Misplaced Pages

Palmerston North railway station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#934065

68-665: Palmerston North railway station is a main station on the North Island Main Trunk serving the city of Palmerston North in the Manawatū-Whanganui region of New Zealand . It is the northern terminus of the Capital Connection long-distance commuter train to Wellington and a major stop on the Northern Explorer service between Auckland and Wellington. A new Palmerston North (regional) intermodal freight hub

136-581: A spiral built to overcome large elevation differences with grades suitable for steam engines, the ruling gradient being 1 in 50. When the first sections of the NIMT were built, there was great uncertainty as to even the route in Waikato , with Cambridge , Kihikihi , Te Awamutu and Alexandra considered as possible destinations in Waikato. The central section was gradually extended to meet up in 1909, 23 years after

204-448: A banker locomotive added for the steep bank up to Pukerua Bay, and from 1940 it was the southern terminal station for steam locomotives. Previously there was a signal box at each end of the station, a two-road shed with water, coal and oil facilities, a turntable, and (until Wellington Airport was opened) a rail/air freight depot for Paraparaumu Airport . The Paekakariki Station Precinct Trust works "to acquire, develop, and administer

272-548: A modern concrete structure, though the original has been restored as a tourist attraction. In 1980 the 1880s Poro-O-Tarao Tunnel in the King Country was replaced by a tunnel with clearances which allowed for large hicube containers. In 2009–10, the 1.5 km (0.93 mi) section of line between Wellington Junction and Distant Junction was rebuilt from double track to triple track, to ease peak-time congestion. In February 2011, duplication between Paekākāriki and Waikanae

340-695: A new eastern route from Auckland to Westfield via Glen Innes and Hobsons Bay, running into the new Auckland railway station and providing better access to the Port of Auckland. The original section between Auckland and Westfield via Newmarket later ceased to be part of the NIMT: Auckland to Newmarket became the Auckland-Newmarket Line , and Newmarket to Westfield became part of the North Auckland Line (NAL) which runs between Whangarei and Westfield. In

408-479: A number of peak services run express or non-stop between Wellington and Porirua before stopping at all stations from Porirua to Waikanae. All services running between Waikanae and Wellington stop at Paekākāriki. Northern Explorer trains and diesel-hauled KiwiRail freight trains pass by the station but do not stop, except that southbound freight trains may stop to attach banking engines. The railway from Wellington to Paekākāriki opened on 3 November 1886 as part of

476-759: A technical study carried out with assistance from the Japanese Railway Technical Research Institute . The report stated that track capacity would be increased by electrification because such traction is faster and able to move more freight at once. The report stated, for example, that whereas a diesel locomotive could haul 720-tonne trains at 27 km/h (17 mph) up the Raurimu Spiral , an electric locomotive could haul 1100/1200-tonne trains at 45 km/h (28 mph), cutting 3–5 hours off journey times. Less fuel would be needed and employing regenerative braking in electric locomotives lowers

544-507: A year after the last major battle. This line reached Mercer by 20 May 1875, with 29 km (18 mi) from Ngāruawāhia being constructed by the Volunteer Engineer Militia and opened on 13 August 1877. It was extended to Frankton by December 1877, and to Te Awamutu in 1880. An economic downturn stalled construction for the next five years, and Te Awamutu remained the railhead. There were also negotiations with local Māori, and

612-688: Is now used only by Transdev Wellington for Metlink suburban passenger services on the Kapiti Line , and was extended to Paraparaumu on 7 May 1983 and Waikanae on 20 February 2011. Funded by the Greater Wellington Regional Council , the extension to Waikanae coincided with the delivery of new FP class Matangi electric multiple units . Following the Second World War railway services suffered due to skill and coal shortages. Skilled staff sought employment opportunities elsewhere in

680-589: Is proposed by KiwiRail for a site to the north-east of Palmerston North. The plan has been developed with a grant of $ 40 million from the Provincial Growth Fund, as announced by the minister Shane Jones on 15 November 2018. The freight hub would replace the Tremaine Avenue freight yard, which is to the east of the station and provides mainly for freight to Auckland, Wellington, Christchurch and Dunedin. The original Palmerston North Central railway station

