Misplaced Pages

Bruckner Expressway

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

The Bruckner Expressway is a freeway in the borough of the Bronx in New York City . It carries Interstate 278 (I-278) and I-95 (and formerly I-878 ) from the Triborough Bridge to the south end of the New England Thruway at the Pelham Parkway interchange. The highway follows a mostly northeast–southwest alignment through the southern portion of the borough, loosely paralleling the course of the East River . It connects to several major freeways including the Bronx River Parkway , and at the Bruckner Interchange , it connects to the Cross Bronx Expressway , the Hutchinson River Expressway , and the Hutchinson River Parkway .

#145854

167-757: The expressway begins at the northern approach to the Triborough Bridge, where I-278 meets the southern end of I-87 , here known as the Major Deegan Expressway . It heads to the northeast as an elevated highway, carrying the I-278 designation through the South Bronx . After 2 miles (3.2 km), the Bruckner Expressway meets NY 895 (Sheridan Boulevard) and turns eastward to cross the Bronx River into

334-407: A cloverleaf interchange providing access to Saratoga Spa State Park and downtown Saratoga Springs. I-87 turns slightly to the northeast and begins to loosely parallel the northwestern edge of Saratoga Lake as it crosses Kayaderosseras Creek and enters Saratoga Springs . As the route travels the east side of Saratoga Springs, it meets NY 9P at exit 14. The junction is adjacent to

501-468: A "Parclo A2" Partial cloverleaf interchange , before crossing the Hudson River and entering Warren County . Between the bridge and exit 18, I-87 passes two rest areas, one for each direction. The road's northward course quickly brings it to the outskirts of Glens Falls , and as such the highway heads across another swath of residential neighborhoods. Exits 18 and 19 are the main exits for

668-466: A $ 1.1 billion project to rebuild parts of the Bruckner Expressway and improve traffic flow, which would reduce air and noise pollution. The project would rebuild the interchanges with both Sheridan Boulevard and Hunts Point Avenue, add a third lane in both directions of the Bruckner, and rebuild four bridges. The mileposts below follow actual signage, even though the route is continuous. The entire route

835-717: A backdrop to a straight stretch of highway. While US 9 heads northwest into the Warrensburg to connect to NY 28 , I-87 turns northward to follow the east bank of the Schroon River for 17 miles (27 km) through a deep, remote valley. The Northway reaches exit 24 while in this valley, which once again serves the town of Bolton Landing . Exit 25 serves NY 8 at a diamond interchange . The stretch away from US 9 ends at exit 26, where I-87 reconnects to US 9 in Pottersville . At this point, I-87 makes

1002-462: A component of I-278. The conversion of Gowanus Expressway to a six-lane freeway configuration was completed in 1964 at a cost of $ 100 million (equivalent to $ 751 million in 2023 ). The NY 27A designation was removed from the Gowanus Expressway by 1970. By 2000, an HOV lane was added to the eastbound Gowanus Expressway to serve traffic heading toward Manhattan. Over the years,

1169-513: A diamond interchange just west of the village limits. I-87 takes a northerly track from US 11, crossing the Chazy River and briefly entering the village limits, where it runs past a series of homes and businesses built up along nearby US 9. As both roads head north out of the village, US 9 connects to the Northway one last time (also the northern terminus of US 9) at exit 43,

1336-578: A freeway connecting the Goethals and Verrazzano-Narrows bridges that was a part of a comprehensive system of freeways and parkways for the borough of Staten Island. In 1945, Robert Moses took over planning for the freeway and called it the Clove Lakes Expressway . The plan received approval in stages through the mid-1950s, and construction on the expressway began in 1959. By this time, the SIE had received

1503-399: A marshy area surrounding Dead Creek, a stream feeding into nearby Plattsburgh Bay . Access to the bay shore is provided off to the northeast by exit 39, a modified cloverleaf interchange for NY 314 . Continuing away from the junction, I-87 comes within one mile (1.6 km) of Lake Champlain as it follows US 9 away from Plattsburgh and northward across open, rolling fields in

1670-524: A modified diamond interchange serving County Route 151 (CR 151, named Albany Shaker Road) and Albany International Airport . Wolf Road ends south of the exit; however, another section begins north of the junction, carrying NY 155 away from the airport. Prior to the Northway, there was no break in Wolf Road; in essence, exit 4 was built on top of Wolf Road's intersection with Albany Shaker Road. I-87 and NY 155 meet at exit 5, with

1837-629: A move that city officials said could prolong the viaduct's life by 20 years. The city also planned to ticket overweight vehicles. There was still no long-term plan for the viaduct by mid-2022, but three preliminary plans for the highway's reconstruction were announced in December 2022. NYCDOT formally presented the three plans to the public in February 2023, and city officials began issuing summonses to overweight vehicles in August of that year. In February 2024,

SECTION 10

#1732844485146

2004-481: A panel to formally evaluate each alternative and that the panel's evaluations would end by mid-2019. In February 2020, officials proposed a three-mile (4.8 km) tunnel from the Gowanus Expressway to Flushing Avenue. The proposal was expected to cost $ 11 billion, to be paid by tolls. In late 2021, the section between Atlantic Avenue and the Brooklyn Bridge was reduced from three to two lanes per direction,

2171-549: A result: instead of heading east to NY 9N, it continued north on a parallel routing to US 9. The Northway's former routing to NY 9N, known infrequently today as the Lake George Connector, is now NY 912Q, an unsigned reference route 0.66 miles (1.06 km) in length. NY 912Q has one intermediate interchange with US 9. On March 5, 1967, the Lake George–Pottersville portion of I-87

2338-416: A slight turn to the northeast to follow US 9 as the latter road runs along the western shoreline of Schroon Lake. Both roads pass a handful of lakefront properties on their way into Essex County and the town of Schroon Lake , where the lake comes to an end and NY 74 begins its eastward trek to Ticonderoga at exit 28. The Schroon River resumes north of the exit, and I-87 and US 9 follow

2505-523: A spur of the expressway, the Richmond Parkway , to follow the central ridge of the island, connecting with the Outerbridge Crossing in the southwestern part of the island. However, there was massive local opposition to this spur, and, unlike previous projects by Moses, the northern half of the spur was canceled when Mayor John Lindsay took office in 1966. The southern half of this proposed spur

2672-585: A temporary six-lane highway in the location of the promenade while they repaired the underlying structure. Under this option, lanes would be widened, and shoulders would have been added. In conjunction with the project, NYCDOT hoped to unify Van Voorhees Park, improve safety at the interchange with Atlantic Avenue, and possibly build a pedestrian bridge from Brooklyn Bridge Park to the promenade. The other, more expensive option, which would cost $ 3.4 billion to $ 4 billion (equivalent to $ 4.06 billion to $ 4.78 billion in 2023 ) and take over eight years,

