The Savannah River Site ( SRS ) is a U.S. Department of Energy (DOE) reservation in the United States, located in the state of South Carolina on land in Aiken , Allendale , and Barnwell counties adjacent to the Savannah River . It lies 25 miles (40 km) southeast of Augusta, Georgia . The site was built during the 1950s to refine nuclear materials for deployment in nuclear weapons . It covers 310 square miles (800 km ) and employs more than 10,000 people.
51-560: SREL may refer to: The Savannah River Ecology Laboratory , a research unit of the University of Georgia located in Aiken, South Carolina Service de Renseignement de l’État Luxembourgeois , the Luxembourgish homeland intelligence agency Topics referred to by the same term [REDACTED] This disambiguation page lists articles associated with
102-477: A $ 1.6 billion investment in SRS. This project, expected to run through fiscal year 2011, will result in the accelerated cleanup of nuclear waste at SRS and a significant reduction in the site footprint. In 2009 alone, more than 1,500 new workers were hired and over 800 jobs retained, due to ARRA funding. SRS construction employees reached 23 million hours (11 consecutive years) without a lost time injury case. M Area closure
153-570: A MOX fuel fabrication; pit disassembly and conversion; and plutonium immobilization. WSRC earned the DOE's top safety performance honor of Star Status. Thousands of shipments of transuranic waste were contained and sent by truck and by rail to the DOE's Waste Isolation Pilot Plant (WIPP) Project in New Mexico , with the first shipments beginning in 2001. DWPF completed production of four million pounds of environmentally acceptable classified waste. In 2002,
204-554: A dumping ground for unprocessed weapons grade plutonium for the indefinite future and demanding previously agreed upon payment of contractual non-delivery fines. The federal government filed for dismissal and it was granted in February 2017. The State of South Carolina similarly sued the federal government over the termination of the project, arguing that the Department of Energy had not prepared an environmental impact statement concerning
255-703: A proposal in June 2007 for the new M&O Contract. A team led by URS and including many of the WSRC partners also submitted a proposal. On January 9, 2008, it was announced that SRNS LLC had won the new contract, with a 90-day transition period to start 24 January 2008. However, the transition was delayed by a protest filed with GAO by the URS team on 22 January 2008. The GAO denied the protest on 25 April. DOE-SR then directed SRNS to start transition on 2 May and take over operation on 1 August 2008. Dunbarton, South Carolina Dunbarton
306-464: A request to terminate the plant's construction authorization. A Congressional committee in 1988 heard testimony of over 30 significant accidents at the facility that were hidden from the public. These included: a near loss of control of the L Reactor in 1960 when technicians tried to restart it; a "very significant leak" of water from the C Reactor in 1965; a large radiation release in November, 1970, into
357-601: A sensitive nuclear waste-handling facility at the plant. In 1992, the U.S. Congress enacted "nuclear weapons whistleblower protection". In 1992, the cooling tower was connected to the K Reactor, and the reactor operated briefly for the last time. The Secretary of Energy announced the phase-out of all uranium processing. Non-radioactive operations began at the Replacement Tritium Facility and the Defense Waste Processing Facility (DWPF). K Reactor
408-720: Is a partnership between Fluor Corporation , Newport News Nuclear, Inc. (a subsidiary of Huntington Ingalls Industries ) and Honeywell International . Savannah River Remediation (SRR) was awarded the contract for the Liquid Waste Operations of SRS. Historical markers were placed in P and R Areas commemorating the role both reactors played towards winning the Cold War. Construction on the Waste Solidification Building (WSB) began. In 2009, SRS began The American Reinvestment and Recovery Act (ARRA) project representing
459-546: Is also home to the Savannah River National Laboratory and the United States' only operating radiochemical separations facility. Its tritium facilities are also the United States' only source of tritium, an essential component in nuclear weapons. The United States' only mixed oxide fuel (MOX) manufacturing plant was being constructed at SRS, but construction was terminated in February 2019. Construction
