58-647: The MRT Blue Line ( Thai : รถไฟฟ้ามหานคร สายสีน้ำเงิน ) or MRT Chaloem Ratchamongkon Line ( Thai : รถไฟฟ้ามหานคร สายเฉลิมรัชมงคล ) is Bangkok's third rapid transit line, following the Sukhumvit line and Silom line of the BTS Skytrain . It is the first line of the MRT system and is operated by Bangkok Expressway and Metro (BEM). The original 20 km (12.43 mi) MRT Blue Line from Hua Lamphong to Bang Sue opened on 3 July 2004. A 1.2 km (0.75 mi) extension to Tao Poon opened on 11 August 2017. The 15.9 km (9.88 mi) western extension to Lak Song opened for full service on 29 September 2019 and
116-612: A dominant language in all aspects of society in Thailand, Thai initially saw gradual and later widespread adoption as a second language among the country's minority ethnic groups from the mid-late Ayutthaya period onward. Ethnic minorities today are predominantly bilingual, speaking Thai alongside their native language or dialect. Standard Thai is classified as one of the Chiang Saen languages—others being Northern Thai , Southern Thai and numerous smaller languages, which together with
174-617: A COVID-19 3rd wave in Bangkok ridership plummeted to between 76,000 - 116,000 per weekday. The MRT Blue Line starts at the upper platform of Tha Phra station . It runs on an elevated viaduct northward along Charan Sanit Wong Road to Bang O station . Then turning eastwards crossing the Chao Phraya River , entering Bang Pho station and Tao Poon station in Bang Sue District . The line then descends to an underground section. It follows
232-622: A business based in Linz focused on the design, construction and maintenance of facilities in the process industry and the energy sector. In June 2010, a prospectus was issued with the aim of listing Bilfinger Berger Australia on the Australian Securities Exchange via an initial public offering . In July 2010 the listing was abandoned with a trade sale to Lendlease agreed in December 2010. In 2010, services contributed to 80% of
290-499: A consortium called Nippon-Euro Subway Consortium, which also includes Mitsubishi Electric . Mitsubishi Corporation , another consortium member, had also planned to undertake it. However, the negotiations with the French firm have failed. The bidding for rolling stock was conducted again, and bidders include Bombardier Transportation (later acquired by Alstom in 2021) and Siemens , both from Canada and Germany. On 3 January 2002, Siemens won
348-514: A daily ridership of 800,000 once the Lak Song and Tha Phra extensions opened. However, the impact of the COVID-19 pandemic by late 2020 had resulted in a dramatic reduction of ridership down to an average of 360,000 per weekday reverting to September 2017 levels. By August 2021, during a COVID-19 3rd wave in Bangkok ridership plummeted to only 76,000 per weekday. In 2023 an average of 376,000 passengers rode
406-533: A four-way distinction among stops and affricates . The maximal four-way occurred in labials ( /p pʰ b ʔb/ ) and denti-alveolars ( /t tʰ d ʔd/ ); the three-way distinction among velars ( /k kʰ ɡ/ ) and palatals ( /tɕ tɕʰ dʑ/ ), with the glottalized member of each set apparently missing. The major change between old and modern Thai was due to voicing distinction losses and the concomitant tone split . This may have happened between about 1300 and 1600 CE, possibly occurring at different times in different parts of
464-504: A private sector on a 25-year concessionaire agreement. The winning bidder was Bangkok Expressway and Metro (BEM). Under this agreement, BEM provides maintenance and engineering equipment, including electrical trains, signalling systems, SCADA , communication, platform screen doors and fully operate the system from Hua Lamphong to Bang Sue. BEM has subcontracted maintenance of the system for 10 years to Siemens and seven-year maintenance contracts to two local maintenance services. In 1996,
522-474: A quasi circle loop around Bangkok. Officially named Chaloem Ratchamongkhon (Thai สายเฉลิมรัชมงคล) – "Celebration of Royal Auspice" – or informally but commonly called as the "MRT Blue Line", this was the first metro line under the newly formed government agency, the Mass Rapid Transit Authority of Thailand (MRTA). Most civil infrastructure was provided by this government agency and handed over to