2839-477: A toll gantry exists on the exit 16 ramp midway between the Thruway and NY 17 exit 131 ( NY 32 ). Now a completely tolled highway, the Thruway heads northward as it narrows to four lanes, roughly paralleling the Hudson River to the river's west as it serves the city of Newburgh , village of New Paltz , and city of Kingston , indirectly connecting to the short I-587 in the latter. Past Kingston,

3006-559: A truck-only highway between Hamilton Avenue in Carroll Gardens and the Brooklyn Bridge. Under the plan, only the bottom level would be rebuilt and then be decked over by a linear park and boulevard. The report expected passenger vehicles to be diverted into the underused Brooklyn–Battery Tunnel, whose tolls might be lowered when congestion pricing in New York City was implemented. In early April, de Blasio announced that he would create

3173-523: A turn to the north as well, connecting with I-695 in the process. The Hutchinson and the Bruckner follow mostly parallel alignments to Pelham Bay Park , where the Bruckner Expressway ends at an interchange with the Pelham Parkway . I-95 continues north from this point as the New England Thruway . The Bruckner Expressway was a project envisioned by Robert Moses , who steered the Bruckner through

3340-639: A westbound interchange at 86th Street. Turning more to the north, I-278 comes to an partial interchange at 65th Street, with an exit eastbound and entrance eastbound. The road curves northwest at this point and comes to a directional interchange providing access to 3rd Avenue and the Belt Parkway. The Gowanus Expressway turns northeast again at the interchange with Belt Parkway, and it continues along an elevated alignment above Third Avenue, running through urban residential and commercial areas. Along this viaduct, I-278 has interchanges with 38th Street/39th Street and

3507-580: Is at the Yonkers–Bronx city line. For the Northway section of I-87, mile 0.00 is just north of the overpass with I-90. The entire route is in Albany County . The entire route is in Warren County . All exits are unnumbered. The road has three current spur routes, all located along the Thruway portion of I-87. I-287 serves as a 99-mile (159 km) bypass around New York City, beginning at

SECTION 20

#1732844485146

3674-549: Is in the New York City borough of the Bronx .  Interstate 87 (New York) Interstate 87 ( I-87 ) is a 333.49-mile-long (536.70 km) north–south Interstate Highway located entirely within the US state of New York . I-87 is the main highway that connects New York City and Montreal . The highway begins at exit 47 off I-278 in the New York City borough of

3841-458: Is maintained by the Triborough Bridge and Tunnel Authority (TBTA), has six lanes on the lower level and seven lanes on the upper level which includes one HOV lane. In addition to local traffic on Staten Island, the expressway provides the most direct route from Brooklyn and Long Island to New Jersey. It is widely known throughout the New York City area as one of the most congested roads in

4008-691: Is not contiguous with I-87 in North Carolina . I-87 was assigned in 1957 as part of the establishment of the Interstate Highway System. The portion of I-87 south of Albany follows two controlled-access highways that predate the Interstate Highway designation, the Major Deegan Expressway (locally known as " the Deegan ") in New York City and the tolled New York State Thruway from the New York City line to Albany. North of Albany, I-87 follows

4175-814: Is not in danger of collapse. In 2019, the New York City Department of Transportation (NYCDOT) took over maintenance of the Gowanus Expressway from the New York State Department of Transportation (NYSDOT). The BQE was initially planned in 1936 as the Brooklyn–Queens Connecting Highway, a link between the Gowanus Parkway and the Robert F. Kennedy Bridge . The brief portion of I-278 on the Grand Central Parkway, connecting

4342-707: Is provided by Thruway exit 1 in Yonkers. At the New York City–Yonkers border, I-87's mainline continues onto the New York State Thruway and northward through Yonkers and southern Westchester County . The first few exits serve various local streets, with exit 1 serving Hall Place, exit 2 providing access to Yonkers Raceway & Empire City Casino and exit 3 serving the Cross County Shopping Center . At exit 4, I-87 connects to

4509-638: The Adirondack Northway , a highway built in stages between 1957 and 1967 (finished just in time to bring Americans to the World Exhibition held in Montreal that year). Early proposals for I-87 called for the route to take a more easterly course through the Hudson Valley and extreme southwestern Connecticut between New York City and Newburgh. These plans were scrapped in 1970 when I-87 was realigned onto

4676-738: The Bronx River Parkway . Continuing east, the road has an exit serving White Plains Road and Castle Hill Avenue. I-278's eastern terminus is at the Bruckner Interchange further to the east. Here, the Bruckner Expressway becomes I-95 and continues towards the New England Thruway. At this interchange, I-278 also has access to the Clearview Expressway ( I-295 ), the Hutchinson River Expressway ( I-678 ), and

4843-520: The Brooklyn-Battery Tunnel . restricted to buses, carpools, and vehicles with three or more occupants. On weekdays, this HOV lane carries eastbound traffic in the morning and westbound traffic in the afternoon. The lane is closed at other times, including certain New York City government holidays. The Gowanus Expressway continues northeast into urban residential neighborhoods and reaches an eastbound interchange at Fort Hamilton Parkway and

5010-704: The Cross County Parkway , an east–west parkway providing access to the Saw Mill River, Bronx River , and Hutchinson River parkways. The north–south parkways and I-95 run parallel to the Thruway through Southern Westchester . The Bronx River parkway leaves to the northeast midway through Yonkers, while the Saw Mill and Sprain Brook parkways follow the Thruway out of the city. All three highways take generally parallel tracks to Elmsford , where I-87 directly intersects

5177-832: The Hutchinson River Parkway itself. Legally, the New York section of I-278 is defined as part of Interstate Route Connector 512 and all of Interstate Route Connector 518 in New York Highway Law § 340-a. The New Jersey portion of freeway was planned in 1955 as the Union Freeway and designated as I-278 in 1958. It was to connect the Goethals Bridge west to I-78 at the tripoint of Springfield , Union Township , and Millburn . The western part of this planned freeway faced strong opposition. Even though it

Bruckner Expressway - Misplaced Pages Continue

5344-685: The Korean War on a low budget of only $ 81 million (equivalent to $ 719 million in 2023 ). Unlike other major bridges in New York metropolitan area , the Tappan Zee was designed to last only 50 years. The Federal Highway Administration (FHWA) issued a report in October 2011 designating the Tappan Zee's replacement to be a dual- span twin bridge . Construction officially began in October 2013, with

5511-686: The New Jersey Turnpike in Middlesex County, New Jersey , and ending at I-95 (the New England Thruway ) near the Connecticut border in Rye . I-287 and I-87 overlap for 19 miles (31 km) across Westchester and Rockland counties. East of the concurrency, I-287 is known as the Cross Westchester Expressway (it was originally designated as I-187 and I-487). The other two spurs,

