Fire safety is the set of practices intended to reduce destruction caused by fire . Fire safety measures include those that are intended to prevent the ignition of an uncontrolled fire and those that are used to limit the spread and impact of a fire.

#834165

89-397: Fire safety measures include those that are planned during the construction of a building or implemented in structures that are already standing and those that are taught or provided to occupants of the building. Threats to fire safety are commonly referred to as fire hazards . A fire hazard may include a situation that increases the likelihood of a fire or may impede escape in the event

178-476: A designer , a contractor , a construction manager , or other advisors); such specialists are normally appointed for their expertise in project delivery and construction management and will help the owner define the project brief , agree on a budget and schedule , liaise with relevant public authorities, and procure materials and the services of other specialists (the supply chain , comprising subcontractors and materials suppliers). Contracts are agreed for

267-496: A risk control specialist whose primary job is to survey property to ensure compliance with NFPA standards, assess the current risk level of the property, and make recommendations to reduce the probability of fire loss. Careers in property risk management continue to grow and have been projected to grow 4 to 8% from 2018 to 2028 in the United States. Construction This is an accepted version of this page Construction

356-422: A "live" environment (where residents or businesses remain living in or operating on the site) requires particular care, planning and communication. When applicable, a proposed construction project must comply with local land-use planning policies including zoning and building code requirements. A project will normally be assessed (by the 'authority having jurisdiction', AHJ, typically the municipality where

445-651: A briefing in August 2013 which highlighted the significance of this issue. The briefing referred to several major factory fires, including the 2012 Dhaka garment factory fire in the Tazreen Fashion factory and other examples of fires in Bangladesh, Pakistan and elsewhere, compared the incidence of fire safety issues in a manufacturing context, and highlighted the need for buyers , suppliers and local fire safety enforcement agencies all to take action to improve fire safety within

534-445: A building or other asset that affect safety, including its use, expansion, structural integrity, and fire protection , usually require municipality approval. Depending on the type of project, mortgage bankers , accountants , and cost engineers may participate in creating an overall plan for the financial management of a construction project. The presence of the mortgage banker is highly likely, even in relatively small projects since

623-448: A building that they may have to go into. Using this, fire fighters can locate and avoid potential dangers such as hazardous material (hazmat) storage areas and flammable chemicals . In addition to this, fire safety plans can also provide specialized information that, in the case of a hospital fire, can provide information about the location of things like the nuclear medicine ward. In addition to this, fire safety plans also greatly improve

712-640: A business to lead both design and construction ( design-build ); or they may directly appoint a designer, contractor and specialist subcontractors ( construction management ). Some forms of procurement emphasize collaborative relationships ( partnering , alliancing) between the client, the contractor, and other stakeholders within a construction project, seeking to ameliorate often highly competitive and adversarial industry practices. DfMA (design for manufacture and assembly) approaches also emphasize early collaboration with manufacturers and suppliers regarding products and components. Construction or refurbishment work in

801-529: A child. One way a child can get used to or trust a firefighter is seeing a firefighter dress, step by step, seeing that they are a person wearing a uniform and protective equipment. Furthermore, being able to walk up and touch the firefighter can reassure the child that he or she is a real person. Elderly and disabled people are potentially at greater risk in emergency situations as a result of poor mobility or intellectual disability from age. Fire prevention outreach often involves ensuring that these groups have

890-718: A clearly defined plan of what to do in the event of an emergency and easy access to emergency exits . Elderly people are considered by the United States Fire Administration those to be the ages of 65 and older and those that have mental and physical impairments and may rely heavily on medical supplements to get through their everyday lives. In many jurisdictions, landlords are responsible for implementing fire prevention and fire safety measures in accordance with various laws. Landlords must perform regular fire safety risk assessments in order to identify if any properties could be potentially harmed by fires. Hording

979-479: A conceptual cost estimate performed by a building estimator . As portions of a project are completed, they may be sold, supplanting one lender or owner for another, while the logistical requirements of having the right trades and materials available for each stage of the building construction project carry forward. Public–private partnerships (PPPs) or private finance initiatives (PFIs) may also be used to help deliver major projects. According to McKinsey in 2019,

