The Altamont Pass wind farm is located in the Altamont Pass of the Diablo Range in Northern California . It is one of the earliest wind farms in the United States . The first wind turbines were placed on the Altamont in the early 1980s by Fayette Manufacturing Corporation , on land owned by cattle rancher Joe Jess. The wind farm is composed of 4,930 relatively small wind turbines of various types, making it at one time the largest wind farm in the world in terms of capacity.
55-516: Challicum Hills Wind Farm is a wind farm encompassed by 35 (1.5 MW) NEG NM 64 wind turbines , with a total generating capacity of 52.5 MW of electricity . The wind farm is near Ararat in western Victoria , Australia . The power station was commissioned in August 2003 and is in a long term Power Purchase Agreement (PPA) with Origin Energy. The wind farm is owned and operated by Pacific Blue . Part of
110-445: A capacity of over 6,000 MW by 2012, with a goal of 20,000 MW by 2020. As of December 2020, the 1218 MW Hornsea Wind Farm in the UK is the largest offshore wind farm in the world . Individual wind turbine designs continue to increase in power , resulting in fewer turbines being needed for the same total output. Because they require no fuel, wind farms have less impact on
165-464: A drop in tourism. Some critics claim that wind farms have adverse health effects, but most researchers consider these claims to be pseudoscience (see wind turbine syndrome ). Wind farms can interfere with radar, although in most cases, according to the US Department of Energy, "siting and other mitigations have resolved conflicts and allowed wind projects to co-exist effectively with radar". Location
220-515: A list of capable areas is constructed, the list is refined based on long term wind measurements, among other environmental or technical limiting factors such as proximity to load and land procurement. Many independent system operators (ISOs) in the United States such as the California ISO and Midcontinent ISO use interconnection request queues to allow developers to propose a new generation for
275-428: A maximum capacity of 1.65 MW, for a total of 24.75 MW. The 15 on-shore turbines are spaced 326 metres (1,070 ft) apart, each 70 metres (230 ft) high, with 41 metres (135 ft) long blades, with a rotor diameter of 82 metres (269 ft) and a wind swept area of 5,281 square metres (56,840 sq ft). Phase II was completed in August 2008, and added 5 more wind turbines with the same capacity, and brought
330-430: A minimum of 3.5 times the turbine's rotor diameter of clear space between each adjacent turbine's respective spatial envelope. Closer spacing is possible depending on the turbine model, the conditions at the site, and how the site will be operated. Airflows slow as they approach an obstacle, known as the 'blockage effect', reducing available wind power by 2% for the turbines in front of other turbines. The capacity of
385-472: A role as a prominent backdrop in several feature films of the mid- and late 1980s, including the 1985 film based on the Bret Easton Ellis novel Less than Zero , featuring Andrew McCarthy and Robert Downey, Jr. Modern wind turbines kill about 0.279 birds per GWh generated, in comparison to 0.200 birds per GWh by coal power plants without climate change effects, and 5.18 birds per GWh with. However,
440-499: A single wind turbine for testing purposes have been built. One such installation is Østerild Wind Turbine Test Field . Airborne wind farms have been envisaged. Such wind farms are a group of airborne wind energy systems located close to each other connected to the grid at the same point. Wind farms consisting of diverse wind turbines have been proposed in order to efficiently use wider ranges of wind speeds. Such wind farms are proposed to be projected under two criteria: maximization of
495-457: A specific given area and grid interconnection. These request queues have both deposit costs at the time of request and ongoing costs for the studies the ISO will make for up to years after the request was submitted to ascertain the viability of the interconnection due to factors such as ATC. Larger corporations who can afford to bid the most queues will most likely have market power as to which sites with
550-465: A total capacity of 539 MW. An important limiting factor of wind power is variable power generated by wind farms. In most locations the wind blows only part of the time, which means that there has to be back-up capacity of dispatchable generation capacity to cover periods that the wind is not blowing. To address this issue it has been proposed to create a " supergrid " to connect national grids together across western Europe , ranging from Denmark across
605-640: A tunnel like pass towards areas of lower pressure and flatter land. Passes used for wind farms like the San Gorgonio Pass and Altamont Pass are known for their abundant wind resource capacity and capability for large-scale wind farms. These types of passes were the first places in the 1980s to have heavily invested large-scale wind farms after approval for wind energy development by the U.S. Bureau of Land Management. From these wind farms, developers learned much about turbulence and crowding effects of large-scale wind projects, which were previously unresearched, in