580-510: A result of numerous acquisitions and disposals, is no longer a traditional construction company but instead a provider of services for industrial plants, power plants and real estate. In financial year 2019, revenues came from industrial and engineering services in the Chemical & Petrochemical (30%), Energy & Utilities (15%), Oil & Gas (30%), Pharma & Biopharma (10%), Metallurgy (5%) and Cement/Other (10%) industries. The ownership of
638-525: A syllable that formerly began with a voiceless consonant (including glottalized stops). An additional complication is that formerly voiceless unaspirated stops/affricates (original /p t k tɕ ʔb ʔd/ ) also caused original tone 1 to lower, but had no such effect on original tones 2 or 3. The above consonant mergers and tone splits account for the complex relationship between spelling and sound in modern Thai. Modern "low"-class consonants were voiced in Old Thai, and
SECTION 10
#1732847649646696-642: A temporary promotional fare scheme which allowed passengers to travel any distance on the MRT for only ten baht. [REDACTED] Thai language Thai , or Central Thai (historically Siamese ; Thai: ภาษาไทย ), is a Tai language of the Kra–Dai language family spoken by the Central Thai , Mon , Lao Wiang , Phuan people in Central Thailand and the vast majority of Thai Chinese enclaves throughout
754-500: Is based on the register of the educated classes by Central Thai and ethnic minorities in the area along the ring surrounding the Metropolis . In addition to Central Thai, Thailand is home to other related Tai languages . Although most linguists classify these dialects as related but distinct languages, native speakers often identify them as regional variants or dialects of the "same" Thai language, or as "different kinds of Thai". As
812-553: Is based on the dialect of the central Thai people, and it is written in the Thai script . Hlai languages Kam-Sui languages Kra languages Be language Northern Tai languages Central Tai languages Khamti language Tai Lue language Shan language others Northern Thai language Thai language Southern Thai language Tai Yo language Phuthai language Lao language (PDR Lao, Isan language ) Thai has undergone various historical sound changes. Some of
870-479: Is the language of television, education, news reporting, and all forms of media. A recent research found that the speakers of the Northern Thai language (also known as Phasa Mueang or Kham Mueang) have become so few, as most people in northern Thailand now invariably speak Standard Thai, so that they are now using mostly Central Thai words and only seasoning their speech with the "Kham Mueang" accent. Standard Thai
928-670: The MRT Purple Line . The 1.2 km (0.75 mi) Bang Sue to Tao Poon extension opened on 11 August 2017. This added the first elevated station, Tao Poon, to the Blue line. The major extension of the MRT Blue Line was the 27 km (16.8 mi) extension west to Lak Song and from Tao Poon to Tha Phra with 19 stations consisting of four underground and 15 elevated stations. Contracts for civil work were divided into five contracts. Successful bids were announced in late 2010. On 17 February 2011,
986-688: The Second World War , Grün & Bilfinger employed Jewish slave laborers from the Kovno Ghetto in occupied Lithuania where it was known for its brutal harassment of the Jewish slaves. In 1970, Grün & Bilfinger acquired a majority stake in Julius Berger-Bauboag AG, itself a merger of two companies, Julius Berger Tiefbau AG and Berlinische Boden-Gesellschaft AG, both founded in 1890. The combined business, fully integrated in 1975, finally took
1044-420: The 11 km (6.84 mi) extension from Tao Poon to Tha Phra to form the quasi loop, opened for full service on 30 March 2020. The line has a total length of 48 km (29.83 mi), being a quasi circle route of the Bangkok rapid transit network. The MRT Blue line connects major business, residential and cultural areas of Bangkok. In late 2019, the average daily ridership was 400,000. In mid 2021, during
1102-683: The 4th quarter of 2017. However, the tender was subsequently delayed until late 2019 due to other projects. In late 2019, the project was put on hold due to government budget constraints. In August 2021, the MRTA confirmed that the extension was not a priority especially given delays with the tenders for the MRT Orange and MRT Purple line extensions. & Ride (Platform 3&4) • [REDACTED] ARL • SRT (future) • HSR Eastern Line (under construction) and Asok for SRT Eastern Line This station has
