The Tsugaru Railway Line ( 津軽鉄道線 , Tsugaru Tetsudō-sen ) is a railway line in Aomori Prefecture , Japan , connecting Tsugaru-Goshogawara in the city of Goshogawara and Tsugaru-Nakasato in the town of Nakadomari , in central-southern Tsugaru Peninsula . The line is the only railway line operated by the Tsugaru Railway Company , which is locally referred to as Tsutetsu ( 津鉄 ) . The Tsugaru Railway Line is notable for its seasonal trains that are run during the summer, autumn and winter. During the winter, the railcars are heated by coal fired stoves. The Tsugaru Railway Line should not be confused with the former government Tsugaru Line , now operated by JR East .
68-460: The Tsugaru Railway Line is single-track for its entire length, and its sole passing loop is located at Kanagi Station . Railway signaling of the line consists of two staff tokens ; one token controls access between Tsugaru-Goshogawara and Kanagi , while the other token controls access between Kanagi and Tsugaru-Nakasato . As of 1 July 2023, there are 12 round-trip trains daily that run between Tsugaru-Goshogawara and Tsugaru-Nakasato . This
136-436: A railway junction or where a spur or siding branches off. The most common type of switch consists of a pair of linked tapering rails, known as points ( switch rails or point blades ), lying between the diverging outer rails (the stock rails ). These points can be moved laterally into one of two positions to direct a train coming from the point blades toward the straight path or the diverging path. A train moving from
204-638: A barrier between the metal surfaces to prevent ice from forming between them (i.e. having frozen together by ice). Such approaches however, may not always be effective for extreme climates since these chemicals will be washed away over time, especially for heavily thrown switches that experience hundreds of throws daily. Heating alone may not always be enough to keep switches functioning under snowy conditions. Wet snow conditions, which generate particularly sticky snow and whiteout conditions, may occur at temperatures just below freezing, causing chunks of ice to accumulate on trains. When trains traverse over some switches,
272-426: A connection between two or more parallel tracks, allowing a train to switch between them. In many cases, where a switch is supplied to leave a track, a second is supplied to allow the train to reenter the track some distance down the line; this allows the track to serve as a siding, allowing a train to get off the track to allow traffic to pass (this siding can either be a dedicated short length of track, or formed from
340-601: A crossover can be used either to detour "wrong-rail" around an obstruction or to reverse direction. A crossover can also join two tracks of the same direction, possibly a pair of local and express tracks, and allow trains to switch from one to the other. On a crowded system, routine use of crossovers (or switches in general) will reduce throughput, as use of the switch blocks multiple tracks. For this reason, on some high-capacity rapid transit systems, crossovers between local and express tracks are not used during normal rush hour service, and service patterns are planned around use of
408-408: A radio system to set the points from a distance. The design of crossing loops may have to be modified where there are severe gradients that make it difficult for a train to restart from a stationary position, or where the terrain is unsuitable for a normal loop. A crossing loop on steep gradient may have catch points on the downhill end to reduce the impact of runaways. Since central operation of
476-427: A regular crossing. Double outside slip switches are only used in rare, specific cases. A crossover is a pair of switches that connects two parallel rail tracks , allowing a train on one track to cross over to the other. Like the switches themselves, crossovers can be described as either facing or trailing . When two crossovers are present in opposite directions, one after the other, the four-switch configuration
544-442: A section of a second, continuous, parallel line), and also allows trains coming from either direction to switch between lines; otherwise, the only way for a train coming from the opposite direction to use a switch would be to stop, and reverse through the switch onto the other line, and then continue forwards (or stop, if it is being used as a siding). A straight track is not always present; for example, both tracks may curve, one to
612-417: A switch in this direction is known as a trailing-point movement and switches that allow this type of movement without damage to the mechanism are called trailable switches . A switch generally has a straight "through" track (such as the main-line) and a diverging route. The handedness of the installation is described by the side that the diverging track leaves. Right-hand switches have a diverging path to
680-637: A traditional passenger car heated using a potbelly stove . A supplementary 'stove train' ticket, which costs ¥ 500, is required to board the 'stove train'. 'Stove trains' follow the Semi-Express stopping pattern. The Tsugaru Railway Company was founded in 1928, and the first section of the line was opened on July 15, 1930, from Goshogawara to Kanagi. This was extended to Ōzawanai by October 4, 1930, and to its present terminus of Tsugaru-Nakasato by November 13, 1930. All freight operations were discontinued on February 1, 1984. This article incorporates material from