SECTION 10
#1733105479713660-803: Is a German wind turbine manufacturer. In the end of 2011 49.6 MW was expected to be completed. The Pakistani government also issued a Letter Of Interest in a 100 MW Wind power plant to FFCEL. The Pakistani government had plans to achieve electric power generation of up to 2500 MW by the end of 2015 from wind energy to bring down an energy shortage. Currently four wind farms are operational (Fauji Fertilizer 49.5 MW (subsidiary of Fauji Foundation), Three Gorges 49.5 MW, Zorlu Energy Pakistan 56 MW, Sapphire Wind Power Company Limited 52.6 MW) and six are under construction phase ( Master Wind Energy Limited 52.6 MW, Sachal Energy Development Limited 49.5 MW, Yunus Energy Limited 49.5 MW, Gul Energy 49.5 MW, Metro Energy 49.5 MW, Tapal Energy) and were expected to achieve COD in 2017. In
715-481: Is a group of wind turbines in the same location used to produce electricity . Wind farms vary in size from a small number of turbines to several hundred wind turbines covering an extensive area. Wind farms can be either onshore or offshore . Many of the largest operational onshore wind farms are located in China, India, and the United States. For example, the largest wind farm in the world , Gansu Wind Farm in China had
770-416: Is critical to the overall success of a wind farm. Additional conditions contributing to a successful wind farm location include: wind conditions, access to electric transmission, physical access, and local electricity prices. The faster the average wind speed, the more electricity the wind turbine will generate, so faster winds are generally economically better for wind farm developments. The balancing factor
825-408: Is crucial to determining site potential in order to finance the project. Local winds are often monitored for a year or more, detailed wind maps are constructed, along with rigorous grid capability studies conducted, before any wind generators are installed. The wind blows faster at higher altitudes because of the reduced influence of drag. The increase in velocity with altitude is most dramatic near
880-449: Is finding areas with adequate available transfer capability (ATC). ATC is the measure of the remaining capacity in a transmission system available for further integration of two interconnected areas without significant upgrades to existing transmission lines and substations. Significant equipment upgrades have substantial costs, potentially undermining the viability of a project within a location, regardless of wind resource availability. Once
935-427: Is now composed of five constituent wind farms. The Golden Hills Wind Farm is the largest constituent wind farm, as well as being the only one located south of Altamont Pass . In 2015, NextEra – which owns some of the 100kW Kenetech/US Windpower older turbines installed during the 1980s – agreed to remove the machines and replace them with 48 new model wind turbines. A power purchase agreement has been completed to power
990-580: Is pursuing several proposed locations in the Great Lakes , including the suspended Trillium Power Wind 1 approximately 20 km from shore and over 400 MW in size. Other Canadian projects include one on the Pacific west coast. In 2010, there were no offshore wind farms in the United States, but projects were under development in wind-rich areas of the East Coast, Great Lakes, and Pacific coast; and in late 2016
1045-465: Is that strong gusts and high turbulence require stronger more expensive turbines, otherwise there is a risk of damage. The average power in the wind is not proportional to the average wind speed. For this reason, the ideal wind conditions would be strong but consistent winds with low turbulence coming from a single direction. Mountain passes are ideal locations for wind farms under these conditions. Mountain passes channel wind, blocked by mountains, through
1100-556: Is the first wind power plant in Pakistan. The wind farm is being developed in Jhimpir, by Zorlu Energy Pakistan the local subsidiary of a Turkish company. The total cost of the project is $ 136 million.[3] Completed in 2012, it has a total capacity of around 56MW. Fauji Fertilizer Company Energy Limited, has built a 49.5 MW wind Energy Farm at Jhimpir. Contract of supply of mechanical design was awarded to Nordex and Descon Engineering Limited. Nordex
1155-470: The Block Island Wind Farm was commissioned. Installation and service / maintenance of off-shore wind farms are a challenge for technology and economic operation of a wind farm. As of 2015 , there are 20 jackup vessels for lifting components, but few can lift sizes above 5 MW. Service vessels have to be operated nearly 24/7 (availability higher than 80% of time) to get sufficient amortisation from
SECTION 20
#17331054797131210-721: The Western Cape region. These include the 100 MW Sere Wind Farm and the 138 MW Gouda Wind Facility . Most future wind farms in South Africa are earmarked for locations along the Eastern Cape coastline. Eskom has constructed one small scale prototype windfarm at Klipheuwel in the Western Cape and another demonstrator site is near Darling with phase 1 completed. The first commercial wind farm, Coega Wind Farm in Port Elisabeth,
