Bukit Beruntung is a town in Hulu Selangor District , Selangor , Malaysia . It spans over 2,900 hectares between Serendah and Batang Kali , bordered by the Rantau Panjang forest reserve. The planned city was originally developed by Europlus Corporation and is home to the Bukit Beruntung Golf & Country Club.
49-546: The land clearing for the construction of Bukit Beruntung Golf & Country Club and the houses surrounding the area happened around April 1992, with the earliest golf courses completed in late 1993. It is accessible via a Bukit Beruntung Interchange 118 of the PLUS Expressway [REDACTED] North–South Expressway Northern Route , as well as the Federal Route 3208 Jalan Bukit Beruntung trunk road from Sg. Choh (after
98-409: A closed toll collection system , is a system used on some toll roads in which a user pays a toll rate based on the distance traveled from their originating entrance to their destination exit. The correct toll is determined by requiring all users to take a ticket from a machine or from an attendant when entering the system. The ticket prominently displays the location (or exit number) from which it
147-652: A dangerous stretch. There are two dangerous stretches along the expressway, the Changkat Jering-Ipoh North (Jelapang) and Gopeng-Tapah sections. The Gopeng Rural Transformation Centre (RTC) Rest and Service Area (RSA) is the first expressway RTC rest and service area in Malaysia. The RTC rest and service area is located near Simpang Pulai Layby north bound of the North–South Expressway Northern Route. During workdays or peak hours. There
196-400: A few local roads with traffic lights . South from the town are several rural villages with residential roads intersecting with the expressway. Just to the north of the town of Jitra , route 1 continues southwards while the expressway bends southeast to bypass the said town, marking the end of the concurrency and the start of the controlled-access highway proper. Just to the east of the town
245-511: A non-stop route across Ipoh . This was achieved through the construction of two local-express lanes for each side, which are only accessible via Exit 138 Ipoh South Exit (for northbound traffic) and Exit 141 Ipoh North Exit (for southbound traffic). The toll plazas in Ipoh were therefore relocated at each ends of the local-express lanes. Upon approaching either of the two exits, the exit signs showing Ipoh are written in large typefaces in contrast with
294-433: Is a community that works together in ensuring the safety of its surroundings and the environment. There is a TESCO warehouse, a golf and country club, a main local supermarket, gas stations, clinics, elementary schools, secondary schools and a Public Bank branch. It has the main mosque as well as other places of worship for other community members. Local stores and a wet market are an important part of this community as well. It
343-557: Is a developing community as there is a lot of lands left unowned. North%E2%80%93South Expressway Northern Route The North–South Expressway Northern Route is an interstate controlled-access highway running parallel to the northwestern coast of Peninsular Malaysia . The 460-kilometre (290-mile) expressway forms the north section of the North–South Expressway , passing through the northwestern states of Kedah , Penang , Perak and Selangor . The expressway begins at
392-481: Is a restricted routes at the North–South Expressway Northern Route from Rawang (South) to Bukit Lanjan. Heavy vehicles (except buses and tankers) with laden and unladen heavy vehicles weighing 10,000 kg or more are not allowed to enter the expressway between 6:30 am until 9:30 am on Monday to Friday (except public holidays). A compound fines will be issued to heavy vehicles which flouted the rule. The Jelapang and Ipoh South toll plazas were demolished in 2009 to make
441-638: Is an incident. They are also given auxiliary police powers. PLUS also provides traffic information to commuters through variable-message signs located on some sections of the expressway, and on Twitter @plustrafik in Malay . Major radio stations in Peninsular Malaysia also broadcast traffic updates for the expressway. The North–South Expressway northern route has 12 full rest areas (which includes one overhead bridge restaurant), 23 laybys and one vista point (scenic area) total along both directions of
490-459: Is meant for commuters to enjoy the scenery at that location. Laybys are found every 25 to 50 kilometres, while full rest areas are found every 80 to 100 kilometres. The only vista point on this expressway is in Ipoh. The North–South Expressway northern route, being part of the larger North–South Expressway network, was constructed in phases simultaneously with the south section . The first segment on this expressway, from Bukit Kayu Hitam to Jitra,