748-483: A train could potentially split the points (end up going down both tracks) if the points were to move underneath the train. During trailing moves, the wheels of a train will force the points into the correct position if they attempt to move, although this may cause considerable damage. This act is known as a "run through". In the United Kingdom, FPLs were common from an early date, due to laws being passed which forced
SECTION 10
#1732858052381816-417: Is a lever and accompanying linkages to align the points of a switch by hand. The lever and its accompanying hardware is usually mounted to a pair of long ties (sleepers) that extend from the switch at the points. They are often used in a place of a switch motor on less frequently used switches. In some places, the lever may be some distance from the points, as part of a lever frame or ground frame. To prevent
884-425: Is a short piece of rail placed alongside the main (stock) rail opposite the crossing. These ensure that the wheels follow the appropriate flangeway through the frog and that the train does not derail. Check rails are often used on very sharp curves, even where there are no switches. A switch motor or switch machine (point motor or point machine) is an electric, hydraulic or pneumatic mechanism that aligns
952-410: Is called a double crossover . If the crossovers in different directions overlap to form an ×, it is dubbed a scissors crossover , scissors crossing , or just scissors ; or, due to the diamond in the center, a diamond crossover . This makes for a very compact track layout at the expense of using a level junction . In a setup where each of the two tracks normally carries trains of only one direction,
1020-604: Is down from 14 round-trip trains daily that ran before the COVID-19 pandemic . An additional 2 trains that run between Kanagi and Tsugaru-Nakasato (one of which does not run on holidays), providing a service every 60-90 minutes during the day. All train services on the line are officially classified by the company as Local services, and most trains stop at all stations; however, some trains are timetabled to skip several stations. Historically, such trains were classified separately as Semi-Express services, and are referred to as such in
1088-433: Is measured as the number of units of length for a single unit of separation. In North America this is generally referred to as a switch's "number". For example, on a "number 12" switch, the rails are one unit apart at a distance of twelve units from the center of the frog. In the United Kingdom points and crossings using chaired bullhead rail would be referred to using a letter and number combination. The letter would define
1156-448: Is only one passenger platform, it is not convenient to cross two passenger trains if both stop. This type of passing loop is common in Russia and post-Soviet states. A disadvantage of the platform and through arrangement is the speed limits through the turnouts at each end. In the example layout shown, trains take the left-hand track in their direction of running. Low-speed turnouts restrict
1224-425: Is possible to modify the simpler types of switch to allow trains to pass at high speed. More complicated switch systems, such as double slips, are restricted to low-speed operation. On European high-speed lines, it is not uncommon to find switches where a speed of 200 km/h (124 mph) or more is allowed on the diverging branch. Switches were passed over at a speed of 560 km/h (348 mph) (straight) during
1292-472: Is referred to as a dynamic loop. For example, the Windermere branch line will be getting one to permit a 2tph service pattern. Some railways fit catch points at the ends of crossing loops so that if a train overruns the loop, it is derailed rather than collide with an opposing train. Since the available space for crossing loops is usually limited, they do not normally have an overlap (safety margin) between
1360-491: The French world speed run of April 2007. The US Federal Railroad Administration has published the speed limits for higher-speed turnouts with No. 26.5 turnout that has speed limit of 60 miles per hour (97 km/h) and No. 32.7 with speed limit of 80 miles per hour (129 km/h). Under cold weather conditions, snow and ice can prevent the proper movement of switch or frog point rails, essentially inhibiting
1428-620: The UK and most other Commonwealth countries, the term points refers to the entire mechanism. In professional parlance, the term refers only to the movable rails and the entire mechanism is named turnout or points and crossings . Turnout and switch are terms used in North America in all contexts. In some cases, the switch blades can be heat treated for improvement of their service life. There are different kinds of heat treatment processes such as edge hardening or complete hardening. The cross-section of
SECTION 20
