A regional transmission organization ( RTO ) in the United States is an electric power transmission system operator (TSO) that coordinates, controls, and monitors a multi-state electric grid . The transfer of electricity between states is considered interstate commerce, and electric grids spanning multiple states are therefore regulated by the Federal Energy Regulatory Commission (FERC). The voluntary creation of RTOs was initiated by FERC in December 1999. The purpose of the RTO is to promote economic efficiency, reliability, and non-discriminatory practices while reducing government oversight.

#736263

41-505: [REDACTED] Look up RTO in Wiktionary, the free dictionary. RTO may refer to: Organisations [ edit ] The Really Terrible Orchestra , a British amateur orchestra Regional Transport Office , Indian government bureau Regional transmission organization , in electric utility distribution Registered training organisation NATO Research and Technology Organisation ,

82-554: A division of the North Atlantic Treaty Organisation (NATO) Russian theatrical society , which was formed in the 19th century Other [ edit ] Return to office, a requirement set by an executive compelling workers to gather in the office during the COVID-19 pandemic Return to owner, an acronym used in social media Recovery time objective , the time for a business process to be restored after

123-427: A division of the North Atlantic Treaty Organisation (NATO) Russian theatrical society , which was formed in the 19th century Other [ edit ] Return to office, a requirement set by an executive compelling workers to gather in the office during the COVID-19 pandemic Return to owner, an acronym used in social media Recovery time objective , the time for a business process to be restored after

164-629: A US-based ISO. Within the United States one ISO, and its participating utilities, does not fall under FERC authority: The Electric Reliability Council of Texas (ERCOT) . ERCOT falls under the authority of NERC and operates a reliability function, separate from its market function, in order to comply with NERC requirements. ISOs act as a marketplace operator in wholesale power, resulting from FERC order No. 888. Most are set up as nonprofit corporations using governance models approved by FERC and/or regional or local commissions. There are regions of

205-493: A disruption referred-to-output Rejected takeoff , in aviation Regenerative thermal oxidizer , in off-gas treatment Retransmission timeout, in the Transmission Control Protocol Reverse takeover , a merger between a public company and a private company Rent-to-own a piece of property Radiotelephone operator, a former occupational specialty in the U.S. military Request time out,

246-414: A disruption referred-to-output Rejected takeoff , in aviation Regenerative thermal oxidizer , in off-gas treatment Retransmission timeout, in the Transmission Control Protocol Reverse takeover , a merger between a public company and a private company Rent-to-own a piece of property Radiotelephone operator, a former occupational specialty in the U.S. military Request time out,

287-408: A diverse membership including public power. Wider membership contributes to the establishment of an entity with the size necessary to function as an RTO. In the 1990s, as states and regions in the United States established wholesale competition for electricity, groups of utilities and their federal and state regulators began forming independent transmission operators that would ensure equal access to

328-469: A nonprofit corporation, is not a regional transmission organization (RTO) and has no plans to become one, but instead seeks to achieve many of the benefits of an RTO through incremental additions to its functions. ColumbiaGrid was formed after some of its members chose not to continue in efforts to form Grid West, a Northwest evolutionary structure with the ability to add functions and to move toward independent grid management. The ColumbiaGrid members, including

369-472: A packet loss on ping (networking utility) Topics referred to by the same term [REDACTED] This disambiguation page lists articles associated with the title RTO . If an internal link led you here, you may wish to change the link to point directly to the intended article. Retrieved from " https://en.wikipedia.org/w/index.php?title=RTO&oldid=1260033561 " Category : Disambiguation pages Hidden categories: Short description

410-472: A packet loss on ping (networking utility) Topics referred to by the same term [REDACTED] This disambiguation page lists articles associated with the title RTO . If an internal link led you here, you may wish to change the link to point directly to the intended article. Retrieved from " https://en.wikipedia.org/w/index.php?title=RTO&oldid=1260033561 " Category : Disambiguation pages Hidden categories: Short description

451-416: Is commonplace, and rules or recommendations introduced by FERC often are voluntarily accepted by NERC members outside of FERC's jurisdiction. Therefore, one Canadian Province is a member of a U.S.-based RTO, while two others function as an Electric System Operator (ESO), an organization essentially equal to a U.S.-based ISO. Some ISOs and RTOs also act as a marketplace in wholesale power, especially since

SECTION 10

#1732844055737

492-566: Is different from Wikidata All article disambiguation pages All disambiguation pages RTO [REDACTED] Look up RTO in Wiktionary, the free dictionary. RTO may refer to: Organisations [ edit ] The Really Terrible Orchestra , a British amateur orchestra Regional Transport Office , Indian government bureau Regional transmission organization , in electric utility distribution Registered training organisation NATO Research and Technology Organisation ,

533-485: Is different from Wikidata All article disambiguation pages All disambiguation pages Regional transmission organization An independent system operator ( ISO ) is similarly an organization formed at the recommendation of FERC. In the areas where an ISO is established, it coordinates, controls, and monitors the operation of the electrical power system, usually within a single US state, but sometimes encompassing multiple states. RTOs typically perform