SECTION 10

#1732858830835

1068-533: A core part of fire prevention outreach involves encouraging people to ensure that they have an adequate number of smoke detectors installed in their home and how to maintain them. A wet-pipe sprinkler system is an automatic sprinkler system in which the supply valves are open and the system is charged with water. They are the quickest at getting water on the fire and are the simplest to maintain. Wet-pipe systems are installed where indoor temperatures can be maintained at or above 40 degrees Fahrenheit (4 °C). If

1157-454: A fire fighting force. Managers must ensure buildings comply with fire evacuation regulations , and that building features such as spray fireproofing remains undamaged. Fire policies may be in place to dictate training and awareness of occupants and users of the building to avoid obvious mistakes, such as the propping open of fire doors . Buildings, especially institutions such as schools, may conduct fire drills at regular intervals throughout

1246-590: A fire occurs. Fire safety is often a component of building safety . Those who inspect buildings for violations of the Fire Code and go into schools to educate children on fire safety topics are Fire Department members known as Fire Prevention Officers . The Chief Fire Prevention Officer or Chief of Fire Prevention will normally train newcomers to the Fire Prevention Division and may also conduct inspections or make presentations. Fire safety policies apply at

1335-440: A fire safety plan for buildings which fit the fire code occupancy type can result in a fine, and they are required for all buildings, such as commercial, industrial, assembly, etc. As previously stated, a copy of the approved fire safety plan shall be available for the responding fire department. This, however, is not always the case. Up until now, all fire plans were stored in paper form in the fire department. The problem with this

1424-706: A firefighter wears into a fire. A typical fire prevention division consists of a Chief Fire Prevention Officer and Fire Prevention Officers. Those in the Fire Prevention Division have their own insignia, such as epaulets with two thin bars that read "FIRE PREVENTION OFFICER" below them; crescents on their helmets; and collar pins. Depending on its budget, a division may have its own fire vehicle. Many fire departments observe "Fire Prevention Month" for all of October. Fire departments may visit schools, hang banners, give firehouse tours or hold open houses. Various fire organizations and fire professionals from all across

1513-555: A great fire hazard in severe cases because of the number of items that may pile up. Often the homes of hoarders will block exits that provide a means of escape for the occupants. Firefighters that are responding to an emergency in the home of hoarders may not be able to get to the occupants as quickly because they are obstructed from entering the building. Because of the increased fire load a hoarding environment creates, those who live in occupancies in close proximity may be affected because of amplified smoke and fire conditions. According to

1602-496: A routine duty of firefighters . The National Fire Protection Association identifies that 3 out of 5 deaths that occur during fires happen in homes that do not have smoke detectors installed or homes that do not have working smoke detectors. Research shows that the chances of dying in a fire are cut in half when smoke detectors are present. It is recognized that 74 percent of homes do have working smoke detectors installed. Generally taught more to adults (particularly homeowners ),

1691-433: A rule is inapplicable (the bridge design will not cause a collapse), or that the custom is no longer needed (acceptance of live-work spaces has grown in the community). During the construction of a building, a municipal building inspector usually inspects the ongoing work periodically to ensure that construction adheres to the approved plans and the local building code. Once construction is complete, any later changes made to

1780-482: A source of fascination for young children, the potential for accidents, as a result, is high. Fire prevention often aims to teach children not to play with fire so that they do not accidentally cause one. One of the most critical jobs of a firefighter is search and rescue . For young children, it is important that firefighters are seen as people they can follow and trust. A firefighter in bunker gear breathing with an air tank could be an unfamiliar sight, especially to

1869-518: A way to better protect them from fire emergencies. These are also target audience such as students that can benefit from the knowledge of how to prevent fires from starting in their homes. Children are a major target of fire prevention knowledge. Firefighters will often visit schools and teach students the basics of fire protection and fire safety , including how to evacuate from a burning building and how to prevent fires by avoiding dangerous activities such as playing with matches . Though fire can be

