109-456: The Hell Gate Line is the portion of Amtrak 's high-speed Northeast Corridor between Harold Interlocking in Sunnyside, Queens , and Shell Interlocking in New Rochelle, New York , within the New York metropolitan area . The first portion of the line was built by the Harlem River and Port Chester Railroad , and opened in 1873 as the Harlem River Branch of the New York, New Haven and Hartford Railroad . Commuter service ran along

218-550: A "quasi-public corporation" to take over the operation of intercity passenger trains. Matters were brought to a head on June 21, 1970, when the Penn Central , the largest railroad in the Northeastern United States and teetering on bankruptcy, filed to discontinue 34 of its passenger trains. In October 1970, Congress passed, and President Richard Nixon signed into law (against the objections of most of his advisors),

327-683: A "transitional CEO" who would reorganize Amtrak before turning it over to new leadership. On November 17, 2016, the Gateway Program Development Corporation (GDC) was formed for the purpose of overseeing and effectuating the rail infrastructure improvements known as the Gateway Program. GDC is a partnership of the States of New York and New Jersey and Amtrak. The Gateway Program includes the Hudson Tunnel Project, to build

436-540: A Harlem Line option via wyes at Mott Haven and Spuyten Duyvil. In November 2000, the Final Scoping Document for Penn Station Access was completed, showing 18 alternatives, including a no-build option, a Transportation Systems Management option, various commuter rail options, and alternatives using other modes. Various alternatives considered various ways to run service to Penn Station from the New Haven Line,

545-470: A Notice of Intent (NOI) to prepare a Major Investment Study/Environmental Impact Statement (EIS). The EIS was intended to consider possible additions to Metro-North using existing rail lines, with the intention of providing flexibility and increased regional access. Rail alternatives originally considered included Hudson and New Haven service, via the Empire Connection and Hell Gate Line, respectively, and

654-961: A branch line from the Harlem River at the north end of the Harlem Bridge (now the Third Avenue Bridge ) in New York City to the Village of Port Chester in Westchester County , New York at the Connecticut state border. Only the southern portion was completed, terminating instead about five towns southwest of Port Chester in New Rochelle . At the time, New Rochelle was the final railroad station when traveling from Connecticut before entering New York City. The New York and New Haven Railroad and

763-521: A day's pay for 100-to-150-mile (160 to 240 km) workdays. Streamliners covered that in two hours. Matters approached a crisis in the 1960s. Passenger service route-miles fell from 107,000 miles (172,000 km) in 1958 to 49,000 miles (79,000 km) in 1970, the last full year of private operation. The diversion of most United States Post Office Department mail from passenger trains to trucks, airplanes, and freight trains in late 1967 deprived those trains of badly needed revenue. In direct response,

872-428: A federal environmental study for Penn Station Access, to be completed by 2013. The cost of the project was estimated at $ 350 million with the state of Connecticut funding $ 100 million and the state of New York funding the remaining $ 250 million. The first piece of Penn Station Access would route some New Haven Line trains down Amtrak's Northeast Corridor to Penn Station. The New Haven Line to Grand Central splits off from

981-564: A large overhang of debt from years of underfunding. In the mid-1990s, Amtrak suffered through a serious cash crunch. Under Downs, Congress included a provision in the Taxpayer Relief Act of 1997 that resulted in Amtrak receiving a $ 2.3 billion tax refund that resolved their cash crisis. However, Congress also instituted a "glide path" to financial self-sufficiency, excluding railroad retirement tax act payments. George Warrington became

1090-613: A new tunnel under the Hudson River and rehabilitate the existing century-old tunnel, and the Portal North Bridge, to replace a century-old moveable bridge with a modern structure that is less prone to failure. Later projects of the Gateway Program, including the expansion of track and platforms at Penn Station New York, construction of the Bergen Loop and other improvements will roughly double capacity for Amtrak and NJ Transit trains in

1199-528: A suburban branch that would become a main line with the completion of the New York Connecting Railroad and its Hell Gate Bridge . The bridge opened on March 9, 1917, but was operated by steam with an engine change at Sunnyside Yard east of Penn Station until 1918. The New York, Westchester and Boston Railway commuter rail line opened in 1912, paralleling the HR&;PC just to the west, south of

SECTION 10

#1732851009622

1308-561: A year, its highest number since its founding in 1970. Politico noted a key problem: "the rail system chronically operates in the red. A pattern has emerged: Congress overrides cutbacks demanded by the White House and appropriates enough funds to keep Amtrak from plunging into insolvency. But, Amtrak advocates say, that is not enough to fix the system's woes." Joseph H. Boardman replaced Kummant as president and CEO in late 2008. In 2011, Amtrak announced its intention to improve and expand

1417-462: Is headed by a Board of Directors, two of whom are the Secretary of Transportation and CEO of Amtrak, while the other eight members are nominated to serve a term of five years. Amtrak's network includes over 500 stations along 21,400 miles (34,000 km) of track. It directly owns approximately 623 miles (1,003 km) of this track and operates an additional 132 miles of track; the remaining mileage

1526-475: Is now part of their Northeast Corridor used by its high-speed Acela Express . In February 1968 PRR merged with its rival New York Central Railroad to form the Penn Central (PC). Penn Central was required to absorb the New Haven in 1969 as a condition of the merger, which brought the entire Washington–Boston corridor under the control of one company. On September 21, 1970 all New York–Boston trains except

