69-483: Olympic Highway is a 317-kilometre (197 mi) rural road in the central western and south-eastern Riverina regions of New South Wales , Australia. It services rural communities, links Hume Highway with Mid-Western Highway , and provides part of an alternate road link between Sydney and Albury via Bathurst and Cowra as well as servicing Wagga Wagga , linking with Sturt Highway . Olympic Highway runs generally north–south, roughly aligned to sections of

138-400: A road use tax , is payable on some vehicles used on the public road. The definition of a road depends on the definition of a highway; there is no formal definition for a highway in the relevant Act. A 1984 ruling said "the land over which a public right of way exists is known as a highway; and although most highways have been made up into roads, and most easements of way exist over footpaths,

207-411: A single carriageway road is converted into dual carriageway by building a second separate carriageway alongside the first, it is usually referred to as duplication , twinning or doubling . The original carriageway is changed from two-way to become one-way, while the new carriageway is one-way in the opposite direction. In the same way as converting railway lines from single track to double track ,

276-581: A trumpet interchange with Hume Highway located 18 kilometres (11 mi) north of Albury at Table Top . The only major river crossing is the Murrumbidgee River , crossed between Boorooma and Wagga via the Gobbagombalin Bridge, at 1.4 kilometres (0.87 mi) long believed to be the longest continuous-span viaduct in New South Wales, situated about 6 kilometres (3.7 mi) northwest of

345-457: A 25 to 50 millimeter hole through the pavement into the sub-base with a dry-bit roto-hammer . Next, a two-part epoxy is poured into the hole – dyed for visual clarity. Once the epoxy hardens, technicians drill through the hole. If a void is present, the epoxy will stick to the core and provide physical evidence. Common stabilization materials include pozzolan -cement grout and polyurethane. The requirements for slab stabilization are strength and

414-605: A May 2009 report by the American Association of State Highway and Transportation Officials (AASHTO) and TRIP – a national transportation research organization – driving on rough roads costs the average American motorist approximately $ 400 a year in extra vehicle operating costs. Drivers living in urban areas with populations more than 250,000 are paying upwards of $ 750 more annually because of accelerated vehicle deterioration, increased maintenance, additional fuel consumption , and tire wear caused by poor road conditions. When

483-419: A double-wheeled, steel roller to insert the rod to the desired depth. After inserting the backer rod, the sealant is placed into the joint. There are various materials to choose for this method including hot pour bituminous liquid, silicone and preformed compression seals. Careful design and construction of roads can increase road traffic safety and reduce the harm (deaths, injuries, and property damage) on

552-413: A major two-level (and at one point, three-level) roadway in the downtown area, are being rebuilt with a designed service life of 100 years. Virtually all roads require some form of maintenance before they come to the end of their service life. Pro-active agencies use pavement management techniques to continually monitor road conditions and schedule preventive maintenance treatments as needed to prolong

621-428: A road as "a line of communication (travelled way) using a stabilized base other than rails or air strips open to public traffic, primarily for the use of road motor vehicles running on their own wheels", which includes "bridges, tunnels, supporting structures, junctions, crossings, interchanges, and toll roads, but not cycle paths". The Eurostat , ITF and UNECE Glossary for Transport Statistics Illustrated defines

690-494: A road as a "Line of communication (traveled way) open to public traffic, primarily for the use of road motor vehicles, using a stabilized base other than rails or air strips. [...] Included are paved roads and other roads with a stabilized base, e.g. gravel roads. Roads also cover streets, bridges, tunnels, supporting structures, junctions, crossings and interchanges. Toll roads are also included. Excluded are dedicated cycle lanes." The 1968 Vienna Convention on Road Traffic defines

759-494: A road as the entire surface of any way or street open to public traffic. In urban areas roads may diverge through a city or village and be named as streets, serving a dual function as urban space easement and route. Modern roads are normally smoothed, paved, or otherwise prepared to allow easy travel . Part 2, Division 1, clauses 11–13 of the National Transport Commission Regulations 2006 defines

SECTION 10

#1732851701245

828-519: A road in Australia as 'an area that is open to or used by the public and is developed for, or has as one of its main uses, the driving or riding of motor vehicles.' Further, it defines a shoulder (typical an area of the road outside the edge line, or the curb) and a road-related area which includes green areas separating roads, areas designated for cyclists and areas generally accessible to the public for driving, riding or parking vehicles. In New Zealand,