574-747: Is more efficient than providing them on a smaller-scale, utility by utility. Today's power industry is far more than a collection of power plants and transmission lines. Maintaining an effective grid requires management of three different but related sets of flows – the flow of energy across the grid; the exchange of information about power flows and the equipment it moves across; and the flow of money between producers, marketers, transmission owners, buyers and others. ISO/RTOs play an essential role in managing and enhancing all three of these flows. As of 2023 there are ten ISO/RTOs operating in North America: Non-RTO transmission organizations: ColumbiaGrid,

615-670: Is mostly facilitated through bilateral contracts and power purchase agreements . There are nine ISOs within North America: The New Brunswick System Operator ( NBSO ) was dissolved when New Brunswick's new Electricity Act went into effect in October 2013. An RTO is an organization formed at the approval of the Federal Energy Regulatory Commission (FERC). In the areas where an RTO is established, it coordinates, controls and monitors

656-432: Is often cited as the "Deregulation" of the electric industry. Deregulation, however, is not an accurate term. In actuality, the electricity industry is still regulated, depending on the region, by a series of federal, state, and local agencies and various public commissions. Order No. 888 is substantial in scope. Relative to this article, however, it defined two key elements: In addressing #1 above, Order No. 888 defined

697-635: The Bonneville Power Administration , several Washington State public utilities and two investor-owned utilities, wanted an organization with more limited functions and no independent ability to change. ColumbiaGrid performs single-utility transmission planning and expansion via an open and transparent process and is also establishing a multi-system OASIS portal. The former Grid West participants who had argued for an eventual RTO, mainly investor-owned utilities and state representatives from Oregon , Idaho , Montana , Wyoming and Utah , formed

738-486: The Open Access Same-time Information System (OASIS) (formerly real-time information networks) and prescribed standards of conduct for its use and access. Subsequent orders provided clarifications, standards and protocols. Where as Order No. 888 provided for an entity (an ISO) to facilitate open access, it was not written with the intent to establish one. FERC Order No. 2000 was: Issued by

779-482: The electricity market restructuring of the late 1990s. Most are set up as nonprofit corporations using governance models developed by FERC. FERC Orders 888 and 889 defined how independent power producers (IPPs) and power marketers would be allowed fair access to transmission systems, and mandated the implementation of the Open Access Same-Time Information System (OASIS) to facilitate

820-405: The vertically integrated electric utility with a transmission system designed to serve its own customers worked extremely well for decades. As dependence on a reliable supply of electricity grew and electricity was transported over increasingly greater distances, power pools were formed and interconnections developed. Transactions were relatively few and generally planned well in advance. In

861-609: The FERC for approval, and meet 4 minimum characteristics and 8 minimum functions: Only electric utilities that are located within the United States fall under FERC authority, but a larger organization called the North American Electric Reliability Corporation (NERC) overlays the entire FERC footprint and also includes a Mexican utility and several Canadian utilities. As such, international reciprocity

SECTION 20

#1732844055737

902-455: The FERC on December 29, 1999, Order No. 2000 codified what it means to be an RTO including its minimum characteristics, functions and ratemaking policy. The order also stated its commitment toward open architecture with a stated goal that an RTO "...be designed so that they can evolve over time." The order still, however, does not mandate that a new entity called an RTO be created, nor does it mandate that an entity call itself an RTO to comply with

943-506: The FERC's order. An ISO is an organization formed at the direction or recommendation of the Federal Energy Regulatory Commission (FERC) . In the areas where an ISO is established, it coordinates, controls and monitors the operation of the electrical power system, usually within a single US State, but sometimes encompassing multiple states. Similar to an RTO, the primary difference is that ISOs either do not meet

984-413: The FERC, for the right to establish designs of independent system operations. Through negotiation, collaboration and legal challenges, the first ISOs to emerge included California ISO, PJM Interconnection, New York ISO and New England ISO. Each proposed a slightly different market design according to their collaborative results. In order to facilitate competitive wholesale markets, Order No. 888 specified

1025-479: The United States where ISOs do not exist. Consequently, the utilities do not engage in wholesale power markets. The Pacific Northwest, and states east of California and west of the Dakotas, Nebraska, Kansas and Texas largely do not participate. The majority of Southeastern states do not participate in wholesale markets. While these regions must conform to open access as mandated by FERC, the power exchanges between utilities

1066-466: The continued reliability of a system unequaled anywhere else, and 3) multiple transmission charges that will not negate the savings to the end-use customer. Critics of RTOs counter that the wholesale electricity market as operated through the RTOs is in fact raising prices beyond what would obtain in a truly competitive situation, and that the organizations themselves add a needless layer of bureaucracy. While

1107-433: The entire FERC footprint and includes a Mexican utility and several Canadian utilities. As such, international reciprocity is commonplace, and rules or recommendations introduced by FERC often are voluntarily accepted by NERC members outside of FERC's jurisdiction. Therefore, one Canadian Province is a member of a US-based RTO, while two others function as an Electric System Operator (ESO), an organization essentially equal to

1148-481: The fair handling of transactions between electric power transmission suppliers and their customers. TSOs in Europe cross state and provincial borders like RTOs. RTOs were created by the Federal Energy Regulatory Commission (FERC) as a way to handle the challenges associated with the operation of multiple interconnected independent power supply companies. FERC describes this as a voluntary system. The traditional model of