#17328580523811496-681: The arrangement may also be called a double switch , or more colloquially, a puzzle switch . The Great Western Railway in the United Kingdom used the term double compound points , and the switch is also known as a double compound in Victoria (Australia) . In Italian, the term for a double switch is deviatoio inglese , which means English switch . Likewise, it is called Engels(e) Wissel in Dutch and, occasionally, Engländer ("english one", literally "Englishman") in German. A single slip switch works on
1564-461: The case. A mechanism is provided to move the points from one position to the other ( change the points ). Historically, this would require a lever to be moved by a human operator, and some switches are still controlled this way. However, most are now operated by a remotely controlled actuator called a point machine ; this may employ an electric motor or a pneumatic or hydraulic actuator . This both allows for remote control and monitoring and for
1632-489: The corresponding article in the Japanese Misplaced Pages. Passing loop A passing loop (UK usage) or passing siding (North America) (also called a crossing loop , crossing place , refuge loop or, colloquially, a hole ) is a place on a single line railway or tramway , often located at or near a station , where trains or trams travelling in opposite directions can pass each other. Trains / trams going in
1700-431: The crossing are often connected to move in unison, so the crossing can be worked by just two levers or point motors. This gives the same functionality of two points placed end to end. These compact (albeit complex) switches usually are found only in locations where space is limited, such as station throats (i.e. approaches) where a few main lines spread out to reach any of numerous platform tracks. In North American English,
1768-402: The diamond instead of inside. An advantage over an inside slip switch is that trains can pass the slips with higher speeds. A disadvantage over an inside slip switch is that they are longer and need more space. An outside slip switch can be so long that its slips do not overlap at all, as in the example pictured. In such a case a single, outside slip switch is the same as two regular switches and
1836-404: The earlier type of interlocking. A railroad car 's wheels are primarily guided along the tracks by coning of the wheels, rather than relying on the flanges on the insides of the wheels. When the wheels reach the switch, the wheels are guided along the route determined by which of the two points is connected to the track facing the switch. In the illustration, if the left point is connected,
1904-481: The following corresponding radii: Switches are necessary for the operation of a railway, but they do pose a number of risks: Switch-related accidents caused by one or more of these risks have occurred, including: The switch rails or points ( point blades ) are the movable rails which guide the wheels towards either the straight or the diverging track. They are tapered, except on stub switches in industrial sidings, which have square ends. In popular parlance in
1972-418: The frequency of trains, or applying anti-icing chemicals such as ethylene glycol to the trains. The divergence and length of a switch is determined by the angle of the frog (the point in the switch where two rails cross, see below) and the angle or curvature of the switch blades. The length and placement of the other components are determined from this using established formulas and standards. This divergence
2040-494: The left and one to the right (such as for a wye switch ), or both tracks may curve, with differing radii , while still in the same direction. Switches consume a relatively high proportion of a railway maintenance budget. Simple single-bladed switches were used on early wooden railways to move wagons between tracks. As iron-railed plateways became more common in the eighteenth century, cast iron components were made to build switches with check rails. In 1797, John Curr described
2108-503: The left or on the right, generally the same for the whole country. But this is generally valid only on double track. On passing loops this principle is not necessarily used. Often the train that shall not stop uses the straight track. See also Right- and left-hand traffic . Odisha , India Railroad switch A railroad switch ( AE ), turnout , or [ set of ] points ( CE ) is a mechanical installation enabling railway trains to be guided from one track to another, such as at
Tsugaru Railway - Misplaced Pages Continue
2176-408: The left wheel will be guided along the rail of that point, and the train will diverge to the right. If the right point is connected, the right wheel's flange will be guided along the rail of that point, and the train will continue along the straight track. Only one of the points may be connected to the facing track at any time; the two points are mechanically locked together to ensure that this is always
2244-462: The length (and hence the radius) of the switch blades and the number would define the angle of the crossing (frog). Thus an A7 turnout would be very short and likely only to be found in tight places like dockyards whereas an E12 would be found as a fairly high speed turnout on a mainline. On the London, Midland and Scottish Railway , switch curvatures were specified from A (sharpest) to F (shallowest), with