SECTION 20

#1732858830835

1958-511: Is a function of many fire departments . The goal of fire prevention is to educate the public on the precautions that should be taken to prevent potentially harmful fires from occurring. It is a proactive method of preventing fire-based emergencies and reducing the damage caused by them. Fire prevention education can take the form of videos, pamphlets, and banners. Often, the messages and lessons are simple tips. Many fire departments will have one or more Fire Prevention Officers, which may also be

2047-472: Is a general term meaning the art and science of forming objects , systems , or organizations . It comes from the Latin word constructio (from com- "together" and struere "to pile up") and Old French construction . To 'construct' is a verb : the act of building, and the noun is construction: how something is built or the nature of its structure. In its most widely used context, construction covers

2136-499: Is a model code adopted by the state or local jurisdiction and enforced by fire prevention officers within municipal fire departments . It is a set of rules prescribing minimum requirements to prevent fire and explosion hazards arising from storage, handling, or use of dangerous materials, or from other specific hazardous conditions. It complements the building code . The fire code is aimed primarily at preventing fires, ensuring that necessary training and equipment will be on hand, and that

2225-499: Is also the owner's responsibility to ensure that all visitors and staff are informed of what to do in case of fire. During a fire emergency, a copy of the approved fire safety plan must be available for the responding fire department's use. In the United Kingdom, a fire safety plan is called a fire risk assessment. Fire safety plans are a useful tool for fire fighters to have because they allow them to know critical information about

2314-410: Is often taught as part of fire protection education efforts as it is both a simple technique and an effective way of extinguishing burning clothing. It is particularly suited to children who may panic if their clothing catches fire and they do not know how to put it out. These groups of people are those that are considered at higher risk for fires and should are the target of fire prevention education in

2403-425: Is one of the biggest threats to property with losses adding up to billions of dollars in damages every year. In 2019 alone, the total amount of property damage resulting from fire was $ 14.8 billion in the United States. Insurance companies in the United States are not only responsible for financially covering fire loss but are also responsible for managing risk associated with it. Most commercial insurance companies hire

2492-468: Is that sorting and storing these plans is a challenge, and it is difficult for people to update their fire plans. As a result, only half of the required buildings have fire plans, and of those, only around 10 percent are up-to-date. This problem has been solved through the introduction of digital fire plans. These fire plans are stored in a database and can be accessed wirelessly on site by firefighters and are much simpler for building owners to update. Fire

2581-405: Is the discipline of safely and efficiently tearing down buildings and other artificial structures . Demolition contrasts with deconstruction , which involves taking a building apart while carefully preserving valuable elements for reuse purposes ( recycling – see also circular economy ). The output of the global construction industry was worth an estimated $ 10.8 trillion in 2017, and in 2018

2670-421: Is the disorder in which a person or group of people have a difficulty throwing away things they no longer need or parting away with any kind of possession because they believe that they will need to save them for something. Hoarding can range from mild cases that may not have a very heavy impact on a person’s life to severe cases where the daily function of the person is hindered by their actions Hoarding becomes

2759-937: Is the process of adding structures to areas of land, also known as real property sites. Typically, a project is instigated by or with the owner of the property (who may be an individual or an organisation); occasionally, land may be compulsorily purchased from the owner for public use. Residential construction may be undertaken by individual land-owners ( self-built ), by specialist housebuilders , by property developers , by general contractors , or by providers of public or social housing (e.g.: local authorities, housing associations ). Where local zoning or planning policies allow, mixed-use developments may comprise both residential and non-residential construction (e.g.: retail, leisure, offices, public buildings, etc.). Residential construction practices, technologies , and resources must conform to local building authority's regulations and codes of practice . Materials readily available in

Fire safety - Misplaced Pages Continue

2848-413: Is the second largest construction market with a 2018 output of $ 1.581 trillion. Construction is a major source of employment in most countries; high reliance on small businesses, and under-representation of women are common traits. For example: According to McKinsey research, productivity growth per worker in construction has lagged behind many other industries across different countries including in

2937-537: Is visually stimulating but the safety message is only transmitted orally. Other props are more elaborate, access more senses and increase the learning factor. They mix audio messages and visual cues with hands-on interaction. Examples of these include mobile trailer safety houses and tabletop hazard house simulators. Some fire prevention software is also being developed to identify hazards in a home. All programs tend to mix messages of general injury prevention, safety, fire prevention, and escape in case of fire. In most cases

