Misplaced Pages

GPS Block III

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

The error analysis for the Global Positioning System is important for understanding how GPS works, and for knowing what magnitude of error should be expected. The GPS makes corrections for receiver clock errors and other effects but there are still residual errors which are not corrected. GPS receiver position is computed based on data received from the satellites. Errors depend on geometric dilution of precision and the sources listed in the table below.

#113886

73-760: GPS Block III (previously Block IIIA ) consists of the first ten GPS III satellites , which are used to keep the Navstar Global Positioning System operational. Lockheed Martin designed, developed and manufactured the GPS III Non-Flight Satellite Testbed (GNST) and all ten Block III satellites. The first satellite in the series was launched in December 2018. The United States' Global Positioning System (GPS) reached Full Operational Capability on 17 July 1995, completing its original design goals. Advances in technology and new demands on

146-691: A WAAS satellite sent the initial L5 signal test transmissions. SVN-62 , the first GPS block IIF satellite, continuously broadcast the L5 signal starting on 28 June 2010. As a result of schedule delays to the GPS III control segment, the L5 signal was decoupled from the OCX deployment schedule. All satellites capable of transmitting the L5 signal (all GPS satellites launched since May 2010) began broadcasting pre-operational civil navigation (CNAV) messages in April 2014, and in December 2014

219-479: A GPS receiver requires the current time, the position of the satellite and the measured delay of the received signal. The position accuracy is primarily dependent on the satellite position and signal delay. To measure the delay, the receiver compares the bit sequence received from the satellite with an internally generated version. By comparing the rising and trailing edges of the bit transitions, modern electronics can measure signal offset to within about one percent of

292-453: A US$ 395 million contract option with Lockheed Martin for the ninth and tenth Block III space vehicles, expected to be available for launch by 2022. 6 of 10 GPS Block III satellites have been launched. 6 are currently operational, with 0 undergoing testing. One of the first announcements was the addition of a new civilian-use signal to be transmitted on a frequency other than the L1 frequency used for

365-562: A bit pulse width, 0.01 × 300 , 000 , 000   m / s ( 1.023 × 10 6 / s ) {\displaystyle {\frac {0.01\times 300,000,000\ \mathrm {m/s} }{(1.023\times 10^{6}/\mathrm {s} )}}} , or approximately 10 nanoseconds for the C/A code. Since GPS signals propagate at the speed of light , this represents an error of about 3 meters. This component of position accuracy can be improved by

438-498: A cryptographic algorithm from a classified seed key available only to authorized users (the U.S. military, its allies and a few other users, mostly government) with a special military GPS receiver. Mere possession of the receiver is insufficient; it still needs the tightly controlled daily key. Before it was turned off on May 2, 2000, typical SA errors were about 50 m (164 ft) horizontally and about 100 m (328 ft) vertically. Because SA affects every GPS receiver in

511-463: A day due to their velocity. The amount of dilation due to gravity is determined using the gravitational time dilation equation: where t r {\displaystyle t_{r}} is the time passed at a distance r {\displaystyle r} from the center of the Earth and t ∞ {\displaystyle t_{\infty }} is the time passed for

584-1073: A direct comparison of the L1 and L2 signals using the coded signal instead of the carrier wave. The effects of the ionosphere generally change slowly, and can be averaged over time. Those for any particular geographical area can be easily calculated by comparing the GPS-measured position to a known surveyed location. This correction is also valid for other receivers in the same general location. Several systems send this information over radio or other links to allow L1-only receivers to make ionospheric corrections. The ionospheric data are transmitted via satellite in Satellite Based Augmentation Systems (SBAS) such as Wide Area Augmentation System (WAAS) (available in North America and Hawaii), EGNOS (Europe and Asia), Multi-functional Satellite Augmentation System (MSAS) (Japan), and GPS Aided Geo Augmented Navigation (GAGAN) (India) which transmits it on

