37-722: Magenta Line may refer to: K Line (Los Angeles Metro) , Los Angeles, California Magenta Line (Delhi Metro) , Delhi, India Magenta Line (Paris) , Paris Metro, France Magenta Line (São Paulo Metro) , Brazil Magenta Line (Shanghai) , China The Metropolitan line of the London Underground West Rail line , former railway line in Hong Kong, China See also [ edit ] Magenta (disambiguation) Pink Line (disambiguation) Purple Line (disambiguation) Red Line (disambiguation) Topics referred to by

74-550: A decade of study, a Final Environmental Impact Report was completed in May 2011. The FTA gave its approval to build the line in 2012, and heavy construction began in June 2014, funded by Measure R . Los Angeles County Supervisor Mark Ridley-Thomas was a key advocate for tunneling and other grade separation along the line. He also convinced Metro in 2013 to add an extra underground station at Leimert Park (Crenshaw/Vernon). The route

111-400: A mile to the north, requiring the design of an additional station while the overall line was still under construction. In 2014, Metro approved the planning and scoping of this station, which was called Aviation/96th in planning documents but was ultimately designated LAX/Metro Transit Center station . This station is intended to serve as Metro Rail's main gateway to the airport itself, while

148-427: A potential northward extension, which increased the cost of the original project by $ 236 million. With the passage of Measure M and the enthusiastic support of the city of West Hollywood , the K Line Northern Extension, which would travel north from the current Expo/Crenshaw terminus, connecting along the way to the B and D lines, is currently under development. Three options are being studied, all ending at

185-463: A shuttle service providing passengers access to the LAX shuttle and the C Line at Aviation/LAX station. The northern portion of the line ultimately opened on October 7, 2022. Varying service patterns have been proposed for integrating the completed K Line into the rest of the system over the course of its planning and construction, all of which have involved sharing trackage and infrastructure facilities with

222-517: A single line operating between Expo/Crenshaw and Norwalk station . Passengers from the Redondo Beach area would have been served by a shuttle to the LAX area, where they would need to transfer to another train to continue east or north. Instead, board members approved a one-year pilot of a configuration that would combine an Expo-to-Norwalk line with another line that would connect Redondo Beach with Willowbrook/Rosa Parks station , allowing transfers to

259-473: A spur towards LAX, they did not include it over fears that commuters would not use the line if they had to go through the airport on the way to work. The proposed extension to LAX was further complicated by concerns from the Federal Aviation Administration that the overhead lines of the rail line would interfere with the landing paths of airplanes. Amid ambivalence at LAX and L.A. City Hall,

296-592: Is different from Wikidata All article disambiguation pages All disambiguation pages K Line (Los Angeles Metro) The K Line is a light rail line in Los Angeles County . It currently consists of two separate noncontiguous segments. The 5.9-mile (9.5 km) northern segment runs north–south between the Jefferson Park and Westchester neighborhoods of Los Angeles , California , passing through various South Los Angeles neighborhoods and

333-506: Is operating a bus shuttle called the "C & K Line Link" from Westchester/Veterans station to Aviation/LAX station via Aviation/Century station. K Line service hours are approximately from 4:30 a.m. until 12:00 a.m. daily. Trains operate every 10 minutes throughout the most of the day. Trains run every 20 minutes after 8:00 p.m. every day and before 8:00 a.m. on weekends. The K Line currently serves 12 stations, with one final station expected to open in 2025. The following

370-604: Is the complete list of stations, from north to south: Extending the C Line (formerly the Green Line) to Los Angeles International Airport was an early goal of Los Angeles transit planners. Studies in 1984 and 1988 outlined routes from the Aviation/LAX station, running northeast to LAX and Westchester , similar to later plans for the second phase of the Sepulveda Transit Corridor . Although planners planned to add

407-505: The A and J Lines. The approved plan would have incurred higher operating expenses but board members argued it would retain better transfer opportunities for South Bay residents. Ongoing construction delays led to a reassessment of that plan in 2022. Metro recommended public outreach aimed at reformulating the operating plan before the connection to the C Line opens in 2024; in March 2023, Metro indicated that it would recommend Option 2 in

SECTION 10

#1732848646342

444-439: The C and K lines underwent service changes to accommodate pre-revenue testing at the upcoming LAX/Metro Transit Center station , scheduled to open in 2025. The C Line's western terminus was redirected to Aviation/Century station and the southern segment of the K Line was created between Aviation/Century station and Redondo Beach station . Once LAX/Metro Transit Center station opens, the C Line will terminate at this station, and