2312-450: The longer and heavier high-speed turnouts may be beyond the capability of manual lever operation. Refuge sidings are used at locations with gradients too steep for heavy freight trains or steam haulage to depart from conventional passing loops, or confined spaces where a passing loop cannot be built. An extra parallel siding is often built at stations on refuge sidings so that two stopping trains can pass, and an extended catch point opposite
2380-431: The loop line has low-speed turnouts at either end. If the station has only one platform, then it is usually located on the main line. If passenger trains are relatively few in number, and the likelihood of two passenger trains crossing each other low, the platform on the loop line may be omitted. If the passenger train from one direction always arrives first, the platform on the loop line may also be omitted by extending
2448-464: The loop should be longer than all trains needing to cross at that point. Unless the loop is of sufficient length to be dynamic , the first train to arrive must stop or move very slowly, while the second to arrive may pass at speed. If one train is too long for the loop it must wait for the opposing train to enter the loop before proceeding, taking a few minutes. Ideally, the shorter train should arrive first and leave second. If both trains are too long for
2516-403: The loop, time-consuming "see-sawing" (or "double saw-by") operations are required for the trains to cross (see Tawa railway station ). On railway systems that use platforms , especially high-level platforms, for passengers to board and disembark from trains, the platforms may be provided on both the main and loop tracks or possibly on only one of them. The main line has straight track, while
2584-407: The movable switch blades were connected to the fixed closure rails with loose joints, but since steel is somewhat flexible it is possible to obviate this looseness by thinning a short section of the rail's bottom itself. This can be called a heelless switch . Turnouts were originally built with straight switch blades, which ended at the pointed end with a sharp angle. These switches cause a bump when
2652-407: The narrow end toward the point blades (i.e. it will be directed to one of the two paths, depending on the position of the points) is said to be executing a facing-point movement . For many types of switch, a train coming from either of the converging directions will pass through the switch regardless of the position of the points, as the vehicle's wheels will force the points to move. Passage through
2720-405: The other, alternatively to going straight across. A train approaching the arrangement may leave by either of the two tracks on the opposite side of the crossing. To reach the third possible exit, the train must change tracks on the slip and then reverse. The arrangement gives the possibility of setting four routes, but because only one route can be traversed at a time, the four blades at each end of
2788-437: The platform past the loop in that direction. The through road has straight track, while the platform road has low-speed turnouts at either end. A possible advantage of this layout is that trains scheduled to pass straight through the station can do so uninterrupted; they do not have to reduce their speed to pass through the curve. This layout is mostly used at local stations where many passenger trains do not stop. Since there
Tsugaru Railway - Misplaced Pages Continue
2856-454: The points and signals from a single signal box is convenient, and since there are practical limits for the distance to these points and signals, crossing loops can have a system-wide effect on train sizes. Line capacity is partly determined by the distance between individual crossing loops. Ideally these should be located at inverse -integer intervals along the track by travel time. The longest section between successive crossing loops will, like
2924-401: The points in and out of the loop operated manually, albeit more recent examples have so-called self-restoring switches that allow trains to exit a loop without needing to change the points. Other forms of remote operation included centralized traffic control , in which a train controller changes points and signals from a remote office; and driver-operated points, which enable train crews to use
2992-597: The points with one of the possible routes. The motor is usually controlled remotely by the dispatcher (signaller in the UK). The switch motor also includes electrical contacts to detect that the switch has completely set and locked. If the switch fails to do this, the governing signal is kept at red (stop). There is also usually some kind of manual handle for operating the switch in emergencies, such as power failures, or for maintenance purposes. A patent by W. B. Purvis dates from 1897. A switch stand ( points lever or ground throw )
3060-581: The proper operation of railroad switches. Historically, railway companies have employees keep their railroad switches clear of snow and ice by sweeping the snow away using switch brooms (Basically wire brooms with a chisel attached onto the opposite end of the broom – quite similar to ice scrapers used today), or gas torches for melting ice and snow. Such operation are still used in some countries, especially for branch routes with only limited traffic (e.g. seasonal lines). Modern switches for heavily trafficked lines are typically equipped with switch heaters installed in
