Misplaced Pages

Lehigh Line Connection

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

40°42′47″N 74°11′12″W  /  40.7130°N 74.1866°W  / 40.7130; -74.1866  ( Hunter Connection (NJT) )

#105894

62-584: The Lehigh Line Connection connects Amtrak's Northeast Corridor (NEC) with the Conrail Lehigh Line 2 miles (3.2 km) south of downtown Newark, New Jersey . It leaves the NEC at Hunter Interlocking, and the line is sometimes called the Hunter Connection . Used by New Jersey Transit (NJT) Raritan Valley Line trains since 1997 when it replaced an older connection, it splits from the NEC just north of

124-605: A day, it is the busiest passenger rail line in the United States by ridership and service frequency. The corridor is used by many Amtrak trains, including the high-speed Acela (formerly Acela Express ), intercity trains, and several long-distance trains. Most of the corridor also has frequent commuter rail service, operated by the MBTA , CT Rail , Metro-North Railroad , Long Island Rail Road , New Jersey Transit , SEPTA , and MARC . While large through freights have not run on

186-418: A new overhead catenary wire made of high-strength silver-bearing copper, specified by Amtrak and later patented by Phelps Dodge Specialty Copper Products of Elizabeth, New Jersey . Service with electric locomotives between New Haven and Boston began on January 31, 2000. The project took four years and cost close to $ 2.3 billion: $ 1.3 billion for the infrastructure improvements and close to $ 1 billion for both

248-406: A part of the line that hugs the shore of Long Island Sound . Some of these crossings constitute the only points of access to waterfront communities and businesses otherwise disconnected from the road network. As such, eliminating them would require grade separation to maintain access. Six of the grade crossings have four-quadrant gates with induction loop sensors, which allow vehicles stopped on

310-547: A suburban branch that would become a main line with the completion of the New York Connecting Railroad and its Hell Gate Bridge . The bridge opened on March 9, 1917, but was operated by steam with an engine change at Sunnyside Yard east of Penn Station until 1918. Electrification north of New Haven to Providence and Boston had been planned by the NH, and authorized by the company's board of directors shortly before

372-550: Is a short line railroad on Long Island , within the southeastern portion of the U.S. state of New York . It was formed in 1997 to provide freight service over the tracks of the Long Island Rail Road , a public commuter rail agency which had decided to privatize its freight operations. A subsidiary of the Anacostia Rail Holdings Company , NY&A operates exclusively on Long Island and is connected to

434-537: Is an electrified railroad line in the Northeast megalopolis of the United States. Owned primarily by Amtrak , it runs from Boston in the north to Washington, D.C. , in the south, with major stops in Providence , New Haven , Stamford , New York City , Newark , Trenton , Philadelphia , Wilmington , and Baltimore . The NEC is roughly paralleled by Interstate 95 for most of its length. Carrying more than 2,200 trains

496-579: Is now called the Northeast Corridor was built, piece by piece, by several railroads constructed as early as the 1830s. Before 1900, their routes had been consolidated as two long and unconnected stretches, each a part of a major railroad. Anchored in Washington, D.C., the stretch owned by the Pennsylvania Railroad , approached New York City from the south, anchored at Boston, the stretch owned by

558-538: Is projected to transport 25,000 cars annually, up from 5,000 per year circa 2018. As of 2019, NYA has about 60 employees, including eight train crews. The railroad has substantially different crewing agreements than the Long Island Rail Road, allowing it more flexibility to match the needs of freight customers. NYA has two crewbases, one in Glendale , Queens and another near the former LIRR station Pine Aire on

620-926: The Commonwealth of Massachusetts bought the Attleboro/Stoughton Line in Massachusetts, later operated by the Massachusetts Bay Transportation Authority . The same month, the New York State Metropolitan Transportation Authority bought, and Connecticut leased, from Penn Central their sections of the New Haven Line , between Woodlawn , New York, and New Haven, Connecticut . In 1973, the Regional Rail Reorganization Act opened

682-507: The Hudson Line ; regular service began on December 11. Electric locomotives began serving Grand Central on February 15, 1907, and all NYC passenger service into Grand Central was electrified on July 1, 1907. NH electrification began in July to New Rochelle , August to Port Chester and October the rest of the way to Stamford. Steam trains last operated into Grand Central on June 30, 1908:

SECTION 10

#1732858399106

744-509: The Long Island Rail Road (LIRR) lines that NYA serves. Most of NYA's customers have their own spurs, making the use of team tracks unnecessary. A new 28-acre, privately funded transload facility in Yaphank , Brookhaven Rail Terminal , opened in 2011. In 2014, work was underway to build a transload facility for vegetable oil, food products and construction material at NYA's Wheel Spur Yard along Newtown Creek near Long Island City . NYA expects

806-783: The Long Island Rail Road (LIRR). LIRR electric service began in 1905 on the Atlantic Branch from downtown Brooklyn past Jamaica , and in June 1910 on the branch to Long Island City : part of the main line to Penn Station. Penn Station opened on September 8, 1910, for LIRR trains and November 27 for the PRR; trains of both railroads were powered by DC electricity from a third rail. PRR trains changed engines (electric to/from steam) at Manhattan Transfer ; passengers could also transfer there to H&M trains to downtown Manhattan. On July 29, 1911, NH began electric service on its Harlem River Branch :

868-676: The New Haven Railroad , and entered New York State from Connecticut . The former terminated at New Jersey ferry slips across the Hudson River from Manhattan Island. The latter extended to the Bronx, where it continued into Manhattan via trackage rights on the New York and Harlem Railroad . It also reached the Bronx via the Harlem River and Port Chester Railroad , which extended to the Bronx from

930-652: The New York Connecting Railroad , and the Hell Gate Bridge . Combined, these constituted a stretch that started just outside of Newark, New Jersey , on the Pennsylvania Railroad side, and connected with the Harlem River and Port Chester Railroad (and thus New Rochelle) on the New Haven side. With the opening of the Hell Gate Bridge in 1917, this final connecting stretch, and thus the Northeast Corridor itself,

992-465: The Port Richmond section of the city, while entering a 50 mph (80 km/h) speed limited (but at the time non- ATC protected) 4° curve at 106 mph (171 km/h), killing eight and injuring more than 200 (eight critically) of the 238 passengers and five crew on board as well as causing the suspension of all Philadelphia–New York NEC service for six days. This was the deadliest crash on

1054-581: The Rail Safety Improvement Act of 2008 . In December 1967, the UAC TurboTrain set a speed record for a production train: 170.8 miles per hour (274.9 km/h) between New Brunswick and Trenton, New Jersey . In February 1968, PRR merged with its rival New York Central Railroad to form the Penn Central (PC). Penn Central was required to absorb the New Haven in 1969 as a condition of

1116-570: The Super Bowl or St. Patrick's Day , the NYA transports 30 rail cars of beer per week, with each car holding 3,500 cases. Some NYA customers are located off-line, and will make use of NYA's team tracks to receive or ship products. Team tracks are located in Bay Ridge , Hicksville , Huntington , Greenlawn , St. James , Islip , Richmond Hill , Maspeth , Speonk , Medford , Southold , and elsewhere on

1178-599: The United States Department of Transportation committed $ 450 million to a six-year project to support capacity increases on one of the busiest segments on the NEC: a 24-mile (39 km) section between New Brunswick and Trenton , passing through Princeton Junction. The Next Generation High-Speed project is designed to upgrade electrical power, signal systems and overhead catenary wires to improve reliability and increase speeds up to 160 mph (260 km/h), and, after

1240-518: The main line , between Deer Park and Brentwood . On a typical weekday, NYA operates six crews. July 8, 2015 – An NYA freight train smashed into a tractor trailer after the crossing gates went down slowly in Maspeth, Queens ; the truck driver escaped with minor injuries. June 17, 2021 – NYA Train RS41, consisting of Locomotives 300 and 271, was rear ended by Long Island Rail Road Inspection Car TC82 east of

1302-460: The 1980s. Electrification between New Haven and Boston was to be included in the 1976 Railroad Revitalization and Regulatory Reform Act . The last grade crossings between New York and Washington were closed about 1985; eleven grade crossings remain in Connecticut. In the 1990s, Amtrak upgraded the NEC north of New Haven, CT to get it ready for the high-speed Acela Express trains. Dubbed