657-550: A factor of 10 using the higher-chiprate P(Y) signal. Assuming the same one percent of bit pulse width accuracy, the high-frequency P(Y) signal results in an accuracy of ( 0.01 × 300 , 000 , 000   m / s ) ( 10.23 × 10 6 / s ) {\displaystyle {\frac {(0.01\times 300,000,000\ \mathrm {m/s} )}{(10.23\times 10^{6}/\mathrm {s} )}}} or about 30 centimeters. Inconsistencies of atmospheric conditions affect

730-503: A far away observer. For small values of G M / ( r c 2 ) {\displaystyle GM/(rc^{2})} this approximates to: Determine the difference Δ t {\displaystyle \Delta t} between the satellite's time t r GPS {\displaystyle t_{r_{\text{GPS}}}} and Earth time t r Earth {\displaystyle t_{r_{\text{Earth}}}} : Earth has

803-399: A few meters (tens of feet) of inaccuracy. For very precise positioning (e.g., in geodesy ), these effects can be eliminated by differential GPS : the simultaneous use of two or more receivers at several survey points . In the 1990s when receivers were quite expensive, some methods of quasi-differential GPS were developed, using only one receiver but reoccupation of measuring points. At

SECTION 10

#1732858567114

876-485: A given area almost equally, a fixed station with an accurately known position can measure the SA error values and transmit them to the local GPS receivers so they may correct their position fixes. This is called Differential GPS (DGPS). DGPS also corrects for several other important sources of GPS errors, particularly ionospheric delay, so it continues to be widely used even though SA has been turned off. The ineffectiveness of SA in

949-404: A number of factors, primarily due to issues found in the navigation payload. Further launch date slippages were caused by the need for additional testing and validation of a SpaceX Falcon 9 rocket which ultimately launched the satellite on 23 December 2018. On 22 August 2019, the second GPS III satellite was launched aboard a Delta IV rocket. On 21 September 2016, the U.S. Air Force exercised

1022-525: A radius of 6,357 km (at the poles) making r Earth {\displaystyle r_{\text{Earth}}} = 6,357,000 m and the satellites have an altitude of 20,184 km making their orbit radius r GPS {\displaystyle r_{\text{GPS}}} = 26,541,000 m. Substituting these in the above equation, with Earth mass M = 5.974 × 10 , G = 6.674 × 10 , and c = 2.998 × 10 (all in SI units), gives: This represents

1095-457: A redundant signal in case of localized interference. The immediate effect of having two civilian frequencies being transmitted from one satellite is the ability to directly measure, and therefore remove, the ionospheric delay error for that satellite. Without such a measurement, a GPS receiver must use a generic model or receive ionospheric corrections from another source (such as a Satellite Based Augmentation System ). Advances in technology for

1168-405: Is computed by taking the square root of the sum of the squares of the individual component standard deviations. PDOP is computed as a function of receiver and satellite positions. A detailed description of how to calculate PDOP is given in the section Geometric dilution of precision computation (GDOP) .   σ R {\displaystyle \ \sigma _{R}} for

1241-469: Is defined in IS-GPS-705. L1C is a civilian-use signal, to be broadcast on the same L1 frequency (1575.42 MHz) that contains the C/A signal used by all current GPS users. L1C broadcasting started when GPS III Control Segment (OCX) Block 1 becomes operational, scheduled for 2022. The L1C signal will reach full operational status when being broadcast from at least 24 GPS Block III satellites, projected for

1314-453: Is feasible to put such ephemeris data on the web so it can be loaded into mobile GPS devices. See also Assisted GPS . The satellites' atomic clocks experience noise and clock drift errors. The navigation message contains corrections for these errors and estimates of the accuracy of the atomic clock. However, they are based on observations and may not indicate the clock's current state. These problems tend to be very small, but may add up to

1387-415: Is known as kinetic time dilation : in an inertial reference frame, the faster an object moves, the slower its time appears to pass (as measured by the frame's clocks). General relativity takes into account also the effects that gravity has on the passage of time. In the context of GPS the most prominent correction introduced by general relativity is gravitational time dilation : the clocks located deeper in