1635-632: Is over rail lines owned by other railroad companies. While most track speeds are limited to 79 mph (127 km/h) or less, several lines have been upgraded to support top speeds of 110 mph (180 km/h), and parts of the Northeast Corridor support top speeds of 160 mph (260 km/h). In fiscal year 2022, Amtrak served 22.9 million passengers and had $ 2.1 billion in revenue, with more than 17,100 employees as of fiscal year 2021. Nearly 87,000 passengers ride more than 300 Amtrak trains daily. Nearly two-thirds of passengers come from

1744-485: Is owned by Metro-North Railroad . This line is electrified using the former New Haven Railroad's system , which supplies 12.5 kV at 60 Hz. Amtrak The National Railroad Passenger Corporation , doing business as Amtrak ( / ˈ æ m t r æ k / ; reporting marks AMTK , AMTZ ), is the national passenger railroad company of the United States. It operates inter-city rail service in 46 of

1853-596: Is owned by New York's Metropolitan Transportation Authority and the Connecticut Department of Transportation as the New Haven Line .) This mainline became Amtrak's "jewel" asset, and helped the railroad generate revenue. While the NEC ridership and revenues were higher than any other segment of the system, the cost of operating and maintaining the corridor proved to be overwhelming. As a result, Amtrak's federal subsidy

1962-575: Is powered by overhead lines ; for the rest of the system, diesel-fueled locomotives are used. Routes vary widely in the frequency of service, from three-days-a-week trains on the Sunset Limited to several times per hour on the Northeast Corridor. For areas not served by trains, Amtrak Thruway routes provide guaranteed connections to trains via buses, vans, ferries and other modes. The most popular and heavily used services are those running on

2071-449: Is the largest host to Amtrak routes, with 6.3 million train-miles. Freight rail operators are required under federal law to give dispatching preference to Amtrak trains. However, Amtrak has accused freight railroads of violating or skirting these regulations, resulting in passenger trains waiting for freight traffic to clear the track. Harlem River and Port Chester Railroad The Harlem River and Port Chester Railroad ( HR&PC )

2180-734: The California Zephyr between Oakland and Chicago via Denver and revived the Auto Train , a unique service that carries both passengers and their vehicles. Amtrak advertised it as a great way to avoid traffic along the I-95 running between Lorton, Virginia (near Washington, D.C.) and Sanford, Florida (near Orlando) on the Silver Star alignment. In 1980s and 1990s, stations in Baltimore, Chicago, and Washington, D.C. received major rehabilitation and

2289-442: The 10 largest metropolitan areas and 83% of passengers travel on routes shorter than 400 miles (645 km). In 1916, 98% of all commercial intercity travelers in the United States moved by rail, and the remaining 2% moved by inland waterways . Nearly 42 million passengers used railways as primary transportation. Passenger trains were owned and operated by the same privately owned companies that operated freight trains. As

SECTION 20

#1732851009622

2398-472: The Atchison, Topeka and Santa Fe Railway filed to discontinue 33 of its remaining 39 trains, ending almost all passenger service on one of the largest railroads in the country. The equipment the railroads had ordered after World War II was now 20 years old, worn out, and in need of replacement. As passenger service declined, various proposals were brought forward to rescue it. The 1961 Doyle Report proposed that

2507-1004: The COVID-19 pandemic , Amtrak continued operating as an essential service. It started requiring face coverings the week of May 17, and limited sales to 50% of capacity. Most long-distance routes were reduced to three weekly round trips in October 2020. In March 2021, following President Joe Biden's American Jobs Plan announcement, Amtrak CEO Bill Flynn outlined a proposal called Amtrak Connects US that would expand state-supported intercity corridors with an infusion of upfront capital assistance. This would expand service to cities including Las Vegas , Phoenix , Baton Rouge , Nashville , Chattanooga , Louisville , Columbus (Ohio) , Wilmington (North Carolina) , Cheyenne , Montgomery , Concord , and Scranton . Also in March 2021, Amtrak announced plans to return 12 of its long-distance routes to daily schedules later in

2616-638: The Harlem River Yard . Commuter service ran along the line from the Harlem River Terminal up to the New Haven main line in New Rochelle until 1931. The New York, Westchester and Boston Railway commuter rail line opened in 1912, paralleling the HR&PC just to the west, south of the crossing of the Bronx River . Until 1924, when a new combined station was built, the short Willis Avenue Spur of

2725-654: The Harlem River and Port Chester Railroad (HR&PC; now part of the Northeast Corridor ) just north of the Harlem River . The HR&PC would pass from the Bronx to Queens via the Hell Gate Bridge, then continue south through Queens, eventually connecting to the East River Tunnels and Penn Station. As part of the plan, the Hell Gate Bridge would carry four tracks, which would connect to the NH's four-track lines on either side of

2834-610: The Hartford and New Haven Railroad merged to create the larger New York, New Haven and Hartford Railroad in 1872. The HR&PC was leased by the New Haven Railroad in 1873 and opened later that year, running from the New Haven at New Rochelle south into the Bronx . Leasing the line enabled the New Haven to establish a continuous line of service from Connecticut to Manhattan. The HR&PC provided freight service between New York City and

