Misplaced Pages

East London Transit

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#945054

59-572: East London Transit (ELT) is a part-segregated bus rapid transit , operated as part of the London Buses network. The East London Transit opened in phases between 2010 and 2013. The scheme for this system was developed by Transport for London to meet the existing and anticipated demand for public transport in East London caused by the Thames Gateway redevelopment, and has been planned to allow for

118-611: A "BHLS" (stands for Bus with a High Level of Service ). The term transitway was originated in 1981 with the opening of the OC Transpo transitway in Ottawa , Ontario , Canada. Critics have charged that the term "bus rapid transit" has sometimes been misapplied to systems that lack most or all the essential features which differentiate it from conventional bus services. The term " bus rapid transit creep " has been used to describe severely degraded levels of bus service which fall far short of

177-485: A BRT system to 35,000 passengers per hour. The single-lane roads of Istanbul Metrobus had been frequently blocked by Phileas buses breaking down, causing delays for all the buses in a single direction. After focusing on Mercedes-Benz buses, capacity increased to 45,000 pph. Light rail, by comparison, has reported passenger capacities between 3,500 pph (mainly street running) to 19,000 pph (fully grade-separated ). Becontree tube station Becontree

236-602: A consultation was held. The extended service started on 7 September 2013. In 2020, the route EL1 was extended from the Barking Reach terminus to further serve the new housing developments that had been built in the area. The route was extended to terminate at the newly built Northgate Road on the far east side of the development and was routed to pass the new Barking Riverside station and Barking Riverside pier that opened in 2022. Route EL3 also has two schoolday journeys that are extended beyond Mallards Road to Northgate Road, however

295-425: A conventional bus system. Typically, a BRT system includes roadways that are dedicated to buses , and gives priority to buses at intersections where buses may interact with other traffic; alongside design features to reduce delays caused by passengers boarding or leaving buses, or paying fares . BRT aims to combine the capacity and speed of a light rail transit (LRT) or mass rapid transit (MRT) system with

354-428: A low-noise, low-emissions "hush mode" (in which the diesel engine operates but does not exceed idle speed ) when underground. The need to provide electric power in underground environments brings the capital and maintenance costs of such routes closer to those of light rail, and raises the question of building or eventually converting to light rail. In Seattle, the downtown transit tunnel was retrofitted for conversion to

413-556: A more direct route between the two cities. The station was not built at the time. The London, Midland and Scottish Railway (LMSR) took ownership of the London, Tilbury and Southend line in 1923 and the station opened as Gale Street Halt on 28 June 1926 to serve the new Becontree Estate and subsequent residential areas. Initially, there were no roads leading to the station. In 1929, the company proposed quadrupling their line between Barking and Upminster and electrifying one pair of tracks for

472-548: A new route EL4 was proposed between Barking Riverside and Becontree Heath bus station via Becontree Underground station . In a council meeting in July 2023, Barking & Dagenham council had talked with TfL about extending the proposed route to Romford . Additional proposals include services to Gallions Reach for the Docklands Light Railway , East Ham , Silvertown and Stratford . The East London Transit formed part of

531-783: A plan for a much larger Thames Gateway Transit service, which would use the Thames Gateway Bridge to connect to the Greenwich Waterfront Transit on the south side of the River Thames. However, construction of the bridge and the Greenwich busway was cancelled in 2008. Bus rapid transit Bus rapid transit ( BRT ), also referred to as a busway or transitway , is a trolleybus , electric bus and public transport bus service system designed to have much more capacity , reliability , and other quality features than

590-415: A possible future upgrade to tram operation. It connects National Rail , London Underground , Elizabeth line and London Overground stations in the London boroughs of Havering , Redbridge , and Barking and Dagenham with major population centers, such as Barking Riverside , that are currently only served by bus routes. The first stage of the scheme opened on 20 February 2010. There are proposals for