3026-550: The Bronze Age , a class of professional craftsmen , like bricklayers and carpenters , appeared. Occasionally, slaves were used for construction work. In the Middle Ages , the artisan craftsmen were organized into guilds . In the 19th century, steam-powered machinery appeared, and later, diesel- and electric-powered vehicles such as cranes , excavators and bulldozers . Fast-track construction has been increasingly popular in

3115-531: The United States and in European countries. In the United States, construction productivity per worker has declined by half since the 1960s. The twenty-five largest countries in the world by construction GVA (2018) Some workers may be engaged in manual labour as unskilled or semi-skilled workers; they may be skilled tradespeople; or they may be supervisory or managerial personnel. Under safety legislation in

3204-599: The United States Fire Administration , the very young and the elderly are considered to be "at risk" populations. These groups represent approximately 33% of the population. Fire safety has been highlighted in relation to global supply chain management . Sedex, the Supplier Ethical Data Exchange, a collaborative platform for sharing ethical supply chain data, and Verité, Inc., a Massachusetts -based supply chain investigatory NGO , issued

3293-474: The architect , engineer or builder acts for the client as the project coordinator. They design the works, prepare specifications and design deliverables (models, drawings, etc.), administer the contract, tender the works, and manage the works from inception to completion. In parallel, there are direct contractual links between the client and the main contractor, who, in turn, has direct contractual relationships with subcontractors. The arrangement continues until

3382-414: The type of building , non-residential building construction can be procured by a wide range of private and public organisations, including local authorities, educational and religious bodies, transport undertakings, retailers, hoteliers, property developers, financial institutions and other private companies. Most construction in these sectors is undertaken by general contractors . Civil engineering covers

3471-581: The "vast majority of large construction projects go over budget and take 20% longer than expected". A construction project is a complex net of construction contracts and other legal obligations, each of which all parties must carefully consider. A contract is the exchange of a set of obligations between two or more parties, and provides structures to manage issues. For example, construction delays can be costly, so construction contracts set out clear expectations and clear paths to manage delays. Poorly drafted contracts can lead to confusion and costly disputes. At

3560-461: The 21st century. Some estimates suggest that 40% of construction projects are now fast-track construction. Broadly, there are three sectors of construction: buildings, infrastructure and industrial: The industry can also be classified into sectors or markets. For example, Engineering News-Record ( ENR ), a US-based construction trade magazine, has compiled and reported data about the size of design and construction contractors. In 2014, it split

3649-447: The 21st-century introduction of building information modeling (BIM) processes has involved the use of computer-generated models that can be used in their own right or to generate drawings and other visualisations as well as capturing non-geometric data about building components and systems. On some projects, work on-site will not start until design work is largely complete; on others, some design work may be undertaken concurrently with

Fire safety - Misplaced Pages Continue

3738-528: The United Kingdom, for example, construction workers are defined as people "who work for or under the control of a contractor on a construction site"; in Canada, this can include people whose work includes ensuring conformance with building codes and regulations, and those who supervise other workers. Laborers comprise a large grouping in most national construction industries. In the United States, for example, in May 2021

3827-413: The area generally dictate the construction materials used (e.g.: brick versus stone versus timber ). Costs of construction on a per square meter (or per square foot) basis for houses can vary dramatically based on site conditions, access routes, local regulations, economies of scale (custom-designed homes are often more expensive to build) and the availability of skilled tradespeople. Depending upon

3916-554: The asset as an advanced technological system requiring close integration of many sub-systems and their individual components, including sustainability. For buildings, building engineering is an emerging discipline that attempts to meet this new challenge. Traditionally, design has involved the production of sketches , architectural and engineering drawings , and specifications . Until the late 20th century, drawings were largely hand- drafted ; adoption of computer-aided design (CAD) technologies then improved design productivity, while

4005-419: The budget on the job, and a construction manager , design engineer , construction engineer or architect supervises it. Those involved with the design and execution must consider zoning requirements and legal issues, environmental impact of the project, scheduling , budgeting and bidding , construction site safety , availability and transportation of building materials , logistics, and inconvenience to