5678-635: The New York City Department of Transportation , makes a sharp turn to the east away from the East River and comes to an interchange serving the Brooklyn Bridge and Cadman Plaza . The freeway continues on an elevated alignment and makes a turn southeast as it comes to ramps accessing the Manhattan Bridge . As of 2022, the city portion is planned to be rebuilt. North of the bridges, the highway becomes state-maintained again and reaches at an exit serving Tillary Street and Flushing Avenue . At this point,

5845-734: The Palisades Interstate Parkway and the Garden State Parkway Connector , with the latter providing access to the Garden State Parkway in New Jersey. The Thruway continues generally westward to Suffern , where I-87 and I-287 split at a large semi-directional T interchange (exit 15) only about a half mile (0.80 km) from the New Jersey border. At this point, I-287 heads south into New Jersey while I-87 and

6012-598: The Route ;24 interchange in Springfield, New Jersey . This was canceled because of opposition from the communities along the route. The segment that does exist in New Jersey was opened in 1969. There were also plans to extend I-78 east across Manhattan and into Brooklyn via the Williamsburg Bridge ; this would have been a second interchange between I-278 and its parent highway, but these plans were also thwarted. I-78

6179-518: The Soundview neighborhood. Here, the highway connects to the Bronx River Parkway at an interchange one block north of that road's official southern terminus. The Bruckner Expressway remains I-278 into the adjacent neighborhood of Castle Hill , where I-278 enters the west half of the complicated Bruckner Interchange and I-95 transitions from the Cross Bronx Expressway to the Bruckner. In

6346-858: The Staten Island Expressway ( SIE ) across Staten Island ; the Gowanus Expressway in southern Brooklyn ; the Brooklyn–Queens Expressway ( BQE ) across Northern Brooklyn and Queens ; a small part of the Grand Central Parkway in Queens; and a part of the Bruckner Expressway in the Bronx. I-278 also crosses multiple bridges, including the Goethals , Verrazzano-Narrows , Kosciuszko , and Robert F. Kennedy bridges. I-278

6513-440: The 1970s as a result of public opposition. Part of what would have been I-487 is now the Croton Expressway, which is part of US 9 , and part of what would have been I-687 is now the Albany Airport Connector, which provides direct access between the Northway (I-87) and Albany International Airport. Interstate 278 Interstate 278 ( I-278 ) is an auxiliary Interstate Highway in New Jersey and New York in

6680-450: The BQE and the Robert F. Kennedy Bridge, had opened in the 1930s. A part of the Brooklyn–Queens Connecting Highway, namely the Kosciuszko Bridge and the viaducts leading to the bridge, opened in 1939 between Meeker Avenue/Morgan Avenue and Queens Boulevard (NY 25). In 1940, Moses proposed an expressway between Queens and Brooklyn to relieve local streets of congestion from the Manhattan and Williamsburg bridges. The section between

6847-407: The BQE continues east through residential areas and turns northeast upon coming to the Wythe Avenue/Kent Avenue exit. The road passes through the Williamsburg neighborhood on a depressed alignment, reaching an interchange that serves the Williamsburg Bridge , with an exit at Metropolitan Avenue a short distance later. I-278 becomes elevated again as it passes through more neighborhoods and comes to

Bruckner Expressway - Misplaced Pages Continue

7014-582: The Bronx , just north of the Robert F. Kennedy Bridge and Grand Central Parkway . From there, the route runs northward through the Hudson Valley , the Capital District , and the easternmost part of the North Country to the Canada–United States border in the town of Champlain . At its north end, I-87 continues into Quebec as Autoroute 15 (A-15). I-87 connects with several regionally important roads: I-95 in New York City, New York State Route 17 (NY 17; future I-86 ) near Harriman , I-84 near Newburgh , and I-90 in Albany . The highway

7181-422: The Bruckner Boulevard alignment in order to provide a connection between the Robert F. Kennedy Bridge and a freeway leading north into Westchester County . Moses took over planning for the road in 1951 and called for an elevated freeway between the Robert F. Kennedy Bridge and the Bronx River and a depressed freeway east of there. Construction on the elevated segment of the Bruckner Expressway began in 1957 and on

7348-412: The Bruckner Boulevard is the service road, except at the Bruckner Interchange, where Bruckner Boulevard passes underneath the flying junction. West of Sheridan Boulevard, Bruckner Boulevard is underneath the expressway, and extends past the expressway's western terminus for about 0.5 miles (0.80 km), ending under the Third Avenue Bridge . In 2019, the New York State Department of Transportation began

7515-464: The Bruckner Expressway past there) before the current numbering took place by 1970, with I-895 designated onto the Sheridan Expressway (which was subsequently downgraded to a state highway in 2017). The New Jersey segment of I-278 begins in Linden , Union County , at the junction with US 1 and US 9 ( US 1/9 ), where it merges into the southbound direction of that road. The freeway heads east and carries two lanes in each direction, with

7682-479: The Canada–United States border. The total cost to build the Adirondack Northway was $ 208 million (equivalent to $ 1.45 billion in 2023 ). Another gap in I-87 existed in downstate New York, as the plan to build I-87 along the proposed Hudson River Expressway had been scrapped by 1962. Instead, I-87 was now proposed to begin in Port Chester and follow a new routing through Purchase , Armonk , and Katonah to Brewster , where it would join I-84. The routing

7849-401: The Federal Highway Administration rejected the city's request for $ 800 million to redesign and rebuild the cantilever. By the next month, no design had been finalized, and the start date for the triple cantilever's reconstruction had been postponed to 2028. The Bruckner Expressway was originally Bruckner Boulevard, designated as part of NY 1A . In the 1930s, a freeway was planned on

8016-405: The Goethals Bridge, opening to traffic in 1969 at a cost of $ 11.5 million (equivalent to $ 73.3 million in 2023 ). The Union Freeway Extension was revived in the late 1960s and was to start at US 1/9 but end at I-287 in Hanover Township , following Route 24 between I-78 and I-287. However, the Federal Highway Administration (FHWA) rejected the proposal in 1970, thus ending

8183-419: The Gowanus Expressway, from the Brooklyn–Battery Tunnel to the Prospect Expressway ( NY 27 ), was opened in May 1950. The freeway was initially planned to be twelve lanes, with two three-lane roadways in each direction, but it was ultimately reduced to a six-lane highway to reduce disruption to the Bay Ridge neighborhood. The Gowanus Expressway was incorporated into the Interstate Highway System and became

8350-423: The Hudson River c.  1961 . The US 9–NY 149 section of the highway was finished on May 26, 1961, at a total cost of $ 9.5 million (equivalent to $ 74.2 million in 2023 ). Work on the Latham–Malta segment concluded on November 22 of that year with the opening of a $ 6.6-million (equivalent to $ 51.5 million in 2023 ) piece between NY 146 and NY 67. When the Latham–Malta segment

8517-410: The Hudson River Expressway proposal was cancelled in the 1960s, the alignment of I-87 was shifted farther east to follow a newly completed freeway in the Route 22 corridor that started at I-287 in White Plains, then cut north through the extreme southwest corner of Connecticut before reentering New York and reaching I-84 at Brewster. I-87 then followed I-84 west to Newburgh. In 1970, the I-87 designation