1460-501: Is known, a mathematical model can be used to estimate and compensate for these errors. Ionospheric delay of a microwave signal depends on its frequency. It arises from ionized atmosphere (see Total electron content ). This phenomenon is known as dispersion and can be calculated from measurements of delays for two or more frequency bands, allowing delays at other frequencies to be estimated. Some military and expensive survey-grade civilian receivers calculate atmospheric dispersion from

1533-489: The Lorentz factor : For small values of v/c this approximates to: The GPS satellites move at 3874 m/s relative to Earth's center. We thus determine: This difference of 8.349 × 10 represents the fraction by which the satellites' clocks tick slower than the stationary clocks. It is then multiplied by the number of nanoseconds in a day: That is the satellites' clocks are slower than Earth's clocks by 7214 nanoseconds

SECTION 20

#1732858567114

1606-569: The United States Department of Defense announced that future GPS III satellites will not be capable of implementing SA, eventually making the policy permanent. Another restriction on GPS, antispoofing, remains on. This encrypts the P-code so that it cannot be mimicked by a transmitter sending false information. Few civilian receivers have ever used the P-code, and the accuracy attainable with

1679-422: The ephemeris data is transmitted every 30 seconds, the information itself may be up to two hours old. Variability in solar radiation pressure has an indirect effect on GPS accuracy due to its effect on ephemeris errors. If a fast time to first fix (TTFF) is needed, it is possible to upload a valid ephemeris to a receiver, and in addition to setting the time, a position fix can be obtained in under ten seconds. It

1752-529: The Air Force started transmitting CNAV uploads on a daily basis. The L5 signal will be considered fully operational once at least 24 space vehicles are broadcasting the signal, currently projected to happen in 2027. As of 10 July 2023, L5 is being broadcast from 17 satellites, after the removal of the block IIF, SVM-63. WRC-2000 added a space signal component to this aeronautical band so the aviation community can manage interference to L5 more effectively than L2. It

1825-495: The C/A code and then transfer to lock onto the P(Y) code. In a major departure from previous GPS designs, the M-code is intended to be broadcast from a high-gain directional antenna , in addition to a wide angle (full Earth) antenna. The directional antenna's signal, termed a spot beam , is intended to be aimed at a specific region (i.e., several hundred kilometers in diameter) and increase

1898-422: The C/A code is given by: The standard deviation of the error in estimated receiver position   σ r c {\displaystyle \ \sigma _{rc}} , again for the C/A code is given by: The error diagram on the left shows the inter relationship of indicated receiver position, true receiver position, and the intersection of the four sphere surfaces. The position calculated by

1971-532: The Director of the U.S. Air Force's Global Positioning Systems Directorate announced the first satellite would launch in the spring of 2018. In March 2017, the U.S. General Accounting Office stated "Technical issues with both the GPS III satellite and the OCX Block 0 launch control and checkout system have combined to place the planned March 2018 launch date for the first GPS III satellite at risk". The delays were caused by

2044-606: The GPS OCS, Architectural Evolution Plan 7.5, was operationally accepted in 2019. In 2010, the United States Air Force announced plans to develop a modern control segment, a critical part of the GPS modernization initiative. OCS will continue to serve as the ground control system of record until the new system, Next Generation GPS Operational Control System (OCX), is fully developed and functional. OCX features are being delivered to

2117-608: The GPS constellation, albeit in a limited fashion, without having to wait until OCX Block 1 becomes operational (scheduled for 2022). The United States Space Force awarded the US$ 96 million Contingency Operations contract in February 2016. Contingency Ops was operationally accepted by in April 2020. GPS satellite blocks Too Many Requests If you report this error to the Wikimedia System Administrators, please include

2190-515: The GPS frequency using a special pseudo-random noise sequence (PRN), so only one receiver and antenna are required. Humidity also causes a variable delay, resulting in errors similar to ionospheric delay, but occurring in the troposphere . This effect is more localized than ionospheric effects, changes more quickly and is not frequency dependent. These traits make precise measurement and compensation of humidity errors more difficult than ionospheric effects. The Atmospheric pressure can also change

2263-485: The GPS satellites and the GPS receivers have made ionospheric delay the largest source of error in the C/A signal. A receiver capable of performing this measurement is referred to as a dual frequency receiver. Its technical characteristics are: It is defined in IS-GPS-200. A major component of the modernization process, a new military signal called M-code was designed to further improve the anti-jamming and secure access of