897-432: Is 40 years for new bitumen and concrete pavement. Maintenance is considered in the whole life cost of the road with service at 10, 20 and 30-year milestones. Roads can be and are designed for a variety of lives (8-, 15-, 30-, and 60-year designs). When pavement lasts longer than its intended life, it may have been overbuilt, and the original costs may have been too high. When a pavement fails before its intended design life,

966-433: Is a non-destructive method of solving this problem and is usually employed with other concrete pavement restoration methods including patching and diamond grinding. The technique restores support to concrete slabs by filing small voids that develop underneath the concrete slab at joints, cracks or the pavement edge. The process consists of pumping a cementitious grout or polyurethane mixture through holes drilled through

1035-487: Is also common. Some road fixtures such as road signs and fire hydrants are designed to collapse on impact. Light poles are designed to break at the base rather than violently stop a car that hits them. Highway authorities may also remove larger trees from the immediate vicinity of the road. During heavy rains, if the elevation of the road surface is not higher than the surrounding landscape, it may result in flooding. Speed limits can improve road traffic safety and reduce

1104-485: Is another common procedure used to locate voids. It is recommended to do this testing at night as during cooler temperatures, joints open, aggregate interlock diminishes and load deflections are at their highest. Ground penetrating radar pulses electromagnetic waves into the pavement and measures and graphically displays the reflected signal. This can reveal voids and other defects. The epoxy/core test, detects voids by visual and mechanical methods. It consists of drilling

1173-418: Is discovered it is removed, moisture content is managed and replaced with standard fill compacted to meet the design requirements (generally 90–95% relative compaction). Blasting is not frequently used to excavate the roadbed as the intact rock structure forms an ideal road base. When a depression must be filled to come up to the road grade the native bed is compacted after the topsoil has been removed. The fill

1242-451: Is made by the "compacted layer method" where a layer of fill is spread then compacted to specifications, under saturated conditions. The process is repeated until the desired grade is reached. General fill material should be free of organics , meet minimum California bearing ratio (CBR) results and have a low plasticity index . The lower fill generally comprises sand or a sand-rich mixture with fine gravel, which acts as an inhibitor to

1311-616: Is now known as Gerogery Road). The passing of the Roads Act of 1993 through the Parliament of New South Wales updated road classifications and the way they could be declared within New South Wales. Under this act, Olympic Way was renamed Olympic Highway in 1996, and the route between Wagga Wagga and Cowra was used again for the 2000 Sydney Olympic Games torch relay . Olympic Highway today retains its declaration as Main Road 78, but despite its name,

1380-564: Is primarily due to environmental effects such as frost heaves , thermal cracking and oxidation often contribute, however accumulated damage from vehicles also contributes. According to a series of experiments carried out in the late 1950s, called the AASHO Road Test , it was empirically determined that the effective damage done to the road is roughly proportional to the fourth power of axle weight . A typical tractor-trailer weighing 80,000 pounds (36.287 t ) with 8,000 pounds (3.629 t) on

1449-517: Is some ambiguity between the terms highway and road . For the purposes of the English law , Highways Act 1980 , which covers England and Wales but not Scotland or Northern Ireland , road is "any length of highway or of any other road to which the public has access, and includes bridges over which a road passes". This includes footpaths, bridleways and cycle tracks, and also road and driveways on private land and many car parks. Vehicle Excise Duty ,

SECTION 20

#1732851701245

1518-410: Is taken to preserve reference Benchmarks Roads are designed and built for primary use by vehicular and pedestrian traffic. Storm drainage and environmental considerations are a major concern. Erosion and sediment controls are constructed to prevent detrimental effects. Drainage lines are laid with sealed joints in the road easement with runoff coefficients and characteristics adequate for

1587-546: Is the native material underneath a constructed road. Road construction requires the creation of an engineered continuous right-of-way or roadbed , overcoming geographic obstacles and having grades low enough to permit vehicle or foot travel , and may be required to meet standards set by law or official guidelines. The process is often begun with the removal of earth and rock by digging or blasting, construction of embankments , bridges and tunnels , and removal of vegetation (this may involve deforestation ) and followed by

1656-559: Is usually stripped and stockpiled nearby for rehabilitation of newly constructed embankments along the road. Stumps and roots are removed and holes filled as required before the earthwork begins. Final rehabilitation after road construction is completed will include seeding, planting, watering and other activities to reinstate the area to be consistent with the untouched surrounding areas. Processes during earthwork include excavation, removal of material to spoil, filling, compacting, construction and trimming. If rock or other unsuitable material

