30-461: [REDACTED] The Trans-Australian Railway , opened in 1917, runs from Port Augusta in South Australia to Kalgoorlie in Western Australia , crossing the Nullarbor Plain in the process. As the only rail freight corridor between Western Australia and the eastern states , the line is economically and strategically important. The railway includes the world's longest section of completely straight track. The inaugural passenger train service

60-761: A distance of 1,063 miles (1,711 km). The line was to be built to the standard gauge of 4 ft  8 + 1 ⁄ 2  in ( 1,435 mm ), even though the state railway systems at both ends were narrow gauge at the time. Its cost was estimated at £4,045,000. Legislation authorising the construction was passed in December 1911 by the Fisher Commonwealth Government . Work commenced in September 1912 in Port Augusta . Work proceeded eastwards from Kalgoorlie and westwards from Port Augusta through

90-530: A proposed line to Darwin . Under South Australian ownership the narrow gauge railway, known as the Great Northern Railway, was extended in stages and reached Oodnadatta in 1891. In 1882, this line also connected Port Augusta to Adelaide when the Peterborough–Quorn railway line was completed, as there was already railway from Peterborough to Adelaide. The original Port Augusta railway station

120-477: Is by train orders , using verbal communication. In the time of the operation of the railway, 'washaways' and 'flooding' in most cases rendered the railway inoperable at a range of locations. Washaways usually removed ballast, leaving rails suspended above the flooding areas. In most cases the underlying ballast was removed, and required replacing. Significant events on the line were in 1921, 1930 1937 and 2022. The 1930 flooding had two trains held up on sections of

150-446: The Tea and Sugar supply train carried vital provisions to the work sites and localities, all of them isolated, along the route: a butcher and banking and postal services were among the facilities provided. The length of the line, as constructed, was 1051.73 mi (1692.60 km), slightly less than the original survey. Although there are several hundred curves and gradients on the line,

180-480: The Commonwealth of Australia . At that time, Perth , the capital of Western Australia , was isolated from the remaining Australian states by thousands of miles of desert terrain and the only practicable method of transport was by sea. The voyage across the notoriously rough Great Australian Bight was time-consuming, inconvenient and often uncomfortable. One of the inducements held out to Western Australians to join

210-399: The turnouts as required. Crossing loops have self-restoring points, so that points are reset to the straight route when a train departs from a crossing loop. The loops are fitted with radio controls so that train crew can set the points as they approach. Locomotive cabs are fitted with an activated points system (ICAPS) to set the required route without having to stop the train. Safeworking

240-484: The entire coast-to-coast service following agreement with the governments of Western Australia and New South Wales . In 1997, following the privatisation of Australian National, the Indian Pacific was sold to a company, Great Southern Rail (as of 2020 trading as "Journey Beyond"). As of 2020, the Indian Pacific is a weekly, all-through, experiential tourism service. From the start of construction until 1996,

270-437: The indirect 290 kilometres (180 miles), 1,067 mm ( 3 ft 6 in ) narrow-gauge connection from Terowie via Peterborough and Quorn, resulting in a much shorter and more comfortable journey to Adelaide . These two projects eliminated one break of gauge in the journey across Australia, but they turned Port Pirie Junction yard into a complex three-gauge facility. Railway engineers, however, were able to construct

300-577: The inevitable problems of finding suitable water for steam locomotives in a desert, the original engineer, Henry Deane envisaged diesel locomotives for the line and made inquiries with potential manufacturers, although the technology was not well developed at the time. Unfortunately, a scandal involving the supply of sleepers led to Deane's resignation before the proposal had advanced. Initially trains were hauled by G class locomotives and from 1938 by C class locomotives, both steam. From 1951, diesel-electric locomotives hauled passenger services, using

330-445: The line is identifiable from space because of its unnatural straightness: "It's a very fine line, it's like someone has drawn a very fine pencil line across the desert". At no point along the route does the line cross a permanent fresh watercourse. Bores and reservoirs were established at intervals, but the water was often brackish and unsuitable for steam locomotive use, let alone human consumption, so water supplies had to be carried on

SECTION 10

#1732845088212

360-636: The line was extended through mainly dry and desolate regions until the two halves of the line met at Ooldea on 17 October 1917. Under the aegis of the federal department of transport, the Commonwealth Railways was established in 1917 to operate the line. Once passenger trains started to run, maintenance staff found that the high mineral salt content of bore water available along the route was playing havoc with steam locomotive boilers : repairs to boilers at one time accounted for an extraordinary 87 per cent of all locomotive maintenance. The problem

390-765: The line was inaugurated, the passenger service was named as the Great Western Express . Later, the train became known as the Trans-Australian or, colloquially, "The Trans". After the Sydney–Perth route was converted to standard gauge in 1970, the railway was no longer flanked at both ends by narrow-gauge lines and an all-through service, called the Indian Pacific , was started. Although passengers no longer had to move to different carriages at change-of-gauge localities, Commonwealth Railways remained responsible for

420-483: The line. 32°28′02″S 137°46′00″E  /  32.46709079°S 137.76673101°E  / -32.46709079; 137.76673101 Port Augusta railway station Port Augusta railway station is a railway station located on the Adelaide-Port Augusta railway line in Port Augusta , South Australia . In 1878, the first railway line in to Port Augusta was when it became the southern terminus of

450-490: The new GM class locomotives. The railway originally had 400 m (1,300 ft)-long crossing loops (passing sidings) every 100 km (62 mi) or so. As traffic increased the number of crossing loops increased. To handle longer trains, crossing loops were lengthened so that in 2008 they were all at least 1,800 m (5,900 ft) long and spaced about 30 km (19 mi) to 60 km (37 mi) apart. Most crossing loops are unattended and train crew operate