GPS Block III - Misplaced Pages Continue

2336-440: The GPS. Special relativity allows the comparison of clocks only in a flat spacetime , which neglects gravitational effects on the passage of time. According to general relativity, the presence of gravitating bodies (like Earth) curves spacetime, which makes comparing clocks not as straightforward as in special relativity. However, one can often account for most of the discrepancy by the introduction of gravitational time dilation ,

2409-446: The L2C navigation data was scheduled to enter service in February 2016, but was delayed until 2022 or later. As a result of OCX delays, the L2C signal was decoupled from the OCX deployment schedule. All satellites capable of transmitting the L2C signal (all GPS satellites launched since 2005) began broadcasting pre-operational civil navigation (CNAV) messages in April 2014, and in December 2014

2482-490: The TU Vienna the method was named qGPS and post processing software was developed. GPS formerly included a feature called Selective Availability ( SA ) that added intentional, time varying errors of up to 100 meters (328 ft) to the publicly available navigation signals. This was intended to deny an enemy the use of civilian GPS receivers for precision weapon guidance. SA errors are actually pseudorandom, generated by

2555-674: The U.S. Air Force in April 2022. OCX Block 3F upgrades OCX with the ability to perform Launch & Checkout for Block IIIF satellites. Block IIIF satellites are expected to start launching in 2026. The OCX Block 3F contract, valued at $ 228 million, was awarded to Raytheon Intelligence and Space on 30 April 2021. GPS III Contingency Operations ("COps") is an update to the GPS Operational Control Segment, allowing OCS to provide Block IIF Position, Navigation, and Timing (PNT) features from GPS III satellites. The Contingency Operations effort enables GPS III satellites to participate in

2628-460: The U.S. Air Force started transmitting CNAV uploads on a daily basis. The L2C signal will be considered fully operational after it is being broadcast by at least 24 space vehicles, projected to happen in 2023. As of October 2017, L2C was being broadcast from 19 satellites; by June 2022 there were 24 satellites broadcasting this signal. The L2C signal is tasked with providing improved accuracy of navigation, providing an easy-to-track signal, and acting as

2701-481: The U.S. Space Force hopes to complete operational acceptance for all of OCX in 2027. OCX Block 0 provides the minimum subset of full OCX capabilities necessary to support launch and early on-orbit spacecraft bus checkout on GPS III space vehicles. Block 0 completed two cybersecurity testing events in April and May 2018 with no new vulnerabilities found. In June 2018, Block 0 had its third successful integrated launch rehearsal with GPS III. The U.S. Air Force accepted

2774-516: The United States Air Force in three separate phases, known as "blocks". The OCX blocks are numbered zero through two. With each block delivered, OCX gains additional functionality. In June 2016, the U.S. Air Force formally notified Congress the OCX program's projected program costs had risen above US$ 4.25 billion, thus exceeding baseline cost estimates of US$ 3.4 billion by 25%, also known as a critical Nunn-McCurdy breach. Factors leading to

2847-654: The ability to begin broadcasting the civilian L1C signal. In November 2016, the GAO reported that OCX Block 1 had become the primary cause for delay in activating the GPS III PNT mission. Block 1 completed the final iteration of Critical Design Review (CDR) in September 2018. Software development on Block 1 is scheduled to complete in 2019, after which the Block 1 software will undergo 2.5 years of system testing. OCX Block 2 upgrades OCX with

2920-452: The advanced M-code features for military users and the ability to monitor performance of the civilian signals. In March 2017, the contractor rephased its OCX delivery schedule so that Block 2 will now be delivered to the Air Force concurrently with Block 1. In July 2017, an additional nine months delay to the schedule was announced. According to the July 2017 program schedule, OCX will be delivered to

2993-399: The amount of daily time dilation experienced by GPS satellites relative to Earth we need to separately determine the amounts due to the satellite's velocity and altitude, and add them together. The amount due to velocity is determined using the Lorentz transformation . The time measured by an object moving with velocity v {\displaystyle v} changes by (the inverse of)