3128-476: The proper position without damage. Examples include variable switches, spring switches, and weighted switches. If the points are rigidly connected to the switch control mechanism, the control mechanism's linkages may be bent, requiring repair before the switch is again usable. For this reason, switches are normally set to the proper position before performing a trailing-point movement. Generally, switches are designed to be safely traversed at low speed. However, it
3196-410: The provision of FPLs for any routes traveled by passenger trains – it was, and still is, illegal for a passenger train to make a facing move over points without them being locked, either by a point lock, or temporarily clamped in one position or another. Joints are used where the moving points meet the fixed rails of the switch. They allow the points to hinge easily between their positions. Originally
3264-419: The refuge siding may be added so as not to interfere with passing trains. If a crossing loop is several times the length of the trains using it, and is suitably signalled, then trains proceeding in opposite directions can pass (cross) each other without having to stop or even slow down. This greatly reduces the time lost by the first train to arrive at the crossing loop for the opposing train to go by. This system
3332-443: The right of the straight track, when coming from the point blades, and a left-handed switch has the diverging track leaving to the opposite side. In many cases, such as rail yards, many switches can be found in a short section of track, sometimes with switches going both to the right and left (although it is better to keep these separated as much as feasible). Sometimes a switch merely divides one track into two; at others, it serves as
3400-417: The same direction can also overtake, provided that the signalling arrangement allows it. A passing loop is double-ended and connected to the main track at both ends, though a dead end siding known as a refuge siding , which is much less convenient, can be used. A similar arrangement is used on the gauntlet track of cable railways and funiculars , and in passing places on single-track roads . Ideally,
3468-421: The same principle as a double slip, but provides for only one switching possibility. Trains approaching on one of the two crossing tracks can either continue over the crossing, or switch tracks to the other line. However, trains from the other track can only continue over the crossing, and cannot switch tracks. This is normally used to allow access to sidings and improve safety by avoiding having switch blades facing
SECTION 50
#17328580523813536-451: The shock, vibration, possibly in combination with slight heating caused by braking or a city microclimate, may cause the chunks of ice to fall off, jamming the switches. The heaters need time to melt the ice, so if service frequency is extremely high, there may not be enough time for the ice to melt before the next train arrives, which will then result in service disruptions. Possible solutions include installing higher capacity heaters, reducing
3604-459: The speed in one direction. Two platform faces are needed, and they can be provided either at a single island platform or two side platforms (as shown). Overtaking is not normally possible at this kind of up-and-down loop as some of the necessary signals are absent. Crossing loops using up-and-down working are very common in British practice. For one thing, fewer signals are required if the tracks in
3672-490: The starting signals and the end of the double line. In Australia, the Australian Rail Track Corporation (ARTC) policy provides for overlaps of about 500 m and 200 m respectively in an effort to avoid derailment or collision. Many crossing loops are designed to operate automatically in an unattended mode. Such loops may be track-circuited with home signals cleared by the approaching train. Some loops have
3740-411: The station are signaled for one direction only; also, there is less likelihood of a collision caused by signalling a train onto the track reserved for trains in the opposing direction. In France, they often use spring switches and the speed is equally restricted in both directions. The speed restriction in one direction can be eliminated with higher-speed turnouts, but this may require power operation, as
3808-427: The station list below. During the summer (from 1 July to 31 August), locally-made wind chimes and haiku strips are hung from the ceiling of all trains in operation. These are replaced with baskets of suzumushi during the autumn (1 September to mid-October). During the winter (from 1 December until 31 March the following year), a 'stove train' is generally operated three times per day. The 'stove train' features