1725-603: The Roads & Traffic Authority on 16 January 1989. When formed, the DMR was responsible for managing 26,321 km of the major roads in NSW. These were formally classified as: By 1972 this network had grown to 43,292 km and by then also included some additional classifications: Local roads continued to managed by local councils. The Department of Main Roads was headed by a Commissioner who

1794-653: The Sydney–Melbourne and the Blayney–Demondrille railway lines. A 2-kilometre (1.2 mi) section through Wagga Wagga is a four-lane divided urban road where it is concurrent with Sturt Highway. Olympic Highway approximately parallels Hume Highway to the east and Newell Highway to the west, sharing a short concurrency with Sturt Highway in Wagga Wagga. It is mostly single carriageway and also includes wider sections within urban areas and some passing lanes. Where

1863-406: The land zoning and storm water system. Drainage systems must be capable of carrying the ultimate design flow from the upstream catchment with approval for the outfall from the appropriate authority to a watercourse , creek , river or the sea for drainage discharge. A borrow pit (source for obtaining fill, gravel, and rock) and a water source should be located near or in reasonable distance to

1932-582: The DMR from the Department of Motor Transport, which was a successor of Department of Road Transport and Tramways. Many specialist traffic management staff and traffic signal maintenance crews also became part of the DMR at this time. Pursuant to the Transport Administration Act 1988 , the DMR merged with the Traffic Authority of New South Wales and the Department of Motor Transport to form

2001-459: The Department had a total employment of 2,425. By 1970, as tasks expanded, this number had grown to 11,497. In the later 1970s and through the 1980s successive waves of internal re-organisation led to more work being let out to contract with the total employment number dropping to 8,700 by the time the Department ceased to exist in 1989. The Department of Main Roads became a member of Conference of State Road Authorities (COSRA) when that organisation

2070-672: The Wagga CBD and opened on 26 July 1997. Prior to the completion of the "Gobba" Bridge, the Olympic Highway followed a route that took it through the Wagga central business district via the Hampden Bridge , a wooden Allan Truss bridge that was opened in 1895 and eventually demolished in 2014. The passing of the Main Roads Act of 1924 through the Parliament of New South Wales provided for

2139-422: The ability to flow into or expand to fill small voids. Colloidal mixing equipment is necessary to use the pozzolan-cement grouts. The contractor must place the grout using a positive-displacement injection pump or a non-pulsing progressive cavity pump. A drill is also necessary but it must produce a clean hole with no surface spalling or breakouts. The injection devices must include a grout packer capable of sealing

Olympic Highway - Misplaced Pages Continue

2208-510: The appointment of a Commissioner of Main Roads who held the powers necessary to manage the major highways of the state. Hugh Hamilton Newell was appointed as the first Commissioner. The new Department also took over the management of the newly constructed Sydney Harbour Bridge from the Public Works Department . In 1976 the responsibilities for managing traffic, including the operation of the traffic signal system, were transferred to

2277-521: The average US motorist pays about $ 335/year. In contrast, the average motorist pays about $ 171/year in road maintenance taxes (based on 600 gallons/year and $ 0.285/gallon tax). Distress and serviceability loss on concrete roads can be caused by loss of support due to voids beneath the concrete pavement slabs. The voids usually occur near cracks or joints due to surface water infiltration . The most common causes of voids are pumping, consolidation, subgrade failure and bridge approach failure. Slab stabilization

2346-688: The declaration of Main Roads, roads partially funded by the State government through the Main Roads Board (later the Department of Main Roads , and eventually Transport for NSW ). Main Road No. 57 was declared from the intersection with Monaro Highway (today Sturt Highway ) at Wagga Wagga to Old Junee and continuing north via Temora, Wyalong, Condobolin and Tullamore to the intersection with North-Western Highway (today Mitchell Highway ) at Trangie , Main Road No. 210

2415-538: The definition of a road is broad in common law where the statutory definition includes areas the public has access to, by right or not. Beaches, publicly accessible car parks and yards (even if privately owned), river beds, road shoulders (verges), wharves and bridges are included. However, the definition of a road for insurance purposes may be restricted to reduce risk. In the United Kingdom The Highway Code details rules for "road users", but there