GPS Block III - Misplaced Pages Continue

3066-421: The antenna. Short delay reflections are harder to filter out because they interfere with the true signal, causing effects almost indistinguishable from routine fluctuations in atmospheric delay. Multipath effects are much less severe in moving vehicles. When the GPS antenna is moving, the false solutions using reflected signals quickly fail to converge and only the direct signals result in stable solutions. While

3139-495: The breach include "inadequate systems engineering at program inception", and "the complexity of cybersecurity requirements on OCX". In October 2016, the Department of Defense formally certified the program, a necessary step to allow development to continue after a critical breach. In July 2021, all OCX monitor station installations had been completed. OCX monitoring stations are expected to transition to operations in "early 2023," and

3212-417: The clocks on the satellites to gain 38.6 microseconds per day relative to the clocks on the ground. This is a difference of 4.465 parts in 10 . Without correction, errors of roughly 11.4 km/day would accumulate in the position. This initial pseudorange error is corrected in the process of solving the navigation equations . In addition, the elliptical, rather than perfectly circular, satellite orbits cause

3285-400: The coarse/acquisition (C/A) and precise codes are also shown in the table. These standard deviations are computed by taking the square root of the sum of the squares of the individual components (i.e., RSS for root sum squares). To get the standard deviation of receiver position estimate, these range errors must be multiplied by the appropriate dilution of precision terms and then RSS'ed with

3358-535: The delivery of OCX Block 0 in November 2017, and is used it to prepare for the first GPS launch in December 2018. As of May 2022, OCX Block 0 has successfully supported the launch and checkout of GPS III SV 01–05. OCX Block 1 is an upgrade to OCX Block 0, at which time the OCX system achieves Initial Operating Capability (IOC). Once Block 1 is deployed, OCX will for the first time be able to command and control both Block II and Block III GPS satellites, as well as support

3431-444: The desired frequency on Earth; specifically, at 10.22999999543 MHz instead of 10.23 MHz. Since the atomic clocks on board the GPS satellites are precisely tuned, it makes the system a practical engineering application of the scientific theory of relativity in a real-world environment. Placing atomic clocks on artificial satellites to test Einstein's general theory was proposed by Friedwardt Winterberg in 1955. To calculate

3504-596: The details below. Request from 172.68.168.132 via cp1112 cp1112, Varnish XID 358734512 Upstream caches: cp1112 int Error: 429, Too Many Requests at Fri, 29 Nov 2024 05:36:07 GMT Ionospheric delay User equivalent range errors (UERE) are shown in the table. There is also a numerical error with an estimated value,   σ n u m {\displaystyle \ \sigma _{num}} , of about 1 meter (3 ft 3 in). The standard deviations,   σ R {\displaystyle \ \sigma _{R}} , for

3577-469: The different delays in the L1 and L2 frequencies, and apply a more precise correction. This can be done in civilian receivers without decrypting the P(Y) signal carried on L2, by tracking the carrier wave instead of the modulated code. To facilitate this on lower cost receivers, a new civilian code signal on L2, called L2C, was added to the Block IIR-M satellites, which was first launched in 2005. It allows

3650-442: The directive, the induced error of SA was changed to add no error to the public signals (C/A code). Clinton's executive order required SA to be set to zero by 2006; it happened in 2000 once the U.S. military developed a new system that provides the ability to deny GPS (and other navigation services) to hostile forces in a specific area of crisis without affecting the rest of the world or its own military systems. On 19 September 2007,

3723-430: The distance increases, the errors at the two sites will not correlate as well, resulting in less precise differential corrections. During the 1990–91 Gulf War , the shortage of military GPS units caused many troops and their families to buy readily available civilian units. Selective Availability significantly impeded the U.S. military's own battlefield use of these GPS, so the military made the decision to turn it off for

SECTION 50

#1732858567114

3796-499: The duration of the war. In the 1990s, the FAA started pressuring the military to turn off SA permanently. This would save the FAA millions of dollars every year in maintenance of their own radio navigation systems. The amount of error added was "set to zero" at midnight on May 1, 2000 following an announcement by U.S. President Bill Clinton , allowing users access to the error-free L1 signal. Per