SECTION 50

#1732844485146

8684-500: The I-278 designation. The construction of the SIE was particularly noted for the massive movement of earth required to build the section of the highway between Clove Road and Price Street (now Narrows Road North, a service road of the expressway) between Grymes Hill and Emerson Hill . The earth removed from the cut in the hill was placed in a remote section of central Staten Island adjacent to Sea View Hospital and has since been nicknamed "Moses Mountain". Originally, Moses intended for

8851-428: The I-278 project. The original four-lane Goethals Bridge, which predated the I-278 designation, was replaced with two new three-lane cable-stayed bridges , each carrying traffic in one direction. The new eastbound bridge opened to both directions of traffic in June 2017, and westbound traffic was shifted to the new westbound bridge in May 2018. The SIE was first planned in 1941 as the Cross-Richmond Express Highway,

9018-410: The Kosciuszko and Williamsburg bridges opened on May 25, 1950. A further extension between the Brooklyn–Battery Tunnel and the Brooklyn Bridge, which included the Brooklyn Heights Promenade , was opened on June 23, 1954, connecting to the Gowanus Expressway. This was followed by a mile-long (1.6 km) section between the Williamsburg Bridge and Flushing Avenue on September 1, 1958. Two sections of

9185-409: The Major Deegan Expressway date back to 1936 when the Regional Plan Association concluded that in order to relieve New York City 's traffic problems, a limited-access, truck-accessible expressway should be built on the west side of the Bronx . This route would connect the brand-new Triborough Bridge to the proposed New York State Thruway in Westchester County . A 1.5-mile (2.4 km) section of

9352-506: The Manhattan and Williamsburg bridges using the triple cantilever structure, which would be tolled. At the same time, the Brooklyn Heights Promenade was deteriorating significantly and was set to undergo renovations starting 2020. The structure is supported by steel rods inside rebar, which is corroding due to the seeping of road salt into widening cracks. If nothing was done on the roadway by 2026, weight restrictions would have to be implemented, with trucks diverted to local roads, and, by 2036,

9519-467: The New Jersey Turnpike, Conrail Shared Assets Operations ' (CSAO) Chemical Coast Secondary line, a Staten Island Railway freight line that is used by CSAO, industrial areas, CSAO's Bayway Industrial Track line, and finally Arthur Kill on the six-lane Goethals Bridge into Staten Island , a borough of New York City . This bridge is maintained by the Port Authority of New York and New Jersey (PANYNJ). Upon coming onto Staten Island, I-278 becomes

9686-434: The Northeast Corridor. Along this section, there is a westbound exit and eastbound entrance for East 138th Street. Sheridan Boulevard ( NY 895 ) splits from the eastbound direction of I-278 as the Bruckner Expressway makes a turn to the east into residential and commercial neighborhoods on a surface alignment, crossing the Bronx River on a drawbridge . The road has an interchange at Hunts Point Avenue before coming to

9853-426: The Northway feeds into a 0.86-mile (1.38 km) expressway spur known locally as Fuller Road Alternate , which links I-87 and I-90 to US 20. Fuller Road Alternate is designated as New York State Route 910F ( NY 910F ), an unsigned reference route , by NYSDOT . In 2004, NYSDOT ceremonially designated the entire 176-mile (283 km) Northway as the Adirondack Veterans Memorial Highway. The Northway,

10020-456: The Northway section of I-87, as this number was reserved for an interchange with the now-canceled I-687 . A project to improve motorist access to the Albany International Airport at exit 4 took place in the late 2010s. The two old deteriorating bridges at exit 4 which had carried 102,000 vehicles a day were replaced. Once the new replacement bridges were built, the old bridges were demolished. Construction began in February 2015 and

10187-482: The Northway through the Adirondack Park had been an unserved zone for cellular telephone service. In 2007, a driver who crashed off the road was unable to summon help, prompting messages from local governments to telephone companies to add new wireless towers to address the problem and warning signs to inform travelers of the so-called "dark zone". Throughout this area, roadside emergency call boxes were located approximately every two miles (3.2 km) on both sides of

SECTION 60

#1732844485146

10354-412: The Northway through the northern parts of Adirondack Park . I-87 and the Major Deegan Expressway begins in the Bronx at the northern approach to the Robert F. Kennedy Bridge , where it connects to the Bruckner Expressway ( I-278 ) at a directional T interchange . The route heads west from the interchange, paralleling loosely with the Harlem River through Mott Haven . After one mile (1.6 km),

10521-417: The Northway, allowing northbound and traffic direct access to Albany Shaker Road/NY 155 near the Desmond Hotel Albany. Southbound traffic was able to both exit and enter to/from the connector. The southbound entrance for the connector (exit 3) opened on September 27, 2019, while the southbound exit opened the next month. Traffic signals were installed at the intersection of Albany Shaker Road and

10688-445: The Northway, while I-90 merges in from the east to follow the Thruway toward Buffalo and then Pennsylvania . Off the Thruway, I-87 and I-90 overlap for a half mile (0.80 km) along I-90's toll-free path through the Albany area. The brief concurrency ends at exit 1 of the Adirondack Northway in Guilderland , a junction also numbered as exit 1 on I-90. The Adirondack Northway and I-87 are still separate routes that share

10855-418: The Prospect Expressway ( NY 27 ). After the interchange with the Prospect Expressway (NY 27), the freeway widens to eight lanes and heads north, coming to an interchange with the Brooklyn–Battery Tunnel approach (officially the Hugh L. Carey Tunnel, I-478), with the exit ramps splitting from the median of I-278. Westbound access to the tunnel is provided by the Hamilton Avenue exit. In this area,

11022-416: The Robert F. Kennedy Bridge carries the route over the Bronx Kill into the Bronx , where westbound tolls are collected electronically. In the Bronx, I-278 becomes the Bruckner Expressway and reaches an interchange with the Major Deegan Expressway ( I-87 ). At this point, the Bruckner Expressway heads northeast on a six-lane elevated alignment through industrial areas with some residences, paralleling

11189-421: The SIE. After the Goethals Bridge, the highway passes under the Travis Branch railroad line that is owned by the Staten Island Railway and operated by CSAO and has a toll plaza serving the bridge. At this point, the freeway becomes eight lanes and maintained by the New York State Department of Transportation (NYSDOT), coming to an exit for Western and Forest avenues before reaching a directional interchange with

11356-445: The Salmon River and intersects NY 22 at exit 36, a junction serving nearby Plattsburgh International Airport . While NY 22 heads northeast into the city of Plattsburgh , I-87 runs north through its western suburbs, passing over the Saranac River and intersecting NY 3 at exit 37. The Northway and NY 22 meet again north of downtown at exit 38. The section of I-87 between exits 38 and 39 crosses