748-629: Is the main railway line in the North Island of New Zealand, connecting the capital city Wellington with the country's largest city, Auckland . The line is 682 kilometres (424 mi) long, built to the New Zealand rail gauge of 1,067 mm ( 3 ft 6 in ) and serves the large cities of Palmerston North and Hamilton . Most of the NIMT is single track with frequent passing loops , but sections at each end also handling suburban commuter traffic are double tracked. The section known as

SECTION 10

#1732852518935

816-532: The King Country was not accessible to Europeans until 1883. The Wellington - Longburn (near Palmerston North ) section was constructed between 1881 and 1886 by the Wellington and Manawatu Railway Company (WMR). The company was acquired by the government and merged with the New Zealand Railways Department in 1908. The Longburn to Marton section had been opened on 18 April 1878, as part of

884-463: The Kāpiti Coast , New Zealand , is an intermediate station on the Kapiti Line for Metlink 's electric multiple unit commuter trains from Wellington . Paekākāriki was the terminal station of the commuter service from 1940 to 1983, when the service was extended to Paraparaumu, and to Waikanae in 2011. The station was opened in 1886. Initially, banking locomotives were attached at Paekākāriki for

952-808: The North-South Junction between Wellington and Waikanae , except for 3.3 km (2.1 mi) of single-track through tunnels between North Junction (35.3 km (21.9 mi) from Wellington) and South Junction, (32 km (20 mi) from Wellington), on the Pukerua Bay to Paekākāriki section, Around 460 km (290 mi) (approximately 65%) of the line is electrified in three separate sections: one section at 1500 V DC between Wellington and Waikanae, and two sections at 25 kV AC : 412 km (256 mi) between Palmerston North and Te Rapa (Hamilton) and 34 km (21 mi) between Pukekohe and Auckland Waitematā. The first section of what became

1020-599: The Onehunga Branch . The line was later continued south from Penrose into the Waikato. To support the Invasion of the Waikato , a 3.5 mi (5.6 km) tramway was built from Maungatāwhiri to Meremere in 1864, with a first sod event near Koheroa on Tuesday, 29 March 1864 by Auckland's Chief Superintendent of Roads & Bridges, W R Collett . Turning of the first sod of the Auckland and Drury Railway took place in 1865,

1088-527: The Public Works Department (PWD) was stopped on 18 April 1929, when within 42 ch (840 m) of completion, by Minister of Works Alfred Ransom and restarted in 1938 by Bob Semple but halted by the Second World War. Work finally resumed in 1957 under Minister John McAlpine , the first stage to Milson from the north-east was opened on 22 April 1954. The deviation was opened to Longburn for through goods trains on 27 July 1959. On 21 October 1963,

1156-557: The Wellington-Manawatu Line built by the Wellington and Manawatu Railway Company (WMR). Before 1905, the name was spelt Paikakariki . The official name of the town was changed to Paekākāriki (with macrons ) by the New Zealand Geographic Board on 21 June 2019. The first Auckland - Wellington through expresses ran on 14 February 1909, taking 19 hours 13 minutes, and stopping at Paekākāriki. Following

1224-686: The war delayed most of these works for over a decade. In 1927, automatic colour-light signalling was installed from Otahuhu to Mercer. In 1930 the signalling was extended 34 mi 72 ch (56.2 km) to Frankton and the 6 mi 55 ch (10.8 km) from there to Horotiu was doubled. The 3 mi 54 ch (5.9 km) north to Ngāruawāhia was doubled from 5 December 1937, followed by 9 mi 12 ch (14.7 km) Ngāruawāhia to Huntly on 4 December 1938 and Huntly to Ohinewai and Papakura to Paerata in December 1939. By then, wartime shortages delayed further double-tracking. Pokeno to Mercer

1292-493: The 'Last Spike' monument is at Manganui-o-te-Ao 39°16.44′S 175°23.37′E  /  39.27400°S 175.38950°E  / -39.27400; 175.38950 , near Pokaka . A two-day NIMT service started on 9 November, with an overnight stop at Ohakune. On 14 February 1909, the first NIMT express left Auckland for Wellington, an overnight trip scheduled to take 19 hours 15 minutes, with a sleeping car, day cars with reclining seats, and postal/parcels vans. The dining car went on