2943-640: The Highway Trust Fund and Aviation Trust Fund paid for by user fees, highway fuel and road taxes, and, in the case of the General Fund, from general taxation. Gunn dropped most freight express business and worked to eliminate deferred maintenance. A plan by the Bush administration "to privatize parts of the national passenger rail system and spin off other parts to partial state ownership" provoked disagreement within Amtrak's board of directors. Late in 2005, Gunn

3052-571: The New Haven Line , located in Co-op City , Morris Park , Parkchester/Van Nest , and Hunts Point . The stations would provide fast, direct rides to West Midtown and facilitate reverse-commuting trips to Westchester County and Connecticut. The new stations would provide transit access to the transit-deficient East Bronx. Previously, a station was also considered to be built in Astoria ; however, analysis showed that there wouldn’t be enough riders to justify

3161-651: The New York, New Haven and Hartford Railroad (the "New Haven") and the Pennsylvania Railroad (PRR). The Hell Gate Bridge was conceived in the early 1900s to link New York and the Pennsylvania Railroad (PRR) with New England and the New York, New Haven, and Hartford Railroad (NH). In June 1906, the NH applied for and received a franchise to operate trains from the northeastern suburbs of New York City to Pennsylvania Station in Midtown Manhattan , built by

3270-613: The Railroad Revitalization and Regulatory Reform Act of 1976. A large part of the legislation was directed to the creation of Conrail , but the law also enabled the transfer of the portions of the NEC not already owned by state authorities to Amtrak. Amtrak acquired the majority of the NEC on April 1, 1976. (The portion in Massachusetts is owned by the Commonwealth and managed by Amtrak. The route from New Haven to New Rochelle

3379-619: The Turboservice were rerouted into Penn Station from Grand Central; the Turboservice moved on February 1, 1971 for cross-platform transfers to the Metroliners. The line between New Rochelle and the Harold Interlocking was transferred to Amtrak in 1976 upon dissolution of Penn Central . The electrification system continued to be controlled as a portion of the ex-New Haven system until the 1987 conversion to 60 Hz operation. When

Hell Gate Line - Misplaced Pages Continue

3488-482: The design–build contracts for Penn Station Access. At that point, the project's opening date was announced as 2024. Shortly afterward, work was placed on hold due to the COVID-19 pandemic in the United States . The Federal Transit Administration (FTA) published a draft environmental impact statement in May 2021, and the state government commenced a request for proposals for the project's development. The project's completion

3597-684: The elevated IRT Third Avenue Line ran to the Harlem River terminal of the HR&PC and the NYW&;B. In 1917 the New York Connecting Railroad opened for passenger service between the HR&PC at Port Morris and the Pennsylvania Tunnel and Terminal Railroad at Sunnyside Yard . This allowed NYNH&H trains to run over the HR&PC and into New York Penn Station , though most continued to serve Grand Central Terminal until Amtrak took over intercity operations in 1971. On January 1, 1927

3706-552: The 20th century progressed, patronage declined in the face of competition from buses , air travel , and the car . New streamlined diesel-powered trains such as the Pioneer Zephyr were popular with the traveling public but could not reverse the trend. By 1940, railroads held 67 percent of commercial passenger-miles in the United States. In real terms, passenger-miles had fallen by 40% since 1916, from 42 billion to 25 billion. Traffic surged during World War II , which

3815-483: The 48 contiguous U.S. states and three Canadian provinces . Amtrak is a portmanteau of the words America and track. Founded in 1971 as a quasi-public corporation to operate many U.S. passenger rail routes, Amtrak receives a combination of state and federal subsidies but is managed as a for-profit organization . The company's headquarters is located one block west of Union Station in Washington, D.C. Amtrak

3924-545: The Bronx, Queens and Manhattan to five locations. The remaining alternatives considered would have used either the Hudson or New Haven Lines. The Harlem Line options were removed from consideration. The five remaining stations under consideration were at West 125th Street and West 59th Street under the Hudson alternative, and at Co-Op City, Parkchester and Hunts Point under the New Haven alternative. The preferred alternatives would have used three miles of trackage, and would have involved

4033-599: The California corridor trains accounted for a combined 2.35 million passengers in fiscal year 2021. Other popular routes include the Empire Service between New York City and Niagara Falls , via Albany and Buffalo , which carried 613.2 thousand passengers in fiscal year 2021, and the Keystone Service between New York City and Harrisburg via Philadelphia that carried 394.3 thousand passengers that same year. Four of

4142-448: The DOT's analysis was far too optimistic, with director George Shultz arguing to cut the number of routes by around half. Nixon agreed with Shultz, and the public draft presented by Volpe on November 30 consisted of only 16 routes. The initial reaction to this heavily-cut-back proposed system from the public, the press, and congressmen was strongly negative. It made front-page headlines across

4251-399: The Empire Connection tunnel opened in 1991, allowing Amtrak to consolidate all New York services at Penn Station. Despite the improvements, Amtrak's ridership stagnated at roughly 20 million passengers per year, amid uncertain government aid from 1981 to about 2000. In the early 1990s, Amtrak tested several different high-speed trains from Europe on the Northeast Corridor. An X 2000 train

4360-416: The HR&PC and into New York Penn Station , though most continued to serve Grand Central Terminal until Amtrak took over intercity operations in 1971. On January 1, 1927 the HR&PC was merged into the New York, New Haven and Hartford Railroad . The NYNH&H was merged into Penn Central in 1969, and Penn Central became part of Conrail in 1976. The HR&PC was ultimately sold to Amtrak and