481-715: The Harbor Subdivision ROW into the South Bay, to the Torrance Regional Transit Center (RTC). Metro and the public are considering two alternatives in the DEIR: an elevated light-rail extension along Hawthorne Boulevard, and an at-grade extension along a BNSF line beside Condon Avenue. The study of the South Bay Extension will lead to the publication of a Draft Environmental Impact Report (DEIR). The study

518-694: The Torrance Transit Center , a 4.5-mile (7.2 km) extension study area. According to the LA County Expenditure Plan (Measure M), groundbreaking for the project is scheduled for 2026, with an expected opening in 2030–2033. The timeline is expected to be accelerated under the Twenty-eight by '28 initiative The project became an extension of the K Line upon the completion of Aviation/Century station , along with its associated service changes, on November 3, 2024. The original plans for

555-780: The Aviation/Century station will serve destinations along the busy Century Boulevard corridor. While initial plans called for the full length of the project to be opened for service while the LAX/Metro Transit Center was under development, delays in the opening of the main line meant that major construction on the station was already underway by the time the line was ready. As a result, the line opened on October 7, 2022 only from Expo/Crenshaw station to Westchester/Veterans station . The C Line and K lines will began operating along their final service patterns on November 3, 2024, with Aviation/Century station opening. However,

592-616: The B Line's Hollywood/Highland station , with an optional station at the Hollywood Bowl also being considered. The San Vicente Alternative, also known as the hybrid alternative, follows Crenshaw Boulevard and San Vicente Boulevard , turning north on Fairfax Avenue to serve The Original Farmers Market and Television City before turning on Beverly Boulevard to connect back to San Vicente Boulevard near Cedars-Sinai Medical Center towards West Hollywood at Pacific Design Center . Finally, serving new stations on Santa Monica Boulevard ,

629-478: The C Line tracks near the Aviation/LAX station. There would also be a station serving the LAX Airport (Aviation/Century station), completing the LAX connection envisioned by planners in the 1980s. The new line was championed by State Senator Diane Watson and County Supervisor Yvonne Brathwaite Burke , both representing portions of the corridor. A Major Investment Study was initiated in 1993, and after more than

666-543: The Crenshaw/LAX Line project connected Wilshire Boulevard to Los Angeles International Airport. However, once light rail was selected as the preferred mode, the cost for the entire route exceeded the project budget, so part of the corridor north of Exposition Boulevard was deferred until funds became available. The final design for the Crenshaw/LAX project included a tunneled station at Expo/​Crenshaw to accommodate

703-418: The K Line will operate as a single, continuous service through it. The LAX Automated People Mover , which will offer a connection to the airport's terminals, will begin service at LAX/Metro Transit Center station in 2026. The northern terminus of the northern segment is at Expo/Crenshaw station , a transfer point to the E Line . The K Line station here is underground and does not provide a track connection to

740-445: The at-grade E Line. Provisions are in place to allow the line to extend further north . The route follows Crenshaw Boulevard from Exposition Boulevard south to 67th Street. It travels underground in a one-mile (1.6 km) deep-bore tunnel , which transitions into an at-grade segment in the median of Crenshaw Boulevard (between 48th and 59th Streets) where trains run synchronized to existing traffic signals. From 59th and 67th Streets,

777-649: The city of Inglewood . The southern segment runs north–south between the Westchester neighborhood of Los Angeles and the city of Redondo Beach . It is one of six lines in the Los Angeles Metro Rail system operated by the Los Angeles County Metropolitan Transportation Authority (Metro). The northern segment, the oldest segment of the line, opened on October 7, 2022, making it the system's newest line. On November 3, 2024,

SECTION 20

#1732848646342

814-458: The corridor while at the same time providing stimulus for positive economic growth in the South Los Angeles region. The corridor was originally served by Los Angeles Railway Line 5 yellow streetcars until 1955 when the service was replaced with buses. The proposed line would link the E and C lines via Crenshaw and Florence, and a wye would be constructed to connect the K Line tracks to

851-494: The existing C Line. Although some early proposals would have sent trains through all three directions of the wye, this was rejected by Metro because it would cause too much wear and tear on the track switch mechanisms . The debate over service patterns proved somewhat contentious. In 2018, with the line then scheduled to open within the year, the Metro board of directors overrode a recommendation by operations staff that would have had

888-529: The figure above, in which the K Line would run north–south between Expo/Crenshaw and Redondo Beach, while the C Line would run west-east between LAX and Norwalk. On June 22, 2023, Metro's board of directors officially approved the implementation of Option 2 based on staff recommendation and public opinion. While the stations on the K Line were built to accommodate three-car trains, the former C Line stations built south of Interstate 105 were only built to accommodate two-car trains. To enable increased capacity of