2484-465: The design structural capacity, stop erosion or eliminate faulting. It does, however, restore the slab support, therefore, decreasing deflections under the load. Stabilization should only be performed at joints and cracks where the loss of support exists. Visual inspection is the simplest manner to find voids. Signs that repair is needed are transverse joint faulting, corner breaks and shoulder drop off and lines at or near joints and cracks. Deflection testing

2553-441: The first pathways were the trails made by animals has not been universally accepted; in many cases animals do not follow constant paths. Some believe that some roads originated from following animal trails. The Icknield Way may exemplify this type of road origination, where human and animal both selected the same natural line. By about 10,000 BC human travelers used rough roads/pathways. In transport engineering , subgrade

2622-416: The functional condition of the road while reducing the need for routing maintenance, leading to extended service life without increasing structural capacity. Older concrete pavements that develop faults can be repaired with a dowel bar retrofit , in which slots are cut in the pavement at each joint, and dowel bars are placed in the slots, which are then filled with concrete patching material. This can extend

2691-464: The growth of plants or other vegetable matter. The compacted fill also serves as lower-stratum drainage. Select second fill ( sieved ) should be composed of gravel , decomposed rock or broken rock below a specified particle size and be free of large lumps of clay . Sand clay fill may also be used. The roadbed must be "proof rolled" after each layer of fill is compacted. If a roller passes over an area without creating visible deformation or spring

2760-404: The highway system from traffic collisions. On neighborhood roads traffic calming , safety barriers , pedestrian crossings and cycle lanes can help protect pedestrians, cyclists, and drivers. Lane markers in some countries and states are marked with Cat's eyes or Botts dots. Botts dots are not used where it is icy in the winter, because frost and snowplows can break the glue that holds them to

2829-580: The hole. The injection device must also have a return hose or a fast-control reverse switch, in case workers detect slab movement on the uplift gauge. The uplift beam helps to monitor the slab deflection and has to have sensitive dial gauges. Also called joint and crack repair, this method's purpose is to minimize infiltration of surface water and incompressible material into the joint system. Joint sealants are also used to reduce dowel bar corrosion in concrete pavement restoration techniques. Successful resealing consists of old sealant removal, shaping and cleaning

Olympic Highway - Misplaced Pages Continue

2898-540: The incoming Stevens Government and its Minister for Transport Michael Bruxner sought to reorganise the management of the road network in NSW. The new department essentially resumed the functions that had been held by the Main Roads Board from 1925 until March 1932, when they were transferred to the Department of Transport by the Lang Government . The Transport (Division of Functions) Act of 1932 provided for

2967-404: The laying of pavement material. A variety of road building equipment is employed in road building. After design, approval , planning , legal, and environmental considerations have been addressed alignment of the road is set out by a surveyor . The radii and gradient are designed and staked out to best suit the natural ground levels and minimize the amount of cut and fill. Great care

3036-518: The life of the concrete pavement for 15 years. Failure to maintain roads properly can create significant costs to society. A 2009 report released by the American Association of State Highway and Transportation Officials estimated that about 50% of the roads in the US are in bad condition, with urban areas worse. The report estimates that urban drivers pay an average of $ 746/year on vehicle repairs while

3105-609: The lifespan of their roads. Technically advanced agencies monitor the road network surface condition with sophisticated equipment such as laser/inertial profilometers . These measurements include road curvature , cross slope , asperity , roughness , rutting and texture . Software algorithms use this data to recommend maintenance or new construction. Maintenance treatments for asphalt concrete generally include thin asphalt overlays, crack sealing, surface rejuvenating, fog sealing, micro milling or diamond grinding and surface treatments . Thin surfacing preserves, protects and improves

3174-515: The new carriageway is not always constructed directly alongside the existing carriageway. Roads that are intended for use by a particular mode of transport can be reallocated for another mode of transport, i.e. by using traffic signs . For instance, in the ongoing road space reallocation effort, some roads (particularly in city centers) which are intended for use by cars are increasingly being repurposed for cycling and/or walking . Like all structures, roads deteriorate over time. Deterioration

3243-457: The newly declared State Highway 17, later Newell Highway , at Narrandera). Trunk Road 57 was extended south, from Wagga Wagga via Henty and Culcairn to the intersection with Hume Highway near Ettamogah (subsuming Main Road 210), and declared Trunk Road 78 from the intersection with Mid-Western Highway in Cowra via Young, Wombat, Wallandbeen and Cootamundra to Junee (the southern end of Main Road 239