SECTION 20

#1732858399106

1364-401: The 541 on board. The NEC is a cooperative venture between Amtrak and various state agencies. Amtrak owns the track between Washington and New Rochelle , New York , a northern suburb of New York City. The segment from New Rochelle to New Haven is owned by the states of New York and Connecticut; Metro-North Railroad commuter trains operate there. Amtrak owns the tracks north of New Haven to

1426-505: The Bay Ridge Branch. New York & Atlantic moved 30,000 carloads in 2018, up from approximately 9,200 when it began operating in May 1997. The majority of its deliveries take place during the night, when fewer commuter trains are running. About 15 percent of freight cars transported by the NYA are floated across New York Harbor from Jersey City to NYNJ Rails's railyard in Bay Ridge on

1488-563: The Brooklyn waterfront. The daily barge operation is managed by the Port Authority of New York and New Jersey , but the number of cars transferred to NYA by that method had been restricted by the use of only one aging barge that has a 14-car capacity. In 2017 and 2018, the Port Authority added two new barges, each with a capacity of 18 cars. The proposed Cross-Harbor Rail Tunnel , if built,

1550-573: The NEC between Groton, Connecticut , and Hillsgrove, Rhode Island , but this clause was rejected the following month by the U.S. Railway Association . By April 1976, Amtrak owned the entire NEC except Boston to the RI state line, which is owned by the Commonwealth of Massachusetts, and New Haven to New Rochelle, New York, which is owned by the States of Connecticut and New York. Amtrak still operates and maintains

1612-694: The NEC since the early 1980s, some sections still carry smaller local freights operated by CSX , Norfolk Southern , CSAO , Providence and Worcester , New York and Atlantic , and Canadian Pacific . CSX and NS partly own their routes. Long-distance Amtrak services that use the Northeast Corridor include the Cardinal , Crescent , and Silver Meteor trains, which reach 125 mph (201 km/h), as well as its Acela trains, which reach 150 mph (240 km/h) in parts of Massachusetts , Rhode Island , and New Jersey . Some express trains operated by MARC that reach 125 mph (201 km/h) also operate on

1674-522: The NYA's main traffic. Occasionally, NYA will transport utility poles and electrical transformers to the Long Island Power Authority facility in Hicksville, which has its own spurs. NYA also moves municipal solid waste in sealed containers on container trains. NYA serves Belmont Park , delivering boxcars, usually from BNSF , full of feed for the race track's horses. For occasions such as

1736-661: The New Haven at New Rochelle . From 1903 to 1917, the two railroads undertook a number of projects that connected their lines and completed, in effect, the Northeast Corridor. These included the New York Tunnel Extension , which extended from New Jersey to Long Island (and was composed of the Manhattan Transfer station , the North River Tunnels , a new Pennsylvania Station , the East River Tunnels ),

1798-408: The Northeast Corridor are indicated using the following abbreviations. Other services are listed in the right-most column. Note that not all trains necessarily stop at all indicated stations. [REDACTED] DC Streetcar : H Street/Benning Road Line The entire Northeast Corridor has 11 grade crossings , all in southeastern New London County, Connecticut . The remaining grade crossings are along

1860-465: The Northeast Corridor since 16 died when Amtrak's Washington–Boston Colonial (TR#94) rear-ended three stationary Conrail locomotives at Gunpow Interlocking near Baltimore on January 4, 1987. Frankford Junction curve was the site of a previous fatal accident on September 6, 1943, when an extra section of the PRR's Washington to New York Congressional Limited derailed there, killing 79 and injuring 117 of

1922-593: The Northeast Corridor titled NEC FUTURE, and released the final environmental impact statement in December 2016. Multiple potential alignments north of New York City were studied. The proposed upgrades have not been funded. Eleven minutes after leaving 30th Street Station in Philadelphia on May 12, 2015, a year-old ACS-64 locomotive (#601) and all seven Amfleet I coaches of Amtrak's northbound Northeast Regional (TR#188) derailed at 9:21pm at Frankford Junction in