4094-447: The client enters into separate contracts with the designer (architect or engineer), a construction manager , and individual trade contractors . The client takes on the contractual role, while the construction or project manager provides the active role of managing the separate trade contracts, and ensuring that they complete all work smoothly and effectively together. This approach is often used to speed up procurement processes, to allow

4183-410: The client greater flexibility in design variation throughout the contract, to enable the appointment of individual work contractors, to separate contractual responsibility on each individual throughout the contract, and to provide greater client control. In the industrialized world, construction usually involves the translation of designs into reality. Most commonly (i.e.: in a design-bid-build project),

4272-487: The construction of a building and throughout its operating life. Building codes are enacted by local, sub-national, or national governments to ensure such features as adequate fire exits , signage, and construction details such as fire stops and fire rated doors, windows, and walls. Fire safety is also an objective of electrical codes to prevent overheating of wiring or equipment, and to protect from ignition by electrical faults. Fire codes regulate such requirements as

4361-665: The construction sector employed just over 7.5 million people, of whom just over 820,000 were laborers, while 573,000 were carpenters , 508,000 were electricians , 258,000 were equipment operators and 230,000 were construction managers. Like most business sectors, there is also substantial white-collar employment in construction – 681,000 US workers were recorded by the United States Department of Labor as in 'office and administrative support occupations' in May 2021. Large-scale construction requires collaboration across multiple disciplines. A project manager normally manages

4450-434: The correct type in accessible places, and proper storage and handling of flammable materials. Depending on local regulations, a fire inspection may result in a notice of required action, or closing of a building until it can be put into compliance with fire code requirements. Owners and managers of a building may implement additional fire policies. For example, an industrial site may designate and train particular employees as

4539-485: The country attend, along with a number of students and teachers. Songs and entertainment regarding fire safety are also available making fire education fun. Guest speakers are also a large part of fire protection week. Fire Prevention Week started in 1922 by the Nation Fire Protection Association. Having been started in 1922 and continued every year from then on, the observance of Fire Prevention Week

SECTION 50

#1732858830835

4628-750: The data into nine market segments: transportation, petroleum , buildings, power, industrial, water, manufacturing, sewage/waste, telecom , hazardous waste , and a tenth category for other projects. ENR used data on transportation, sewage, hazardous waste and water to rank firms as heavy contractors. The Standard Industrial Classification and the newer North American Industry Classification System classify companies that perform or engage in construction into three subsectors: building construction, heavy and civil engineering construction, and specialty trade contractors. There are also categories for professional services firms (e.g., engineering , architecture , surveying , project management ). Building construction

4717-426: The delivery of services by all businesses, alongside other detailed plans aimed at ensuring legal, timely, on-budget and safe delivery of the specified works. Design, finance, and legal aspects overlap and interrelate. The design must be not only structurally sound and appropriate for the use and location, but must also be financially possible to build, and legal to use. The financial structure must be adequate to build

4806-440: The design provided and must pay amounts that are legally owed. Legal structures integrate design with other activities and enforce financial and other construction processes. These processes also affect procurement strategies. Clients may, for example, appoint a business to design the project, after which a competitive process is undertaken to appoint a lead contractor to construct the asset ( design–bid–build ); they may appoint

4895-451: The design team is employed by (i.e. in contract with) the property owner. Depending upon the type of project, a design team may include architects , civil engineers , mechanical engineers , electrical engineers , structural engineers , fire protection engineers , planning consultants , architectural consultants, and archaeological consultants. A 'lead designer' will normally be identified to help coordinate different disciplinary inputs to

4984-821: The design, construction, and maintenance of the physical and naturally built environment , including public works such as roads, bridges, canals, dams, tunnels, airports, water and sewerage systems, pipelines, and railways. Some general contractors have expertise in civil engineering; civil engineering contractors are firms dedicated to work in this sector, and may specialise in particular types of infrastructure. Industrial construction includes offshore construction (mainly of energy installations: oil and gas platforms , wind power ), mining and quarrying , refineries , breweries , distilleries and other processing plants, power stations , steel mills , warehouses and factories . Some construction projects are small renovations or repair jobs, like repainting or fixing leaks, where