3312-466: The number of road traffic casualties from traffic collisions . In their World report on road traffic injury prevention report, the World Health Organization (WHO) identify speed control as one of various interventions likely to contribute to a reduction in road casualties. Road conditions are the collection of factors describing the ease of driving on a particular stretch of road, or on

3381-506: The owner may have excessive repair and rehabilitation costs. Some asphalt pavements are designed as perpetual pavements with an expected structural life in excess of 50 years. Many asphalt pavements built over 35 years ago, despite not being specifically designed as a perpetual pavement, have remained in good condition long past their design life. Many concrete pavements built since the 1950s have significantly outlived their intended design lives. Some roads like Chicago 's Wacker Drive ,

3450-418: The pavement performance, reduce construction costs and decrease maintenance. The completed roadway is finished by paving or left with a gravel or other natural surface. The type of road surface is dependent on economic factors and expected usage. Safety improvements such as traffic signs , crash barriers , raised pavement markers and other forms of road surface marking are installed. According to

3519-569: The presence or absence of a made road has nothing to do with the distinction. Another legal view is that while a highway historically included footpaths , bridleways , driftways, etc., it can now be used to mean those ways that allow the movement of motor vehicles , and the term rights of way can be used to cover the wider usage. In the United States, laws distinguish between public roads , which are open to public use, and private roads , which are privately controlled. The assertion that

SECTION 50

#1732851701245

3588-656: The public so that drivers going through a particular area can be aware of hazards that may exist in that area. News agencies, in turn, rely on tips from area residents with respect to certain aspects of road conditions in their coverage area. Department of Main Roads (New South Wales) The Department of Main Roads (DMR) was an agency of the Government of New South Wales , responsible for planning, constructing and maintaining major road infrastructure. The DMR directly managed highways and major roads and provided funding to local councils for regional and local roads. The agency

3657-418: The reservoir, installing the backer rod and installing the sealant. Sawing, manual removal, plowing and cutting are methods used to remove the old sealant. Saws are used to shape the reservoir. When cleaning the reservoir, no dust, dirt or traces of old sealant should remain. Thus, it is recommended to water wash, sand-blast and then air blow to remove any sand, dirt or dust. The backer rod installation requires

3726-494: The road conditions". Specific aspects of road conditions can be of particular importance for particular purposes. For example, for autonomous vehicles such as self-driving cars , significant road conditions can include "shadowing and lighting changes, road surface texture changes, and road markings consisting of circular reflectors, dashed lines, and solid lines". Various government agencies and private entities, including local news services, track and report on road conditions to

3795-399: The road construction area may be marked for retention. These protected trees should not have the topsoil within the area of the tree's drip line removed and the area should be kept clear of construction material and equipment. Compensation or replacement may be required if a protected tree is damaged. Much of the vegetation may be mulched and put aside for use during reinstatement. The topsoil

3864-512: The road construction site. Approval from local authorities may be required to draw water or for working (crushing and screening) of materials for construction needs. The topsoil and vegetation is removed from the borrow pit and stockpiled for subsequent rehabilitation of the extraction area. Side slopes in the excavation area not steeper than one vertical to two horizontal for safety reasons. Old road surfaces, fences, and buildings may need to be removed before construction can begin. Trees in

3933-1017: The road is not an official highway as classified by Transport for NSW , and is considered a rural road. Olympic Highway was signed National Route 41 across its entire length in 1974. With the conversion to the newer alphanumeric system in both states in 2013, this was replaced with route A41. 34°52′12″S 147°32′40″E  /  34.87000°S 147.54444°E  / -34.87000; 147.54444 Road There are many types of roads , including parkways , avenues , controlled-access highways (freeways, motorways, and expressways), tollways , interstates , highways , thoroughfares , and local roads. The primary features of roads include lanes , sidewalks (pavement), roadways (carriageways), medians , shoulders , verges , bike paths (cycle paths), and shared-use paths . Historically many roads were simply recognizable routes without any formal construction or some maintenance. The Organization for Economic Co-operation and Development (OECD) defines

4002-631: The road passes through suburban areas it accommodates both parking and pedestrian needs of the town shopping centre and highway through traffic. At its northern terminus in Cowra, Olympic Highway meets Mid-Western Highway, along which route A41 continues east to Bathurst, and west as route B64 to Grenfell ; and Lachlan Valley Way that generally runs northwest–southwest between Forbes and Boorowa and beyond. Olympic Highway heads generally south by west through Koorawatha , Young , Cootamundra , Junee , Wagga Wagga, and Culcairn towards its southern terminus via