510-409: Is held by Savannah River Mission Completion, which is a team of companies led by BWX Technologies , AECOM , and Fluor. A major focus is cleanup activities related to work done in the past for American nuclear buildup. Currently none of the reactors on-site are operating (see list of nuclear reactors ), although two of the reactor buildings are being used to consolidate and store nuclear materials. SRS
561-486: Is owned by the U.S. Department of Energy (DOE). The management and operating contract is held by Savannah River Nuclear Solutions LLC ( SRNS ), a partnership between Fluor Corporation , Newport News Nuclear, Inc. (a subsidiary of Huntington Ingalls Industries ) and Honeywell International , and the Integrated Mission Completion contract (including the former scope of the Liquid Waste Operations contract)
SECTION 10
#1732852595841612-619: The National Nuclear Security Administration estimated the total cost over a 20-year life cycle for the Savannah river site MOX plant to be $ 47 billion if the annual funding cap was increased to $ 500 million or $ 110 billion if it were increased to $ 375 million. Other studies have disputed this cost assessment as excessive. The estimated time-to-completion of the facility was also contingent upon annual appropriations, with an estimated construction completion date of FY2043 for
663-661: The Salt Waste Processing Facility (SWPF), a facility designed to process radioactive liquid waste stored in underground storage tanks at the site. The SWPF project work is performed by a group anchored by Parsons Corp . Work continued on design of the MOX fuel fabrication facility by a company now known as Shaw AREVA MOX Services. The SRNL was designated as the Department of Energy Office of Environmental Management's "Corporate Laboratory." Aiken County 's new Center for Hydrogen Research opened its doors. F-Area deactivation work
714-493: The vitrification process. K Reactor was shut down. F Canyon was restarted and began stabilizing nuclear materials. In 1997, the first high-level radioactive waste tanks were closed, numbers 17 and 20. The Cold War Historic Preservation Program was begun. In 2000, the K-Reactor building was converted to the K Area Materials Storage Facility. The Savannah River Site was selected as the location of three new plutonium facilities for:
765-429: The $ 500 million annual cap and FY2099 for the $ 375 million annual cap (where completion was indicated to not be possible for annual appropriations below this level). The Obama and Trump administrations have proposed cancelling the project, but Congress continues to fund construction. The Aiken Chamber of Commerce of the state of South Carolina filed a lawsuit against the federal government claiming they have simply become
816-451: The Defense Waste Processing Facility (DWPF) began in 1983. Wackenhut Services Incorporated (WSI) began providing security support services at SRP. In 1985, HB-Line began producing plutonium -238 for NASA 's deep-space exploration program. The L-Reactor was restarted and C-Reactor shut down. A full-scale groundwater remediation system constructed in M-Area. Construction of Saltstone and of
867-422: The F Canyon and FB Line facilities completed their last production run. The Savannah River Technology Center participated in a study of using a nuclear power reactor to produce hydrogen from water. Scientists reported finding a new species of radiation-resistant extremophiles inside one of the tanks. It was named Kineococcus radiotolerans . In January 2003, Westinghouse Savannah River Co. completed transferring
918-501: The Heavy Water Rework Facility in 1952, and the first production reactor, R Reactor, went critical in 1953. P, L, and K Reactors followed in 1954, and the first irradiated fuel was discharged. F Canyon, the world's first operational full-scale PUREX separation plant, began radioactive operations on 4 November. PUREX ( Plutonium and Uranium EXtraction) extracted plutonium and uranium products from materials irradiated in
969-512: The National Priority List and became regulated by the EPA . Westinghouse Savannah River Company (WSRC) assumed management and operation of site facilities. The name of the facility changed from Savannah River Plant (SRP) to Savannah River Site (SRS). In 1990, construction of a cooling tower for K Reactor began. Saltstone started operation. In 1991, the mixed waste management facility became
1020-411: The Replacement Tritium Facility began in 1986. In 1987, DuPont notified DOE that it would not continue to operate and manage the site. The Effluent Treatment Project (ETP) construction began. In 1988, K, L and P Reactors were shut down. An Effluent Treatment Facility began operations to treat low-level radioactive wastewater from the F and H Area Separations facilities. In 1989, the site was included on