649-449: A result, less forced ventilation will be required in tunnels to achieve the same air quality. Another alternative is to use electric propulsion, which Seattle 's Metro Bus Tunnel and Boston 's Silver Line Phase II implemented. In Seattle, dual-mode (electric/diesel electric) buses manufactured by Breda were used until 2004, with the center axle driven by electric motors obtaining power from trolley wires through trolley poles in

SECTION 10

#1732848675946

708-404: A shared hybrid-bus and light-rail facility in preparation for Seattle's Central Link Light Rail line, which opened in July 2009. In March 2019, expansion of the light rail in the tunnel moved busses back to surface streets. Bi-articulated battery electric buses cause no problems in tunnels anymore but provide BRT capacity. A BRT system can be measured by a number of factors. The BRT Standard

767-419: A static map, featuring services like trip planning, live arrival and departure times, up-to-date line schedules, local station maps, service alerts, and advisories that may affect one's current trip. Transit and Moovit are examples of apps that are available in many cities around the world. Some operators of bus rapid transit systems have developed their own apps, like Transmilenio. These apps even include all

826-477: A total daily ridership), in the developing world this capacity constraint (or rumor of a capacity constraint) was a significant argument in favor of heavy rail metro investments in some venues. When TransMilenio opened in 2000, it changed the paradigm by giving buses a passing lane at each station stop and introducing express services within the BRT infrastructure. These innovations increased the maximum achieved capacity of

885-662: A variety of extensions. The East London Transit (ELT) was developed by Transport for London as an integrated public transport system in conjunction with the London Borough of Barking and Dagenham and the London Borough of Redbridge and other stakeholders. There are three routes in the East London Transit system. EL1 replaced the previous route 369 bus service and operated 24 hours a day, initially between Thames View Estate and Ilford, and has since been extended from Thames View Estate to Barking Riverside . EL2 operated over

944-487: Is a London Underground station located to the south of Becontree in the London Borough of Barking and Dagenham , east London. It is on the District line between Upney to the west and Dagenham Heathway to the east. It is 9.1 kilometres (5.7 mi) along the line from the eastern terminus at Upminster and 25.1 kilometres (15.6 mi) to Earl's Court in central London where the line divides into numerous branches. It

1003-581: Is a risk of a dangerous gap between bus and platform , and is even greater due to the nature of bus operations. Kassel curbs or other methods may be used to ease quick and safe alignment of the BRT vehicle with a platform. A popular compromise is low-floor buses with a low step at the door, which can allow easy boarding at low-platform stops compatible with other buses. This intermediate design may be used with some low- or medium-capacity BRT systems. The MIO system in Santiago de Cali, Colombia, pioneered in 2009

1062-512: Is in London fare zone 5 . London Bus routes 62 and 145 serve the station. Becontree is on the Upminster part of the line between Upney and Dagenham Heathway . The typical off-peak service in trains per hour (tph) is: The station is said to be haunted by a faceless woman with long blonde hair that several staff members have sighted. A possible connection to this could be that in 1958 there

1121-472: Is in London fare zone 5 . The station was originally opened as Gale Street Halt in 1926 by the London, Midland and Scottish Railway on the existing route from Fenchurch Street in London toward Southend. The station was renamed and completely rebuilt in 1932 with an additional pair of platforms to serve the electric District Railway (now the District line) local service. Main-line services ceased to call at

1180-569: Is less complex than rail maintenance. Moreover, buses are more flexible than rail vehicles, because a bus route can be altered, either temporarily or permanently, to meet changing demand or contend with adverse road conditions with comparatively little investment of resources. The first use of a protected busway was the East Side Trolley Tunnel in Providence , Rhode Island . It was converted from trolley to bus use in 1948. However,

1239-459: Is today over 18.5 miles long. The OC Transpo BRT system in Ottawa , Canada, was introduced in 1983. The first element of its BRT system was dedicated bus lanes through the city centre, with platformed stops. The introduction of exclusive separate busways (termed 'Transitway') occurred in 1983. By 1996, all of the originally envisioned 31 km Transitway system was in operation; further expansions were opened in 2009, 2011, and 2014. As of 2019,