4071-473: The road, although they can be embedded in short, shallow trenches carved in the roadway, as is done in the mountainous regions of California. For major roads risk can be reduced by providing limited access from properties and local roads, grade separated junctions and median dividers between opposite-direction traffic to reduce the likelihood of head-on collisions. The placement of energy attenuation devices (e.g. guardrails, wide grassy areas, sand barrels)

4140-404: The roads of a particular locality, including the quality of the pavement surface , potholes , road markings, and weather . It has been reported that "[p]roblems of transportation participants and road conditions are the main factors that lead to road traffic accidents". It has further been specifically noted that "weather conditions and road conditions are interlinked as weather conditions affect

4209-524: The same day, 8 August 1928. With the passing of the Main Roads (Amendment) Act of 1929 to provide for additional declarations of State Highways and Trunk Roads, this was amended to Trunk Road 57 and Main Roads 210 and 239 and 243 on 8 April 1929. The Department of Main Roads , which had succeeded the MRB in 1932, truncated the eastern end of Main Road 243 to Junee on 16 March 1938 (with its western end terminating at

SECTION 60

#1732851701245

4278-406: The section is deemed to comply. Geosynthetics such as geotextiles , geogrids , and geocells are frequently used in the various pavement layers to improve road quality. These materials and methods are used in low-traffic private roadways as well as public roads and highways. Geosynthetics perform four main functions in roads: separation, reinforcement, filtration, and drainage; which increase

4347-437: The slab. The grout can fill small voids beneath the slab and/or sub-base. The grout also displaces free water and helps keep water from saturating and weakening support under the joints and slab edge after stabilization is complete. The three steps for this method after finding the voids are locating and drilling holes, grout injection and post-testing the stabilized slabs. Slab stabilization does not correct depressions, increase

4416-476: The steer axle and 36,000 pounds (16.329 t) on both of the tandem axle groups is expected to do 7,800 times more damage than a passenger vehicle with 2,000 pounds (0.907 t) on each axle. Potholes on roads are caused by rain damage and vehicle braking or related construction work. Pavements are designed for an expected service life or design life . In some parts of the United Kingdom the standard design life

4485-593: Was a statutory appointment by the Minister for Roads . The department employed salaried staff who carried out planning, management and administrative tasks and day labour staff who undertook road and bridge works. For much of its existence the DMR undertook a significant proportion of its road and bridge construction and all its maintenance activities using its own labour force. It also operated major mechanical workshops, asphalt plants , spray sealing crews, road linemarking teams and materials testing laboratories. In 1932

4554-487: Was declared from the intersection with Hume Highway near Ettamogah, via Culcairn, Henty to the intersection with Wagga-Narrandera Road (today Sturt Highway ) at Wagga Wagga , Main Road No. 239 was declared from Young to Wombat (and continuing southwards to Murrumburrah, and northwards to Grenfell), and Main Road No. 243 was declared from Junee to Wallendbeen (and continuing westwards via Coolamon and Grong Grong to Narrandera, and continuing eastwards via Harden to Bowning), on

4623-630: Was merged with other agencies to form the Roads & Traffic Authority in 1989. The Ministry of Transport was established in December 1932 by way of the Transport (Division of Functions) Act of 1932 , following the dismissal of the Lang Government and the subsequent state election . The ministry consisted of three departments, including the Department of Main Roads and the Department of Road Transport & Tramways. The departments were established as

4692-534: Was truncated just south of Old Junee) and was officially named Olympic Way on 19 June 1963, in honour of part of the path that the Olympic Torch took on its journey from Cowra to Albury for the 1956 Melbourne Olympic Games . The southern end of Olympic Way was re-aligned on 1 July 1988, to run from Gerogery directly south to terminate at the current-day intersection with Hume Highway roughly 10 km north of its previous terminus at Ettamogah (the former alignment

4761-407: Was truncated to meet Trunk Road 78 at Young), on the same day, 29 June 1938; Trunk Road 78 was later extended a short distance west past Junee to the intersection with Trunk Road 57 south of Old Junee on 17 May 1939. Trunk Road 78 was extended further south via Wagga Wagga, Henty and Culcairn to the intersection with Hume Highway near Ettamogah (subsuming the former alignment of Trunk Road 57, which