5073-443: The desire to prevent indisputably bad phenomena, e.g. explosions or bridge collapses. Other legal requirements come from malum prohibitum considerations, or factors that are a matter of custom or expectation, such as isolating businesses from a business district or residences from a residential district. An attorney may seek changes or exemptions in the law that governs the land where the building will be built, either by arguing that

5162-535: The early stages of on-site activity (for example, work on a building's foundations may commence while designers are still working on the detailed designs of the building's internal spaces). Some projects may include elements that are designed for off-site construction (see also prefabrication and modular building ) and are then delivered to the site ready for erection, installation or assembly. Once contractors and other relevant professionals have been appointed and designs are sufficiently advanced, work may commence on

5251-553: The fire department representative is regarded as the expert and is expected to present information in a manner that is appropriate for each age group. The US industry standard that outlines the recommended qualifications for fire safety educators is NFPA 1035: Standard for Professional Qualifications for Public Fire and Life Safety Educator, which includes the requirements for Fire and Life Safety Educator Levels I, II, and III; Public Information Officer; and Juvenile Firesetter Intervention Specialist Levels I and II. According to

5340-412: The first feature of the permanent structure has been put in place, such as pile driving, or the pouring of slabs or footings. Commissioning is the process of verifying that all subsystems of a new building (or other assets) work as intended to achieve the owner's project requirements and as designed by the project's architects and engineers. A period after handover (or practical completion) during which

5429-468: The maximum occupancy for buildings such as theatres or restaurants, for example. Fire codes may require portable fire extinguishers within a building, or may require permanently installed fire detection and suppression equipment such as a fire sprinkler system and a fire alarm system . Local authorities charged with fire safety may conduct regular inspections for such items as usable fire exit and proper exit signage, functional fire extinguishers of

SECTION 60

#1732858830835

5518-854: The most preventable of all. Most fires that involve smoking start inside the home, when a smoker does not properly dispose of their ashes or cigarette butts, they can fall into things such as couches and chairs which quickly ignite. Smokers who discard their cigarettes and ashes in the trash can start fires that lead to other collateral damage. Many fire departments have fire prevention divisions, which consist of groups of firefighters who conduct building inspections to make sure they are compliant with fire codes ; they also visit schools and daycare centers to make presentations about arson , malicious false alarms , and fire safety. Fire Prevention Officers may also conduct tours of their fire house for visitors. They demonstrate what each of their apparatuses does, and sometimes will don their bunker gear to show what

5607-686: The original design basis of the building, including the basic plan set out by the architect , is not compromised. The fire code also addresses inspection and maintenance requirements of various fire protection equipment in order to maintain optimal active fire protection and passive fire protection measures. A typical fire safety code includes administrative sections about the rule-making and enforcement process, and substantive sections dealing with fire suppression equipment, particular hazards such as containers and transportation for combustible materials, and specific rules for hazardous occupancies, industrial processes, and exhibitions. Sections may establish

5696-476: The outside temperature is below freezing and the interior temperature is less than 40 degrees Fahrenheit, the steel sprinkler piping, which rapidly conducts heat and rapidly loses it, will cause the pipes to freeze. The frozen area may be isolated and near an opening or uninsulated portion of the building which could be enough to put the whole system out of service. Much of fire prevention education also involves advice on how to reduce false alarms . False alarms have

5785-486: The overall budget is adequate, presenting a temporary issue. Cost overruns with government projects have occurred when the contractor identified change orders or project changes that increased costs, which are not subject to competition from other firms as they have already been eliminated from consideration after the initial bid. Fraud is also an issue of growing significance within construction. Large projects can involve highly complex financial plans and often start with

5874-441: The overall design. This may be aided by integration of previously separate disciplines (often undertaken by separate firms) into multi-disciplinary firms with experts from all related fields, or by firms establishing relationships to support design-build processes. The increasing complexity of construction projects creates the need for design professionals trained in all phases of a project's life-cycle and develop an appreciation of