11523-420: The Saw Mill River Parkway at exit 7A. Not far to the north is exit 8, a semi-directional T interchange with I-287 (the Cross Westchester Expressway). I-287 joins the Thruway here, following I-87 west across the Hudson River into Rockland County on the Tappan Zee Bridge . I-87 and I-287 remain overlapped for 15 miles (24 km) through the densely populated southern portion of Rockland County, meeting

11690-442: The Sheridan Expressway and I-678 from there to I-95. Later, I-278 was planned to follow the Bruckner Expressway from I-87 to the Sheridan Expressway, where it would continue on that freeway to I-95, while the Bruckner Expressway was not designated an Interstate north of there. By 1970, I-278 was routed onto its current alignment, with I-895 (now NY 895) created along the Sheridan Expressway. Multiple express buses operated by

11857-407: The Soundview section of the Bronx, further altering the neighborhood after the 15-year construction of the Cross Bronx Expressway, which was completed in 1963. The Bruckner Expressway itself was completed in 1973, making it one of the last roads of the New York City Expressway system to be built. It is named in honor of former Bronx Borough President and Congressman, Henry Bruckner (1871–1942), and

12024-437: The Thruway and NY 7 near Latham . This segment was open to traffic by 1960, by which time work had begun on two additional segments from Latham to Malta (at NY 67 ) and from US 9 in northern Saratoga County to US 9 and NY 149 midway between Glens Falls and Lake George village. The expressway was completed between Latham and Clifton Park ( NY 146 ) and from US 9 south of Glens Falls to

12191-453: The Thruway between Westchester County and Newburgh. I-87 makes up most of the major strategic corridor between New York City , the largest metropolitan area in the US, and Montreal , the second-largest metropolitan area in Canada (formerly the largest). The New York State Department of Transportation (NYSDOT) considers the route important for commerce, as it connects with numerous highways in

12358-578: The Thruway turn northward into the valley of the Ramapo River . The Thruway continues north as a six-lane tollway through the river valley toward Harriman , where it encounters the Woodbury toll gantry , the southeastern end of the main line's major closed toll system. The barrier is located on the mainline within exit 16 ( NY 17 ), a trumpet interchange . Along with the mainline barrier in Harriman,

12525-654: The United States. The road runs 35.62 miles (57.32 km) from US Route 1/9 (US 1/9) in Linden, New Jersey , northeast to the Bruckner Interchange in the New York City borough of the Bronx . The majority of I-278 is in New York City, where it serves as a partial beltway and passes through all five of the city's boroughs . I-278 follows several freeways, including the Union Freeway in Union County, New Jersey ;

12692-671: The West Shore Expressway ( New York State Route 440 (NY 440). NY 440 forms a concurrency with I-278, and the road heads into residential neighborhoods. The road carries four lanes eastbound and three lanes westbound as it comes to the exit serving Richmond Avenue . Immediately after, NY 440 splits from the SIE at a large interchange, heading north on the Dr. Martin Luther King Jr. Expressway. This interchange also provides access to Victory Boulevard . East of this point,

12859-572: The bridge. Formerly, the frontage road of the Grand Central Parkway between the BQE and the Robert F. Kennedy Bridge served as a truck route, since large trucks are not permitted on the parkway. Exemptions are provided for smaller trucks that conform with strict regulations, but only on the section of the Grand Central Parkway that overlaps with I-278. In December 2017, the state concluded a $ 2.5-million (equivalent to $ 3.06 million in 2023 ) project that lowered

13026-548: The bus lanes were opened to high-occupancy vehicles during rush hours. In July 2008, officials announced a $ 50-million (equivalent to $ 69.5 million in 2023 ) project to improve the severe traffic conditions on a 1.8-mile (2.9 km) stretch of the expressway. Included in the project is the construction of six new on- and offramps, improvements to and relocations of existing on- and offramps, and other improvements to surrounding roads. This followed numerous minor alterations to alleviate traffic, such as time/distance displays and

13193-502: The city has grown around them and it's not an option to just say we can't deal with that traffic." City Council Speaker Corey Johnson called for the city to study alternatives, including the removal of the BQE in its entirety, in his State of the City address . On March 13, 2019, Stringer issued a plan calling for converting the triple cantilever structure and the open cut in Cobble Hill into

13360-534: The city would have to shut down this section of the BQE. In late 2018, NYSDOT proposed rebuilding the double-decker, 1.5-mile (2.4 km) section of I-278 running under the Brooklyn Heights Promenade, which had deteriorated severely over the years. Two options were proposed. The cheaper option, which would cost $ 3.3 billion to $ 3.6 billion (equivalent to $ 3.94 billion to $ 4.3 billion in 2023 ) and take six years, entailed building

13527-560: The city, with the latter connecting to NY 254 near Aviation Mall , located on NY 254 just west of the route's junction with US 9. A northwestern turn in the freeway takes I-87 past the Great Escape amusement park and lodge , both of which are accessed from exit 20 and NY 149 . Past exit 20, I-87 runs across increasingly remote areas of Queensbury as the road enters Adirondack Park and heads toward Lake George . The freeway closely follows US 9 northwest to

13694-535: The city. After the Verrazzano-Narrows Bridge, I-278 continues into Brooklyn on the Gowanus Expressway. Immediately after the bridge, the freeway comes to an eastbound exit and westbound entrance for the Belt Parkway . After this, a full interchange serves 92nd Street at which point I-278 becomes a single-level six-lane freeway. Soon after, one of the eastbound lanes becomes an HOV lane, continuing east to

13861-465: The connector. The northbound exit opened in November 2019. Other changes completed as part of the project include: Afternoon traffic was expected to be reduced by 54 percent, and morning traffic was expected to decrease by 29 percent. During construction, the project received criticism over the fact that some of the ramps were built on sacred Indian land. Murals were supposed to be installed on

14028-418: The depressed segment in 1959. The depressed portion was opened in 1961 while the elevated portion of the Bruckner Expressway was opened in 1962. In 1972, the large Bruckner Interchange was finished, completing the route. Over the years, the I-278 portion of the Bruckner Expressway has had different designations. When the Interstate Highway System was first created, the road was to be part of I-895 from I-87 to

14195-427: The designated bus lanes. Construction started in November 2010, with the project then expected to cost $ 75 million (equivalent to $ 102 million in 2023 ). A new exit 15, which served Lily Pond Avenue and Bay Street on the eastern end of Staten Island, opened to traffic on July 9, 2012, replacing a former exit further to the east. Signage was also changed to display Fingerboard Road and Lily Pond Avenue as

14362-653: The east half of the junction, located on the opposite bank of Westchester Creek in Throggs Neck , the Bruckner Expressway (now designated I-95) intersects the Hutchinson River Parkway , I-295 , and I-678 . I-295 proceeds southeast from the Bruckner Interchange as the Cross Bronx Expressway, while the Hutchinson Parkway and I-678 head to the north and south, respectively. The Bruckner eventually makes

