its construction. Barotrauma of
510-478: The Delta Works project in The Netherlands include: The Deltacommissie ( English : Delta Commission), a governmental expert panel convened to advise on measures to avert disasters like the 1953 flood , described these structures as side dams ( Dutch : nevendammen ), rather than compartmentalisation dams. Following the completion of these dams, the original Delta Plan was adapted. Instead of constructing
540-513: The H-beams are left extended above the base. A reinforced concrete plug may be placed under the water, a process known as tremie concrete placement . When the caisson is dewatered, this plug acts as a pile cap, resisting the upward forces of the subsoil. A monolithic caisson (or simply a monolith ) is larger than the other types of caisson, but similar to open caissons. Such caissons are often found in quay walls, where resistance to impact from ships
570-607: The Zandkreek. The Delta Plan was of such unprecedented size and complexity that the plan was to start with the easiest parts and gain experience along the way. There were a total of four sea arms to be closed in the Delta region, of which the Veerse Gat - extending east into the Zandkreek - was the smallest. By commencing with the smaller works, the engineers of the Delta Service could thus gain knowledge of construction methods, materials, and equipment - essential exercises for closing
600-564: The Zandkreekdam locks to permit vehicular traffic to pass over it at any time. Johan van Veen's Three-Island Plan required that construction of the Zankreekdam and the Veerse Gatdam should be undertaken as early as possible in the Delta Works programme, to permit Dutch civil engineers and contractors to gain experience that would be necessary for more complicated Delta Works projects such as
630-523: The Zandkreekdam, together with the Veerse Gatdam in 1961, created the freshwater Veerse Meer (Veerse Lake). Poor water quality in the lake led to the decision to build a control lock , known as the Katse Heule , which was completed in 2004 and re-established saltwater intrusion from the Oosterschelde into the Veerse Meer, and led to a significant improvement in water quality. There are two bridges at
SECTION 20
#1732859545309660-435: The base of the caisson. When the caisson hits bedrock, the sandhogs exit through the airlock and fill the box with concrete, forming a solid foundation pier. A pneumatic (compressed-air) caisson has the advantage of providing dry working conditions, which is better for placing concrete. It is also well suited for foundations for which other methods might cause settlement of adjacent structures. Construction workers who leave
690-508: The coastline from 52 kilometers to 2.5 kilometres and open up large areas of land which could then be reclaimed from the sea. Van Veen recognised the need to close both bodies of water, with the Zandkreekdam acting as a secondary dam to make the works on the Veerse Gatdam easier and therefore being constructed first. Having made extensive studies, van Veen realised that the closure of the Veerse Gat alone would cause unacceptable tidal streams in
720-417: The dam, with the maximum depth of the closing hole being 5m below N.A.P. On 3 May 1960, a pair of caissons were sunk into the final gap and the dam was then completed to a height of 8.25m above N.A.P. The navigation lock, 140 metres long and 20 metres wide, was ready for shipping in the spring of 1960. Compartmentalisation dam Compartmentalisation dams have been deployed in scenarios where there
750-415: The edge of the workspace to a water-filled pit, connected by a tube (called the muck tube ) to the surface. A crane at the surface removes the soil with a clamshell bucket . The water pressure in the tube balances the air pressure, with excess air escaping up the muck tube. The pressurized air flow must be constant to ensure regular air changes for the workers and prevent excessive inflow of mud or water at
780-524: The effects of storm surges in both the Veerse Gat and the Zandkreek. The body set up to implement the Delta Works scheme, known as the Deltacommissie (English: Delta Commission), adopted the Three Islands Plan and the Zandkreekdam was taken forward. The design was based on the use of caissons 6 metres high, 7.5 metres wide and 11 metres long to form a closure dam, along with the construction of
810-413: The establishment of a compartmentalisation dam becomes crucial. Without such a structure (represented by the dotted line), Dam A would require the basin to be entirely filled through sea inlet B. This scenario could lead to a significant increase in flow rate at the inlet, causing the channel to widen and deepen, thereby complicating or outright preventing closure. Constructing a compartmentalisation dam
840-481: The larger Brouwershavense Gat and the Eastern Scheldt . The location pinpointed by van Veen for the Zandkreekdam is at a wantij , a Dutch term for the point at which the tidal currents from both sea arms meet at high tide, and the current is minimal. It was also important that construction of the Veerse Gatdam did not lag too far behind the Zandkreekdam, as closing only the Zandkreek would dangerously increase
870-757: The non-completion of the Oosterschelde closure and the deferred decision to build a storm surge barrier, the Volkerak remained open, maintaining significant flow rates through the Zijpe channel. This persistent flow led to erosion, necessitating additional protective measures until the completion of the Oosterscheldekering. Caisson (engineering) In geotechnical engineering , a caisson ( / ˈ k eɪ s ən , - s ɒ n / ; borrowed from French caisson 'box', from Italian cassone 'large box', an augmentative of cassa )
900-401: The permanent works, such as the foundation for a bridge pier. Hollow concrete structures are usually less dense than water so a box caisson must be ballasted or anchored to keep it from floating until it can be filled with concrete. Sometimes elaborate anchoring systems may be required, such as in tidal zones . Adjustable anchoring systems combined with a GPS survey enable engineers to position