5963-409: The owner may act as designer, paymaster and laborer for the entire project. However, more complex or ambitious projects usually require additional multi-disciplinary expertise and manpower, so the owner may commission one or more specialist businesses to undertake detailed planning, design, construction and handover of the work. Often the owner will appoint one business to oversee the project (this may be

6052-405: The owner may identify any shortcomings in relation to the building specification ('defects'), with a view to the contractor correcting the defect. Maintenance involves functional checks, servicing, repairing or replacing of necessary devices, equipment, machinery , building infrastructure, and supporting utilities in industrial, business, governmental, and residential installations. Demolition

6141-498: The owner of the building is responsible for the preparation of a fire safety plan. Buildings with elaborate emergency systems may require the assistance of a fire protection consultant. After the plan has been prepared, it must be submitted to the Chief Fire Official or authority having jurisdiction for approval. Once approved, the owner is responsible for implementing the fire safety plan and training all staff in their duties. It

6230-478: The owner's equity in the property is the most obvious source of funding for a building project. Accountants act to study the expected monetary flow over the life of the project and to monitor the payouts throughout the process. Professionals including cost engineers, estimators and quantity surveyors apply expertise to relate the work and materials involved to a proper valuation. Financial planning ensures adequate safeguards and contingency plans are in place before

6319-409: The potential to waste manpower and resources, which may be needed desperately during a real emergency. In addition, firefighters responding to calls in fire engines are at increased risk of traffic collisions when driving under emergency conditions . In 2008 the state of New York found that 18% of firefighter deaths in the line of duty had occurred whilst responding to calls. Stop, drop and roll

6408-595: The processes involved in delivering buildings , infrastructure , industrial facilities, and associated activities through to the end of their life. It typically starts with planning , financing , and design that continues until the asset is built and ready for use. Construction also covers repairs and maintenance work, any works to expand, extend and improve the asset, and its eventual demolition , dismantling or decommissioning . The construction industry contributes significantly to many countries' gross domestic products ( GDP ). Global expenditure on construction activities

6497-414: The project brief and then selects a preferred supplier. Often this will be a consortium involving a design firm and a contractor (sometimes more than one of each). In the United States, departments of transportation usually use design-build contracts as a way of progressing projects where states lack the skills or resources, particularly for very large projects. In a construction management arrangement,

6586-435: The project is ready for handover. Design-build became more common from the late 20th century, and involves the client contracting a single entity to provide design and construction. In some cases, the design-build package can also include finding the site, arranging funding and applying for all necessary statutory consents. Typically, the client invites several Design & Build (D&B) contractors to submit proposals to meet

6675-405: The project is started, and ensures that the plan is properly executed over the life of the project. Construction projects can suffer from preventable financial problems. Underbids happen when builders ask for too little money to complete the project. Cash flow problems exist when the present amount of funding cannot cover the current costs for labour and materials; such problems may arise even when

6764-518: The project site. Typically, a construction site will include a secure perimeter to restrict unauthorised access, site access control points, office and welfare accommodation for personnel from the main contractor and other firms involved in the project team, and storage areas for materials, machinery and equipment. According to the McGraw-Hill Dictionary of Architecture and Construction's definition, construction may be said to have started when

6853-745: The project will be located) for its potential impacts on neighbouring properties, and upon existing infrastructure (transportation, social infrastructure, and utilities including water supply, sewerage, electricity, telecommunications, etc.). Data may be gathered through site analysis , site surveys and geotechnical investigations . Construction normally cannot start until planning permission has been granted, and may require preparatory work to ensure relevant infrastructure has been upgraded before building work can commence. Preparatory works will also include surveys of existing utility lines to avoid damage-causing outages and other hazardous situations. Some legal requirements come from malum in se considerations, or

6942-628: The public, including those caused by construction delays . Some models and policy-making organisations promote the engagement of local labour in construction projects as a means of tackling social exclusion and addressing skill shortages. In the UK, the Joseph Rowntree Foundation reported in 2000 on 25 projects which had aimed to offer training and employment opportunities for locally based school leavers and unemployed people. The Foundation published "a good practice resource book" in this regard at

7031-420: The requirements for obtaining permits and specific precautions required to remain in compliance with a permit. For example, a fireworks exhibition may require an application to be filed by a licensed pyrotechnician, providing the information necessary for the issuing authority to determine whether safety requirements can be met. Once a permit is issued, the same authority (or another delegated authority) may inspect