14529-505: The eastbound direction widening to three lanes. I-278 runs between urban residential areas to the north and the Bayway Refinery to the south as it continues into Elizabeth . In this area, the road meets Route 439 and the New Jersey Turnpike ( I-95 ) at the only intermediate interchange that I-278 has in New Jersey. This short length is sometimes called the Union Freeway. After this interchange, I-278 turns southeast and crosses

14696-471: The exit for Broadway and Roosevelt Avenue . I-278 heads back onto a viaduct and comes to a single-point urban interchange at Northern Boulevard ( NY 25A ). A short distance past Northern Boulevard (NY 25A), the freeway splits into east and west segments with four lanes each that respectively merge into the Grand Central Parkway east- and westbound. Astoria Boulevard is accessible from either leg. Both legs receive Interstate funding, though only

14863-406: The exit 3 overpass, but the murals had still not been installed after the completion of all work on exit 3 in late 2020. The murals were finally installed in early 2021. The mileposts below follow actual signage, even though the route is continuous. For the Bronx section of I-87, mile 0.00 is just north of the Robert F. Kennedy Bridge. For the Thruway section of I-87, mile 0.00

15030-548: The exits become farther apart. Here, the Northway narrows from six to four lanes, preparing for the more rural areas and rugged terrain that follow. North of Lake George, the Northway runs alongside US 9 to Warrensburg , a small town on the Schroon River served by exit 23. The view straight ahead on the northbound side from this interchange acts as an unofficial gateway to the Adirondacks, with tall mountains acting as

15197-570: The expressway from the bridge to the Grand Concourse was completed in April 1939. The highway was adorned with Whitestone-style light posts placed every 75 feet (23 m) of the six-lane highway, each of which were 12 feet (3.7 m) in width. The expressway was designated as New York State Route 1B ( NY 1B ) c.  1941 ; however, the designation was removed by 1947. In 1945, public works planner Robert Moses proposed extending

15364-497: The expressway gains a bus lane in each direction. The six-lane I-278 turns to the east past this point, with Gannon Avenue South and Gannon Avenue North serving as frontage roads , and reaches the Bradley Avenue exit. The next interchange the SIE is with Todt Hill Road and Slosson Avenue. This exchange was the original terminal of the bus lane in each direction that also serves as a high-occupancy vehicle lane (HOV lane) that

15531-580: The expressway opened on August 26, 1959: a segment between the Brooklyn Bridge and Tillary Street in Brooklyn and between the Grand Central Parkway and Roosevelt Avenue in Queens. The expressway between Tillary Street and Flushing Avenue , around the Brooklyn Navy Yard , was opened shortly thereafter on January 6, 1960. The road in its entirety was completed on December 23, 1964 at a cost of $ 137 million (equivalent to $ 1.03 billion in 2023 ), with

15698-519: The expressway, the two-tiered promenade section in Brooklyn Heights that was designed by Moses, was originally planned to go straight through Hicks Street, then connect to the Brooklyn Bridge at Adams Street. Another route that was proposed by Moses would have continued up Hicks Street past Atlantic Avenue , removing all the buildings on one side of Court Street, then curving east into Tillary Street (at Cadman Plaza ). The Brooklyn Heights Association

15865-555: The freeway gains a pair of service roads and heads north to the New York City line, where it becomes the New York State Thruway as it passes into Westchester County . The last northbound exit on the Deegan connects to McLean Avenue, located north of the city line in Yonkers . The exit 14 ramp leads to the service road in the Bronx but does not meet McLean Avenue until it crosses the county line. Southbound access to McLean Avenue

16032-552: The freeway has is with Hylan Boulevard . A short distance later, the SIE comes to a large interchange that serves Lily Pond Avenue and Bay Street. Immediately after, I-278 reaches the former toll plaza for the Verrazzano-Narrows Bridge , where electronic toll collection is in effect. Following the toll plaza area, I-278 goes onto the Verrazzano Bridge linking to Brooklyn over The Narrows . This bridge, which

16199-528: The freeway makes a turn to the east, passing over homes before crossing over New Calvary Cemetery. The road turns northeast through more urban neighborhoods and reaches an interchange at Queens Boulevard ( NY 25 ). At this point, I-278 becomes city-maintained again and passes under the Long Island Rail Road 's Main Line as it continues into a depressed alignment. The BQE turns north as it approaches

16366-661: The freeway passes over the Gowanus Canal , an extremely polluted canal that was once used for shipping. The site has been designated a Superfund site by the Environmental Protection Agency . After the exit for the Brooklyn–Battery Tunnel, I-278 heads north onto the six-lane BQE, passing through urban neighborhoods near Downtown Brooklyn on a depressed alignment. The next interchange the highway reaches serves Atlantic Avenue . After Atlantic Avenue,

16533-532: The governor's middle initial in the name. In the wake of former New York Yankees player Joe DiMaggio 's death on March 8, 1999, Governor George Pataki proposed renaming the Deegan Expressway to the "Joe DiMaggio Highway." However, New York City Mayor Rudy Giuliani favored renaming the West Side Highway for DiMaggio instead. Pataki agreed to Giuliani's proposal one week later. A long stretch of

16700-475: The highway heads north through Wards Island Park and passes to the east of Manhattan Psychiatric Center as it passes over the border onto Randalls Island , which is connected to Wards Island by land. I-278 passes through the bridge's former toll plaza before an interchange that provides access to FDR Drive by way of another segment of the Robert F. Kennedy Bridge over the Harlem River . After this interchange,

16867-535: The highway makes a turn to the north, mirroring a change in the nearby river's course. It passes by Yankee Stadium on its way to Highbridge , where the Deegan connects to the Cross Bronx Expressway ( I-95 and US Route 1 [US 1]) at the eastern approach to the Alexander Hamilton Bridge . The Deegan remains in close proximity to the Harlem River until the waterway turns westward at Kingsbridge to form

17034-612: The highway runs closer to the river as it parallels US 9W through the towns of Saugerties , Catskill , Coxsackie , and Ravena . Just north of Ravena, the Thruway meets the west end of the Berkshire Connector, a spur linking the Thruway mainline to the Massachusetts Turnpike 25 miles (40 km) to the east. The highway continues into the vicinity of Albany , where it connects to Troy via I-787 at exit 23 and intersects I-90 at exit 24. The latter of

17201-510: The highway to the proposed Thruway. Construction on the extension began in 1950, and the new route was opened in 1956. The Major Deegan Expressway is named for William Francis Deegan , who died in 1932. He was an architect, a major in the Army Corps of Engineers , and a Democratic political leader in New York City. I-87 was assigned on August 14, 1957, as part of the establishment of the Interstate Highway System. The highway initially utilized