SECTION 20

#1732848675946

1298-559: The BRT Standard promoted by the Institute for Transportation and Development Policy (ITDP) and other organizations. Compared to other common transit modes such as light rail transit (LRT), bus rapid transit (BRT) service is attractive to transit authorities because it does not cost as much to establish and operate: no track needs to be laid, bus drivers typically require less training and less pay than rail operators, and bus maintenance

1357-431: The District line . The station was rebuilt and new platforms were constructed for the new pair of tracks. Gale Street Halt was renamed as Becontree and the new station building to the designs of the architect William Henry Hamlyn opened on 18 July 1932, with electrified District line services starting operation 2 months after on 12 September. In addition to the start of electrified services, two new adjacent stations on

1416-605: The Indonesian capital city . Bus rapid transit is a mode of mass rapid transit (MRT) and describes a high-capacity urban public-transit system with its own right of way , vehicles at short headways , platform-level boarding, and preticketing. The expression "BRT" is mainly used in the Americas and China; in India, it is called "BRTS" (BRT System); in Europe it is often called a "busway" or

1475-906: The MIO in Cali since November 2008, Metrolinea in Bucaramanga since December 2009, Megabús in Pereira since May 2009. This design is also used in Johannesburg 's Rea Vaya . The term "station" is more flexibly applied in North America and ranges from enclosed waiting areas ( Ottawa and Cleveland ) to large open-sided shelters ( Los Angeles and San Bernardino ). A unique and distinctive identity can contribute to BRT's attractiveness as an alternative to driving cars, (such as Viva, Max, TransMilenio, Metropolitano, Metronit, Select) marking stops and stations as well as

1534-435: The 15,000 to 25,000 range. Research of the Institute for Transportation and Development Policy (ITDP) shows a capacity ranking of MRT modes, based on reported performance of 14 light rail systems, 14 heavy rail systems (just 1-track + 3 2-track-systems "highest capacity") and 56 BRT systems. The study concludes, that BRT-"capacity on TransMilenio exceeds all but the highest capacity heavy rail systems, and it far exceeds

1593-412: The District line named Upney and Heathway (now Dagenham Heathway) opened. By 1935, there were approximately 18,000 homes in this area, and together with developers, Dagenham Council added more than 5000 homes until 1965. By 1940, the population grew to 116,000. This particular section of the line between Barking and Upminster was popular among commuters getting to West and East Ham which reduced

1652-656: The LT&;SR service was withdrawn in 1962. One of the platforms is fenced off from the westbound District line platform. The single-storey brick station buildings are of typical 1930s design which are also constructed at Dagenham East , Hornchurch and Upminster at the time. Station refurbishment works were completed by Metronet in 2006, where heritage features were restored, CCTV equipment replaced and PA system enhanced. New wall tiles and ceilings were clad, and new tactile strips, customer Help Points and better lighting were installed. Whilst these works were done between 2005 and 2006,

1711-639: The United States, BRT began in 1977, with Pittsburgh's South Busway , operating on 4.3 miles (6.9 km) of exclusive lanes. Its success led to the Martin Luther King Jr. East Busway in 1983, a fuller BRT deployment including a dedicated busway of 9.1 miles (14.6 km), traffic signal preemption , and peak service headway as low as two minutes. After the opening of the West Busway , 5.1 miles (8.2 km) in length in 2000, Pittsburgh's Busway system

1770-419: The buses. Large cities usually have big bus networks. A map showing all bus lines might be incomprehensible, and cause people to wait for low-frequency buses that may not even be running at the time they are needed. By identifying the main bus lines having high-frequency service, with a special brand and separate maps, it is easier to understand the entire network. Public transit apps are more convenient than