4469-553: The Harlem Line would have required the construction of wye tracks. One option would have branched off of the Harlem Line at Mott Haven, using a wye track to go north via the Hudson Line. Using a newly-constructed wye track at Spuyten Duyvil, service would turn south via the Empire Connection before reaching Penn Station. Another option considered would have constructed a wye track at Woodlawn, allowing Harlem trains to go east and head down

Hell Gate Line - Misplaced Pages Continue

4578-523: The Hell Gate Bridge began on March 1, 1912 and ended on September 30, 1916. The bridge was dedicated and opened to rail traffic on March 9, 1917, with Washington–Boston through trains first running on April 1. It was the world's longest steel arch bridge until the Bayonne Bridge opened in 1931. The New Haven's system was extended across the Hell Gate Bridge to the New York Connecting Railroad upon

4687-522: The Hell Gate Line to Penn Station. The final option would have required the reconstruction of the Port Morris Branch and the Hell Gate Line. An additional option would have extended service from Grand Central to Penn Station through the construction of a new tunnel. In September 2002, a second screening took place narrowing five alternatives to four, and narrowing 20 potential station locations in

4796-463: The Hell Gate. Construction was overseen by Gustav Lindenthal , whose original design left a gap of 15 feet (4.6 m) between the steel arch and the masonry towers. Fearing that the public assumed that the towers were structurally integral to the bridge, Lindenthal added aesthetic girders between the upper chord of the arch and the towers to make the structure appear more robust. The original plans for

4905-510: The Hudson Line, and the Harlem Line, either during all times, or only operating during off-peak hours and weekends. Existing Metro-North riders would have the choice of arriving at either Penn Station or Grand Central on the New Haven Line and the Hudson Line. Service from the New Haven Line would diverge at New Rochelle, using Amtrak's Hell Gate Line to access Penn Station, while service from the Hudson Line would split off at Spuyten Duyvil station via Amtrak's Empire Connection. The alternatives via

5014-478: The NEC and rises in automobile fuel costs. The inauguration of the high-speed Acela in late 2000 generated considerable publicity and led to major ridership gains. However, through the late 1990s and very early 21st century, Amtrak could not add sufficient express freight revenue or cut sufficient other expenditures to break even. By 2002, it was clear that Amtrak could not achieve self-sufficiency, but Congress continued to authorize funding and released Amtrak from

5123-630: The NEC, including the Acela and Northeast Regional . The NEC runs between Boston and Washington, D.C. via New York City and Philadelphia. Some services continue into Virginia . The NEC services accounted for 4.4 million of Amtrak's 12.2 million passengers in fiscal year 2021. Outside the NEC the most popular services are the short-haul corridors in California, the Pacific Surfliner , Capitol Corridor , and San Joaquins , which are supplemented by an extensive network of connecting buses. Together

5232-982: The NRPC as a politically expedient way for the President and Congress to give passenger trains a "last hurrah" as demanded by the public. They expected the NRPC to quietly disappear as public interest waned. After Fortune magazine exposed the manufactured mismanagement in 1974, Louis W. Menk , chairman of the Burlington Northern Railroad , remarked that the story was undermining the scheme to dismantle Amtrak. Proponents also hoped that government intervention would be brief and that Amtrak would soon be able to support itself. Neither view had proved to be correct; popular support allowed Amtrak to continue in operation longer than critics imagined, while financial results made passenger train service returning to private railroad operations infeasible. The Rail Passenger Service Act gave

5341-421: The NRPC had hired Lippincott & Margulies to create a brand for it and replace its original working brand name of Railpax. On March 30, L&M's work was presented to the NRPC's board of incorporators, who unanimously agreed on the "headless arrow" logo and on the new brand name "Amtrak", a portmanteau of the words America and trak , the latter itself a sensational spelling of track . The name change

5450-581: The Navy and retired Southern Railway head William Graham Claytor Jr. came out of retirement to lead Amtrak. During his time at Southern, Claytor was a vocal critic of Amtrak's prior managers, who all came from non-railroading backgrounds. Transportation Secretary Drew Lewis cited this criticism as a reason why the Democrat Claytor was acceptable to the Reagan White House. Despite frequent clashes with

5559-656: The New Haven main line was converted by Metro-North to 60 Hz operation, the Amtrak Hell Gate line was also converted, but as an isolated system powered from the Van Nest substation. Control of the catenary system was transferred from Cos Cob to the Load Dispatcher at New York Penn Station . Although conversion occurred subsequent to the PRR-era electrification , Amtrak substation numbers 45-47 were assigned for consistency with

SECTION 50

#1732851009622

5668-587: The Northeast Corridor near New Rochelle . The Northeast Corridor (also known here as the Hell Gate Line) continues south crossing the Pelham Bay Bridge into the Bronx , the Hell Gate Bridge into Queens , and entering Manhattan through the East River Tunnels also used by the Long Island Rail Road . This phase includes the construction of four new Metro-North stations in the Bronx to be served by

5777-447: The Northeast Corridor, some of which connect to it or are extensions from it. In addition to its inter-city services, Amtrak also operates commuter services under contract for three public agencies: the MARC Penn Line in Maryland, Shore Line East in Connecticut, and Metrolink in Southern California. Service on the Northeast Corridor (NEC), between Boston , and Washington, D.C. , as well as between Philadelphia and Harrisburg ,