17368-574: The highway's construction, Saratoga County has become the fastest growing area of the Capital District, and indeed all of upstate New York. For its first few miles in Saratoga County, I-87 runs across lightly developed parts of the towns of Halfmoon and Clifton Park . Near exit 9, however, the freeway passes through the commercial center of Clifton Park as it connects to NY 146 . Clifton Park Center , one of several shopping plazas at

17535-504: The interchange with 31st Street, and I-278 continues northwest along the tolled, eight-lane Robert F. Kennedy Bridge , which passes over Astoria. Eastbound tolls are collected electronically at this point. I-278 crosses the East River on the Robert F. Kennedy Bridge, which maintained by the TBTA . It then enters Wards Island , which is a part of the borough of Manhattan . On Wards Island,

17702-653: The interchange with Humboldt Street/ McGuinness Boulevard . The BQE enters more industrial areas as it comes to the Meeker Avenue/Morgan Avenue exit. I-278 crosses the Newtown Creek into Queens on the Kosciuszko Bridge . Upon entering Queens, the BQE runs north between residential neighborhoods to the east and Calvary Cemetery to the west before coming to an interchange with the LIE ( I-495 ). After I-495,

17869-410: The junction, is situated southwest of the exit. Past exit 9, the commercial development subsides as I-87 traverses another area dominated by housing tracts. Just north of the exit, the freeway passes a rest area for northbound traffic. The freeway continues on, passing to the west of the centers of Round Lake at exit 11 and Malta at exit 12. The roadway then meets US 9 at Exit 13,

18036-617: The last interchange on I-87 before the Canada–United States border. Past the exit, the highway doubles in width, becoming eight lanes wide as it begins to run past the customs facilities on the American side of the border. The Northway and I-87 end shortly thereafter at the Canada–United States border, where the highway continues past the Champlain–St. Bernard de Lacolle Border Crossing into Quebec as A-15 toward Montreal. The origins of

18203-536: The latter routed along Watervliet Shaker Road. After a brief stretch of housing tracts, I-87 connects to NY 2 and NY 7 at exit 6, a single-point urban interchange , in a commercialized part of Latham . NY 7 joins I-87 here, following the freeway for roughly 0.8 miles (1.3 km) to exit 7, the west end of a limited-access highway previously known locally as Alternate Route 7. While NY 7 heads east toward Troy , I-87 continues north past gradually less commercialized areas as it approaches

18370-527: The new Tappan Zee Bridge became one of the longest cable-stayed spans in the nation. In June 2017, the Tappan Zee Bridge was renamed the Governor Mario M. Cuomo Bridge. The renaming resulted in controversy from the public who wanted to keep the name to honor Tappan Indians and Dutch who previously resided in the area. In August 2019, some signs for the bridge were replaced because they did not include

18537-508: The new spans being built to the north of the existing bridge. The new bridge connects to the existing highway approaches of I-87 and I-287 on both river banks. The northbound/westbound span opened on August 25, 2017. Southbound/eastbound traffic remained on the old bridge until October 6, 2017. At that point, southbound/eastbound traffic shifted to the westbound span of the new bridge and the old bridge closed. The bridge's eastbound span opened to traffic on September 11, 2018. Upon completion,

18704-521: The northern county line. The businesses ultimately give way to stretches of homes and subdivisions as the highway crosses into Saratoga County by way of the Thaddeus Kosciusko Bridge , called by locals "the twin bridges ", spanning the Mohawk River . The northern portion of the Northway through Colonie and Saratoga County is now a heavily traveled commuter route as a six-lane freeway. Since

18871-548: The northern edge of Manhattan . North of Kingsbridge, the expressway follows a generally northeasterly alignment, passing through the center of Van Cortlandt Park as it connects to Mosholu Parkway and Jerome Avenue . Mosholu Parkway also links the Deegan to the Henry Hudson and Saw Mill River parkways, which run parallel to the Major Deegan Expressway through the western Bronx and Manhattan. Past Jerome Avenue,

19038-403: The northern part of Lake George. At the time, I-87 curved around the western outskirts of the village to end at NY 9N north of the village on a highway built c.  1964 . In mid-1966, the state opened a $ 23-million (equivalent to $ 165 million in 2023 ) section of the Northway between Lake George and exit 26 at Pottersville . I-87 was reconfigured slightly near Lake George as

19205-635: The northwest, bypassing the village to cross the Ausable River and enter Clinton County. Just across the county line, I-87 intersects NY 9N again at exit 34 in Keeseville , finally leaving the more rural, mountainous areas of the Adirondack Mountains and entering a more populated region. Exit 34 is the southernmost junction to feature bilingual guide signs in English and French due to

19372-480: The opening of a mile-long (1.6 km) underpass connecting Queens Boulevard with Roosevelt Avenue. The major interchange with the Long Island Expressway was rebuilt in 1966 for $ 32.7 million (equivalent to $ 235 million in 2023 ). The construction of the BQE, overseen by Moses, tore through many residential neighborhoods in Brooklyn and Queens instead of following the East River. One portion of

19539-399: The outlet for the new exit, rather than Lily Pond Avenue and Bay Street. On January 17, 2013, westbound exit 13 was permanently closed in favor of a new interchange setup, which involved two new ramps: exit 13B for Richmond Road and Targee Street and exit 13A for Clove Road. The Gowanus Expressway was initially the Gowanus Parkway, first planned in the 1930s. Construction of

19706-466: The part from Katonah to Goldens Bridge, was completed by 1971. On January 1, 1970, I-87 was rerouted between Elmsford and Newburgh to follow the mainline of the Thruway instead, leaving the Purchase–Brewster freeway to become I-684 . The original Tappan Zee Bridge , carrying the concurrency of New York State Thruway , I-87, and I-287 , was a cantilever bridge built during 1952–55. The bridge

19873-486: The part of Interstate 87 (I-87) north of the New York State Thruway, was built in segments, which became I-87 as they were completed and linked to the pre-existing route. Construction began in the late 1950s on the portion of the Northway between the Thruway and NY 7 near Latham . This segment was open to traffic by 1960. Fuller Road Alternate, the lone portion of the Adirondack Northway not part of I-87,

20040-585: The preexisting New York State Thruway from Albany to Newburgh and in lower Westchester County, and the Major Deegan Expressway in New York City. From Newburgh to the Elmsford area, I-87 was to follow a new highway running parallel to US 9 northward along the eastern bank of the Hudson River to Fishkill . I-87 would then have followed the proposed I-84 across the Hudson to rejoin the Thruway outside of Newburgh. After

20207-472: The project, $ 1.7 billion in city funding was allocated, with the remainder to be footed from the state and federal governments. Because of sizable opposition to demolishing the promenade, mayor Bill de Blasio later stated that his administration was open to considering other ideas, including routing the expressway over Brooklyn Bridge Park . Hundreds of people, including Brooklyn Borough President Eric Adams and City Comptroller Scott Stringer, rallied on