1360-1142: The Greater Wellington Regional Council. Services between Wellington and Porirua or Waikanae are operated by electric multiple units of the FT/FP class (Matangi). Two diesel-hauled carriage trains, the Capital Connection and the Northern Explorer , pass through the station but do not stop. Travel times by train are 14n minutes to Waikanae, 15 minutes to Porirua, 46 minutes to Wellington for trains stopping at all stations and 41 minutes for express trains that do not stop between Porirua and Wellington. Trains run every 20 minutes during daytime off-peak hours, more frequently during peak periods, and less frequently at night. Before July 2018, off-peak passenger train services between Wellington and Waikanae ran every 30 minutes but were increased to one every 20 minutes from 15 July 2018. Off-peak trains stop at all stations between Wellington and Waikanae. During peak periods, some trains from Wellington that stop at all stations may terminate at Porirua and return to Wellington while

1428-543: The Milson deviation to shift the line and station northwest and away from the centre of Palmerston North started in May 1926, but was delayed by the depression and Second World War , and objections from the local business quarter; when work was suspended in April 1929, the reasons given by Prime Minister, Sir Joseph Ward , included the distance of the new station from the town centre. Work by

SECTION 20

#1732852518935

1496-606: The Minister of Public Works William Hall-Jones instigated a night shift (under kerosene lamps). By the beginning of 1908, there was a 39 km (24 mi) gap between Erua and Ohakune, with a connecting horse-drawn coach service. From Ohakune south to Waiouru, the Public Works Department operated the train, as this section of 27 km (17 mi) had not yet been handed over to the Railways Department. The gap

1564-649: The Ministry of Works, but was too expensive. In 1966 the NZR General Manager Alan Gandell said that the deviation would eliminate five old and narrow tunnels, and that New Zealand topography precluded a fast run , but travel time would be cut from 13½ hours to between 11½ and 12 hours, the best possible without tremendous expense . But two modern express trains were being designed for the NIMT, and should be introduced in three to four years. The central section from Te Rapa near Hamilton to Palmerston North

1632-678: The NIMT opened in 1873 in Auckland. Construction at the Wellington end began in 1885. The line was completed in 1908 and was fully operational by 1909. It is credited for having been an economic lifeline, and for having opened up the centre of the North Island to European settlement and investment. In the early days, a passenger journey between Wellington and Auckland could take more than 20 hours; today, it takes approximately 11 hours. The NIMT has been described as an "engineering miracle", with numerous engineering feats such as viaducts , tunnels and

1700-473: The NIMT which are electrified: Auckland's urban network and the central section (25 kV AC) from Palmerston North – Te Rapa (north of Hamilton) at 25 kV AC . Wellington's urban network is electrified at 1500 V DC; as formerly used in other sections of the New Zealand network. In Wellington the operating voltage has been increased to 1650V DC, and 1700V DC since the full introduction of the Matangi EMU , to increase

1768-540: The NIMT, the General Motors G12 export models were ordered, becoming the D class . The 411 km (255 mi) section between Palmerston North and Hamilton was electrified at 25 kV 50 Hz AC , opened on 24 June 1988 as one of the Muldoon National Government's " Think Big " energy development projects. An overall cost in excess of $ 100 million had been projected, with some 40% being for

1836-606: The NIMT. In 1957 when the installation of CTC over the remaining 354 km (220 mi) commenced, it was estimated that using CTC over the 330 km (205 mi) Taumarunui to Otaki section with control centres at Ohakune (which shifted to Taumarunui in 1977), Taihape and Palmerston North would replace 74 men in traffic working duties. The last section converted was Piriaka-Owhango. A 1926 article by "Backblocks" described conditions for staff at these stations where four workers lived in isolated areas, and their efforts to get special trains for transport to special events. In 1913,

1904-615: The Peka Peka to Otaki section of the Kāpiti Expressway required 1.3 km (0.81 mi) of the NIMT immediately north of Otaki station to be realigned. Construction began in 2017, and trains were switched onto the new alignment over the 2019 Easter long weekend (19–22 April). In the Auckland area, a third main line between Wiri and Westfield is under construction; this will allow freight (or other) trains to bypass stationary passenger trains. There are three independent sections of