1071-546: The Savannah River Site received contaminated soil from the environmental clean up and remediation. Soil with radiation contamination levels above 1.2 MBq/m2 was placed in 250-litre (66 U.S. gallon) drums and shipped to the Savannah River Plant for burial. A total of 2.2 hectares (5.4 acres) was decontaminated by this technique, producing 6,000 barrels. 17 hectares (42 acres) of land with lower levels of contamination
SECTION 20
#17328525958411122-487: The Savannah River Site. The town of Dunbarton was incorporated in 1910. Dunbarton is named after the Dunbar family. It was an agricultural, trading, and sawmill town. By the early 1950s, Dunbarton had a population of about 300, about 35 residences, about 15 commercial buildings, one church, two schools including Dunbarton High School, two cotton gins, and the railroad station. Four Mile High School, an African-American high school,
1173-750: The Tritium Extraction Facility (TEF) completed for the purpose of extracting tritium from materials irradiated in the Tennessee Valley Authority 's commercial nuclear reactors. Savannah River Site's first shipment of neptunium oxide arrived at the Argonne West Laboratory in Idaho. This was the last of the USA's neptunium inventory, and the last of the materials to be stabilized to satisfy commitments for stabilizing nuclear materials. F Canyon
1224-474: The construction of the Atlantic Coast Line in 1899 from Denmark, South Carolina , to Robins, South Carolina. Robins was on the railroad from Port Royal to Augusta, Georgia. Robins was in the area taken for the Savannah River Plant. This line of the railroad was later rerouted to the south of Dunbarton. This line is now part of CSX Transportation . The old line east of Dunbarton is a spur that now services
1275-682: The contract with the existing partners for 18 months to June 2008. In 2006 DOE decided to split the WSRC contract into two new separate contracts, i.e. the M&O Contract and the Liquid Waste Contract to be awarded before June 2008. Responding to the DOE RFP, the Savannah River Nuclear Solutions (SRNS), LLC – now a Fluor partnership with Honeywell , and Huntington Ingalls Industries (formerly part of Northrop Grumman ) – submitted
1326-756: The federal government requested that DuPont build and operate a nuclear facility to make heavy water and tritium near the Savannah River in South Carolina. The company had expertise in nuclear operations, having designed and built the plutonium production complex at the Hanford site for the Manhattan Project during World War II. A large portion of farmland, the towns of Ellenton and Dunbarton , and several other communities including Meyers Mill , Leigh, Robbins, and Hawthorne were bought under eminent domain , and
1377-517: The first site facility to be closed and certified under the provisions of RCRA. L Reactor and M Area settling basin were shut down. With the end of the Cold War , production of nuclear materials for weapons use ceased. Roger D. Wensil, a pipe-fitter, worked for the B.F. Shaw Co., a subcontractor at Savannah River. In 1985, Wensil was dismissed as a whistleblower, after he complained of safety violations and illegal drug use among construction workers building
1428-462: The flux from P Reactor, with confirmation published in the 20 July 1956 issue of Science . Reines was awarded the 1995 Physics Nobel Prize ; Cowan had already died. In 1961, the AEC established a permanent ecology laboratory on the site; two Army barracks were converted into laboratory space for the scientists. The next year, the University of Georgia hired a full-time staff with doctoral degrees to expand
1479-482: The interior of the facility; and a melting of fuel rods in the C Reactor in December, 1970. After six years of litigation over plutonium moved to the site, South Carolina Attorney General Alan Wilson announced August 31, 2020 that the federal government agreed to pay the state $ 600 million. Wilson described this as "the single largest settlement in South Carolina's history". The federal government also agreed to remove
1530-439: The last of F Canyon's radioactive material to H Tank Farm. DWPF began radioactive operations with its second melter, installed during a shutdown. The last depleted uranium metal was shipped from M Area for disposition at Envirocare of Utah . The last unit of spent nuclear fuel from RBOF was shipped across the site to L Reactor in preparation for RBOF's deactivation. Salt Waste Processing Facility (SWPF) construction began. In 2004,