1829-585: The center of major arterial roads, in 1980 the Curitiba system added a feeder bus network and inter-zone connections, and in 1992 introduced off-board fare collection, enclosed stations, and platform-level boarding. Other systems made further innovations, including platooning (three buses entering and leaving bus stops and traffic signals at once) in Porto Alegre , and passing lanes and express service in São Paulo . In

East London Transit - Misplaced Pages Continue

1888-591: The central part of the Transitway has been converted to light rail transit , due to the downtown section being operated beyond its designed capacity. In 1995, Quito , Ecuador, opened MetrobusQ its first BRT trolleybuses in Quito , using articulated trolleybuses. The TransMilenio in Bogotá , Colombia, opening in 2000, was the first BRT system to combine the best elements of Curitiba's BRT with other BRT advances, and achieved

1947-568: The concept while sketching on the back of an envelope. The town was designed around the transport system, with most residents no more than five minutes walking distance, or 500 yards (460 m), from the Busway. The second BRT system in the world was the Rede Integrada de Transporte (RIT, integrated transportation network ), implemented in Curitiba , Brazil, in 1974. The Rede Integrada de Transporte

2006-483: The estate and then rejoining the current line to Barking. This was not supported by Ilford and Barking councils, and was abandoned due to problems with Ilford authorities and the need to electrify the Barking to Upminster line. There was also a deferred plan for a Kearney Monorail tube connecting Becontree to the city. The station has four platforms, of which two are used by the District line and another two are disused since

2065-458: The evenings and on Sunday; this gives a combined frequency of ten buses an hour over the core route from Barking to Thames View Estate during the day. Phase 1 commenced on 20 February 2010. Construction of phase 2 began in 2011 and was completed in 2013. It received funding from the Homes and Communities Agency . In 2013 it was proposed to extend route EL1 from Thames View Estate to Barking Reach and

2124-683: The first BRT system in the world was the Runcorn Busway in Runcorn , England. First conceived in the Runcorn New Town Masterplan in 1966, it opened for services in October 1971 and all 22 kilometres (14 mi) were operational by 1980. The central station is at Runcorn Shopping City where buses arrive on dedicated raised busways to two enclosed stations. Arthur Ling , Runcorn Development Corporation's Master Planner, said that he had invented

2183-611: The flexibility, lower cost and simplicity of a bus system. The world's first BRT system was the Runcorn Busway in Runcorn New Town, England, which entered service in 1971. As of March 2018 , a total of 166 cities in six continents have implemented BRT systems, accounting for 4,906 km (3,048 mi) of BRT lanes and about 32.2 million passengers every day. The majority of these are in Latin America , where about 19.6 million passengers ride daily, and which has

2242-442: The following features: Bus-only lanes make for faster travel and ensure that buses are not delayed by mixed traffic congestion . A median alignment bus-only keeps buses away from busy curb-side side conflicts, where cars and trucks are parking, standing and turning. Separate rights of way may be used such as the completely elevated Xiamen BRT . Transit malls or 'bus streets' may also be created in city centers. Fare prepayment at

2301-662: The green phase or reducing the red phase in the required direction compared to the normal sequence. Prohibiting turns may be the most important measure for moving buses through intersections. The station platforms for BRT systems should be level with the bus floor for quick and easy boarding, making it fully accessible for wheelchairs, disabled passengers and baby strollers, with minimal delays. High-level platforms for high-floored buses makes it difficult to have stops outside dedicated platforms, or to have conventional buses stop at high-level platforms, so these BRT stops are distinct from street-level bus stops. Similar to rail vehicles, there

2360-628: The highest capacity and highest speed BRT system in the world. In January 2004 the first BRT in Southeast Asia, TransJakarta , opened in Jakarta , Indonesia. As of 2015 , at 210 kilometres (130 mi), it is the longest BRT system in the world. Africa's first BRT system was opened in Lagos , Nigeria, in March 2008 but is considered a light BRT system by many people. Johannesburg , South Africa, BRT Rea Vaya ,