1160-787: The Kamphaeng Phet, Phahon Yothin and Lat Phrao Roads, then turns south following Ratchadaphisek Road to Queen Sirikit National Convention Centre station . It then turns west following Rama IV Road. It passes Hua Lamphong station in Pathum Wan District , through Chinatown, then under the Chao Phraya River before ascending onto an elevated viaduct to the lower platform of Tha Phra station . The line continues west along Phet Kasem Road to Lak Song station in Bang Khae , situated near Kanchanaphisek Road or Western Outer Ring road. It forms
1218-547: The Khmer system first before the Thai borrowed. Old Thai had a three-way tone distinction on "live syllables" (those not ending in a stop), with no possible distinction on "dead syllables" (those ending in a stop, i.e. either /p/, /t/, /k/ or the glottal stop that automatically closes syllables otherwise ending in a short vowel). There was a two-way voiced vs. voiceless distinction among all fricative and sonorant consonants, and up to
SECTION 20
#17328476496461276-609: The Northwestern Tai and Lao-Phutai languages, form the Southwestern branch of Tai languages . The Tai languages are a branch of the Kra–Dai language family , which encompasses a large number of indigenous languages spoken in an arc from Hainan and Guangxi south through Laos and Northern Vietnam to the Cambodian border. Standard Thai is the principal language of education and government and spoken throughout Thailand. The standard
1334-532: The Overseas Economic Cooperation Fund (OECF), later known as the Japan Bank for International Cooperation (JBIC), granted the loans for the project with an official development assistance (ODA) scheme. Construction of the line began on 19 November of that year, when Crown Prince His Royal Highness Crown Prince Maha Vajiralongkorn (later King Vajiralongkorn) came to lay the foundation stone for
1392-484: The Thai-speaking area. All voiced–voiceless pairs of consonants lost the voicing distinction: However, in the process of these mergers, the former distinction of voice was transferred into a new set of tonal distinctions. In essence, every tone in Old Thai split into two new tones, with a lower-pitched tone corresponding to a syllable that formerly began with a voiced consonant, and a higher-pitched tone corresponding to
1450-471: The blue line. SRT Dark Red Line and SRT Light Red Line opened on 21 August 2021, BL11 Bang Sue became a connecting station. On 17 January 2005, just after 09:15, an empty train returning to the depot collided with a peak-hour train filled with passengers at the Thailand Cultural Centre station. Around 100-262 people, depending on
1508-610: The business as at 31 December 2019 was as follows: Major projects have included: In March 2009, a building collapsed in Cologne due to the nearby construction site for the Cologne Stadtbahn Nord-Süd-Stadtbahn (in German) . The collapse is suspected to be caused by the construction works, and to several irregularities. In June 2020, Bilfinger reached an out-of-court agreement that settles all civil claims arising from
1566-494: The company will order an additional 21 train sets, each comprising three cars, for the MRT Blue line to meliorate congestion during peak hour. The manufacturer for this new rolling stock has not yet been disclosed. The MRT Blue Line operates from 05:30 to 24:00 on weekdays and from 06:00 to 24:00 on weekends and public holidays. During the weekday morning rush hour, there are two service patterns: At opening in 2004, initial ridership
1624-653: The company's total output volume of €8,123 million and EBIT for the services division amounted to €297 million. In November 2011, Bilfinger acquired 98 percent of shares in Neo Structo Construction Private Ltd., located in Surat, India, for a purchase price of €47 million. In 2010 Bilfinger became a Societas Europaea (SE). In December 2014 Bilfinger signed a deal to sell the construction division to Switzerland's Implenia AG. It had once been Germany's second largest builder. In June 2016 Bilfinger announced
1682-516: The construction of the MRT project, which is Thailand's first subway project, with the aim of relieving Bangkok's traffic problems. The first contract was awarded to a joint venture between CH. Karnchang Public Company Limited , Bilfinger-Berger , Kumagai Gumi , and Tokyu Construction Co. for the southern section, while one of the remaining contractors, the northern section, was awarded to ION Joint Venture, which comprises Italian Thai Development , Obayashi Corporation , and Nishimatsu Construction, and