3876-460: The switch blades also influences performance. New tangential blades perform better than old-style blades. The crossing is the component that enables passage of wheels on either route through the turnout. It can be assembled out of several appropriately cut and bent pieces of rail or can be a single casting of manganese steel. On lines with heavy use, the casting may be treated with explosive shock hardening to increase service life. A guard rail
3944-423: The switch rails being about 25 mm (0.98 in) less high, and stockier in the middle. Apart from the standard right-hand and left-hand switches, switches commonly come in various combinations of configurations. A double slip switch ( double slip ) is a narrow-angled diagonal flat crossing of two lines combined with four pairs of points in such a way as to allow vehicles to change from one straight track to
4012-424: The system that he developed which used a single iron blade, hinged on a vertical pin that was tapered to lie against the plateway. By 1808, Curr's basic design was in common use. The use of a sprung rail, giving a smooth transition, was patented by Charles Fox in 1838. Prior to the widespread availability of electricity , switches at heavily traveled junctions were operated from a signal box constructed near
4080-405: The tampering of switches by outside means, these switches are locked when not in use. A facing point lock ( FPL ), or point lock , is a device which, as the name implies, locks a set of points in position, as well as mechanically proving that they are in the correct position. The facing point part of the name refers to the fact that they prevent movement of the points during facing moves, where
4148-579: The tracks through an elaborate system of rods and levers . The levers were also used to control railway signals to control the movement of trains over the points. Eventually, mechanical systems known as interlockings were introduced to make sure that a signal could only be set to allow a train to proceed over points when it was safe to do so. Purely mechanical interlockings were eventually developed into integrated systems with electric control. On some low-traffic branch lines, in self-contained marshalling yards , or on heritage railways , switches may still have
SECTION 60
#17328580523814216-492: The train traverses in the turnout direction. The switch blades could be made with a curved point which meets the stockrail at a tangent, causing less of a bump, but the disadvantage is that the metal at the point is thin and necessarily weak. A solution to these conflicting requirements was found in the 1920s on the German Reichsbahn. The first step was to have different rail profile for the stock rails and switch rails, with
4284-406: The use of stiffer, strong switches that would be too difficult to move by hand, yet allow for higher speeds. In a trailing-point movement (running through the switch in the wrong direction while they are set to turn off the track), the flanges on the wheels will force the points to the proper position. This is sometimes known as running through the switch . Some switches are designed to be forced to
4352-414: The usual direction of traffic. To reach the sidings from what would be a facing direction, trains must continue over the crossing, then reverse along the curved route (usually onto the other line of a double track) and can then move forward over the crossing into the siding. An outside slip switch is similar to the double or single slip switches described above, except that the switch blades are outside of
4420-404: The usually flying junctions at each end of the local-express line. A stub switch lacks the tapered points (point blades) of a typical switch. Instead, both the movable rails and the ends of the rails of the diverging routes have their ends cut off square. The switch mechanism aligns the movable rails with the rails of one of the diverging routes. In 19th century US railroad use, the stub switch
4488-535: The vicinity of their point rails so that the point rails will not be frozen onto the stock rail and can no longer move. These heaters may take the form of electric heating elements or gas burners mounted on the rail, a lineside burner blowing hot air through ducts, or other innovative methods (e.g. geothermal heat sink, etc.) to keep the point & stock rails above freezing temperatures. Where gas or electric heaters cannot be used due to logistic or economic constraints, anti-icing chemicals can sometimes be applied to create
4556-420: The weakest link in a chain, determine the overall line capacity. Long and short trains can cross at a short loop if the long train arrives second but leaves first. It is best if all crossing loops are longer than the longest train. Two long trains can cross at a short loop using a slow so-called see-saw process, which wastes time. Countries generally have a principle on which side trains shall meet, either on
4624-482: Was typically used in conjunction with a harp switch stand . The rails leading up to a stub switch are not secured to the sleepers for several feet, and rail alignment across the gap is not positively enforced. Stub switches also require some flexibility in the rails (meaning lighter rails), or an extra joint at which they hinge. Therefore, these switches cannot be traversed at high speed or by heavy traffic and so are not suitable for main line use. A further disadvantage
#380619