1265-556: The Altamont Pass was crowded with over 26 different windfarms. The increased visibility from the nearby I-580 freeway, which had once sparked the media and community's interest, was now widely regarded as a growing eyesore. Successful windfarms at the Altamont Pass encouraged the development of further industrial wind areas in southern California . These windfarms, in the Tehachapi Pass , led to wider recognition, after windmills played
1320-678: The Altamont hills alongside the Altamont Pass portion of the I-580 freeway, the appearance of the modern windmill generated media excitement and public interest. This portion of the freeway was an increasingly used corridor for growing the bedroom communities of Tracy, Lodi and Modesto serving the Bay Area of California (Oakland, San Francisco and Pleasanton). Daily commuters crowded past the otherwise barren cattle ranches for several hours each day. By 1985,
1375-574: The Asian Development Bank amounting to $ 300 million to invest in renewable energies. From this funding as well as $ 80 million from the Sri Lankan Government and $ 60 million from France's Agence Française de Développement, Sri Lanka was expected to build two 100MW wind farms from 2017 due to be completed by late 2020 in northern Sri Lanka. As of September 2015, a number of sizable wind farms have been constructed in South Africa mostly in
1430-540: The Chinese wind industry appeared unaffected by the financial crisis of 2007–2008 , according to industry observers. According to the Global Wind Energy Council , the development of wind energy in China, in terms of scale and rhythm, is unparalleled in the world. The National People's Congress permanent committee passed a law that requires the Chinese energy companies to purchase all the electricity produced by
1485-539: The Gharo wind corridor, two wind farms (Foundation Energy 1 & II each 49.5 MW) are operational while two wind farms Tenaga Generasi Limited 49.5 MW and HydroChina Dawood Power Pvt. Limited 49.5 are under construction and expected to achieve COD in 2017. According to a USAID report, Pakistan has the potential of producing 150,000 megawatts of wind energy, of which the Sindh corridor can produce 40,000 megawatts. The Philippines has
1540-559: The Netherlands, Norway, Sweden and the United Kingdom, with a combined operating capacity of 2,396 MW. More than 100 GW (or 100,000 MW) of offshore projects are proposed or under development in Europe. The European Wind Energy Association set a target of 40 GW installed by 2020 and 150 GW by 2030. As of 2017 , The Walney Wind Farm in the United Kingdom is the largest offshore wind farm in
1595-468: The U.S. due to the lack of operational wind farms large enough to conduct these types of studies. Usually sites are screened on the basis of a wind atlas , and validated with on-site wind measurements via long term or permanent meteorological-tower data using anemometers and wind vanes . Meteorological wind data alone is usually not sufficient for accurate siting of a large wind power project. Collection of site specific data for wind speed and direction
1650-736: The country's economy. With its large land mass and long coastline, China has exceptional wind resources. Researchers from Harvard and Tsinghua University have found that China could meet all of their electricity demands from wind power by 2030. By the end of 2008, at least 15 Chinese companies were commercially producing wind turbines and several dozen more were producing components. Turbine sizes of 1.5 MW to 3 MW became common. Leading wind power companies in China were Goldwind , Dongfang Electric , and Sinovel along with most major foreign wind turbine manufacturers. China also increased production of small-scale wind turbines to about 80,000 turbines (80 MW) in 2008. Through all these developments,
1705-571: The country's power. In Japan's electricity sector , wind power generates a small proportion of the country's electricity. It has been estimated that Japan has the potential for 144 gigawatts (GW) for onshore wind and 608 GW of offshore wind capacity. As of 2023, the country had a total installed capacity of 5.2 GW. As of 2018, government targets for wind power deployment were relatively low when compared to other countries, at 1.7% of electricity production by 2030. The 117 MW Tafila Wind Farm in Jordan
Challicum Hills Wind Farm - Misplaced Pages Continue
1760-474: The energy produced by the farm and minimization of its costs. The Australian Greens have been significant supporters of Australian wind farms, however the party's previous leader Bob Brown and former leader Richard Di Natale have now both expressed concerns about environmental aspects of wind turbines, particularly the potential danger they impose for birds. In July 2022 Brazil reached 22 GW of installed wind power in about 750 wind farms In 2021 Brazil
1815-412: The environment than many other forms of power generation and are often referred to as a good source of green energy . Wind farms have, however, been criticised for their visual impact and impact on the landscape. Typically they need to be spread over more land than other power stations and need to be built in wild and rural areas, which can lead to "industrialization of the countryside", habitat loss , and