1740-527: The contract (Contract 5) to supply, install and maintain the E&S systems, install station platform screen doors and fit out the depot. Siemens also won the contract to supply 35 sets of rolling stock. In 2017, the cabinet approved the amendment of the Blue line concession with BEM, and the new agreement was signed on 31 March 2017. Under the new agreement, BEM will operate the new extensions from Hua Lamphong to Lak Song and Bang Sue to Tha Phra. The concession period
1798-704: The contract for a cost of $ 385 million. * Car 1016 and 1028 were swapped after the train collision in 2005. In 2017, BEM ordered 35 three-car as part of the line extension program. Under the contract, Siemens were to supply 35 trains and provide maintenance for ten years with a price tag of 20 billion baht. The fleet was built at the Siemens plant in Vienna and tested in Germany. The first train arrived in 2019 with all trains delivered by early 2020. On 18 July 2024, Mr. Phongsarit Tantisuvanitchkul, executive chairman of BEM revealed that
Blue Line (Bangkok) - Misplaced Pages Continue
1856-499: The country. It is the sole official language of Thailand . Thai is the most spoken of over 60 languages of Thailand by both number of native and overall speakers. Over half of its vocabulary is derived from or borrowed from Pali , Sanskrit , Mon and Old Khmer . It is a tonal and analytic language . Thai has a complex orthography and system of relational markers . Spoken Thai, depending on standard sociolinguistic factors such as age, gender, class, spatial proximity, and
1914-438: The depot was awarded to Siam Nippon Metro Consortium, composed of Hazama Corporation , Maeda Corporation , Mitsui & Co. , Kajima , T.S.B. Trading, and Siam Syntech Construction Public Co., Ltd. Tunneling works began on 5 February 1999. The project suffered multiple delays not only because of the 1997 economic crisis , but also due to challenging civil engineering works of constructing massive underground structures deep in
1972-415: The depot. The driver applied its brake and was waiting to be towed to the depot close to Thailand Cultural Centre station . A rescue train was attempting to connect to the stalled train when the driver was told to release the brake while coupling had not yet been successful. It was then that the empty train began to roll backwards at a speed of ten meters per second, before smashing into the other train, which
2030-429: The five contracts were signed. Construction commenced in mid-2011 for a scheduled 2016 opening but this was subsequently delayed to 2019–2020. In August, 2017, BEM awarded the automatic fare collection ticket for the extension to Thales which to install its TransCity system. The contract also includes ongoing training and future support. In September 2017, BEM announced that Siemens and ST Electronics Thailand were awarded
2088-495: The former Executive Board members. The settlement with a total volume of €18.2 million ends the assertion of claims of for damages by Bilfinger. Bilfinger SE is a Deutsche Börse SDAX index traded, leading international industrial services provider. The portfolio covers the entire value chain from consulting, engineering, manufacturing, assembly, maintenance, plant expansion as well as turnarounds and also includes environmental technologies and digital applications. Bilfinger, as
2146-689: The initial part of the line. The trains entered service on 3 July 2004. In 2017, BEM starts removing some seats from the train to increase interior space to cope with rising number of passengers. In 2019, the BEM stated that it is interested in refurbishing the first generation trains. Including the CCTV cameras, and new dynamic route map replacing the traditional ones. In 2000, Alstom won a contract to supply 21x3 car Metropolis train sets, and this design would have been similar to C751A used for Singapore's North East MRT line if it had been built. The trains were provided by
2204-407: The initial rush ridership settled down to around 180,000 riders daily — considerably lower than projections of over 400,000, despite fares being slashed in half from 12 to 38 baht to 10-15 baht per trip. It was scheduled to be opened in 2003, in time for the same year's APEC summit , and later pushed back again to April and then August of the following year. However, no problems were encountered during