Lehigh Line Connection - Misplaced Pages Continue

1984-401: The Northeast Corridor up to five hours. Railroad officials blamed Amtrak's funding woes for the deterioration of the track and power supply system, which in places is almost a hundred years old. These problems have decreased in recent years after tracks and power systems were repaired and improved. In September 2013, one of two feeder lines supplying power to the New Haven Line failed, while

2046-413: The Northeast Corridor. Acela can travel the 225 mi (362 km) between New York City and Washington, D.C., in under three hours, and the 229 mi (369 km) between New York and Boston in under 3.5 hours. In 2012, Amtrak proposed improvements to enable "true" high-speed rail on the corridor, which would have roughly halved travel times at an estimated cost of $ 151 billion. Most of what

2108-488: The Northeast High Speed Rail Improvement Program (NHRIP), the effort eliminated grade crossings , rebuilt bridges and modified curves. Concrete railroad ties replaced wood ties, and heavier continuous welded rail (CWR) was laid-down. In 1996, Amtrak began installing electrification gear along the 157 miles (253 kilometres) of track between New Haven and Boston. The infrastructure included

2170-698: The PRR Main Line (now the Keystone Corridor ). Electric service to Chestnut Hill (now the Chestnut Hill West Line ), including a stretch of the NEC, began on March 30, 1918. Local electric service to Wilmington, Delaware , on the NEC began on September 30, 1928, and to Trenton, New Jersey , on June 29, 1930. Electrified service between Exchange Place , the Jersey City terminal, and New Brunswick, New Jersey , began on December 8, 1932, including

2232-584: The PRR main line. At the top of the hill at NK interlocking, LV diesels exchanged the train(s) with PRR electric locomotives. Despite the lack of electrification on the line past the connection, the new trackage is also equipped with catenary wire . Amtrak and NJT have proposed constructing the Hunter Flyover, which would carry Newark-bound Raritan Valley Line trains up and over the six-track NEC main line. Currently, Raritan Valley trains heading toward Newark have to cross three or four tracks at grade to access

2294-476: The U.S. Department of Transportation to facilitate mutual cooperation and planning and to advise Congress on Corridor rail and development policy. The commission members include USDOT, Amtrak and the Northeast Corridor states. In October 2010, Amtrak released "A Vision for High-Speed Rail on the Northeast Corridor," an aspirational proposal for dedicated high-speed rail tracks between Washington, D.C., and Boston. Many of these proposals are unfunded. In August 2011

2356-799: The U.S. mainland via CSX 's Fremont Secondary over the Hell Gate Bridge . It also interchanges with New York New Jersey Rail 's car float at the 65th Street Yard and US Rail of New York in Yaphank, New York . Its primary freight yard is Fresh Pond Junction in Queens. It has another yard, Pine Aire Yard, in northern Bay Shore, New York . The NY&A officially took over Long Island Rail Road's freight operations on May 11, 1997, with an initial franchise for 20 years. The New York & Atlantic serves about 80 customers. Lumber, building products, scrap metal, construction & demolition debris, bio-diesel fuel, food, beer , gravel, propane , chemicals, structural steel, plastics and recyclable cardboard/paper are

2418-537: The United States entered World War I . This plan was not carried out because of the war and the company's financial problems. Electrification north of New Haven did not occur until the 1990s, by Amtrak, using a 60 Hz system. In 1905, the PRR began to electrify its suburban lines at Philadelphia: an effort that eventually led to 11 kV, 25 Hz AC catenary from New York and Washington. Electric service began in September 1915, with multiple unit trains west to Paoli on

2480-448: The border between Rhode Island and Massachusetts. The final segment from the border north to Boston is owned by the Commonwealth of Massachusetts. At just over 453 miles (729 km), the Northeast Corridor is the longest electrified rail corridor in the United States. Most electrified railways in the country are for rapid transit or commuter rail use; the Keystone Corridor is the only other electrified intercity mainline. Currently,

2542-506: The corridor uses three catenary systems. From Washington, D.C., to Sunnyside Yard (just east of New York Penn Station), Amtrak's 25 Hz traction power system (originally built by the Pennsylvania Railroad) supplies 12 kV at 25 Hz. From Sunnyside to Mill River (just east of New Haven station), the former New Haven Railroad's system , since modified by Metro-North, supplies 12.5 kV at 60 Hz. From Mill River to Boston,