1870-716: The first windfarm in Southeast Asia. Located in the northern part of the country's biggest island, Luzon, alongside the seashore of Bangui , Ilocos Norte . The wind farm uses 20 units of 70-metre (230 ft) high Vestas V82 1.65 MW wind turbines, arranged on a single row stretching along a nine-kilometre shoreline off Bangui Bay, facing the South China Sea . Phase I of the NorthWind power project in Bangui Bay consists of 15 wind turbines, each capable of producing electricity up to
1925-568: The highest European wind power production with 43 TWh compared to Germany's 35 TWh. In addition to the ' London Array ', an off-shore wind farm in the Thames Estuary in the United Kingdom , with a capacity of 630 MW (the world's largest off-shore wind farm when built), other large wind farms in Europe include Fântânele-Cogealac Wind Farm near Constanța , Romania with 600 MW capacity, and Whitelee Wind Farm near Glasgow , Scotland which has
1980-510: The installed capacity, from wind energy, from 280 MW in 2010 to 2000 MW in 2020. Pakistan has wind corridors in Jhimpir, Gharo and Keti Bundar in Sindh province and is currently developing wind power plants in Jhimpir and Mirpur Sakro (District Thatta). The government of Pakistan decided to develop wind power energy sources due to problems supplying energy to the southern coastal regions of Sindh and Balochistan. The Zorlu Energy Putin Power Plant
2035-631: The local wildlife, according to a report done for the Bonneville Power Administration . As of 2010, a settlement has been reached between the Audubon Society , Californians for Renewable Energy and NextEra Energy Resources, who operate some 5,000 turbines in the area. Nearly half of the smaller turbines will be replaced by newer, more bird-friendly models. The project was expected to be complete by 2015 and included $ 2.5 million for raptor habitat restoration. The Altamont Pass Wind Farm
2090-445: The most resource and opportunity are eventually developed. After the deadline to request a place in the queue has passed, many firms will withdraw their requests after gauging the competition in order to make back some of the deposit for each request that is determined too risky in comparison to other larger firms' requests. A major factor in wind-farm design is the spacing between the turbines, both laterally and axially (with respect to
2145-409: The prevailing winds). The closer the turbines are together, the more the upwind turbines block wind from their rear neighbors (wake effect). However, spacing turbines far apart increases the costs of roads and power cables, and raises the amount of land needed to install a specific capacity of turbines. As a result of these factors, turbine spacing varies by site. Generally speaking, manufacturers require
2200-517: The profits flow into a community fund that supports local projects. This article about a building or structure in Victoria (state) is a stub . You can help Misplaced Pages by expanding it . This article about an Australian power station is a stub . You can help Misplaced Pages by expanding it . This article about a wind farm is a stub . You can help Misplaced Pages by expanding it . Wind farm A wind farm or wind park , or wind power plant ,
2255-585: The renewable energy sector. In 2011 the European Union had a total installed wind capacity of 93,957 MW. Germany had the third-largest capacity in the world (after China and the United States), with an installed capacity of 29,060 MW at the end of 2011. Spain had 21,674 MW, and Italy and France each had between 6,000 and 7,000 MW. By January 2014, the UK installed capacity was 10,495 MW. But energy production can be different from capacity – in 2010, Spain had
Challicum Hills Wind Farm - Misplaced Pages Continue
2310-428: The same amount of electricity as one modern turbine. These outdated turbines are set 60-80 feet tall, the same height as bird flight paths. Considered largely obsolete, these numerous small turbines are as of 2009 being gradually replaced with much larger and more cost-effective units. The larger units rotate at a much lower angular frequency to the previous turbines, and, being elevated higher, are less hazardous to
2365-561: The small turbines used at Altamont in 2007 were dangerous to various raptors that hunt California ground squirrels in the area. In that year, 1,300 raptors were killed annually, among them 70 federally protected golden eagles . In total, 4,700 birds were killed annually. The effects of the Altamont Pass wind farm on wildlife were exacerbated by its proximity to bird migration routes, its craggy landscape ideal for birds of prey, and its predominant outdated turbine designs (as of 2013). As of 2013 it takes 15-34 Altamont Pass turbines to produce
2420-571: The southern North Sea to England and the Celtic Sea to Ireland, and further south to France and Spain especially in Higueruela which was for some time the biggest wind farm in the world. The idea is that by the time a low pressure area has moved away from Denmark to the Baltic Sea the next low appears off the coast of Ireland. Therefore, while it is true that the wind is not blowing everywhere all of