925-483: The future LAX/Metro Transit Center station . Trains access the yard via crossovers from the north and south sides of the yard. As of 2024, the Kinki Sharyo P3010 is the only rolling stock to serve the K Line. Trains run in one- or two-car consists. Metro is planning to extend the platforms south of Aviation/​Century station to be able to eventually accommodate up to three-car trains. Expo An expo

962-540: The line returns underground into a shallow cut-and-cover tunnel for a half-mile (0.8 km). South of there, the route emerges from the tunnel and enters the Harbor Subdivision right of way , which runs parallel to Florence Avenue and Aviation Boulevard . The line mostly operates at-grade in this exclusive right-of-way, briefly transitioning onto elevated viaducts to cross over major thoroughfares including La Brea Avenue and I-405 . The southern terminus of

999-436: The line, Metro plans to lengthen the platforms at Aviation/LAX station , Mariposa station , Douglas station , and Redondo Beach station . The project would also add traction power substations and replace catenary wire and track ties. In April 2023, the state awarded Metro $ 95 million for the project, which is expected to cost $ 141 million. The project is expected to be complete in time for the 2028 Summer Olympics. The line

1036-472: The northern segment is Westchester/Veterans station . The extension under construction continues along an exclusive right of way, crossing over Manchester Avenue , Century Boulevard , and Imperial Highway . North of Century Boulevard, LAX/Metro Transit Center station will be at-grade and serve as the new western terminus of the C Line and function as a transfer point to the currently under construction LAX Automated People Mover . The northern terminus of

1073-461: The plans to extend the line to the airport were shelved. To serve the once bustling aerospace sector in El Segundo, the line went south to Redondo Beach station . Access to the airport requires connecting to a shuttle bus at the Aviation/LAX station. A north–south line along Crenshaw Boulevard was planned following the 1992 Los Angeles riots as a way to better serve transit-dependent residents in

1110-533: The route curves north again towards Hollywood . The other two options follow a traditional north–south routing on either Fairfax Avenue or La Brea Avenue . On Metro Rail's internal timetables, the K Line is called line 807 . The K Line is operated by Division 16 (Southwestern Yard) in Westchester directly east of the northern runways of the Los Angeles International Airport , and adjacent to

1147-421: The same term [REDACTED] This disambiguation page lists articles associated with the title Magenta Line . If an internal link led you here, you may wish to change the link to point directly to the intended article. Retrieved from " https://en.wikipedia.org/w/index.php?title=Magenta_Line&oldid=1180067347 " Category : Disambiguation pages Hidden categories: Short description

Magenta Line - Misplaced Pages Continue

1184-446: The segment of both lines between Westchester/Veterans station and Aviation/Century station, including LAX/Metro Transit Center station, will not provide passenger service for a period of pre-revenue testing before they open at a later date. Metro is currently working on the initial environmental study of a corridor extension of the K Line from its Redondo Beach terminus toward the southeast. The C Line Extension would roughly follow

1221-447: The southern segment begins at Century Boulevard, at Aviation/Century station , which sit on a viaduct and is shared with the C Line. The line then briefly enters an open trench as it passes close to the LAX runways before splitting from each other at a wye west of Aviation/LAX station . The line then heads roughly south through El Segundo before ending at Redondo Beach station . Until LAX/Metro Transit Center station opens, Metro

1258-509: Was designated as the K Line in November 2019. Originally scheduled to open in 2019, the project saw repeated delays. In April 2020, Metro announced that the completion date for the project would be pushed to no earlier than May 2021 due to construction issues. The support structures for bridges and tunnels had concrete plinths that were incorrectly installed, requiring extensive repairs to sections where tracks had already been installed. The K Line

1295-581: Was expected to be completed in 2011. The project was placed on hold in the spring of 2012 due to uncertain funding. With the passage of Measure M in 2016, $ 619 million was cited for the Green Line Extension south, and the study resumed. The DEIR was released in January 2023. The study area includes the former Harbor Subdivisions right of way. The extension study includes the Redondo Beach station to

1332-473: Was from its inception intended to offer a connection to LAX via an Automated People Mover (APM). However, at the time the line was designed, it was unclear where exactly that connection would take place. While Metro expected that the connection would be at Aviation/Century station, ultimately the route chosen for the LAX Automated People Mover intersected with the new line at 96th Street, about half

1369-515: Was substantially complete on June 17, 2022. Even with the line's completion, it won't connect to the C Line or LAX until late 2024. Metro is currently constructing a new station at LAX/Metro Transit Center, providing Metro riders a seamless transfer to the airport terminals via the LAX Automated People Mover system. During construction, Metro is only operating the K Line from Expo/Crenshaw station to Westchester/Veterans station with