Genus ( / ˈ dʒ iː n ə s / ; pl. : genera / ˈ dʒ ɛ n ər ə / ) is a taxonomic rank above species and below family as used in the biological classification of living and fossil organisms as well as viruses . In binomial nomenclature , the genus name forms the first part of the binomial species name for each species within the genus.
98-660: Sebastes is a genus of marine ray-finned fish belonging to the subfamily Sebastinae part of the family Scorpaenidae , most of which have the common name of rockfish . A few are called ocean perch , sea perch or redfish instead. They are found in the Atlantic and Pacific Oceans. Sebastes was first described as a genus in 1829 by the French zoologist Georges Cuvier , the Dutch ichthyologist Pieter Bleeker designated Perca norvegica , which may have been originally described by
196-557: A species : see Botanical name and Specific name (zoology) . The rules for the scientific names of organisms are laid down in the nomenclature codes , which allow each species a single unique name that, for animals (including protists ), plants (also including algae and fungi ) and prokaryotes ( bacteria and archaea ), is Latin and binomial in form; this contrasts with common or vernacular names , which are non-standardized, can be non-unique, and typically also vary by country and language of usage. Except for viruses ,
294-496: A LOC incident. However, when a team was sent to investigate the status of the RCIC of unit 2 the following morning (02:55), they confirmed that the RCIC was operating with the PCV pressure well below design limits. Based on this information, efforts were focused on unit 1. However, the condensate storage tank from which the RCIC draws water was nearly depleted by the early morning, and so the RCIC
392-403: A closed coolant loop from the pressure vessel with a heat exchanger in a dedicated condenser tank. Steam would be forced into the heat exchanger by the reactor pressure, and the condensed coolant would be fed back into the vessel by gravity. Each reactor was initially designed to be equipped with two redundant ICs which were each capable of cooling the reactor for at least 8 hours (at which point,
490-405: A closed-loop system which draws coolant from the suppression chamber (SC) instead of the storage tank, should the storage tank be depleted. Although this system could function autonomously without an external energy source (besides the steam from the reactor), direct current (DC) was needed to remotely control it and receive parameters and indications and alternating current (AC) was required to power
588-643: A later homonym of a validly published name is a nomen illegitimum or nom. illeg. ; for a full list refer to the International Code of Nomenclature for algae, fungi, and plants and the work cited above by Hawksworth, 2010. In place of the "valid taxon" in zoology, the nearest equivalent in botany is " correct name " or "current name" which can, again, differ or change with alternative taxonomic treatments or new information that results in previously accepted genera being combined or split. Prokaryote and virus codes of nomenclature also exist which serve as
686-621: A long time and redescribed as new by a range of subsequent workers, or if a range of genera previously considered separate taxa have subsequently been consolidated into one. For example, the World Register of Marine Species presently lists 8 genus-level synonyms for the sperm whale genus Physeter Linnaeus, 1758, and 13 for the bivalve genus Pecten O.F. Müller, 1776. Within the same kingdom, one generic name can apply to one genus only. However, many names have been assigned (usually unintentionally) to two or more different genera. For example,
784-538: A port near Fukushima city, Japan, not far from the Fukushima Daiichi Nuclear Power Plant , nearly 2 years after the nuclear disaster (ex: 107000 Bq /kg (2013-02-12); 116000 Bq/kg (2013-02-13) and 132000Bq/kg (2013-02-13), respectively 1070, 1160, and 1320 times more than the maximum allowed by Japanese authorities (as updated on April 1, 2012) Sebastes rockfish are important sport and commercial fish, and many species have been overfished . As
882-409: A reference for designating currently accepted genus names as opposed to others which may be either reduced to synonymy, or, in the case of prokaryotes, relegated to a status of "names without standing in prokaryotic nomenclature". An available (zoological) or validly published (botanical) name that has been historically applied to a genus but is not regarded as the accepted (current/valid) name for
980-533: A result, seasons are tightly controlled in many areas. Sebastes species are sometimes fraudulently substituted for the more expensive northern red snapper ( Lutjanus campechanus ). [REDACTED] Media related to Sebastes at Wikimedia Commons Genus The composition of a genus is determined by taxonomists . The standards for genus classification are not strictly codified, so different authorities often produce different classifications for genera. There are some general practices used, however, including
1078-460: A spiny horizontal ridge below the eye. The jaws have many small conical teeth and there are teeth on the roof of the mouth. The single dorsal fin is typically strongly incised at the posterior of the spiny portion which contains 12–15 robust, venom-bearing spines and to the rear of these are 9–16 soft rays, The anal fin has 2–4 spines and 6 to 11 soft rays. There is a spine in each of the pelvic fins as well as 5 soft rays and these are placed under
SECTION 10