2262-668: The line farther from Lak Song west to the Phutthamonthon area. The MRTA indicated a willingness to undertake this extension. In July 2014, the MRTA submitted a request for 84 million baht to complete a route survey for a 7.8 km (4.8 mi), 4 station extension from Lak Song to Phutthamonthon Sai 4. In late March 2017, the Transport Ministry stated that this 7.8 km (4.8 mi) extension would be submitted to Cabinet for approval in April 2017 with construction expected to commence in
2320-515: The local patois as pronounced in Guangdong Ayutthaya , the old capital of Thailand from 1351 - 1767 A.D., was from the beginning a bilingual society, speaking Thai and Khmer . Bilingualism must have been strengthened and maintained for some time by the great number of Khmer-speaking captives the Thais took from Angkor Thom after their victories in 1369, 1388 and 1431. Gradually toward the end of
2378-503: The longest escalator in Southeast Asia Region at 43-metre. (Platform 1&2) The MRT Blue line is served by 54 three-car trains of which, 19 are first generation Siemens Modular Metro sets and 35 sets are second generation. The trains are powered by 750 V DC via third rail system, are air-conditioned and capable of traveling at up to 80 km/h (50 mph). Nineteen three-car Siemens Modular Metro were ordered for
Blue Line (Bangkok) - Misplaced Pages Continue
2436-557: The minor-damaged cars, was already fitted for operation at the end of 2006 and the remaining one was still under heavy repair until mid of 2007; it was released into service in October 2007. The cost resulting from the accident might be a much higher figure than BEM quoted, and it was expected to be at least 400 million baht, which was totally insured by a local insurance company. The line resumed full operations on 1 February 2005. Passenger numbers soon rose back to pre-crash levels, partly due to
2494-547: The most significant changes occurred during the evolution from Old Thai to modern Thai. The Thai writing system has an eight-century history and many of these changes, especially in consonants and tones, are evidenced in the modern orthography . According to a Chinese source, during the Ming dynasty , Yingya Shenglan (1405–1433), Ma Huan reported on the language of the Xiānluó (暹羅) or Ayutthaya Kingdom, saying that it somewhat resembled
2552-440: The name Bilfinger & Berger Bauaktiengesellschaft. In 1994 the acquisition of Razel Company took place. In 2001 the business changed its name to Bilfinger Berger AG. In 2005, Bilfinger bought all shares of Babcock Borsig Service Group from Deutsche Beteiligungs AG. In 2008 the company sold Razel to group Fayat for 137 million euro. In October 2009 the company acquired directly MCE Beteiligungsverwaltungs GmbH itself,
2610-464: The news source, were injured. Most of whom sustained only minor injuries, and the entire Metro network was shut down for two weeks. On 31 January 2005, then prime minister Thaksin Shinawatra rode the metro to increase public confidence in the system. After initial investigations, it was found that the empty train had run into problems shortly before the accident, grinding to a halt on a curve leading to
2668-415: The period, a language shift took place. Khmer fell out of use. Both Thai and Khmer descendants whose great-grand parents or earlier ancestors were bilingual came to use only Thai. In the process of language shift, an abundance of Khmer elements were transferred into Thai and permeated all aspects of the language. Consequently, the Thai of the late Ayutthaya Period which later became Ratanakosin or Bangkok Thai,
2726-484: The royal vocabulary according to their immediate environment. Thai and Pali, the latter from Theravada Buddhism, were added to the vocabulary. An investigation of the Ayutthaya Rajasap reveals that three languages, Thai, Khmer and Khmero-Indic were at work closely both in formulaic expressions and in normal discourse. In fact, Khmero-Indic may be classified in the same category as Khmer because Indic had been adapted to
2784-447: The sale of the facilities management and real estate business to Swedish financial investor EQT. In February 2018 the company announced that it would seek damages from the former directors of the company after alleged breaches in compliance and a series of acquisitions that failed to create shareholder value. After securing shareholder consent in June 2020, Bilfinger reached a settlement with