539-628: Is scheduled to end on 31 December 2038. The main features of the expressway include the Penang Bridge which is Malaysia's second longest bridge, Sungai Perak Bridge ( Jambatan Sultan Azlan Shah ), Menora Tunnel and the North-South Expressway Monument at Rawang Rest and Service Area (R&R) (North bound). The Gopeng-Tapah section is the most expensive section of the North-South Expressway network. It can be considered
SECTION 10
#1732852446360588-654: Is the Jitra Toll Plaza, where a one-time payment is made. After the toll plaza the expressway continues southwest, entering the district of Kota Setar and interchanging with route 1 near Kepala Batas . Shortly south is the Hutan Kampung Toll Plaza, where ticket tolling begins. The expressway runs east of the city of Alor Setar , where it makes two interchanges with the Sultanah Bahiyah Highway (route 255) , both leading to aforementioned city. Past
637-656: Is toll-free due to heavy usage by local commuters to access Penang Bridge . In the vicinity of Ipoh, the section between Jelapang and Ipoh South features a local-express lane system. This is the longest expressway in Peninsular Malaysia. The expressway begins at the Malaysia–Thailand border at Bukit Kayu Hitam in Kedah , where the road continues as Phetkasem Road in Thailand . The expressway proceeds southwards through
686-1201: The Bukit Kayu Hitam checkpoint in Kedah, where the Malaysia–Thailand border lies, and ends at Bukit Lanjan in Selangor state where the expressway interchanges with the New Klang Valley Expressway . The expressway is operated by PLUS Expressways . The expressway runs in a north–south direction close to the northwestern coast of the peninsula, connecting several major towns including Bukit Kayu Hitam , Changlun , Jitra , Alor Setar , Pendang , Gurun , Sungai Petani , Butterworth , George Town , Seberang Perai , Juru , Bukit Tambun , Simpang Empat , Nibong Tebal , Bandar Baharu , Bagan Serai , Taiping , Changkat Jering , Kuala Kangsar , Ipoh , Simpang Pulai , Gopeng , Tapah , Bidor , Sungkai , Slim River , Behrang , Tanjung Malim , Lembah Beringin , Bukit Tagar , Bukit Beruntung , and Sungai Buaya , Rawang , Sungai Buloh , while also providing access to several rural villages on its path. The expressway runs parallel to
735-644: The Kerian River is the Kerian district in Perak, where a new interchange with route 147 at Alor Pongsu is being constructed. The expressway then briefly winds eastwards, then southwards, to meet Bukit Merah . The expressway continues directly southwards into Larut, Matang dan Selama , interchanging again with route 1 as well as 3146 to the northwest of Taiping . Gently, the expressway winds southeast towards Changkat Jering , where it interchanges with route 60 . From here,
784-535: The New Klang Valley Expressway , North–South Expressway Central Link and North–South Expressway Southern Route ; it is possible to travel from Juru on this expressway to Skudai , Johor on the North–South Expressway Southern Route without leaving the toll system. A separate ticket system is in place between Hutan Kampung and Sungai Dua, due to the toll-free section in Penang . The toll rate for
833-567: The Sultan Abdul Halim Muadzam Shah Bridge (expressway 28) terminates on this expressway, connecting Bandar Cassia as well as the southwest district on the island. The last interchange in Penang is with route 1 at Jawi . The expressway then briefly re-enters the state of Kedah to interchange at Bandar Baharu , serving itself, Parit Buntar just across the border at Perak , as well as the rest of southernmost Kedah. Across
882-574: The JKR Hulu Selangor border sign and the Petronas station) and a shortcut road from Rasa . In terms of public transportation, the closest rail stations are KA11 KTM Serendah and KA12 KTM Batang Kali . In recent years, various corporations have opened factories, warehouses, and manufacturing sites in the Bukit Beruntung industrial area. It is accessible and it
931-420: The border in Thailand the road continues as Phetkasem Road . The expressway proceeds southwards concurrently along the old Federal Route 1 , which has not been upgraded and is still a limited-access road . The first grade-separated interchange, which is with route 194 , provides access to the northwestern state of Perlis . The route then enters the heart of the town of Changlun , where it intersects with