#17328524890341176-427: A taxon; however, the names published in suppressed works are made unavailable via the relevant Opinion dealing with the work in question. In botany, similar concepts exist but with different labels. The botanical equivalent of zoology's "available name" is a validly published name . An invalidly published name is a nomen invalidum or nom. inval. ; a rejected name is a nomen rejiciendum or nom. rej. ;
1274-455: A total of c. 520,000 published names (including synonyms) as at end 2019, increasing at some 2,500 published generic names per year. "Official" registers of taxon names at all ranks, including genera, exist for a few groups only such as viruses and prokaryotes, while for others there are compendia with no "official" standing such as Index Fungorum for fungi, Index Nominum Algarum and AlgaeBase for algae, Index Nominum Genericorum and
1372-618: Is derived from the Greek Sebastos , an honorific used in ancient Greek for the Roman imperial title of Augustus , an allusion to the old name for S. norvegicus on Ibiza , its type locality , which Cuvier translated as "august" or "venerable". The fossil record of rockfish goes back to the Miocene , with unequivocal whole body fossils and otoliths from California and Japan (although fossil otoliths from Belgium , " Sebastes " weileri , may push
1470-596: Is discouraged by both the International Code of Zoological Nomenclature and the International Code of Nomenclature for algae, fungi, and plants , there are some five thousand such names in use in more than one kingdom. For instance, A list of generic homonyms (with their authorities), including both available (validly published) and selected unavailable names, has been compiled by the Interim Register of Marine and Nonmarine Genera (IRMNG). The type genus forms
1568-460: Is somewhat arbitrary. Although all species within a genus are supposed to be "similar", there are no objective criteria for grouping species into genera. There is much debate among zoologists about whether enormous, species-rich genera should be maintained, as it is extremely difficult to come up with identification keys or even character sets that distinguish all species. Hence, many taxonomists argue in favor of breaking down large genera. For instance,
1666-474: Is the type species , and the generic name is permanently associated with the type specimen of its type species. Should the specimen turn out to be assignable to another genus, the generic name linked to it becomes a junior synonym and the remaining taxa in the former genus need to be reassessed. In zoological usage, taxonomic names, including those of genera, are classified as "available" or "unavailable". Available names are those published in accordance with
1764-621: The International Code of Zoological Nomenclature ; the earliest such name for any taxon (for example, a genus) should then be selected as the " valid " (i.e., current or accepted) name for the taxon in question. Consequently, there will be more available names than valid names at any point in time; which names are currently in use depending on the judgement of taxonomists in either combining taxa described under multiple names, or splitting taxa which may bring available names previously treated as synonyms back into use. "Unavailable" names in zoology comprise names that either were not published according to
1862-916: The International Nuclear Event Scale by Nuclear and Industrial Safety Agency, following a report by the JNES (Japan Nuclear Energy Safety Organization). It is regarded as the worst nuclear incident since the Chernobyl disaster in 1986, which was also rated a seven on the International Nuclear Event Scale. According to the United Nations Scientific Committee on the Effects of Atomic Radiation , "no adverse health effects among Fukushima residents have been documented that are directly attributable to radiation exposure from
1960-799: The International Plant Names Index for plants in general, and ferns through angiosperms, respectively, and Nomenclator Zoologicus and the Index to Organism Names for zoological names. Totals for both "all names" and estimates for "accepted names" as held in the Interim Register of Marine and Nonmarine Genera (IRMNG) are broken down further in the publication by Rees et al., 2020 cited above. The accepted names estimates are as follows, broken down by kingdom: The cited ranges of uncertainty arise because IRMNG lists "uncertain" names (not researched therein) in addition to known "accepted" names;
2058-476: The disposal of treated wastewater once used to cool the reactor , resulting in numerous protests in neighboring countries. The Fukushima Daiichi Nuclear Power Plant consisted of six General Electric (GE) light water boiling water reactors (BWRs). Unit 1 was a GE type 3 BWR. Units 2–5 were type 4. Unit 6 was a type 5. At the time of the Tōhoku earthquake on 11 March 2011 , units 1–3 were operating. However,
SECTION 20
#17328524890342156-420: The pectoral fins . The pectoral fins are large and may be rounded or pointed in shape with 14–22 soft rays, the longest being the central rays. The caudal fin is straight to slightly concave. The lateral line may have pored or tubed scales. They vary in size from a maximum total length of 13.7 cm (5.4 in) in S. koreanus to 108 cm (43 in) in S. borealis . Sebastes rockfish are found in
2254-404: The platypus belongs to the genus Ornithorhynchus although George Shaw named it Platypus in 1799 (these two names are thus synonyms ) . However, the name Platypus had already been given to a group of ambrosia beetles by Johann Friedrich Wilhelm Herbst in 1793. A name that means two different things is a homonym . Since beetles and platypuses are both members of the kingdom Animalia,