1581-539: The long-term storage of plutonium in the state and additionally that the government had failed to follow the statutory provisions concerning obtaining a waiver to cease construction on the facility. In January 2019, the Fourth Circuit Court of Appeals rejected South Carolina's suit for lack of standing; in October 2019 the U.S. Supreme Court rejected the state of South Carolina's petition of certiorari, thereby allowing
SREL - Misplaced Pages Continue
1632-553: The lower court's ruling to stand and the federal government to terminate construction. In May 2018, Energy Secretary Rick Perry informed Congress he had effectively ended the about 70% complete project. Perry stated that the cost of a dilute and dispose approach to the plutonium will cost less than half of the remaining lifecycle cost of the MOX plant program. In February 2019, the Nuclear Regulatory Commission (NRC) granted
1683-451: The property. Many of the residents moved themselves, and in some cases, their homes to Barnwell , Williston , Jackson , Beech Island , Aiken , South Carolina , and Augusta, Georgia . Some moved out of state. Eventually, nearly all that was left behind was the streets, curbs, driveways, and walkways. Dunbarton's location was approximately 33°12'40" N and 81°33' W. It was located at the intersection of South Carolina highways 39 and 64 and
1734-496: The reactors. In 1955, C Reactor went critical. The first plutonium shipment left the site. H Canyon, a chemical separation facility, began radioactive operations. Permanent tritium facilities became operational and the first shipment of tritium to the Atomic Energy Commission (AEC) was made. In 1956, the construction of the basic plant was complete. The neutrino was discovered by Fred Reines and Clyde Cowan using
1785-478: The remaining 9.5 metric tons of plutonium stored at the site by 2037. At a town hall meeting at USC-Aiken on August 20, 2021, S.C. Governor Henry McMaster led a discussion on how to spend $ 525 million of that amount. Savannah River is home to the following nuclear reactors: (see list of nuclear reactors ) Management of the Savannah River Site was to be bid in 2006, but the Department of Energy extended
1836-721: The research effort. Known initially as the Laboratory of Radiation Ecology, it was renamed in the mid-1960s the Savannah River Ecology Laboratory, reflecting the broad spectrum of ecological studies carried out on the site. In 1962, the Heavy Water Components Test Reactor (HWCTR) went into operation, testing the heavy water system for use with civilian power reactors. In 1963, Receiving Basin for Off-Site Fuels (RBOF) received its first shipment of off-site spent nuclear fuel. That same year, curium -244
1887-451: The site of 310 square miles (800 km ) became the Savannah River Site, managed by the U.S. Atomic Energy Commission . Biologists from the University of Georgia , led by professor Eugene Odum , began ecological studies of local plants and animals in 1951 creating Savannah River Ecology Laboratory (SREL), and plant construction began. Production of heavy water for site reactors started in
1938-579: The site shipped its 10,000th drum of transuranic waste to the Waste Isolation Pilot Plant (WIPP), a DOE facility in New Mexico, 12 years ahead of schedule. In a visit, Secretary of Energy Spencer Abraham designated the Savannah River National Laboratory (SRNL), one of 12 DOE national laboratories. Two prototype bomb disposal robots developed by SRNL were deployed for military use in Iraq. 2005 saw
1989-563: The startup of the Plutonium Fuel Fabrication (PUFF) Facility. The Savannah River Archaeological Program (SRARP) was established onsite in 1978 to perform data analysis of prehistoric and historic sites on SRP land. In 1981, an environmental cleanup program began. M Area Settling Basin cleanup began under the Resource Conservation and Recovery Act (RCRA). The heavy water rework facility was closed in 1982. Construction of
2040-462: The title SREL . If an internal link led you here, you may wish to change the link to point directly to the intended article. Retrieved from " https://en.wikipedia.org/w/index.php?title=SREL&oldid=908717244 " Category : Disambiguation pages Hidden categories: Short description is different from Wikidata All article disambiguation pages All disambiguation pages Savannah River Ecology Laboratory It
2091-529: Was a town in Barnwell County , South Carolina , United States. The area was originally settled circa 1800. Dunbarton grew after a train stop was built on a new rail line. In 1951, it was acquired by the U.S. Atomic Energy Commission as part of a site for the Savannah River Plant . The nearest incorporated community is the town of Snelling , to the northeast. The settlement of the town began with