2475-410: The surface and is affected by topography, surface roughness, and upwind obstacles such as trees or buildings. At altitudes of thousands of feet/hundreds of metres above sea level, the power in the wind decreases proportional to the decrease in air density. Often in heavily saturated energy markets, the first step in site selection for large-scale wind projects, before wind resource data collection,
2530-677: The time, it will tend to be blowing somewhere. In July 2022, Seagreen , the world's deepest fixed-bottom wind farm, became operative. Located 26 miles off the Angus coastline, in Scotland, it has 114 turbines that generate 1.1 gigawatts (GW) of electricity. India has the fifth largest installed wind power capacity in the world. As of 31 March 2014, the installed capacity of wind power was 21136.3 MW mainly spread across Tamil Nadu state (7253 MW). Wind power accounts nearly 8.5% of India's total installed power generation capacity, and it generates 1.6% of
2585-701: The total capacity to 33 MW. All 20 turbines describes a graceful arc reflecting the shoreline of Bangui Bay. Adjacent municipalities of Burgos and Pagudpud followed with 50 and 27 wind turbines with a capacity of 3 MW each for a Total of 150 MW and 81 MW respectively. Two other wind farms were built outside of Ilocos Norte, the Pililla Wind Farm in Rizal and the Mindoro Wind Farm near Puerto Galera in Oriental Mindoro . Sri Lanka has received funding from
2640-607: The wind accelerates over a ridge. The additional wind speeds gained in this way can increase energy produced because more wind goes through the turbines. The exact position of each turbine matters, because a difference of 30 metres could potentially double output. This careful placement is referred to as 'micro-siting'. Europe is the leader in offshore wind energy, with the first offshore wind farm (Vindeby) being installed in Denmark in 1991. As of 2010, there were 39 offshore wind farms in waters off Belgium, Denmark, Finland, Germany, Ireland,
2695-457: The wind turbines. Therefore, special fast service vehicles for installation (like Wind Turbine Shuttle) as well as for maintenance (including heave compensation and heave compensated working platforms to allow the service staff to enter the wind turbine also at difficult weather conditions) are required. So-called inertial and optical based Ship Stabilization and Motion Control systems (iSSMC) are used for that. Experimental wind farms consisting of
2750-535: The world at 659 MW , followed by the London Array (630 MW) also in the UK. Offshore wind turbines are less obtrusive than turbines on land, as their apparent size and noise is mitigated by distance. Because water has less surface roughness than land (especially deeper water), the average wind speed is usually considerably higher over open water. Capacity factors (utilisation rates) are considerably higher than for onshore locations. The province of Ontario, Canada
2805-410: The world in wind energy production, going from 2,599 MW of capacity in 2006 to 62,733 MW at the end of 2011. However, the rapid growth outpaced China's infrastructure and new construction slowed significantly in 2012. At the end of 2009, wind power in China accounted for 25.1 gigawatts (GW) of electricity generating capacity, and China has identified wind power as a key growth component of
SECTION 50
#17331054797132860-463: The world's first wind farm was 0.6 MW, produced by 20 wind turbines rated at 30 kilowatts each, installed on the shoulder of Crotched Mountain in southern New Hampshire in December 1980. Onshore turbine installations in hilly or mountainous regions tend to be on ridges generally three kilometres or more inland from the nearest shoreline. This is done to exploit the topographic acceleration as
2915-487: Was developed by the Belgian company Electrawinds. Altamont Pass wind farm Altamont Pass is still one of the largest concentration of wind turbines in the world, with a capacity of 576 megawatts (MW), producing about 125 MW on average and 1.1 terawatt-hours (TWh) yearly. They were installed after the 1970s energy crisis in response to favorable tax policies for investors. When the first windfarms appeared in 1981, on
2970-399: Was inaugurated in December 2015, and is the first large scale wind farm project in the region. Morocco has undertaken a vast wind energy program, to support the development of renewable energy and energy efficiency in the country. The Moroccan Integrated Wind Energy Project, spanning over a period of 10 years with a total investment estimated at $ 3.25 billion, will enable the country to bring
3025-501: Was the 7th country in the world in terms of installed wind power (21 GW), and the 4th largest producer of wind energy in the world (72 TWh), behind China, USA and Germany. The largest wind farm in the country is the Complexo eólico Lagoa dos Ventos in the State of Piauí , onshore with a current capacity of 1,000 MW being expanded to 1,500 MW. In just five years, China leapfrogged the rest of