980-499: The city, route 1 returns to run parallel to the expressway, both running southeasterly to enter the district of Pendang , where the expressway interchanges with a local route leading east to the town of the same name. Proceeding southeast, the expressway enters the Kuala Muda district. It interchanges once in Gurun , bends southwest, then interchanges twice again near Sungai Petani , once to
1029-532: The east side of Butterworth , where it makes several important interchanges, including Jalan Permatang Pauh (route 3111) leading to Permatang Pauh , the Butterworth–Kulim Expressway (expressway 15) towards Kulim and Gerik in Kedah, expressway 17 and route 1 in Perai (this is where the other end of E17 is located) as well as the Penang Bridge (expressway 36) towards the island and capital . Here
SECTION 20
#17328524463601078-641: The entire expressway, as with every other expressway in the PLUS expressway network. Alternatively, commuters may dial the toll-free number 1 800 88 0000 on their mobile phones. Both will connect to the PLUS traffic monitoring centre in Subang where commuters may request for traffic information or roadside assistance. The highway patrol and roadside assistance teams are known as PLUSRonda . They provide free first responder services including small fixes for broken down vehicles, towing and also act as traffic police when there
1127-512: The existing Federal Route 1 ; it is also concurrent to the expressway from Bukit Kayu Hitam to Jitra. The ticket system is used for toll collection between the Hutan Kampung and Sungai Dua toll plazas, and also from the Juru toll plaza up to Bukit Lanjan, where the toll collection system merges with that of the New Klang Valley Expressway . The section from Sungai Dua to Juru in the state of Penang
1176-554: The expressway bends southeast away from the coast, going towards and interchanging at the Perai Industrial Area and Juru. After Juru, the road narrows back to four lanes, followed by the Juru Toll Plaza, where the second ticket system begins. The expressway then enters Seberang Perai Selatan . The expressway interchanges with route 149 at Bukit Tambun , connecting several industrial areas nearby. Close by at Batu Kawan ,
1225-476: The expressway heads east through a cutting where the expressway and route 1 briefly run side by side. The route continues towards the district and town of Kuala Kangsar , interchanging at the terminus of route 76 , which plies the rural areas of central northern Perak. At this point route 1 deviates northwards to go around a hill that is part of the Tenasserim Hills cluster. The expressway proceeds towards
1274-601: The expressway. Every rest area and layby includes, as a bare minimum, car parks and public toilets . Most laybys also include public telephones and a small rest hut. Depending on location, laybys can also include petrol stations , a surau , and rarely, food courts , independently operated restaurants as well as automated teller machines . Full rest and service areas have all of the above services and are much larger, so they can accommodate more services. Several rest areas also have small inns , and most have complimentary Wi-Fi services. Vista points only have car parks and
1323-454: The fall of 2015. Meanwhile, the next phase of these works, the 6-lane stretch was expanded from Tanjung Malim Interchange Exit 121 to Slim River Interchange Exit 126. An interchange at Sungai Buaya, Selangor, between Rawang and Bukit Beruntung Interchange was constructed between 2011 and 2013. This new interchange was opened to traffic on 10 January 2014. An interchange at Alor Pongsu, Perak, between Bandar Baharu and Bukit Merah Interchange
1372-746: The federal route goes southeast. The expressway interchanges with several rural roads at Lembah Beringin , Bukit Tagar , the Bukit Beruntung industrial area and at Sungai Buaya . Going southwards, the expressway leaves the Hulu Selangor district into the Gombak district, where it interchanges near the Rawang industrial area with route 3209 . Shortly after, the Guthrie Corridor Expressway (expressway 35) begins as an interchange on this expressway. On
1421-690: The hill, going across the Perak River below the Sultan Azlan Shah Bridge . After the river the expressway goes uphill, through the Menora Tunnel that is about 800 metres (870 yards) long, then downhill into the Kinta Valley . Here, the Ipoh local-express system, constructed in 2008, begins, where all traffic bound for Ipoh or its vicinity is segregated. Southbound commuters entering the local lanes pay