SREL - Misplaced Pages Continue
2142-468: Was built for the production of plutonium and tritium for the H-bomb . About 6,000 people and 6,000 graves were to be relocated. This include the incorporated communities of Dunbarton and Ellenton and the unincorporated communities of Hawthorne, Meyers Mill , Robbins, and Leigh. A significant fraction of those removed were African-American farmers and sharecroppers. The government purchased or condemned
2193-413: Was completed as was T-Area closure. In 2007, the Tritium Extraction Facility (TEF) opened. On 1 August, construction officially began on the $ 4.86 billion MOX facility. Following startup testing, the facility expects a disposition rate of up to 3.5 tons of plutonium oxide each year. In 2008, Savannah River Nuclear Solutions, LLC (SRNS) was awarded the contract for Maintenance and Operation of SRS. SRNS
2244-490: Was completed in 2010, with the P and R Areas following in 2011. In 2021, DOE awarded the new Integrated Mission Completion Contract to Savannah River Mission Completion, an LLC comprising BWX Technologies , Amentum's AECOM , and Fluor . Transition from the Liquid Waste Operations contract to the Integrated Mission Completion Contract was completed in early 2022. The MOX Fuel Fabrication Facility
2295-466: Was created to satisfy the nuclear non-proliferation agreement between the Russian Federation and the United States. The Russian Federation has met its obligations of the 2000 treaty, completed its processing facility and commenced processing of plutonium into MOX fuel with experimental quantities produced in 2014 for a cost of about $ 200 million, reaching industrial capacity in 2015. A report by
2346-403: Was located just outside the town of Dunbarton. It had dormitories so that some students could board during the week. On November 28, 1950, the U.S. Atomic Energy Commission and the E. I. du Pont de Nemours Company announced that the Savannah River Plant would be built on about 300 sq. mi. of Aiken County , Barnwell County , and Allendale County in South Carolina. The Savannah River Plant
2397-428: Was mixed to a depth of 30 centimeters (12 in) by harrowing and plowing. On rocky slopes with contamination above 120 kBq/m , the soil was removed with hand tools and shipped to the United States in barrels. In 1968, L Reactor was shut down for upgrades, and, in 1971, K Reactor became the first reactor to be controlled by computer. The site was designated as a National Environmental Research Park in 1972. 1977 saw
2448-487: Was overseen by the National Nuclear Security Administration . The MOX facility was intended to convert legacy weapons-grade plutonium into fuel suitable for commercial power reactors. Future plans for the site cover a wide range of options, including host to research reactors, a reactor park for power generation, and other possible uses. DOE and its corporate partners are watched by a combination of local, regional and national regulatory agencies and citizen groups. In 1950,
2499-677: Was placed in cold standby condition in 1993. Non-radioactive test runs of the Defense Waste Processing Facility began. Construction began on the Consolidated Incineration Facility. Tritium introduced into the Replacement Tritium Facility and radioactive operations began. The Workforce Transition and Community Assistance was started. In 1994, the Savannah River Site Citizens Advisory Board was established. The Replacement Tritium Facility saw its startup. In 1996, DWPF introduced radioactive material into
2550-429: Was produced as a heat source for space exploration. This was the first full scale conversion of an SRP reactor load to non-weapons materials. R-Reactor and HWCTR were shut down in 1964. In 1965, californium -252, the heaviest isotope produced at SRP, was separated as a byproduct of the curium program. Beginning in 1969, californium-252 was made in a separate production program. Following the 1966 Palomares B-52 crash ,
2601-460: Was the first major nuclear facility at the site to be suspended and deactivated. Low-enriched uranium (LEU) from the site was used by a Tennessee Valley Authority nuclear power reactor to generate electricity. The tritium facilities modernization and consolidation project completed start-up and replaced the gas purification and processing that took place in 232-H. WSRC began multi-stage layoffs of permanent employees. In 2006, design work took place for
SECTION 50
#1732852595841#840159