3869-423: The error in receiver position,   σ r c {\displaystyle \ \sigma _{rc}} , is computed by multiplying PDOP (Position Dilution Of Precision) by   σ R {\displaystyle \ \sigma _{R}} , the standard deviation of the user equivalent range errors.   σ R {\displaystyle \ \sigma _{R}}

3942-465: The existing GPS Coarse Acquisition (C/A) signal. Ultimately, this became known as the L2C signal because it is broadcast on the L2 frequency (1227.6 MHz). It can be transmitted by all block IIR-M and later design satellites. The original plan stated that until the new OCX (Block 1) system is in place, the signal would consist of a default message ("Type 0") that contains no navigational data. OCX Block 1 with

4015-569: The existing system led to the effort to modernize the GPS system. In 2000, the U.S. Congress authorized the effort, referred to as GPS III . The project involves new ground stations and new satellites, with additional navigation signals for both civilian and military users, and aims to improve the accuracy and availability for all users. Raytheon was awarded the Next Generation GPS Operational Control System (OCX) contract on 25 February 2010. The first satellite in

4088-467: The face of widely available DGPS was a common argument for turning off SA, and this was finally done by order of President Clinton in 2000. DGPS services are widely available from both commercial and government sources. The latter include WAAS and the U.S. Coast Guard's network of LF marine navigation beacons. The accuracy of the corrections depends on the distance between the user and the DGPS receiver. As

4161-576: The first satellite's planned 2014 launch, on 27 April 2016, SpaceX , in Hawthorne, California , was awarded a US$ 82.7 million firm-fixed-price contract for launch services to deliver a GPS III satellite to its intended orbit. The contract included launch vehicle production, mission integration, and launch operations for a GPS III mission, to be performed in Hawthorne, California; Cape Canaveral Air Force Station , Florida ; and McGregor, Texas . In December 2016,

4234-545: The gravitational potential well (i.e. closer to the attracting body) tick slower. Special relativity predicts that as the velocity of an object increases (in a given frame), its time slows down (as measured in that frame). For instance, the frequency of the atomic clocks moving at GPS orbital speeds will tick more slowly than stationary clocks by a factor of v 2 / 2 c 2 ≈ 10 − 10 {\displaystyle {v^{2}}/{2c^{2}}\approx 10^{-10}} where

4307-540: The late 2020s. It is defined in IS-GPS-800. Increased signal power at the Earth's surface: Researchers from The Aerospace Corporation confirmed that the most efficient means to generate the high-power M-code signal would entail a departure from full-Earth coverage, characteristic of all the user downlink signals up until that point. Instead, a high-gain antenna would be used to produce a directional spot beam several hundred kilometers in diameter. Originally, this proposal

4380-469: The local signal strength by 20 dB (10× voltage field strength, 100× power). A side effect of having two antennas is that, for receivers inside the spot beam, the GPS satellite will appear as two GPS signals occupying the same position. While the full-Earth M-code signal is available on the Block IIR-M satellites, the spot beam antennas will not be available until the Block III satellites are deployed. Like

4453-453: The military GPS signals. The M-code is transmitted in the same L1 and L2 frequencies already in use by the previous military code, the P(Y) code. The new signal is shaped to place most of its energy at the edges (away from the existing P(Y) and C/A carriers). Unlike the P(Y) code, the M-code is designed to be autonomous, meaning that users can calculate their positions using only the M-code signal. P(Y) code receivers must typically first lock onto

SECTION 60

#1732858567114

4526-413: The numerical error. Electronics errors are one of several accuracy-degrading effects outlined in the table above. When taken together, autonomous civilian GPS horizontal position fixes are typically accurate to about 15 meters (50 ft). These effects also reduce the more precise P(Y) code's accuracy. However, the advancement of technology means that in the present, civilian GPS fixes under a clear view of