Lehigh Line Connection - Misplaced Pages Continue

2604-507: The deadline after which steam trains were banned in Manhattan. Subsequently, all NH passenger trains into Manhattan were electrified. In June 1914, the NH electrification was extended to New Haven , which was the terminus of electrified service for over 80 years. The PRR was building its Pennsylvania Station and electrified approaches, which were served by the PRR's lines in New Jersey and

2666-506: The eastbound tracks at Newark. This flyover would remove many directional conflicts between trains and reduce delays on the NEC. The project would cost $ 250 million and is currently undergoing environmental analysis. This United States rail–related article is a stub . You can help Misplaced Pages by expanding it . This article about transportation in New Jersey is a stub . You can help Misplaced Pages by expanding it . Northeast Corridor The Northeast Corridor ( NEC )

2728-517: The electrification of passenger trains was complete, with 639 daily trains: 191 hauled by locomotives and the other 448 under multiple-unit power. New York–Washington electric freight service began on May 20, 1935, after the electrification of freight lines in New Jersey and Washington,DC. Extensions to Potomac Yard across the Potomac River from Washington, as well as several freight branches along

2790-399: The extension of Penn Station electric service from Manhattan Transfer. On January 16, 1933, the rest of the electrification between New Brunswick and Trenton opened, giving a fully-electrified line between New York and Wilmington. Trains to Washington began running under electricity to Wilmington on February 12, 1933, with the engine-change moved from Manhattan Transfer to Wilmington. The same

2852-577: The facility to support construction of the replacement Kosciuszko Bridge . The yard reopened in 2015. Other products shipped to Long Island via the NYA include bentonite and rock salt. NYA carries nearly 1 million tons of gravel a year from Connecticut quarries , delivered to the NYA by the Providence and Worcester Railroad . The Long Island Rail Road and the New York City Transit Authority occasionally receive new rail cars, and ship out old, retired equipment for scrapping by way of

2914-474: The former connector, with wider radius curves with a maximum speed of 45 mph, compared to the 15 mph of the original alignment. The old connection had a single track with older overhead wire and Pennsylvania Railroad (PRR) signaling. Until 1961 Lehigh Valley Railroad (LV) passenger trains bound to/from New York Penn Station , such as the Black Diamond , used the connection to reach their own railroad from

2976-549: The lines leading from Grand Central Terminal and the split at Mott Haven , using a third rail power system devised by Frank J. Sprague . Electricity was in use on some branch lines of the NYNH&;H for interurban streetcars via third rail or trolley wire . An accident in the Park Avenue Tunnel near the present Grand Central Terminal that killed 17 people on January 8, 1902, was blamed on smoke from steam locomotives ;

3038-508: The merger. On September 21, 1970, all New York–Boston trains except the Turboservice were rerouted into Penn Station from Grand Central; the Turboservice moved on February 1, 1971, for cross-platform transfers to the Metroliners. In 1971, Amtrak began operations, and various state governments took control of portions of the NEC for their commuter transportation authorities. In January,

3100-431: The much newer 60 Hz traction power system supplies 25 kV at 60 Hz. All of Amtrak's electric locomotives can switch between these systems . In addition to catenary, the East River Tunnels have 750 V DC third rail for Long Island Rail Road trains, and the North River Tunnels have third rail for emergency use only. In 2006, several high-profile electric-power failures delayed Amtrak and commuter trains on

3162-526: The new Acela Express trainsets and the Bombardier–Alstom HHP-8 locomotives. On December 11, 2000, Amtrak began operating its higher-speed Acela Express service. Fastest travel time by Acela is three and a half hours between Boston and New York, and two hours forty-five minutes between New York and Washington, D.C. In 2005, there was talk in Congress of splitting the Northeast Corridor, which

SECTION 50

#1732858399106

3224-662: The other feeder was disabled for service. The lack of electrical power disrupted trains on Amtrak and Metro-North Railroad , which share the segment in New York State. There are 109 active stations on the Northeast Corridor; 30 are used by Amtrak. All but three ( Kingston , Westerly , and Mystic ) see commuter service. Amtrak owns Pennsylvania Station in New York, 30th Street Station in Philadelphia, Penn Station in Baltimore, and Union Station in Washington. The main services of