5886-498: The Northeast Corridor, state-supported short-haul service outside the Northeast Corridor, and medium- and long-haul service known within Amtrak as the National Network. Amtrak receives federal funding for the vast majority of its operations including the central spine of the Northeast Corridor as well as for its National Network routes. In addition to the federally funded routes, Amtrak partners with transportation agencies in 18 states to operate other short and medium-haul routes outside of

5995-406: The November 30th draft. These required routes only had their endpoints specified; the selection of the actual routes to be taken between the endpoints was left to the NRPC, which had just three months to decide them before it was due to start service. Consultants from McKinsey & Company were hired to perform this task, and their results were publicly announced on March 22. At the same time,

6104-411: The PRR. The New Haven would be able to accomplish this by constructing a spur from the four-track New Haven Railroad and New York Central Railroad main line in the Bronx (these railroads are now respectively the modern-day New Haven Line and Harlem Line of the Metro-North Railroad ). The spur, now the Port Morris Branch , would split north of Melrose station in the South Bronx , then merge with

6213-476: The Parkchester/Van Nest station and north of the Co-Op City station, and additional switches will be added. Metro-North service to Penn Station will begin after the completion of the East Side Access project, which will divert some Long Island Rail Road trains to Grand Central, therefore opening up slots at Penn Station for Metro-North service. During peak hours there will be between six and ten trains to Penn Station. There will be four trains per hour to Connecticut in

6322-474: The Rail Passenger Service Act. Proponents of the bill, led by the National Association of Railroad Passengers (NARP), sought government funding to ensure the continuation of passenger trains. They conceived the National Railroad Passenger Corporation (NRPC), a quasi-public corporation that would be managed as a for-profit organization , but which would receive taxpayer funding and assume operation of intercity passenger trains – while many involved in drafting

6431-473: The Reagan administration over funding, Claytor enjoyed a good relationship with Lewis, John H. Riley , the head of the Federal Railroad Administration (FRA), and with members of Congress. Limited funding led Claytor to use short-term debt to fund operations. Building on mechanical developments in the 1970s, high-speed Washington–New York Metroliner Service was improved with new equipment and faster schedules. Travel time between New York and Washington, D.C.

6540-401: The Secretary of Transportation, at that time John A. Volpe , thirty days to produce an initial draft of the endpoints of the routes the NRPC would be required by law to serve for four years. On November 24 Volpe presented his initial draft consisting of 27 routes to Nixon, which he believed would make a $ 24 million profit by 1975. The Office of Management and Budget , however, believed Volpe and

6649-455: The bill did not believe the NRPC would actually be profitable, this was necessary in order for the White House and more conservative members of Congress to support the bill. There were several key provisions: Of the 26 railroads still offering intercity passenger service in 1970, only six declined to join the NRPC. Nearly everyone involved expected the experiment to be short-lived. The Nixon administration and many Washington insiders viewed

SECTION 60

#1732851009622

6758-433: The busiest, most complex section of the Northeast Corridor. In June 2017, it was announced that former Delta and Northwest Airlines CEO Richard Anderson would become Amtrak's next President & CEO. Anderson began the job on July 12, assuming the title of President immediately and serving alongside Moorman as "co-CEOs" until the end of the year. On April 15, 2020, Atlas Air Chairman, President and CEO William Flynn

6867-445: The construction of six new Metro-North stations in the Bronx and Manhattan, allowing riders in these areas to easily access Penn Station, Westchester , Dutchess , and Putnam counties upstate as well as Fairfield and New Haven counties in Connecticut . Existing Metro-North riders would have the choice of arriving at either Penn Station or Grand Central on the New Haven Line and the Hudson Line. By 2011, Metro-North had initiated

6976-434: The corridor to make it suitable for higher-speed electric trains. The Northend Electrification Project extended existing electrification from New Haven, Connecticut , to Boston to complete the overhead power supply along the 454-mile (731 km) route, and several grade crossings were improved or removed. Ridership increased during the first decade of the 21st century after the implementation of capital improvements in

7085-477: The country and it was quickly leaked that the DOT had wanted a far larger system than the White House would approve of. The ICC produced its own report on December 29, criticising the proposed draft and arguing for the inclusion of fifteen additional routes, giving further ammunition to the congressmen who wanted an expanded system. Further wrangling between the DOT and the White House produced the final list of routes on January 28, 1971, adding five additional routes to

7194-456: The crossing of the Bronx River . Until 1924, when a new combined station was built, the short Willis Avenue Spur of the elevated IRT Third Avenue Line ran to the Harlem River terminal of the HR&PC and the NYW&B. In 1917 the New York Connecting Railroad opened for passenger service between the HR&PC at Port Morris and the Pennsylvania Tunnel and Terminal Railroad at Sunnyside Yard . This allowed NYNH&H trains to run over

7303-480: The ex- New York Central Railroad 's Water Level Route from New York to Ohio and Grand Trunk Western Railroad 's Chicago to Detroit route. The reduced passenger train schedules created confusion amongst staff. At some stations, Amtrak service was available only late at night or early in the morning, prompting complaints from passengers. Disputes with freight railroads over track usage caused some services to be rerouted, temporarily cancelled, or replaced with buses. On

7412-409: The four new stations. In exchange for being allowed to use the Hell Gate Line and build the four stations, the MTA agreed to replace the Pelham Bay Bridge across the Hutchinson River , as well as pay access fees for using the Hell Gate Bridge. Amtrak and the MTA also agreed to conduct a joint study on the feasibility of extending Amtrak service to Long Island via the tracks used by the LIRR. As part of