1470-671: The last segment, the expressway interchanges with a road next to the Sungai Buloh Hospital, crosses into the Petaling district, interchanges with the Sungai Buloh Highway (route 54) at Sungai Buloh , and finally terminates at its interchange with the New Klang Valley Expressway (which is also designated the route number E1) near Segambut in the north-western part of the Federal Territory Kuala Lumpur . As
1519-583: The latter company was a fully Bumiputra-owned contractor. The former section began construction in November 1989 while the latter section began on 1 March 1990; expected to be completed in August 1992. The 19 km section between Tapah and Kampung Sahum in Perak was constructed by IJM Corporation Berhad and Syarikat Semangat Bersatu; the latter being a Bumiputra-owned construction company. Construction began in January 1991 and
Bukit Beruntung - Misplaced Pages Continue
1568-552: The northeast of the town and once to the southeast. The expressway crosses the bridge over the Muda River , which marks the border between the states of Kedah and Penang . The expressway reaches the town of Bertam, where route 1 deviates westwards from parallelism with the expressway. Further southwest is the Sungai Dua Toll Plaza, where the ticket system ends and the toll-free section begins. The expressway interchanges south of
1617-599: The opening of the 14.7-kilometre (9.1 mi) between Ipoh North (Jelapang) and Ipoh South stretch, highway users no longer stop for toll transactions at the Ipoh North and Ipoh South Toll Plazas.~ The runaway truck ramp is also provided in two locations in Jelapang and Menora. The 6-lane stretch which run from Kuala Lumpur (including New Klang Valley Expressway (NKVE) ) to Rawang Interchange Exit 117 expanded until Tanjung Malim Interchange Exit 121 Works were completed during
1666-544: The plaza, just to the west of Sungai Dua . This interchange marks one terminus of the Butterworth Outer Ring Road (expressway 17) , which goes west towards Bagan Ajam . After this interchange the expressway widens to six lanes and the urban speed limit of 90 km/h applies. The expressway then crosses the Perai River . From this point the expressway enters Seberang Perai Tengah , running southwesterly along
1715-498: The route joins with the New Klang Valley Expressway , a restricted route has been implemented on the North–South Expressway Northern Route between Sungai Buloh and Bukit Lanjan during workdays or peak hours. Heavy vehicles (except buses and tankers) with laden and unladen heavy vehicles weighing 10,000 kg or more are not allowed to enter the expressway between 6:30 am until 9:30 am on Monday to Friday (except public holidays). A compound fine will be issued to heavy vehicles which flout
1764-538: The rule. Most of the expressway enforces a maximum speed limit of 110 km/h (68 mph). Signed exceptions include: There are no signed minimum speed limits. Most of the expressway maintains a ticket system (closed system) of tolling. The expressway however also has two toll plazas using the barrier toll system (open system) at the Bukit Kayu Hitam checkpoint (demolished and takeover by JKR Kedah ) and at Jitra . The ticket system from Juru southwards uses an integrated system of tolling that also applies to
1813-484: The same district, the expressway interchanges with route 1 thrice – at Sungkai , Slim River and Behrang . While going southeast, the expressway crosses the Bernam River into the state of Selangor . Despite this, the next interchange, the final one with route 1, mainly serves Tanjung Malim over in the previous state. From this point, route 1 leaves the vicinity of the expressway as the expressway goes southwards and
1862-470: The southbound local lanes collect their tickets or tap into the system at the Ipoh South Toll Plaza, while northbound motorists entering the local lanes pay their tolls. Leaving the city, the expressway bends southwest to close the gap between the two parallel routes, effectively interchanging with the route at Simpang Pulai . Bending back southeast the expressway interchanges again with route 1 at
1911-484: The standard exit signs, to remind highway users especially northbound drivers intending to enter Ipoh via Exit 138 Ipoh South Exit, as the next exit is Exit 143 Kuala Kangsar Exit, covering a lengthy distance of 34-kilometre (21 mi) between these two exits, whilst passing through the Menora Tunnel. The decision to demolish both toll plazas was made as a result of accidents which happened at Jelapang toll plaza. Since
1960-413: The states of Kedah , Penang , Perak and Selangor , where it terminates at its interchange with the New Klang Valley Expressway , also designated as route E1. While kilometre readings are taken from north to south, exits are numbered in reverse, from south to north. PLUS Expressways , previously Projek Lebuhraya Utara–Selatan (PLUS) formed in 1986, operates and maintains the expressway. The concession