2352-452: The reactor pressure vessel (RPV) and embedded itself into the concrete at the base of the PCV. Although at the time it was difficult to determine how far the fuel had eroded and diffused into the concrete, it was estimated that the fuel remained within the PCV. Computer simulations, from 2013, suggest "the melted fuel in Unit 1, whose core damage was the most extensive, has breached the bottom of
2450-500: The spent fuel pools of all units still required cooling. Many of the internal components and fuel assembly cladding are made from a zirconium alloy (Zircaloy) for its low neutron cross section . At normal operating temperatures (~300 °C (572 °F)), it is inert. However, above 1,200 °C (2,190 °F), Zircaloy can be oxidized by steam to form hydrogen gas or by uranium dioxide to form uranium metal . Both of these reactions are exothermic . In combination with
2548-488: The 13 EDGs, 10 were water-cooled and placed in the basements about 7–8 m below the ground level. The coolant water for the EDGs was carried by several seawater pumps placed on the shoreline which also provide water for the main condenser. These components were unhoused and only protected by the seawall. The other three EDGs were air-cooled and were connected to units 2, 4, and 6. The air-cooled EDGs for units 2 and 4 were placed on
2646-564: The 20th. Unit 6 was not operating, and its decay heat was low. All but one EDG was disabled by the tsunami, allowing unit 6 to retain AC-powered safety functions throughout the incident. However, because the RHR was damaged, workers activated the make-up water condensate system to maintain the reactor water level until the RHR was restored on the 20th. Cold shutdown was achieved on the 20th, less than an hour after unit 5. On 21 March, temperatures in
2744-459: The FP injection port was hidden under debris. The next morning (12 March, 04:00), approximately 12 hours after the loss of power, freshwater injection into the reactor vessel began, later replaced by a water line at 09:15 leading directly from the water storage tank to the injection port to allow for continuous operation (the fire engine had to be periodically refilled). This continued into the afternoon until
2842-420: The French botanist Joseph Pitton de Tournefort (1656–1708) is considered "the founder of the modern concept of genera". The scientific name (or the scientific epithet) of a genus is also called the generic name ; in modern style guides and science, it is always capitalised. It plays a fundamental role in binomial nomenclature , the system of naming organisms , where it is combined with the scientific name of
2940-473: The Fukushima Daiichi nuclear plant accident". Insurance compensation was paid for one death from lung cancer , but this does not prove a causal relationship between radiation and the cancer. Six other persons have been reported as having developed cancer or leukemia . Two workers were hospitalized because of radiation burns , and several other people sustained physical injuries as a consequence of
3038-482: The Fukushima coast. In response to the station blackout during the initial hours of the accident and the ongoing uncertainty regarding the cooling status of units 1 and 2, a 2 km radius evacuation of 1,900 residents was ordered at 20:50. However, due to difficulty coordinating with the national government, a 3 km evacuation order of ~6,000 residents and a 10 km shelter-in-place order for 45,000 residents
Sebastes - Misplaced Pages Continue
3136-519: The HPCI and RCIC systems, but both failed to restart. Following this loss of cooling, workers established a water line from the valve pit to inject seawater into the reactor alongside unit 2. However, water could not be injected due to RPV pressures exceeding the pump capability. Similarly, preparations were also made to vent the unit 3 PCV, but PCV pressure was not sufficient to burst the rupture disk. Later that morning (9:08), workers were able to depressurize
3234-531: The HPCI system showed signs of malfunction. The HPCI isolation valve failed to activate automatically upon achieving a certain pressure. In response, the workers switched off HPCI and began injection of water via the lower-pressure firefighting equipment. However, the workers found that the SRVs did not operate to relieve pressure from the reactor vessel to allow water injection by the DDFP. In response, workers attempted to restart
3332-720: The Norwegian zoologist Peter Ascanius in 1772, as the type species in 1876. The genus is the type genus of both the tribe Sebastini and the subfamily Sebastinae, although some authorities treat these as the subfamily Sebastinae and the family Sebastidae, separating the Sebastidae as a distinct family from the Scorpaenidae. but other authorities place it in the Perciformes in the suborder Scorpaenoidei. Some authorities subdivide this large genus into subgenera as follows: The genus name
3430-435: The PCV was completed later that afternoon at 14:00. At the same time, pressure in the reactor vessel had been decreasing to equalize with the PCV, and the workers prepared to inject water into the reactor vessel using the DDFP once the pressure had decreased below the 0.8 MPa limit. Unfortunately, the DDFP was found to be inoperable and a fire truck had to be connected to the FP system. This process took about 4 hours, as
3528-470: The RCIC system failed. In response, the high-pressure coolant injection (HPCI) system was activated to alleviate the lack of cooling while workers continued to attempt to restart the RCIC. Additionally, the FP system was used to spray the PCV (mainly the SC) with water in order to slow the climbing temperatures and pressures of the PCV. On the morning of the 13th (02:42), after DC power was restored by new batteries,