7521-514: The high cost of constructing a station. The construction of a station was projected to cost over $ 20 million, and the station would only be able to be 4-car lengths long. The station would only have a projected annual ridership of 310,367. Since 2014, local residents have pushed to have a Metro-North station built in Queens, either between 41st and 44th Streets in Astoria, or at Northern Boulevard and Broadway in Woodside . On January 8, 2014, former New York Governor Andrew Cuomo voiced support for

7630-462: The high-speed rail corridor from Penn Station in NYC, under the Hudson River in new tunnels, and double-tracking the line to Newark, NJ , called the Gateway Program , initially estimated to cost $ 13.5 billion (equal to $ 18 billion in 2023). From May 2011 to May 2012, Amtrak celebrated its 40th anniversary with festivities across the country that started on National Train Day (May 7, 2011). A commemorative book entitled Amtrak: An American Story

7739-583: The job, he is the second-longest serving head of Amtrak since it was formed more than 40 years ago. On December 9, 2015, Boardman announced in a letter to employees that he would be leaving Amtrak in September 2016. He had advised the Amtrak Board of Directors of his decision the previous week. On August 19, 2016, the Amtrak Board of Directors named former Norfolk Southern Railway President & CEO Charles "Wick" Moorman as Boardman's successor with an effective date of September 1, 2016. During his term, Moorman took no salary and said that he saw his role as one of

7848-537: The line be operated by the MTA pending completion of the Second Avenue Subway , which was under construction at the time and slated to be completed in 1980. Sixty percent of Co-op City residents that responded to a survey said that they would have used the proposed rail service. Amtrak has applied for $ 15 million for the environmental impact studies and preliminary engineering design to examine replacement options for

7957-412: The line enabled the New Haven to establish a continuous line of service from Connecticut to Manhattan. The HR&PC provided freight service between New York City and the Harlem River Yard . Commuter service ran along the line from the Harlem River Terminal up to main-line New Haven in New Rochelle until 1931. The New York Connecting Railroad was incorporated on April 21, 1892, and was jointly owned by

8066-446: The line from the Harlem River Terminal up to main-line New Haven in New Rochelle until 1931. Electrified service on the line began in 1911, and the line was extended to Penn Station across the Hell Gate with the completion of the Hell Gate Bridge . Metro-North Railroad is currently planning to reinstitute local commuter service on the line as part of the first phase of Penn Station Access . The Harlem River and Port Chester Railroad

8175-463: The line's construction. The system of electrification was an extension of the New Haven's revised 11/22 kV autotransformer architecture. The original electrification extended from the New Haven's main line, across the Hell Gate Bridge, to the Bay Ridge yard. The line south of Bowery Bay Junction was de-electrified in the 1950s. On July 29, 1911, NH began electric service on its Harlem River Branch ,

8284-594: The more than 100-year-old, low-level movable rail Pelham Bay Bridge (just west of Pelham Bridge ) over the Hutchinson River in the Bronx that has been limiting speed and train capacity. The goal is for a new bridge to support expanded service and speeds up to 110 mph (180 km/h). The Penn Station Access project was initiated on September 2, 1999 when the Federal Transit Administration (FTA), in conjunction with Metro-North Railroad, issued

8393-607: The other hand, the creation of the Los Angeles–Seattle Coast Starlight from three formerly separate train routes was an immediate success, resulting in an increase to daily service by 1973. Needing to operate only half the train routes that had operated previously, Amtrak would lease around 1,200 of the best passenger cars from the 3,000 that the private railroads owned. All were air-conditioned, and 90% were easy-to-maintain stainless steel. When Amtrak took over, passenger cars and locomotives initially retained

8502-471: The overall market share fell to 46% by 1950, and then 32% by 1957. The railroads had lost money on passenger service since the Great Depression , but deficits reached $ 723 million in 1957. For many railroads, these losses threatened financial viability. The causes of this decline were heavily debated. The National Highway System and airports , both funded by the government, competed directly with

8611-433: The paint schemes and logos of their former owners which resulted in Amtrak running trains with mismatched colors – the "Rainbow Era". In mid-1971, Amtrak began purchasing some of the equipment it had leased, including 286 EMD E and F unit diesel locomotives, 30 GG1 electric locomotives and 1,290 passenger cars. By 1975, the official Amtrak color scheme was painted on most Amtrak equipment and newly purchased locomotives and

8720-438: The piers on the long approach ramps called for a steel lattice structure. The design was changed to smooth concrete to soothe concerns that asylum inmates on Wards and Randall's islands would climb the piers to escape. The engineering was so precise that when the last section of the main span was lifted into place, the final adjustment needed to join everything together was just 5 ⁄ 16 inch (7.9 mm). Construction of

8829-600: The private railroads pool their services into a single body. Similar proposals were made in 1965 and 1968 but failed to attract support. The federal government passed the High Speed Ground Transportation Act of 1965 to fund pilot programs in the Northeast Corridor , but this did nothing to address passenger deficits. In late 1969, multiple proposals emerged in the United States Congress , including equipment subsidies, route subsidies, and, lastly,

8938-453: The project in his 2014 State of the State address. With his support for the project, $ 695 million was budgeted for the project in the MTA's 2015–2019 Capital Program. In order to accommodate more trains, power and signal systems, and yards at Penn Station and New Rochelle will be upgraded and three railroad bridges will be rehabilitated or replaced. In addition, a third track will be installed between