1189-459: The fundamental purpose of an ISO to "…operate the transmission systems of public utilities in a manner that is independent of any business interest in sales or purchases of electric power by those utilities." The order did not mandate or require the establishment of ISOs. Rather, in an attempt to comply with the FERC's order, groups of participants (or "Power Pools" composed of generators, transmission providers and utilities) partnered, and proposed to

1230-492: The importance on remedying what it terms as "undue discrimination" at the forefront. It is important to note that Order No. 888 was not met without objection among the public, academics and industry participants. Requests for rehearing and/or clarification were filed by 137 entities after the order's issuance. The majority agreed with the FERC's assertion for the need to harness the benefits of competitive electricity markets. Order No. 889 amended rules establishing and governing

1271-568: The last decade of the 20th century, some policy makers and academics projected that the electrical power industry would ultimately experience deregulation . RTOs were conceived as a way to handle the vastly increased number of transactions that take place in a competitive environment. About a dozen states decided to deregulate, but some pulled back following the California electricity crisis of 2000 and 2001. RTOs ensure three key free marketer drivers: 1) open access and non-discriminatory services, 2)

RTO - Misplaced Pages Continue

1312-524: The load instantaneously to keep supply and demand for electricity in balance. The grid operators forecast load and schedule generation to assure that sufficient generation and back-up power is available in case demand rises or a power plant or power line is lost. They also operate wholesale electricity markets that enable participants to buy and sell electricity on a day-ahead or a real-time spot market basis. These markets provide electricity suppliers with more options for meeting consumer needs for power at

1353-432: The lowest possible cost. ISO/RTOs provide non-discriminatory transmission access, facilitating competition among wholesale suppliers to improve transmission service and provide fair electricity prices. Across large regions, they schedule the use of transmission lines; manage the interconnection of new generation and monitor the markets to ensure fairness and neutrality for all participants. Providing these services regionally

1394-509: The minimum requirements specified by FERC to hold the designation of RTO or that the ISO has not petitioned FERC for the status. Electric utilities that are located within the United States and engage in interstate commerce fall under FERC authority. Not all utilities are members of ISOs. All utilities and ISOs are responsible to meet the compliance of a larger organization called the North American Electric Reliability Corporation (NERC) , which overlays

1435-475: The operation of the electrical power system, usually within a single US State, but sometimes encompassing multiple states. The official definition for an RTO: "An entity that is independent from all generation and power marketing interests and has exclusive responsibility for grid operations, short-term reliability, and transmission service within a region." The designation of an RTO is largely one of scope. An organization wanting to achieve RTO status must petition

1476-460: The original intention was for the RTOs to remain an independent, non-profit organization and were given nearly autonomous control of their service area. The primary committees, and a majority of participant committees are almost entirely represented by investor owned utilities and have eroded States power and Federal authority. The RTO concept provides for separation of generation and transmission and elimination of pancaked rates, and it encourages

1517-508: The power grid for non-utility firms, enhance the reliability of the transmission system and operate wholesale electricity markets. Today, seven of these grid operators, either independent system operators (ISOs) or RTOs, coordinate the power grid to ensure the reliable delivery of two-thirds of the electricity used in the United States to two-thirds of its population. Most are overseen by FERC. ISOs and RTOs coordinate generation and transmission across wide geographic regions, matching generation to

1558-482: The region's bulk electricity system. Today's RTOs do the same thing with an added component of greater responsibility for the transmission network, as established by the FERC. In April 1996, the Federal Energy Regulatory Commission (FERC) issued two orders that changed the landscape of how electricity is generated, transmitted, and distributed throughout the North America. Prior to these rulings, generated power and

1599-479: The same functions as ISOs, but cover a larger geographic area. The two are similar, with an RTO being more clearly defined and born out of the concept of electrical grid reliability . The delineation between an ISO and an RTO is subtle to some and quite specific to others, as the similarities in the table below illustrate: In short, an ISO operates a region's electricity grid, administers the region's wholesale electricity markets, and provides reliability planning for

1640-1020: The subsequent energy provided to customers by local service providers was owned and controlled by single entities who often owned the entire generation, transmission, and distribution assets. Because these companies controlled the retail delivery of the energy from generation through their own power lines, consumers had little to no choice regarding whose electricity they were buying. In economic terms, this structure constituted an impediment for new providers who would want to generate power, move energy, or provide retail electricity to individual consumers. Order No. 888 addressed "Promoting Wholesale Competition Through Open Access Non-discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities." and Order No. 889 added and amended existing rules "...establishing and governing an Open Access Same-time Information System (OASIS) (formerly real-time information networks) and prescribing standards of conduct." Order No. 888

1681-456: The unbundling of a utility's operations separating generation and transmission and distribution. In addressing #2 above, the original order (and subsequent clarification by the FERC) allows utilities, under certain defined circumstances, to seek extra-contractual recovery of stranded costs. The FERC continues to receive rehearing petitions regarding stranded cost recovery as it has clearly placed