2842-535: The terminology "low" reflects the lower tone variants that resulted. Modern "mid"-class consonants were voiceless unaspirated stops or affricates in Old Thai—precisely the class that triggered lowering in original tone 1 but not tones 2 or 3. Modern "high"-class consonants were the remaining voiceless consonants in Old Thai (voiceless fricatives, voiceless sonorants, voiceless aspirated stops). The three most common tone "marks" (the lack of any tone mark, as well as
2900-414: The test run; the official opening was brought forward. As part of the rapid transit master plan the original MRT Blue Line section was planned to be extended from Hua Lamphong to Lak Song, and from Bang Sue to Tha Phra, forming a circle open-loop route . The contract for the first part of extension to Tao Poon was signed on 26 August 2009 as part of MRT Purple Line contract as it provided interchange to
2958-657: The three tones of Old Thai were split have since merged into five in standard Thai, with the lower variant of former tone 2 merging with the higher variant of former tone 3, becoming the modern "falling" tone. หม ม หน น, ณ หญ ญ หง ง ป ผ พ, ภ บ ฏ, ต ฐ, ถ ท, ธ ฎ, ด จ ฉ ช Bilfinger Berger Bilfinger dates back to 1880 when August Bernatz founded Bernatz Ingenieurwissenschaft as an engineering business: it became known, from 1886 as Bernatz & Grün and, from 1892, as Grün & Bilfinger when Paul Bilfinger replaced Bernatz as partner. During
SECTION 50
#17328476496463016-423: The two marks termed mai ek and mai tho ) represent the three tones of Old Thai, and the complex relationship between tone mark and actual tone is due to the various tonal changes since then. Since the tone split, the tones have changed in actual representation to the point that the former relationship between lower and higher tonal variants has been completely obscured. Furthermore, the six tones that resulted after
3074-508: The urban/rural divide, is partly mutually intelligible with Lao , Isan , and some fellow Thai topolects . These languages are written with slightly different scripts, but are linguistically similar and effectively form a dialect continuum . Thai language is spoken by over 69 million people (2020). Moreover, most Thais in the northern (Lanna) and the northeastern (Isan) parts of the country today are bilingual speakers of Central Thai and their respective regional dialects because Central Thai
3132-420: The water-logged soil upon which the city is built. The MRT Blue Line opened for a limited public trial period of several weeks starting on 13 April 2004. On 3 July 2004, the line was officially opened at 19:19 local time by HM King Bhumibol and Queen Sirikit who were accompanied by other members of the royal family. Within 30 minutes of its opening, sightseers filled the system to its maximum capacity, but after
3190-419: Was 180,000 per day — considerably lower than the projections of over 400,000. By 2016, the average daily ridership was 273,637. By September 2017, BEM stated that average daily ridership had increased to 360,000 after the opening of the extension to Tao Poon. After the opening of the extension to Lak Song on 29 September 2019, average daily ridership increased to 400,000. The MRT Blue line was expected to grow to
3248-449: Was a thorough mixture of Thai and Khmer. There were more Khmer words in use than Tai cognates. Khmer grammatical rules were used actively to coin new disyllabic and polysyllabic words and phrases. Khmer expressions, sayings, and proverbs were expressed in Thai through transference. Thais borrowed both the Royal vocabulary and rules to enlarge the vocabulary from Khmer. The Thais later developed
3306-409: Was carrying passengers. Therefore, it was believed that the incident was caused by negligence due to insufficient training of operation staff. This accident also resulted in two damaged trains with heavily damaged areas limited to the two leading cars. The colliding speed was suspected to be about 60 km/h due to the appearance of damaged areas. However, one train, which was rebuilt from the repair of
3364-417: Was extended from 2029 to 2050. The extension was opened in stages. The Hua Lamphong - Lak Song extension was opened for trial service on 29 July with full commercial services commencing 29 September 2019. The Tao Poon - Tha Phra extension opened for limited trial services from 29 November 2019 with full commercial services commencing on 30 March 2020. Since 2011, there were requests from residents to extend
#645354