3626-422: The RCIC system was continuing to cool the reactor. However, knowing that their DC supply was limited, the workers managed to extend the backup DC supply to about 2 days by disconnecting nonessential equipment, until replacement batteries were brought from a neighboring power station on the morning of the 13th (with 7 hours between loss and restoration of DC power). At 11:36 the next day, after 20.5 hours of operation,
3724-416: The accident was the 2011 Tōhoku earthquake and tsunami , which resulted in electrical grid failure and damaged nearly all of the power plant's backup energy sources . The subsequent inability to sufficiently cool reactors after shutdown compromised containment and resulted in the release of radioactive contaminants into the surrounding environment. The accident was rated seven (the maximum severity) on
3822-734: The accident. Criticisms have been made about the public perception of radiological hazards resulting from accidents and the implementation of evacuations (similar to the Chernobyl nuclear accident), as they were accused of causing more harm than they prevented. Following the accident, at least 164,000 residents of the surrounding area were permanently or temporarily displaced (either voluntarily or by evacuation order). The displacements resulted in at least 51 deaths as well as stress and fear of radiological hazards. Investigations faulted lapses in safety and oversight, namely failures in risk assessment and evacuation planning. Controversy surrounds
3920-436: The atmosphere, those which remain in a gaseous phase will simply be diluted by the atmosphere, but some which precipitate will eventually settle on land or in the ocean. Approximately 40–80% of the atmospheric caesium-137 was deposited in the ocean. Thus, the majority (90~99%) of the radionuclides which are deposited are isotopes of iodine and caesium, with a small portion of tellurium , which are almost fully vaporized out of
4018-442: The base for higher taxonomic ranks, such as the family name Canidae ("Canids") based on Canis . However, this does not typically ascend more than one or two levels: the order to which dogs and wolves belong is Carnivora ("Carnivores"). The numbers of either accepted, or all published genus names is not known precisely; Rees et al., 2020 estimate that approximately 310,000 accepted names (valid taxa) may exist, out of
Sebastes - Misplaced Pages Continue
4116-410: The blackout, the RCIC was functioning as designed without the need for operator intervention. The safety relief valves (SRVs) would intermittently release steam directly into the PCV suppression torus at its design pressure and the RCIC properly replenished lost coolant. However, following the total blackout of Unit 2, the plant operators (similar to Unit 1) assumed the worst-case scenario and prepared for
4214-456: The condenser tank would have to be refilled). However, it was possible for the IC system to cool the reactor too rapidly shortly after shutdown which could result in undesirable thermal stress on the containment structures. To avoid this, the protocol called for reactor operators to manually open and close the condenser loop using electrically operated control valves. After the construction of Unit 1,
4312-701: The contaminated waters far into the Pacific Ocean, dispersing the radioactivity. As of late 2011, measurements of both the seawater and the coastal sediments suggested that the consequences for marine life would be minor. Significant pollution along the coast near the plant might persist, because of the continuing arrival of radioactive material transported to the sea by surface water crossing contaminated soil. The possible presence of other radioactive substances, such as strontium-90 or plutonium , had not been sufficiently studied. Recent measurements show persistent contamination of some marine species (mostly fish) caught along
4410-431: The core due to their high vapor pressure. The remaining fraction of deposited radionuclides are of less volatile elements such as barium , antimony , and niobium , of which less than a percent is evaporated from the fuel. In addition to atmospheric deposition, there was also a significant quantity of direct releases into groundwater (and eventually the ocean) through leaks of coolant which had been in direct contact with
4508-399: The critical parts of the reactor was found. In 2006, the design of the reactors was reevaluated with new standards requiring the reactors to withstand accelerations ranging up to 450 Gal. In the event of an emergency, operators planned to pump water into the reactors to keep them cool. This would inevitably create steam which should not be very radioactive because the fuel would still be in
4606-473: The exothermic reaction of boron carbide with stainless steel , these reactions can contribute to the overheating of a reactor. In the event of an emergency, reactor pressure vessels (RPV) are automatically isolated from the turbines and main condenser and are instead switched to a secondary condenser system which is designed to cool the reactor without the need for pumps powered by external power or generators. The isolation condenser (IC) system involved
4704-443: The explosion. The debris produced by the explosion damaged the mobile emergency power generator and the seawater injection lines. The seawater injection lines were repaired and put back into operation at 19:04 until the valve pit was nearly depleted of seawater at 01:10 on the 14th. The seawater injection was temporarily stopped in order to refill the valve pit with seawater using a variety of emergency service and JSDF vehicles. However,