9047-477: The project, three track interlockings would be built, one existing interlocking would be rehabilitated, and the line would be widened from three to four tracks between the Hell Gate and Pelham Bay Bridges. Design for the project began in February 2019, and construction was expected to begin in late 2020, with an expected opening by 2023. By February 2020, the MTA had identified three firms that were qualified to bid on

9156-407: The railroads, which, unlike the airline, bus, and trucking companies, paid for their own infrastructure. American car culture was also on the rise in the post-World War II years. Progressive Era rate regulation limited the railroad's ability to turn a profit. Railroads also faced antiquated work rules and inflexible relationships with trade unions. To take one example, workers continued to receive

9265-443: The requirement. In early 2002, David L. Gunn replaced Warrington as seventh president. In a departure from his predecessors' promises to make Amtrak self-sufficient in the short term, Gunn argued that no form of passenger transportation in the United States is self-sufficient as the economy is currently structured. Highways, airports, and air traffic control all require large government expenditures to build and operate, coming from

9374-645: The rest of the PRR numbering scheme. A 1969 proposal by the North Bronx Transportation Project considered running trains via the Hell Gate Bridge to Penn Station, with travel times estimated to be 25 minutes. Some plans for the Second Avenue Subway included integration with the upper portion of the line, providing express service from the East Side of Manhattan to Co-op City and Parkchester. This line

9483-713: The reverse peak direction, and there will be two trains per hour to and from Penn Station during off-peak and weekends. The project would add redundancy to the regional transportation network in case of service interruption. Regional connectivity will be increased with accessible transfers to Amtrak, the Long Island Rail Road and New Jersey Transit at Penn Station. Through-running between the New Haven Line and New Jersey Transit would be possible, linking business centers in Connecticut and New Jersey while providing access to Newark Liberty Airport. The draft Environmental Assessment

9592-532: The rolling stock began appearing. Amtrak inherited problems with train stations (most notably deferred maintenance ) and redundant facilities from the competing railroads that once served the same communities. Chicago is a prime example; on the day prior to Amtrak's inception, intercity passenger trains used four different Chicago terminals: LaSalle , Dearborn , North Western Station , Central , and Union. The trains at LaSalle remained there, as their operator Rock Island could not afford to opt into Amtrak. Of all

9701-468: The schedule. Amtrak uses a sliding scale, with trips under 250 miles (400 km) considered late if they are more than 10 minutes behind schedule, up to 30 minutes for trips over 551 miles (887 km) in length. Outside the Northeast Corridor and stretches of track in Southern California and Michigan, most Amtrak trains run on tracks owned and operated by privately owned freight railroads. BNSF

9810-508: The six busiest stations by boardings are on the NEC: New York Penn Station (first), Washington Union Station (second), Philadelphia 30th Street Station (third), and Boston South Station (fifth). The other two are Chicago Union Station (fourth) and Los Angeles Union Station (sixth). On-time performance is calculated differently for airlines than for Amtrak. A plane is considered on-time if it arrives within 15 minutes of

9919-498: The sixth president in 1998, with a mandate to make Amtrak financially self-sufficient. Under Warrington, the company tried to expand into express freight shipping, placing Amtrak in competition with the "host" freight railroads and the trucking industry . On March 9, 1999, Amtrak unveiled its plan for the Acela Express, a high-speed train on the Northeast Corridor between Washington, D.C. and Boston. Several changes were made to

10028-754: The spring. Most of these routes were restored to daily service in late-May 2021. However, a resurgence of the virus caused by the Omicron variant caused Amtrak to modify and/or suspend many of these routes again from January to March 2022. Amtrak is required by law to operate a national route system. Amtrak has presence in 46 of the 48 contiguous states, as well as the District of Columbia (with only thruway connecting services in Wyoming and no services in South Dakota ). Amtrak services fall into three groups: short-haul service on

10137-431: The system with an aim to reduce costs, speed construction, and improve its corporate image. However, the cash-strapped railroad would ultimately build relatively few of these standard stations. Amtrak soon had the opportunity to acquire rights-of-way. Following the bankruptcy of several northeastern railroads in the early 1970s, including Penn Central, which owned and operated the Northeast Corridor (NEC), Congress passed

10246-626: The trains serving Dearborn Station, Amtrak retained only a pair of Santa Fe trains, which relocated to Union Station beginning with the first Amtrak departures on May 1, 1971. Dearborn Station closed after the last pre-Amtrak trains on the Santa Fe arrived in Chicago on May 2. None of the intercity trains that had served North Western Station became part of the Amtrak system, and that terminal became commuter-only after May 1. The trains serving Central Station continued to use that station until an alternate routing

10355-459: Was adopted in March 1972. In New York City , Amtrak had to maintain two stations ( Penn and Grand Central ) due to the lack of track connections to bring trains from upstate New York into Penn Station; a problem that was rectified once the Empire Connection was built in 1991. The Amtrak Standard Stations Program was launched in 1978 and proposed to build a standardized station design across

10464-414: Was aided by troop movement and gasoline rationing . The railroad's market share surged to 74% in 1945, with a massive 94 billion passenger-miles. After the war, railroads rejuvenated their overworked and neglected passenger fleets with fast and luxurious streamliners. These new trains brought only temporary relief to the overall decline. Even as postwar travel exploded, passenger travel percentages of