7120-460: The safety of fire fighters. According to FEMA, 16 percent of all fire fighter deaths in 2002 occurred due to a structural collapse or because the fire fighter got lost. Fire safety plans can outline any possible structural hazards, as well as give the fire fighter knowledge of where he is in the building. In North America alone, there are around 8 million buildings that legally require a fire safety plan, be it due to provincial or state law. Not having

7209-647: The same time. Use of local labour and local materials were specified for the construction of the Danish Storebaelt bridge , but there were legal issues which were challenged in court and addressed by the European Court of Justice in 1993. The court held that a contract condition requiring use of local labour and local materials was incompatible with EU treaty principles . Later UK guidance noted that social and employment clauses, where used, must be compatible with relevant EU regulation. Employment of local labour

7298-736: The site and monitor safety during the exhibition, with the power to halt operations, when unapproved practices are seen or when unforeseen hazards arise. Most U.S. fire departments have fire safety education programs . Fire prevention programs may include distribution of smoke detectors , visiting schools to review key topics with the students and implementing nationally recognized programs such as NFPA S "Risk Watch" and "Learn not to burn". Other programs or props can be purchased by fire departments or community organizations. These are usually entertaining and designed to capture children's attention and relay important messages. Props include those that are mostly auditory, such as puppets and robots. The prop

7387-473: The start of a project, legal advisors seek to identify ambiguities and other potential sources of trouble in the contract structures, and to present options for preventing problems. During projects, they work to avoid and resolve conflicts that arise. In each case, the lawyer facilitates an exchange of obligations that matches the reality of the project. Design-bid-build is the most common and well-established method of construction procurement. In this arrangement,

7476-463: The supply chains for ready-made garments and other products. The briefing recommended that buyers seek greater visibility of fire safety and other risks across the supply chain and identify opportunities to improve standards: "buyers can encourage change through more responsible and consistent practices". A fire safety plan is required by all North American national, state and provincial fire codes based on building use or occupancy types. Generally,

7565-550: The world health organization consensus there are around 1.3 billion smokers worldwide, 80 percent of those smokers are identified as those that live in low income area and middle income areas. While smoking is a commonly accepted thing that many people do in their daily lives out in public or in their own home it is important for those that smoke to know the fire risk they present. Approximately 500 smokers as well as nonsmokers are killed in fires that start because of improperly discarded cigarettes and ashes. Fires caused by smoking are

7654-422: The year. Beyond individual buildings, other elements of fire safety policies may include technologies such as wood coatings, education and prevention, preparedness measures, wildfire detection and suppression , and ensuring geographic coverage of local and sufficient fire extinguishing capacities. Some common fire hazards are: In the United States, the fire code (also fire prevention code or fire safety code)

7743-588: Was about $ 4 trillion in 2012. In 2022, expenditure on the construction industry exceeded $ 11 trillion a year, equivalent to about 13 percent of global GDP . This spending was forecasted to rise to around $ 14.8 trillion in 2030. The construction industry promotes economic development and brings many non-monetary benefits to many countries, but it is one of the most hazardous industries. For example, about 20% (1,061) of US industry fatalities in 2019 happened in construction. The first huts and shelters were constructed by hand or with simple tools. As cities grew during

7832-455: Was forecast to rise to $ 12.9 trillion by 2022, and to around $ 14.8 trillion in 2030. As a sector, construction accounts for more than 10% of global GDP (in developed countries , construction comprises 6–9% of GDP), and employs around 7% of the total employed workforce around the globe (accounting for over 273 million full- and part-time jobs in 2014). Since 2010, China has been the world's largest single construction market. The United States

7921-584: Was identified as one of several social issues which could potentially be incorporated in a sustainable procurement approach, although the interdepartmental Sustainable Procurement Group recognised that "there is far less scope to incorporate [such] social issues in public procurement than is the case with environmental issues". There are many routes to the different careers within the construction industry. There are three main tiers of construction workers based on educational background and training, which vary by country: Fire prevention Fire prevention