3286-782: The portion in Massachusetts, but the line from New Haven to New Rochelle, New York , is operated by the Metro-North Railroad , which has hindered the establishment of high-speed service. In 1976, Congress authorized an overhaul of the system between Washington and Boston. Called the Northeast Corridor Improvement Project (NECIP), it included safety improvements, modernization of the signaling system by General Railway Signal , and new Centralized Electrification and Traffic Control (CETC) control centers by Chrysler at Philadelphia, New York and Boston. It allowed more trains to run faster and closer together, and set

3348-514: The purchase of new equipment, up to 186 miles per hour (299 km/h). In September 2012, speed tests were conducted using Acela trainsets, achieving a speed of 165 miles per hour (266 km/h). The improvements were scheduled to be completed in 2016, but, due to delays, the project had not been completed until 2020. In 2012, the Federal Railroad Administration began developing a master plan for bringing high-speed rail to

3410-506: The resulting outcry led to a push for electric operation in Manhattan . The NH announced in 1905 that it would electrify its main line from New York to Stamford, Connecticut . Along with the construction of Grand Central Terminal , which was opened in 1913, the NYC electrified its lines. On September 30, 1906, the NYC conducted a test of suburban multiple unit service to Highbridge station on

3472-596: The stage for later high-speed operation. NECIP also introduced the AEM-7 locomotive, which lowered travel times and became the most successful engine on the Corridor. The NECIP set travel time goals of 2 hours and 40 minutes between Washington and New York, and 3 hours and 40 minutes between Boston and New York. These goals were not met because of the low level of funding provided by the Reagan Administration and Congress in

3534-527: The tracks to be detected in time for an oncoming train to stop. The remaining five grade crossings, 3 near New London Union Station and two in Stonington, have dual gates. FRA rules limit track speeds on the corridor to 80 miles per hour (130 km/h) over conventional crossings and 95 miles per hour (153 km/h) over crossings with four-quadrant gates and vehicle detection tied into the signal system. New York and Atlantic The New York and Atlantic Railway ( NY&A ) ( reporting mark NYA )

3596-456: The way for Amtrak to buy sections of the NEC not already been sold to these commuter transportation authorities. These purchases by Amtrak were controversial at the time, and the Department of Transportation blocked the transaction and withheld purchase funds for several months until Amtrak granted it control over reconstruction of the corridor. In February 1975, the Preliminary System Plan for Conrail proposed to stop running freight trains on

3658-498: The way, were electrified in 1937 and 1938. The Potomac Yard retained its electrification until 1981. In the 1930s, PRR equipped the New York–Washington line with Pulse code cab signaling . Between 1998 and 2003, this system was overlaid with an Alstom Advanced Civil Speed Enforcement System (ACSES) , using track-mounted transponders similar to the Balises of the modern European Train Control System . The ACSES will enable Amtrak to implement positive train control to comply with

3720-475: Was complete. With the 1968 creation of Penn Central , which was a combination of those two railroads and the New York Central Railroad, the entire corridor was under the control of a single entity for the first time. After successor Penn Central’s 1970 bankruptcy, the corridor was almost entirely subsumed by the subsequently-created Amtrak on May 1, 1971. In 1899, William J. Wilgus , the New York Central Railroad (NYC)'s chief engineer, proposed electrifying

3782-429: Was done on April 9, 1933, for trains running west from Philadelphia, with the change point moved to Paoli. In 1933, the electrification south of Wilmington was stalled by the Great Depression , but the PRR got a loan from the Public Works Administration to resume work. The tunnels at Baltimore were rebuilt as part of the project. Electric service between New York and Washington began on February 10, 1935. On April 7,

SECTION 60

#1732858399106

3844-427: Was opposed by then-acting Amtrak president David Gunn . The plan, supported by the Bush administration, would "turn over the Northeast Corridor – the tracks from Washington to Boston that are the railroad's main physical asset – to a federal-state consortium." With the passage of the Passenger Rail Investment and Improvement Act of 2008 , the Congress established the Northeast Corridor Commission (NEC Commission) in

#105894