2009-489: The ticket system for passenger cars excluding taxis as of 2011 is 13.6 sen per kilometre. On 1 January 2018, Toll collection at Bukit Kayu Hitam has demolished. Starting from 26 April 2017, all 72 toll plazas from Skudai to Juru no longer accept cash payment and have adopted Full Electronic Toll Collections, as part of an initiative to facilitate faster toll transactions across all PLUS highways. Orange emergency telephones / callboxes are located every two kilometres along
Bukit Beruntung - Misplaced Pages Continue
2058-511: The toll plaza was opened on 28 September 1987, there were many accident cases which involved brake failure in heavy vehicles due to difficult braking when proceeding downhill to the toll plaza. On 7 June 2008, the new Ipoh North toll plaza (South bound) replacing old Jelapang toll plaza opened to traffic, followed by north bound on 15 August 2008. Beginning 11:00 am on 14 July 2009, the Kuala Lumpur-Penang tolled section opened to traffic. With
2107-518: The toll road (hence the "closed" name). Most ticket-based toll roads today use an electronic toll collection system as an alternative. In this case, sensors at both the entry and exit toll plazas read the vehicle's transponder and the correct toll is deducted from the user's account; no ticket is necessary. First employed on the Pennsylvania Turnpike when it opened in 1940, the ticket system has been utilized on lengthy toll highways in which
2156-477: The toll/tap out of the ticket system at the Ipoh North Toll Plaza, while northbound motorists merging in from the local lanes collect the ticket/tap into the system. Proceeding southeast through the heart of Ipoh, the expressway's local lanes interchange with several local roads as well as route 1, which begins to run parallel to the expressway again. The system ends to the south of Tambun, where commuters on
2205-507: The town of Gopeng after crossing into the Kampar district. The expressway then cuts through another hill, passing by Gua Tempurung (a cave). The cutting ends in the Batang Padang district just before the next interchange at Tapah with route 59 , which connects directly to Cameron Highlands . Heading southwards, the expressway interchanges with a local road at Bidor . Further south within
2254-1025: Was expected to be completed by December 1993. The expressway was completed on 5 February 1994 with the opening of the last segment from Juru to Changkat Jering and the opening ceremony for both this expressway and the south section was held on 8 September 1994. The order of construction came under criticism by observers because sections with low traffic were constructed first, while sections with heavy traffic were constructed last. [REDACTED] FT 276 Sintok, Universiti Utara Malaysia (UUM) [REDACTED] , Akademi Binaan Malaysia [REDACTED] FT 60 Federal Route 60 – Temerlok, Pantai Remis, Segari [REDACTED] [REDACTED] West Coast Expressway – Beruas, Sitiawan, Terong, Temerok, Ayer Tawar, Lumut, Pantai Remis, Changkat Keruing, Seri Manjung, Teluk Intan, Sabak Bernam, Kuala Selangor, Jeram, Banting, Klang. West [REDACTED] A1 Jalan Jelapang – Jelapang, Ipoh, Lumut, Pulau Pangkor 271.0 Ticket system A ticket system , also known as
2303-420: Was issued and may contain a precomputed chart of toll rates for each exit. Upon arrival at the toll booth at the destination exit, the user presents the ticket to the toll collector, who determines the correct toll. If no ticket is presented (i.e. the ticket is lost), generally the highest possible toll is charged. For this kind of system to work, toll plazas must be built and staffed at all entrances and exits to
2352-567: Was opened on 1 April 1985, originally as part of Federal Route 1 . The first controlled-access highway segment, from Ipoh to Changkat Jering, was opened by the then Sultan of Perak , Azlan Shah on 28 September 1987. The expressway's portion between Rawang and Tanjung Malim, divided into the Rawang to Sungai Selangor section and the Sungai Selangor to Tanjung Malim section, was constructed by Ho Hup Construction Co Sdn Bhd and Panzana Enterprise;
2401-481: Was opened on 7 June 2016. In July 2010, the operator, PLUS Expressways , announced that the government had awarded contracts to build a fourth lane on a stretch from Rawang to Jalan Duta. The construction was completed in late 2015. The zeroth kilometre point of the entire expressway is located at the Malaysia-Thailand border . The expressway begins at the Bukit Kayu Hitam checkpoint in Kedah , where across
#359640