4802-409: The final 20 km evacuation zone. 20% of residents who were within the initial 2 km radius had to evacuate more than six times. Additionally, a 30 km shelter in place order was communicated on the 15th, although some municipalities within this zone had already decided to evacuate their residents. This order was followed by a voluntary evacuation recommendation on the 25th, although
4900-400: The following numbers of fuel assemblies: The original design basis was a zero-point ground acceleration of 250 Gal and a static acceleration of 470 Gal, based on the 1952 Kern County earthquake (0.18 g , 1.4 m/s , 4.6 ft/s ). After the 1978 Miyagi earthquake , when the ground acceleration reached 0.125 g (1.22 m/s , 4.0 ft/s ) for 30 seconds, no damage to
4998-475: The following units were designed with new open-cycle reactor core isolation cooling (RCIC) systems. This new system used the steam from the reactor vessel to drive a turbine which would power a pump to inject water into the pressure vessel from an external storage tank to maintain the water level in the reactor vessel and was designed to operate for at least 4 hours (until the depletion of coolant or mechanical failure). Additionally, this system could be converted into
SECTION 50
#17328524890345096-446: The form "author, year" in zoology, and "standard abbreviated author name" in botany. Thus in the examples above, the genus Canis would be cited in full as " Canis Linnaeus, 1758" (zoological usage), while Hibiscus , also first established by Linnaeus but in 1753, is simply " Hibiscus L." (botanical usage). Each genus should have a designated type , although in practice there is a backlog of older names without one. In zoology, this
5194-452: The freshwater tank was nearly depleted. In response, injection stopped at 14:53 and the injection of seawater, which had collected in a nearby valve pit (the only other source of water), began. Power was restored to units 1 (and 2) using a mobile generator at 15:30 on 12 March. At 15:36, a hydrogen explosion damaged the secondary confinement structure (the RB). The workers evacuated shortly after
5292-542: The fuel pond had risen slightly, to 61 °C (142 °F), and water was sprayed over the pool. Power was restored to cooling systems on 24 March and by 28 March, temperatures were reported down to 35 °C (95 °F). Quantities of the released material are expressed in terms of the three predominant products released: caesium-137 , iodine-131 , and xenon-133 . Estimates for atmospheric releases range from 7–20 PBq for Cs-137, 100–400 PBq for I-131, and 6,000–12,000 PBq for Xe-133. Once released into
5390-488: The fuel. Estimates for this release vary from 1 to 5.5 PBq caesium-137 and 10-20 PBq iodine-131 . According to the French Institute for Radiological Protection and Nuclear Safety , the release from the accident represents the most important individual oceanic emissions of artificial radioactivity ever observed. The Fukushima coast has one of the world's strongest currents ( Kuroshio Current ). It transported
5488-727: The generic name (or its abbreviated form) still forms the leading portion of the scientific name, for example, Canis lupus lupus for the Eurasian wolf subspecies, or as a botanical example, Hibiscus arnottianus ssp. immaculatus . Also, as visible in the above examples, the Latinised portions of the scientific names of genera and their included species (and infraspecies, where applicable) are, by convention, written in italics . The scientific names of virus species are descriptive, not binomial in form, and may or may not incorporate an indication of their containing genus; for example,
5586-412: The ground floor of the spent fuel building, but the switches and various other components were located below, in the basement. The third air-cooled EDG was in a separate building placed inland and at higher elevations. Although these EDGs are intended to be used with their respective reactors, switchable interconnections between unit pairs (1 and 2, 3 and 4, and 5 and 6) allowed reactors to share EDGs should
5684-440: The ground or basement levels at approximately 15:41. The switching stations that provided power from the three EDGs located higher on the hillside also failed when the building that housed them flooded. One air-cooled EDG, that of unit 6, was unaffected by the flooding and continued to operate. The DC batteries for units 1, 2, and 4 were also inoperable shortly after flooding. As a result, units 1–5 lost AC power and DC power
5782-432: The idea that a newly defined genus should fulfill these three criteria to be descriptively useful: Moreover, genera should be composed of phylogenetic units of the same kind as other (analogous) genera. The term "genus" comes from Latin genus , a noun form cognate with gignere ('to bear; to give birth to'). The Swedish taxonomist Carl Linnaeus popularized its use in his 1753 Species Plantarum , but
5880-415: The isolation valves. In an emergency where backup on-site power was partially damaged or insufficient to last until a grid connection to off-site power could be restored, these cooling systems could no longer be relied upon to reliably cool the reactor. In such a case, the expected procedure was to vent both the reactor vessel and primary containment using electrically or pneumatically operated valves using