1972-528: The coal shortage and prevent heavy expenditure on imported fuels. He commissioned a study into electrification, which concluded that a low-frequency AC system could be cheaper than 1500 V DC, the system in use in Wellington. Aickin sent a technical mission of four senior officers overseas in March 1949 and travelled overseas himself to negotiate a tentative contract with a British construction company. The Chief Mechanical Engineer and Chief Accountant specified and costed

2040-450: The completion of the Tawa Flat deviation on 19 June 1937, electrification of the railway from Wellington to Paekākāriki was completed on 24 July 1940 allowing electric locomotive-hauled commuters carriage trains to operate between Wellington and Paekakariki. DM/D class multiple units were introduced in the 1950s and replaced most locomotive-hauled carriage trains. From the completion of

2108-570: The cost of buying bulk electrical energy generated substantially from New Zealand resources and the cost of generating electricity in a small plant using imported diesel fuel. The Royal Commission on Railways created following Aickin's tenure rejected the report's findings. Aickin's successor Horace Lusty , revised the contract with English Electric to specify D class diesel-electric locomotives . They were later found to be unreliable, and only ten were supplied. 42 D class locomotives were supplied instead for secondary lines. For main lines including

Palmerston North railway station - Misplaced Pages Continue

2176-577: The diesel fuel price. Part of the project included replacing the copper wire communications system with a new fibre optic communications cable (due to interference caused by AC power with the DC copper wire system) between Wellington and Auckland. In 1994 New Zealand Rail Limited sold the cable to Clear Communications for telephone traffic, leasing part of it back for signalling. Paekakariki railway station Paekakariki railway station in Paekākāriki on

2244-558: The economy. From 1948 to 1951 the General Manager of the Railways Department , Frank Aickin advocated electrification of the entire line, despite protests from his engineering staff. Aickin had previously been Staff Superintendent and Chief Legal Advisor to the Department and considered using diesel locomotives for trains on the NIMT to be too expensive. He turned his attention to electrification, mainly because he saw that it could relieve

2312-533: The edge of the city. Between 1973 and 1981, the major Mangaweka deviation in the central section between Mangaweka and Utiku was built, with three viaducts, all over 70m tall, crossing the Rangitīkei and Kawhatau rivers. The viaducts were at the end of their economic lives. The deviation removed a number of tunnels, many of which were built in unstable country, and eliminated a number of steep gradients. A combined road and rail deviation had bean considered with

2380-612: The electrification to Paekākāriki in 1940, steam locomotives were not permitted to work south of Paekākāriki due to the smoke nuisance in the long tunnels on the Tawa Flat deviation. Long-distance passenger and freight trains were hauled by ED and EW class electric locomotives between Wellington and Paekākāriki where the locomotives were changed from electric to steam. During the 1950s, steam locomotives were progressively replaced by diesel-electric locomotives for long distance trains, but locomotives continued to be changed at Paekākāriki because

2448-520: The eventual route. Four options were considered before the Minister of Public Works decided on the present route in 1884, but, when it was realised just how difficult that route was, further surveys considered two other options in 1888. Routes via Napier and Waitara were also considered, with surveying in Taranaki from 1883 to 1889. Construction of the final central section began on 15 April 1885, when paramount chief Wahanui of Ngāti Maniapoto turned

2516-664: The first sod outside Te Awamutu . It was 23 years before the two lines met, as the central section was difficult to survey and construct. The crossing of the North Island Volcanic Plateau with deep ravines required nine viaducts and the world-famous Raurimu Spiral . Richard Seddon ’s Liberal Government pledged in 1903 that the whole route would be open in 1908. In 1904, the railheads were still 146 km (91 mi) apart, and contracts for three massive viaducts (Makatote, Hapuawhenua and Taonui) were not let until 1905. The government committed 2500 workmen, and in 1907,

2584-431: The fuel consumption further. Electrification's advantages were reflected in the economic evaluation in the report, which showed a rate of return of 18%. Sensitivity analysis showed that this high rate of return gave the project robustness against lower traffic volumes than expected (the return remained positive even if traffic fell), against significant increases in construction cost, and against lower than expected rises in