4599-507: The orbital velocity is v = 4 km/s and c = the speed of light. The result is an error of about -7.2 μs/day in the satellite. The special relativistic effect is due to the constant movement of GPS clocks relative to the Earth-centered, non-rotating approximately inertial reference frame . In short, the clocks on the satellites are slowed down by the velocity of the satellite. This time dilation effect has been measured and verified using

4672-452: The other new GPS signals, M-code is dependent on OCX—specifically Block 2—which was scheduled to enter service in October 2016, but which was delayed until 2022, and that initial date did not reflect the two year first satellite launch delays expected by the GAO. Other M-code characteristics are: Safety of Life is a civilian-use signal, broadcast on the L5 frequency (1176.45 MHz). In 2009,

4745-582: The public C/A code was much better than originally expected (especially with DGPS ), so much so that the antispoof policy has relatively little effect on most civilian users. Turning off antispoof would primarily benefit surveyors and some scientists who need extremely precise positions for experiments such as tracking tectonic plate motion. The theory of relativity introduces several effects that need to be taken into account when dealing with precise time measurements. According to special relativity , time passes differently for objects in relative motion. That

4818-577: The series was projected to launch in 2014, but significant delays pushed the launch to December 2018. The tenth and final GPS Block III launch is projected in FY2026. Block III satellites use Lockheed Martin's A2100M satellite bus structure. The propellant and pressurant tanks are manufactured by Orbital ATK from lightweight, high-strength composite materials. Each satellite will carry eight deployable JIB antennas designed and manufactured by Northrop Grumman Astro Aerospace Already delayed significantly beyond

4891-515: The signals reception delay, due to the dry gases present at the troposphere (78% N2, 21% O2, 0.9% Ar...). Its effect varies with local temperature and atmospheric pressure in quite a predictable manner using the laws of the ideal gases. GPS signals can also be affected by multipath issues, where the radio signals reflect off surrounding terrain; buildings, canyon walls, hard ground, etc. These delayed signals cause measurement errors that are different for each type of GPS signal due to its dependency on

4964-401: The sky are on average accurate to about 5 meters (16 ft) horizontally. The term user equivalent range error (UERE) refers to the error of a component in the distance from receiver to a satellite. These UERE errors are given as ± errors thereby implying that they are unbiased or zero mean errors. These UERE errors are therefore used in computing standard deviations. The standard deviation of

5037-555: The slowing down of time near gravitating bodies. In case of the GPS, the receivers are closer to Earth than the satellites, causing the clocks at the altitude of the satellite to be faster by a factor of 5×10 , or about +45.8 μs/day. This gravitational frequency shift is measurable. During early development some believed that GPS would not be affected by general relativistic effects, but the Hafele–Keating experiment showed that it would be. Combined, these sources of time dilation cause

5110-464: The speed of the GPS signals as they pass through the Earth's atmosphere , especially the ionosphere. Correcting these errors is a significant challenge to improving GPS position accuracy. These effects are smallest when the satellite is directly overhead and become greater for satellites nearer the horizon since the path through the atmosphere is longer (see airmass ). Once the receiver's approximate location

5183-402: The time dilation and gravitational frequency shift effects to vary with time. This eccentricity effect causes the clock rate difference between a GPS satellite and a receiver to increase or decrease depending on the altitude of the satellite. To compensate for the discrepancy, the frequency standard on board each satellite is given a rate offset prior to launch, making it run slightly slower than

5256-412: The wavelength. A variety of techniques, most notably narrow correlator spacing, have been developed to mitigate multipath errors. For long delay multipath, the receiver itself can recognize the wayward signal and discard it. To address shorter delay multipath from the signal reflecting off the ground, specialized antennas (e.g., a choke ring antenna ) may be used to reduce the signal power as received by

5329-567: Was considered as a retrofit to the planned Block IIF satellites. Upon closer inspection, program managers realized that the addition of a large deployable antenna, combined with the changes that would be needed in the operational control segment, presented too great a challenge for the then existing system design. The GPS Operational Control Segment (OCS), consisting of a worldwide network of satellite operations centers, ground antennas and monitoring stations, provides Command and Control (C2) capabilities for GPS Block II satellites. The latest update to

#113886