10573-575: Was also considered for through-running with the Northeast Corridor in New Jersey, easing travel for residents of Westchester and Connecticut trying to get to New Jersey. While not proposed officially, in June 1973, two Congressmen and the Mayor of Yonkers proposed having trains run from Stamford, Connecticut , to Penn Station, making stops at Pelham Manor , Co-op City , and Parkchester / Van Nest . They proposed that

10682-413: Was chartered April 23, 1866 as a branch line from the Harlem River at the north end of the Harlem Bridge (now the Third Avenue Bridge ) in New York City to the Village of Port Chester in Westchester County , New York at the Connecticut state border. Only the southern portion was completed, terminating instead about five towns southwest of Port Chester in New Rochelle . At the time, New Rochelle

10791-471: Was chartered in 1866 as a branch line railroad between New York City and Port Chester, New York . The line opened in 1873 as part of the New York, New Haven and Hartford Railroad and served in various capacities until 1971. The HR&PC is now part of the Hell Gate Line section of Amtrak 's high-speed Northeast Corridor . The Harlem River and Port Chester Railroad was chartered April 23, 1866 as

10900-609: Was fired. Gunn's replacement, Alexander Kummant (2006–08), was committed to operating a national rail network, and like Gunn, opposed the notion of putting the Northeast Corridor under separate ownership. He said that shedding the system's long-distance routes would amount to selling national assets that are on par with national parks, and that Amtrak's abandonment of these routes would be irreversible. In late 2006, Amtrak unsuccessfully sought annual congressional funding of $ 1 billion for ten years. In early 2007, Amtrak employed 20,000 people in 46 states and served 25 million passengers

11009-803: Was increased dramatically. In subsequent years, other short route segments not needed for freight operations were transferred to Amtrak. In its first decade, Amtrak fell far short of financial independence, which continues today, but it did find modest success rebuilding trade. Outside factors discouraged competing transport, such as fuel shortages which increased costs of automobile and airline travel, and strikes which disrupted airline operations. Investments in Amtrak's track, equipment and information also made Amtrak more relevant to America's transportation needs. Amtrak's ridership increased from 16.6 million in 1972 to 21 million in 1981. In February 1978, Amtrak moved its headquarters to 400 North Capitol Street NW, Washington D.C. In 1982, former Secretary of

11118-635: Was leased from Sweden for test runs from October 1992 to January 1993, followed by revenue service between Washington, D.C. and New York City from February to May and August to September 1993. Siemens showed the ICE 1 train from Germany, organizing the ICE Train North America Tour which started to operate on the Northeast Corridor on July 3, 1993. In 1993, Thomas Downs succeeded Claytor as Amtrak's fifth president. The stated goal remained "operational self-sufficiency". By this time, however, Amtrak had

11227-544: Was named Amtrak President and CEO. In addition to Atlas Air, Flynn has held senior roles at CSX Transportation , SeaLand Services and GeoLogistics Corp. Anderson would remain with Amtrak as a senior advisor until December 2020. As Amtrak approached profitability in 2020, the company undertook planning to expand and create new intermediate-distance corridors across the country. Included were several new services in Ohio, Tennessee, Colorado, and Minnesota, among other states. During

11336-445: Was publicly announced less than two weeks before operations began. Amtrak began operations on May 1, 1971. Amtrak received no rail tracks or rights-of-way at its inception. All of Amtrak's routes were continuations of prior service, although Amtrak pruned about half the passenger rail network. Of the 366 train routes that operated previously, Amtrak continued only 184. Several major corridors became freight-only, including

11445-499: Was published, a documentary was created, six locomotives were painted in Amtrak's four prior paint schemes , and an Exhibit Train toured the country visiting 45 communities and welcoming more than 85,000 visitors. After years of almost revolving-door CEOs at Amtrak, in December 2013, Boardman was named "Railroader of the Year" by Railway Age magazine, which noted that with over five years in

11554-462: Was reduced to under 3 hours due to system improvements and limited stop service. This improvement was cited as a reason why Amtrak grew its share of intercity trips between the cities along the corridor. Elsewhere in the country, demand for passenger rail service resulted in the creation of five new state-supported routes in California, Illinois, Missouri, Oregon and Pennsylvania, for a total of 15 state-supported routes. Amtrak added two trains in 1983,

11663-418: Was the final railroad station when traveling from Connecticut before entering New York City. The New York and New Haven Railroad and the Hartford and New Haven Railroad merged to create the larger New York, New Haven and Hartford Railroad in 1872. The HR&PC was leased by the New Haven Railroad in 1873 and opened later that year, running from the New Haven at New Rochelle south into the Bronx . Leasing

11772-503: Was then announced for 2025. The expanded services will operate at Moynihan Train Hall , an expansion of Penn Station into the neighboring James A. Farley Building . On September 28, 2021, the FTA issued a Finding of No Significant Impact for the project, allowing the project to move forward. Amtrak owns the entire line up to New Rochelle , New York , where it merges with the New Haven Line , which

11881-411: Was to be made available for public review in late 2018. At the MTA's Metro-North Railroad Committee meeting on January 22, 2019, it was announced that Amtrak and the MTA had reached an agreement regarding track usage rights, and $ 35 million was approved for initial engineering design work. In addition, HNTB New York Engineering and Architecture received a $ 35 million contract to consult on the planning of