2419-447: The highest light rail system." Performance data of 84 systems show More topical are these BRT data After the first BRT system opened in 1971, cities were slow to adopt BRT because they believed that the capacity of BRT was limited to about 12,000 passengers per hour traveling in a given direction during peak demand. While this is a capacity rarely needed in the US (12,000 is more typical as

East London Transit - Misplaced Pages Continue

2478-474: The most cities with BRT systems, with 54, led by Brazil with 21 cities. The Latin American countries with the most daily ridership are Brazil (10.7 million), Colombia (3.0 million), and Mexico (2.5 million). In the other regions, China (4.3 million) and Iran (2.1 million) stand out. Currently, TransJakarta is the largest BRT network in the world, with about 251.2 kilometres (156.1 mi) of corridors connecting

2537-478: The need for bus services. Other reasons were a shortened travel time to Charing Cross of up to 35 minutes and the good availability of trains servicing this part of the line. The slow tracks on the former LT&SR line to Upminster were shared with steam locomotive hauled goods and passenger services, until 1961 when the District line took over exclusive use of the DC electrified lines. LT&SR services ceased to stop at

2596-858: The right side of the street. Groups of criteria form the BRT Standard 2016, which is updated by the Technical Committee of the BRT Standard. High-capacity vehicles such as articulated or even bi-articulated buses may be used, typically with multiple doors for fast entry and exit. Double-decker buses or guided buses may also be used. Advanced powertrain control may be used for a smoother ride. Bottleneck BRT stations typically provide loading areas for simultaneous boarding and alighting of buses through multiple doors coordinated via displays and loudspeakers. An example of high-quality stations include those used on TransMilenio in Bogotá since December 2000,

2655-433: The route still terminates at Mallards Road at all other times. Route EL1 operates via these primary locations: Route EL2 operates via these primary locations: Route EL3 operates via these primary locations: All services are operated by Go-Ahead London using New Routemasters from River Road garage . In February 2017, Blue Triangle commenced a new contract on routes EL1 and EL2 along with new route EL3 (which replaced

2714-771: The schedules and live arrival times and stations for buses that feed the BRT, like the SITP (Sistema Integrado de Transporte Público or Public Transit Integrated System) in Bogotá . A special issue arises in the use of buses in metro transit structures. Since the areas where the demand for an exclusive bus right-of-way are apt to be in dense downtown areas where an above-ground structure may be unacceptable on historic, logistic, or environmental grounds, use of BRT in tunnels may not be avoidable. Since buses are usually powered by internal combustion engines , bus metros raise ventilation issues similar to those of motor vehicle tunnels. Powerful fans typically exchange air through ventilation shafts to

2773-452: The similarly routed 387). These routes gradually introduced New Routemasters. Early proposals for extensions have included Gants Hill for the Central line , Rainham , Barkingside , Romford , Elm Park and Collier Row and Harold Wood . Havering London Borough Council has voiced support for the extension to Rainham through London Riverside . In a bus network development paper from 2016,

2832-424: The station in the 1960s, leaving only two platforms in operation. In 1858 a line through East Ham was constructed to provide a faster connection between Barking and the city of London, which connects to the London and Blackwall Railway route to Fenchurch Street. Between 1885 and 1888, the London, Tilbury and Southend Railway (LT&SR) constructed a line between Barking and Pitsea via Upminster to provide

2891-497: The station on 15 June 1962. The railway here was crossed by Becontree Estate Railway , a temporary railway constructed as part of the building of the Becontree housing estate which operated between 1921 and 1934. Becontree estate was constructed in the 1920s by C. J. Wills and Sons Ltd., with the remainder completed in 1938. The estate was once to be served by high speed tramways, with services starting from Ilford, branching out into

2950-560: The station was closed on several weekends whereby replacement buses operated to Dagenham Heathway station. The station is located on the west side of Gale Street. It serves the residential area of Becontree, which is to the north of the station. There is a commercial area to the south of the station, while Parsloes Park is to the north. Nearby landmarks include a driving school, the Jo Richardson Community School , Roding Primary School and The James Campbell Primary School. It