5978-628: The largest component, with 23,236 ± 5,379 accepted genus names, of which 20,845 ± 4,494 are angiosperms (superclass Angiospermae). By comparison, the 2018 annual edition of the Catalogue of Life (estimated >90% complete, for extant species in the main) contains currently 175,363 "accepted" genus names for 1,744,204 living and 59,284 extinct species, also including genus names only (no species) for some groups. The number of species in genera varies considerably among taxonomic groups. For instance, among (non-avian) reptiles , which have about 1180 genera,
SECTION 60
#17328524890346076-472: The lizard genus Anolis has been suggested to be broken down into 8 or so different genera which would bring its ~400 species to smaller, more manageable subsets. Fukushima Daiichi nuclear disaster The Fukushima nuclear accident was a major nuclear accident at the Fukushima Daiichi nuclear power plant in Ōkuma, Fukushima , Japan which began on 11 March 2011. The proximate cause of
6174-437: The majority of residents had evacuated from the 30 km zone by then. The shelter in place order was lifted on April 22, but the evacuation recommendation remained. Of an estimated 2,220 patients and elderly who resided within hospitals and nursing homes within the 20 km evacuation zone, 51 fatalities are attributed to the evacuation. There was one suspected death due to radiation, as one person died 4 years later of
6272-403: The most (>300) have only 1 species, ~360 have between 2 and 4 species, 260 have 5–10 species, ~200 have 11–50 species, and only 27 genera have more than 50 species. However, some insect genera such as the bee genera Lasioglossum and Andrena have over 1000 species each. The largest flowering plant genus, Astragalus , contains over 3,000 species. Which species are assigned to a genus
6370-428: The name could not be used for both. Johann Friedrich Blumenbach published the replacement name Ornithorhynchus in 1800. However, a genus in one kingdom is allowed to bear a scientific name that is in use as a generic name (or the name of a taxon in another rank) in a kingdom that is governed by a different nomenclature code. Names with the same form but applying to different taxa are called "homonyms". Although this
6468-455: The need arise. The power station was also equipped with backup DC batteries kept charged by AC power at all times, designed to be able to power the station for approximately 8 hours without EDGs. In units 1, 2, and 4, the batteries were located in the basements alongside the EDGs. In units 3, 5, and 6, the batteries were located in the turbine building where they were raised above ground level. The units and central storage facility contained
6566-406: The ocean began two hours later, and cooling of unit 3 resumed in the afternoon (approximately 16:00) and continued until cooling was lost once more as a result of site evacuation on the 15th. Unit 4 was not fueled at the time, but the unit 4 spent fuel pool (SFP) contained a number of fuel rods. On 15 March, an explosion was observed at unit 4 RB during site evacuation. A team later returned to
6664-460: The power station to inspect unit 4, but were unable to do so due to the present radiological hazard. The explosion damaged the fourth-floor rooftop area of Unit 4, creating two large holes in a wall of the RB. The explosion was likely caused by hydrogen passing to unit 4 from unit 3 through shared pipes. The following day, on the 16th, an aerial inspection was performed by helicopter which confirmed there
6762-410: The primary containment vessel and even partially eaten into its concrete foundation, coming within about 30 cm (1 ft) of leaking into the ground". A Kyoto University nuclear engineer said with regard to these estimates: "We just can't be sure until we actually see the inside of the reactors." Unit 2 was the only other operating reactor which experienced a total loss of AC and DC power. Before
6860-496: The primary containment vessel. Therefore, the steam would manually be released by venting valves to prevent a high pressure explosion. The 9.0 M W earthquake occurred at 14:46 on Friday, 11 March 2011, with the epicenter off of the east coast of the Tōhoku region . It produced maximum ground g-force of 560 Gal , 520 Gal, 560 Gal at units 2, 3, and 5 respectively. This exceeded the seismic reactor design tolerances of 450 Gal, 450 Gal, and 460 Gal for continued operation, but
6958-491: The process of restarting seawater injection was interrupted by another explosion in unit 3 RB at 11:01 which damaged water lines and prompted another evacuation. Injection of seawater into unit 1 would not resume until that evening, after 18 hours without cooling. Subsequent analysis in November 2011 suggested that this extended period without cooling resulted in the melting of the fuel in unit 1, most of which would have escaped
7056-526: The provisions of the ICZN Code, e.g., incorrect original or subsequent spellings, names published only in a thesis, and generic names published after 1930 with no type species indicated. According to "Glossary" section of the zoological Code, suppressed names (per published "Opinions" of the International Commission of Zoological Nomenclature) remain available but cannot be used as the valid name for
7154-468: The reactor by operating the safety relief valves using batteries collected from nearby automobiles. This was shortly followed by the bursting of the venting line rupture disk and the depressurization of the PCV. Unfortunately, venting was quickly stopped by a pneumatic isolation valve which closed on the vent path due to a lack of compressed air, and venting was not resumed until over 6 hours later once an external air compressor could be installed. Despite this,