480-553: The new federation was the promise of a federally funded railway line linking Western Australia with the rest of the continent. In 1907, legislation was passed, allowing for the route to be surveyed. The survey, completed in 1909, endorsed a route from Port Augusta (the existing railhead at the head of Spencer Gulf in South Australia's wheatfields) via Tarcoola to the gold mining centre of Kalgoorlie in Western Australia,

510-430: The new yards with no more than minimal dual-gauge track and the complex signalling that would have been incurred. The long-anticipated conversion of the entire line between Sydney and Perth to standard gauge occurred in 1970. In 2004, the gap in standard gauge connections between the mainland state capitals was finally closed with a connection between Port Pirie and Adelaide, thence Melbourne , and by completion of

540-755: The northern component of the Adelaide–Darwin railway line , which diverges from the Trans–Australian Railway at Tarcoola. In 2008, the engineering heritage of the railway was recognised by the Engineering Heritage Recognition Program of Engineers Australia when markers were installed on the platform at the Port Augusta station in South Australia and the ticket office at Kalgoorlie station in Western Australia. On 17 October 2017, centenary celebrations were held at Ooldea. When

570-558: The railhead. The line passed to Commonwealth ownership on 1 January 1911, but continued to be operated by the South Australian Railways until the Commonwealth Railways took over operations on 1 January 1926. An extension of the railway to Alice Springs was completed in 1929. Between 1913 and 1917, the standard gauge Trans-Australian Railway was built from Port Augusta to Kalgoorlie in Western Australia , entering

600-444: The route includes the longest length of straight track in the world – 478.193 kilometres (297.135 miles). A Commonwealth Railways map marked the western end as 793 miles (1,276 km) from Port Augusta, between Loongana and Nurina, and states: "The 'Long Straight' extends from this point for a distance of 297 miles and terminates at the 496 miles [sic] between Ooldea and Watson." According to South Australian astronaut Andy Thomas ,

630-506: The service where it operated between Port Pirie and Kalgoorlie , with its crews and locomotives taking over at those stations. In 1975, Commonwealth Railways was absorbed into an enlarged federal government corporation, Australian National Railways Commission , branded as Australian National Railways and later as "Australian National", which continued to operate the Trans Australian. In 1993, Australian National took over operation of

SECTION 20

#1732845088212

660-466: The town from another direction and the station from the other end. Thus Port Augusta became a break of gauge station until the standard gauge line was extended to Port Pirie Junction in 1937. The new station provided for transfer of passenger and goods between trains on the standard gauge line to Kalgoorlie and the narrow gauge line to Oodnadatta and Adelaide (via Peterborough, and another break of gauge at Terowie ). The new two-storey station building

690-478: The train. In the days of steam locomotion, about half the total load was water for the engine. In later years, condenser plants were built at several major stations. Reflecting the line's ownership by the Commonwealth Government , eight of the localities were named (or renamed) after Australian Prime Ministers . Other prominent people's names were also allocated, as shown on the adjacent map. Because of

720-499: The years of the First World War . Tracklaying proceeded briskly when materials were available. At its peak, up to 2 + 1 ⁄ 2 miles (4.0 km) of track were laid each day, and 442 miles (711 km) were completed in one calendar year – both Australian tracklaying records. By 1915, the two ends of the line were just over 600 miles (966 km) apart with materials being delivered daily. Construction progressed steadily as

750-495: Was 160 by 48 feet (49 m × 15 m) and provided 1,000 feet (300 m) platform for standard gauge trains and 720 feet (220 m) platform for narrow gauge trains. In 1957, a new standard gauge Stirling North to Marree line was built via Leigh Creek , replacing the line via Quorn . In 1972, the Whyalla line opened to Whyalla to serve Whyalla Steelworks . In 2001, the narrow gauge line between Port Augusta and Quorn

780-465: Was known as the Great Western Express ; later, it became the Trans-Australian . As of 2020, two passenger services use the line, both of them experiential tourism services: the Indian Pacific for the entire length of the railway, and The Ghan between Port Augusta and Tarcoola , where it leaves the line to proceed north to Darwin . In 1901, the six Australian colonies federated to form

810-526: Was located in the city of Port Pirie in South Australia . Port Pirie Junction station opened on 23 July 1937 when the Commonwealth Railways standard gauge Trans-Australian Railway was extended south from Port Augusta , and the South Australian Railways line broad gauge north from Redhill to a new break of gauge station in the Port Pirie suburb of Solomontown . On 12 November 1967, it

840-443: Was on Commercial Road, and is now heritage listed and used as an art gallery. The railway continued through what later became railyards, through the original station, and down Commercial Road to the wharf area. The South Australian Government subsequently made offers to several syndicates to construct a line north from Oodnadatta to Pine Creek on the land grant system, however negotiations were unsuccessful and Oodnadatta remained

870-414: Was only arrested with the introduction of barium carbonate water treatment plants at watering points. In 1937, the eastern end was extended 90 kilometres (56 miles) south to Port Pirie . Soon afterwards, the South Australian Railways extended its 1,600 mm ( 5 ft 3 in ) broad-gauge line 47 km (29 mi) north to Port Pirie from Redhill . These two projects made redundant

900-592: Was re-opened by the Pichi Richi Railway Preservation Society . Port Augusta has long been an important railway centre, with Downer Rail having a plant in the city. Journey Beyond 's The Ghan and Indian Pacific services pass Port Augusta on the Adelaide-Port Augusta railway line but do not stop at the station. [REDACTED] Media related to Port Augusta railway station at Wikimedia Commons Port Pirie Junction railway station Port Pirie Junction railway station