2652-401: The heavy X class locomotives used on the central mountainous section from 1908. Some 10 bridges between Frankton and Taumarunui had to be strengthened, and in 1914 there was still 129 km (80 mi) of 53 lb/yd rail to be replaced. In the 1930s 85 lb/yd (42.2 kg/m) was adopted, then 91 lb/yd (45.1 kg/m), and from 1974 100 lb/yd (50 kg/m). Signalling on

2720-400: The last of the northern and southern sections of NIMT had been opened. Auckland's first railway was the 13 km (8.1 mi) line between Point Britomart and Onehunga via Penrose, opened in 1873. It was built by Brogdens , as was the rest of the Auckland & Mercer Railway, for £166,000 for the 41 mi (66 km) to Mercer . The section from Penrose to Onehunga is now called

2788-411: The late 1930s, bridges replaced level crossings at Ohinewai, Taupiri and Hopuhopu . The double track Tawa Flat deviation opened to goods trains on 22 July 1935 and to passenger trains on 19 June 1937, bypassing the original single track WMR line between Wellington and Tawa . With a pair of tunnels under the Wellington hills, the deviation alleviated issues with more and heavier freight traffic on

Palmerston North railway station - Misplaced Pages Continue

2856-663: The line linking the ports of Foxton and Whanganui . In 1882, the Whitaker Ministry passed the North Island Main Trunk Railway Loan Act , to expedite construction of the North Island Main Trunk south of Te Awamutu by authorising the overseas borrowing of a million pounds (probably in London) for the work. From Te Awamutu, it was proposed that the line be built via Taupo or via Taumarunui ,

2924-551: The locomotives, but the final cost was about $ 250 million. The economics of the project was greatly undermined by the fall of the price of oil in the 1980s and the deregulation of land transport, which removed the long-distance monopoly NZR held when the cost-benefit report was written. The electrification of the section, which had its genesis in a study group set up in June 1974 to report on measures to be taken to cope with increasing rail traffic volumes, received approval in 1980. This led to

2992-529: The maximum speed limit on the NIMT was raised to 45 mph (72 km/h), reducing the journey time by 1 hour 25 minutes Auckland-Wellington or to 17 hours and between 30 and 45 minutes. Under Thomas Ronayne , the New Zealand Railways Department general manager from 1895 to 1913, the section south to Parnell was duplicated and improvements made to the worst gradients and tight curves between Auckland and Mercer. Under his successor E. H. Hiley

3060-741: The need to relieve the steep (1 in 57) gradients from Plimmerton to the Pukerua Bay summit by a deviation to the east and allowed more frequent suburban passenger trains (and allowed suburban electric multiple units to run on this section from September 1949). The difficult section down the Paekakariki Escarpment from Pukerua Bay to Paekākāriki with five tunnels between South and North Junctions remains single track. Duplication from Tawa to Porirua opened on 15 December 1957, from Porirua to Paremata on 7 November 1960, and Paremata to Plimmerton on 16 October 1961. The section between Porirua and Plimmerton

3128-485: The new DA class diesel locomotives were initially unable to operate south of Paekakariki due to the limited clearances in the tunnels between Pukerua Bay and Paekākāriki. Work was undertaken to lower the floors of these tunnels to improve clearances and from the 1960s diesel locomotives were able to work south of Paekākāriki and locomotive changes at Paekākāriki became unnecessary. However, electric locomotives were kept at Paekākāriki to bank trains that needed assistance on

3196-519: The new station and yards were opened, and all rail traffic removed from the main street and square of Palmerston North. The old line was closed by mid-1965, and the Awapuni railway station south of the main station on the old route was also closed. The new route was 1 mi 4 ch (1.7 km) shorter than the old. The station currently serves one route – the Capital Connection. This service see

3264-500: The north express from Wellington to Ohakune, then transferred to the southbound express, so avoiding the heavy gradients of the central section. The rails and signalling have been upgraded over the years, and many sections of the line have been deviated: The original 1870s Vogel Era track had rails of 40 lb/yd (19.9 kg/m), some were iron not steel; later rails were 53 lb/yd (26.3 kg/m); and from 1901 70 lb/yd (34.8 kg/m), e.g. between Taumarunui and Taihape for