7252-414: The reactor operators began planning to lower the PCV pressure by venting. The PCV reached its maximum pressure of 0.84 MPa at 02:30 on 12 March, after which it stabilized around 0.8 MPa. The decrease in pressure was due to an uncontrolled vent via an unknown pathway. The plant was notified Okuma town completed evacuation at 9:02 on 12 March. The staff subsequently began controlled venting. Venting of
7350-399: The reactor pressure was immediately low enough to allow for water injection (borated freshwater, as ordered by TEPCO) using the FP system until the freshwater FP tanks were depleted, at which point the injected coolant was switched to seawater from the valve pit. Cooling was lost once the valve pit was depleted but was resumed two hours later (unit 1 cooling was postponed until the valve pit
7448-426: The reactor vessel. However, the reactor pressure had already increased to many times greater than the limit of the DDFP. Additionally, the team detected high levels of radiation within the secondary confinement structure, indicating damage to the reactor core, and found that the primary containment vessel (PCV) pressure (0.6 MPa ) exceeded design specifications (0.528 MPa). In response to this new information,
7546-468: The record back as far as the early Oligocene ). Sebastes contains 109 recognized extant species in this genus are: Sebastes species have bodies which vary from elongate to deep, and which may be moderately to highly compressed with a comparatively large head. Their eyes vary from large to small. They may have spines on the head or these may be absent, if spines are present, these can be small and weak or robust and there can be up to 8 of them. They lack
7644-506: The remaining electricity on site. This would lower the reactor pressure sufficiently to allow for low-pressure injection of water into the reactor using the fire protection system to replenish water lost to evaporation. Station operators switched the reactor control to off-site power for shutdown, but the system was damaged by the earthquake. Emergency diesel generators (EDG) then automatically started to provide AC power. Two EDGs were available for each of units 1–5 and three for unit 6. Of
7742-455: The seismic values were within the design tolerances of unit 6. Upon detecting the earthquake, all three operating reactors (units 1, 2, and 3) automatically shut down. Due to expected grid failure and damage to the switch station as a result of the earthquake, the power station automatically started up the EDGs, isolated the reactor from the primary coolant loops, and activated the emergency shutdown cooling systems. The largest tsunami wave
7840-497: The specific name particular to the wolf. A botanical example would be Hibiscus arnottianus , a particular species of the genus Hibiscus native to Hawaii. The specific name is written in lower-case and may be followed by subspecies names in zoology or a variety of infraspecific names in botany . When the generic name is already known from context, it may be shortened to its initial letter, for example, C. lupus in place of Canis lupus . Where species are further subdivided,
7938-412: The standard format for a species name comprises the generic name, indicating the genus to which the species belongs, followed by the specific epithet, which (within that genus) is unique to the species. For example, the gray wolf 's scientific name is Canis lupus , with Canis ( Latin for 'dog') being the generic name shared by the wolf's close relatives and lupus (Latin for 'wolf') being
8036-403: The taxon is termed a synonym ; some authors also include unavailable names in lists of synonyms as well as available names, such as misspellings, names previously published without fulfilling all of the requirements of the relevant nomenclatural code, and rejected or suppressed names. A particular genus name may have zero to many synonyms, the latter case generally if the genus has been known for
8134-625: The televised news media. Citizens were informed by radio, trucks with megaphones, and door to door visits. Many municipalities independently ordered evacuations ahead of orders from the national government due to loss of communication with authorities; at the time of the 3 km evacuation order, the majority of residents within the zone had already evacuated. Due to the multiple overlapping evacuation orders, many residents had evacuated to areas which would shortly be designated as evacuation areas. This resulted in many residents having to move multiple times until they reached an area outside of
8232-605: The temperate North and South Pacific and Atlantic Oceans. Rockfish range from the intertidal zone to almost 3,000 m (9,800 ft) deep, usually living benthically on various substrates, often, as the name suggests, around rock outcrops. Sebastes rockfish may be long-lived, amongst the longest-living fish on earth, with several species known to surpass 100 years of age, and a maximum reported age of 205 years for S. aleutianus . Like all carnivores, these fish can bioaccumulate some pollutants or radionuclides such as cesium . Highly radioactive rockfish have been caught in
8330-412: The tsunami, operators attempted to manually open the IC control valve, but the IC failed to function, suggesting that the isolation valves were closed. Although they were kept open during IC operation, the loss of DC power in unit 1 (which occurred shortly before the loss of AC power) automatically closed the AC-powered isolation valves to prevent uncontrolled cooling or a potential LOC. Although this status