3009-492: The station, instead of on board the bus, eliminates the delay caused by passengers paying on board. Fare machines at stations also allow riders to purchase multi-ride stored-value cards and have multiple payment options. Prepayment also allows riders to board at all doors, further speeding up stops. Prohibiting turns for traffic across the bus lane significantly reduces delays to the buses. Bus priority will often be provided at signalized intersections to reduce delays by extending

SECTION 50

#1732848675946

3068-404: The subway, and with the rear axle driven by a conventional diesel powertrain on freeways and streets. Boston is using a similar approach, after initially using trolleybuses pending delivery of the dual-mode vehicles that was completed in 2005. In 2004, Seattle replaced its "Transit Tunnel" fleet with diesel-electric hybrid buses, which operate similarly to hybrid cars outside the tunnel and in

3127-417: The surface; these are usually as remote as possible from occupied areas, to minimize the effects of noise and concentrated pollution. A straightforward way to reduce air quality problems is to use internal combustion engines with lower emissions. The 2008 Euro V European emission standards set a limit on carbon monoxide from heavy-duty diesel engines of 1.5 g/kWh, one third of the 1992 Euro I standard. As

3186-428: The theoretical maximum throughput measured in passengers per hour per direction (PPHPD) for a single traffic lane is some 150,000 passengers per hour (250 passengers per vehicle, one vehicle every 6 seconds). In real world conditions BRT Rio (de Janeiro, BRS Presidente Vargas) with 65.000 PPHPD holds the record, TransMilenio Bogotá and Metrobus Istanbul perform 49,000 – 45,000 PPHPD, most other busy systems operating in

3245-499: The use of dual buses, with doors on the left side of the bus that are located at the height of high-level platforms, and doors on the right side that are located at curb height. These buses can use the main line with its exclusive lanes and high level platforms, located on the center of the street and thus, boarding and leaving passengers on the left side. These buses can exit the main line and use normal lanes that share with other vehicles and stop at regular stations located on sidewalks on

3304-550: The whole length of the phase 1 route between Dagenham Dock and Ilford until March 2016, when it was amended to run to Becontree Heath after leaving Barking. EL3 replaced the previous route 387 operated between Little Heath and Barking Riverside, the route change through Barking Town Centre. As a result of these changes, route 179 was withdrawn between Ilford and Barking and was diverted to terminate at Ilford (Hainault Street) bus terminus. Each route operates five buses an hour on Monday to Saturday daytimes and three buses an hour during

3363-438: Was developed by the Institute for Transportation and Development Policy (ITDP) to score BRT corridors, producing a list of rated BRT corridors meeting the minimum definition of BRT. The highest rated systems received a "gold" ranking. The latest edition of the standard was published in 2016. Other metrics used to evaluate BRT performance include: Based on this data, the minimum headway and maximum current vehicle capacities,

3422-490: Was inspired by the previous transport system of the National Urban Transport Company of Peru (In Spanish: ENATRU ), which only had quick access on Lima downtown , but it would not be considered BRT itself. Many of the elements that have become associated with BRT were innovations first suggested by Carlos Ceneviva, within the team of Curitiba Mayor Jaime Lerner . Initially just dedicated bus lanes in

3481-661: Was the first true BRT in Africa, in August 2009, carrying 16,000 daily passengers. Rea Vaya and MIO (BRT in Cali , Colombia, opened 2009) were the first two systems to combine full BRT with some services that also operated in mixed traffic, then joined the BRT trunk infrastructure. In 2017 Marrakesh , Morocco, opened its first BRT Marrakesh trolleybus system (BHNS De Marrakesh) trolleybuses Corridors of 8 km (5.0 mi), of which 3 km (1.9 mi) of overhead wiring for operation as trolleybus. BRT systems normally include most of

#945054