3332-539: The power available. Electrification of the NIMT was mooted by electrical engineer Evan Parry in the first volume of the New Zealand Journal of Science and Technology in November 1918. In light of a national coal shortage following World War I , Parry argued that the network was under great strain due to ever-increasing volumes of freight, and the use of steam traction was partly to blame. Parry also noted that there

3400-603: The rail yard for rail preservation. Several buildings are listed by the New Zealand Historic Places Trust , as Category I ( signal box and water vats) or Category II (station and goods shed) The station and yard is a historic area. Paekākāriki is the second station before Waikanae, the northern terminus on the Kapiti Line, for commuter trains operated by Transdev Wellington under the Metlink brand contracted to

3468-727: The second Parnell Tunnel with two tracks and an easier gradient was completed in 1915–1916. On the Kakariki bank between Halcombe and Marton a deviation reduced the 1 in 53 grade to 1 in 70 in 1915. Similar work was done to ease the gradient to Greatford, on the other side of the Rangitīkei River, in 1939. A 1914 Act authorised spending on the Westfield Deviation , new stations at Auckland and Wellington, track doubling (Penrose-Papakura, Ohinewai-Huntly, Horotiu-Frankton, Newmarket-New Lynn), and grade easements from Penrose to Te Kuiti, but

SECTION 50

#1732852518935

3536-471: The section officially opened on 7 May 1983 allowing the extension of suburban commuter service to Paraparaumu which became the new northern terminal for suburban commuter services. Before 1983 there were buses from Paekākāriki to Paraparaumu and Raumati. The station previously had a refreshment room and a steam locomotive depot. The refreshment room closed when it became unnecessary to stop trains to change locomotives at Paekākāriki. Locomotives were changed or

3604-666: The single-track sections (most of the line) was controlled by Tyer's Electric Train Tablet No 7 system; with each of the stations for the 94 tablet sections staffed by three tablet porters each working a 56-hour week for continuous coverage; hence each station required at least four houses for the stationmaster and three porters. Pierre noticed that with CTC station buildings and even platforms had been removed as there were no longer any staffed stations between Ohakune and National Park. The Train Control system introduced from 1928 to 1932 supplemented

3672-565: The southern section of the NIMT from Wellington to Paekākāriki was completed. The Tawa Flat deviation has a long tunnel (Tawa No 2) not suitable for steam operation because of excessive smoke (although steam trains were temporarily operated in the new deviation from 1935). A Centralised Train Control (CTC) system was installed in 1940, so that new signal boxes were not required and five stations between Tawa and Pukerua Bay no longer had to be continually staffed for Tablet operation; see Kapiti Line and North–South Junction . Electrification eliminated

3740-470: The station visited by 1 or 2 trains per weekday – down from >60 when the station was opened. Heritage excursions also occasionally use the station. The main building is used as KiwiRail offices or storage, and the old cafeteria is used as an after-school care centre. The station is not served by a city bus route but has a taxi rank. North Island Main Trunk The North Island Main Trunk ( NIMT )

3808-416: The steep "hill" up to Pukerua Bay and steam locomotives were changed there for electric locomotives to Wellington from 1940 to the 1960s. The large wooden station building on an island platform is used by a museum, and has a bookshop run by Irving Lipshaw and Michael O’Leary in one section. There are a restored signal box and a level crossing at the south end. Steam Incorporated has taken over most of

3876-573: The steep and twisting original route where long sections at 1 in 60 gradient required banker engines. The Wellington to Johnsonville section of the original line was retained as the Johnsonville Line and the Johnsonville to Tawa section closed. The North-South Junction section from Plimmerton to South Junction, north of Pukerua Bay and Muri, and North Junction to Paekākāriki were duplicated in 1940. From 24 July 1940 electrification at 1500 V DC of

3944-410: The steep grade from Paekākāriki to Pukerua Bay. In the 1980s, the purchase of additional multiple units and more powerful diesel locomotives allowed the electric locomotives to be withdrawn from service. A deviation was built around Tunnel 12 in the early 1900s and a fence to protect from landslides was built after a derailment in 1980. Electrification was extended north of Paekākāriki to Paraparaumu:

4012-524: The system and Aickin was able to complete a substantial report justifying the NIMT electrification and submit it to the Government. Officers from New Zealand Treasury and the Ministry of Works and two experts from Sweden (Thelander and Edenius) commented on the proposal and in December 1950 the Government granted approval in principle and agreed to appoint Thelander as a consultant. Aickin later fell out with

4080-402: The tablet system by operators at the four sections (Auckland, Frankton, Te Kuiti, Ohakune, Marton and Wellington) to expedite operation of trains over several tablet sections; the 1925 Fay-Raven report urged its adoption because of the fitful progress of mixed trains, with locomotives often kept waiting. From 1938 to 1966 Centralised Traffic Control (CTC) gradually replaced the tablet system on

4148-458: The then National Government and retired as General Manager in July 1951. With the change in regime, the electrification proposal disappeared. A key assumption of Aickin's report was that traffic on the NIMT would grow by 50% from 1948 to 1961. Since a diesel-electric locomotive is a travelling power station, the savings through electrification compared to diesel could be regarded as the difference between

SECTION 60

#1732852518935

4216-461: Was electrified between 1984 and 1988 as part of the Think Big government energy program. Some tunnels were opened out or bypassed by deviations while in others clearances were increased, and curves eased. The section between Ohakune and Horopito was realigned with three viaducts replaced to handle higher loads and speeds. The most notable bridge replaced was the curved metal viaduct at Hapuawhenua by

4284-577: Was closed on 7 August 1908 for the first through passenger train, the 11-car Parliamentary Special carrying the Prime Minister Sir Joseph Ward and other parliamentarians north to see the American Great White Fleet at Auckland. But much of the new section was temporary, with some cuttings north of Taonui having vertical batters and unballasted track from Horopito to Makatote. Ward drove the last spike on 6 November 1908, and

4352-603: Was completed as part of the upgrade and expansion of the Wellington suburban network; see Kapiti Line for more information. In 2012–13, four bridges near Rangiriri between Auckland and Hamilton were replaced. The bridges were all over 100 years old with steel spans and timber piers, and were replaced by modern low-maintenance concrete ballast deck bridges. Bridges 479, 480, 481 & 482 were replaced, with lengths of 40 metres (131 ft 3 in), 40 metres (131 ft 3 in), 30 metres (98 ft 5 in) and 18 metres (59 ft 1 in) respectively. The construction of

4420-467: Was doubled from 11 November 1951, Pukekohe to Pokeno 21 November 1954, Mercer to Amokura 1 July 1956 and Ohinewai to Te Kauwhata 14 December 1958. The 13 km (8.1 mi) between Amokura and Te Kauwhata remain single track, as does Ngāruawāhia bridge. Doubling of the section south of Amokura is being investigated in a business case from July 2021. In 1930, the Westfield deviation was opened, creating

4488-502: Was great potential for cheap hydro-electricity generation in the central North Island to power electrification. The first part of the NIMT to be electrified was the Wellington – Paekakariki section via the Tawa Flat deviation that was completed on 24 July 1940. This was largely to prevent smoke nuisance in the 4.3 km No. 2 tunnel, and to provide for banking on the Paekakariki to Pukerua Bay section. Electric traction in this section

4556-515: Was opened on 20 October 1876. Traffic increased with the opening of the line to Napier via Woodville in 1891, and the station was moved 30 chains (603m) south in March 1891. But it was still a bottleneck, and remained the longest-persisting bottleneck on the Main Trunk until the 1960s. Changes were recommended by Hiley in 1914, a commission in 1916 and the Fay-Raven commission in 1924–25. Construction of

4624-458: Was straightened in conjunction with the duplication by reclaiming land along the eastern shore of Porirua Harbour. In 1967, the floors of the tunnels on the former WMR section between Paekākāriki and Pukerua Bay were lowered to enable the D class locomotives to travel all the way to Wellington. Between 1964 and 1966, a deviation away from the centre of Palmerston North via the Milson deviation on

#934065