8428-456: The tsunami. The isolation condenser (IC) was functioning prior to the tsunami, but the DC-operated control valve outside of the primary containment had been in the closed position at the time to prevent thermal stresses on the reactor components. Some indications in the control room stopped functioning and operators correctly assumed loss of coolant (LOC). At 18:18 on 11 March, a few hours after
8526-566: The values quoted are the mean of "accepted" names alone (all "uncertain" names treated as unaccepted) and "accepted + uncertain" names (all "uncertain" names treated as accepted), with the associated range of uncertainty indicating these two extremes. Within Animalia, the largest phylum is Arthropoda , with 151,697 ± 33,160 accepted genus names, of which 114,387 ± 27,654 are insects (class Insecta). Within Plantae, Tracheophyta (vascular plants) make up
8624-429: The virus species " Salmonid herpesvirus 1 ", " Salmonid herpesvirus 2 " and " Salmonid herpesvirus 3 " are all within the genus Salmonivirus ; however, the genus to which the species with the formal names " Everglades virus " and " Ross River virus " are assigned is Alphavirus . As with scientific names at other ranks, in all groups other than viruses, names of genera may be cited with their authorities, typically in
8722-489: Was 13–14 m (43–46 feet) high and hit approximately 50 minutes after the initial earthquake, overtopping the seawall and exceeding the plant's ground level, which was 10 m (33 ft) above sea level. The waves first damaged the seawater pumps along the shoreline, 10 of the plant's 13 cooling systems for the emergency diesel generators (EDG). The waves then flooded all turbine and reactor buildings, damaging EDGs and other electrical components and connections located on
8820-457: Was damaged and the isolation valve for the PCV vent was found to be closed and inoperable. At 13:00 on the 14th, the RCIC pump for unit 2 failed after 68 hours of continuous operation. With no way to vent the PCV, in response, a plan was devised to delay containment failure by venting the reactor vessel into the PCV using the SRVs to allow for seawater injection into the reactor vessel. The following morning (March 15, 06:15), another explosion
8918-416: Was established nearly simultaneously at 21:23. The evacuation radius was expanded to 10 km at 5:44, and was then revised to 20 km at 18:25. The size of these evacuation zones was set for arbitrary reasons at the discretion of bureaucrats rather than nuclear experts. Communication between different authorities was scattered and at several times the local governments learned the status of evacuation via
9016-636: Was filled). However, despite being cooled, PCV pressure continued to rise and the RPV water level continued to drop until the fuel became uncovered on the morning of the 14th (6:20), as indicated by a water level gauge, which was followed by workers evacuating the area out of concerns about a possible second hydrogen explosion similar to unit 1. Shortly after work resumed to reestablish coolant lines, an explosion occurred in unit 3 RB at 11:01 on March 14, which further delayed unit 1 cooling and damaged unit 3's coolant lines. Work to reestablish seawater cooling directly from
9114-519: Was heard on site coinciding with a rapid drop of suppression chamber pressure to atmospheric pressure, interpreted as a malfunction of suppression chamber pressure measurement. Due to concerns about the growing radiological hazard on site, almost all workers evacuated to the Fukushima Daini Nuclear Power Plant . Although AC power was lost, some DC power was still available in unit 3 and the workers were able to remotely confirm that
9212-412: Was lost in units 1, 2, and 4. In response, the operators assumed a loss of coolant in units 1 and 2 and developed a plan in which they would vent the primary containment and inject water into the reactor vessels with firefighting equipment. Tokyo Electric Power Company ( TEPCO ), the utility operator and owner, notified authorities of a "first-level emergency". Two workers were killed by the impact of
9310-424: Was manually reconfigured at 05:00 to recirculate water from the suppression chamber instead. On the 13th, unit 2 was configured to vent the PCV automatically (manually opening all valves, leaving only the rupture disk) and preparations were made to inject seawater from the valve pit via the FP system should the need arise. However, as a result of the explosion in unit 3 the following day, the seawater injection setup
9408-404: Was not possible, as the reactor was not producing sufficient steam. However, the water within the RPV proved sufficient to cool the fuel, with the SRVs venting into the PCV, until AC power was restored on March 13 using the unit 6 interconnection, allowing the use of the low-pressure pumps of the residual heat removal (RHR) system. Unit 5 was the first to achieve a cold shutdown in the afternoon on
9506-445: Was sufficient water remaining in the SFP. On the 20th, water was sprayed into the uncovered SFP, later replaced by a concrete pump truck with a boom on the 22nd. Unit 5 was fueled and was undergoing an RPV pressure test at the time of the accident, but the pressure was maintained by an external air compressor and the reactor was not otherwise operating. Removal of decay heat using the RCIC
9604-435: Was unknown to the plant operators, they correctly interpreted the loss of function in the IC system and manually closed the control valves. The plant operators would continue to periodically attempt to restart the IC in the following hours and days, but it did not function. The plant operators then attempted to use the building's fire protection (FP) equipment, operated by a diesel-driven fire pump (DDFP), to inject water into