20374-484: The promenade, calling for more public review. Local residents are strongly opposed to the construction of the temporary six-lane highway as it would run right up against their homes. In response, the Brooklyn Heights Association came up with an alternate plan, which called for the construction of a temporary bilevel roadway running besides the promenade on land including a parking lot. Support for reducing

20541-584: The region and serves approximately 80 million people in the Mid-Atlantic states , New England , and Quebec . Motorists can connect to multiple highways to travel farther south along I-95 through the Mid-Atlantic states or farther east into New England. The highest traffic counts on the highway are between the Bruckner Expressway and the George Washington Bridge in New York City. The remainder of

20708-491: The regionally popular Saratoga Race Course and thus receives heavy traffic during the racing season. A southbound-only entrance ramp exists off Nelson Avenue Extension about one mile (one point six kilometres) south of exit 14, designed to handle traffic exiting the track at Saratoga Race Course and the Saratoga Casino Hotel . The highway continues around the eastern edge of Saratoga Springs to exit 15, where

20875-448: The relatively undeveloped areas east of I-87 are briefly replaced by Wilton 's commercial district along NY 50 . As I-87 continues northeast through Wilton, it heads across significantly less developed areas, with open fields becoming the most common feature along the road. It continues into Moreau , connecting to US 9 and serving Moreau Lake State Park by way of exit 17, a once cloverleaf interchange being converted to

21042-471: The resorts of Saratoga Springs and Lake George ; and on to Plattsburgh and Montreal . I-87 heads northeast from I-90 as a six-lane freeway with three lanes in each direction. It immediately traverses the Albany Pine Bush Preserve and passes west of Rensselaer Lake before crossing CSX Transportation 's Hudson Subdivision and running parallel to Wolf Road, a business thoroughfare through

21209-427: The river and its rural valley to the northeast for 15 miles (24 km) to the town of North Hudson . In North Hudson, the valley becomes less pronounced as the Schroon River reaches its source near exit 30. Here, US 9 and I-87 cross paths again, with the former heading northwest toward Keene and the latter continuing northeast in a narrow valley formed by Ash Craft Brook. After five miles (8.0 km),

21376-644: The road runs along the East River harbor in Downtown Brooklyn/ Brooklyn Heights and is partially covered to create the Brooklyn Heights Promenade . As of October 2021 , the roadway has been reduced to two lanes in each direction between Atlantic Avenue and the Brooklyn Bridge as part of efforts to extend the life of the roadway and meet modern safety standards for lane width and shoulders. I-278, at this point maintained by

21543-419: The road's proximity to Quebec . Beyond NY 9N, the Northway curves to the north, running along the west side of Keeseville before entering another rural but fairly level stretch that follows I-87 out of Adirondack Park. Now outside the park, the highway encounters more frequent pockets of development as it follows NY 22 into the town of Plattsburgh . Just inside the town line, the Northway crosses over

21710-529: The road, overseen by Robert Moses, started in 1939, with the parkway being built on top of the BMT Third Avenue Line . The parkway was completed in 1941 and became part of the Belt Parkway that received the NY ;27A designation. The Gowanus Parkway was to be reconstructed into the Gowanus Expressway in the 1950s to connect the Verrazzano-Narrows Bridge to the Brooklyn–Battery Tunnel. The first segment of

21877-519: The roadbed of the section of the parkway that is concurrent with I-278. This section of I-278 now has a 14-foot (4.3 m) vertical clearance, which allows most trucks to stay on I-278. In late 2024, the NYCDOT began considering a plan to construct freeway caps above parts of the Brooklyn–Queens Expressway, as well as converting the spaces under the expressway into public plazas. In 1999,

22044-457: The roadway. These boxes used a two-way ultra high frequency radio network to connect directly to New York State Police dispatchers. In February 2023, the New York State police announced that the call box system was being decommissioned and would be removed complete by Fall 2023. The first of 13 new cellular phone towers along I-87 was installed in October 2008. A second cellular phone tower

22211-602: The route in New York City and its suburbs (mainly Suffern and south) also has particularly high traffic counts, especially over the Tappan Zee Bridge as it goes over the Hudson River . Upstate, the most used sections are in Albany and Saratoga , as those are the most populated areas in the north. The least used sections of I-87 are the portions of the Thruway between Newburgh and the Berkshire Connector , followed by

22378-429: The same path; the Northway itself actually begins not at I-87/I-90 but about one mile (1.6 km) south from its interchange, the Northway reaches its southern terminus at Western Ave ( US 20 ), and then joins with I-87 for the rest of its route. I-87 turns to head north toward the Canada–United States border at Champlain while I-90 continues east toward downtown Albany and Rensselaer County . South of this point,

22545-577: The segment of I-278 between the Williamsburg Bridge and the Major Deegan Expressway , but this ultimately became a part of I-278. Additionally, the Bruckner Expressway portion of I-278 had been designated with different route numbers. At first, it was to be I-895 between I-87 and the Sheridan Expressway and I-678 past there. Later, I-278 was planned to follow the Bruckner Expressway and the Sheridan Expressway to I-95 (with no route number for

22712-512: The size of or tearing down the BQE increased, with articles in New York and The Wall Street Journal calling for the removal of the highway. They noted how the removal of highways in other cities improved local neighborhoods and led to economic development. Commissioner Trottenberg had dismissed calls to tear down the highway saying that the city got most of its freight by truck and that "For better or for worse, these Moses-built highways [...] now

22879-681: The stream reaches its source at Lincoln Pond, leaving the Northway to climb in elevation and wind its way northeastward across the surrounding mountains. It reaches slightly more level ground in Westport , where I-87 connects to NY 9N at exit 31. From here, the highway takes a generally northerly track across the Boquet River to the town of Lewis , rejoining US 9 as both roads head toward Clinton County . They split again after seven miles (11 km) as US 9 veers more easterly than I-87 to serve Keeseville . The Northway, meanwhile, heads to

23046-567: The think tank Reason Foundation proposed placing the BQE within Brooklyn Heights in a tunnel. However, NYCDOT did not seriously consider this suggestion until 2016 when it studied six possible tunnel configurations. NYCDOT found that only the tunnel option starting at 21st Street on Third Avenue and ending near Kent Avenue in Williamsburg would be feasible. This option would have served as a bypass, with vehicles heading to Downtown Brooklyn, or

23213-406: The town of Colonie . Wolf Road itself begins adjacent to exit 2, a cloverleaf interchange with NY 5 (Central Avenue). Heading northbound, the ramp for exit 2E feeds directly into the intersection of NY 5 and Wolf Road, located just west of Colonie Center , one of the Capital District 's largest enclosed shopping malls. I-87 continues to run alongside Wolf Road to exit 4,

23380-423: The towns of Beekmantown and Chazy . Outside of the hamlet of Chazy, the Northway begins to run across a series of wetlands along the west side of US 9. The marshy terrain follows I-87 into the town of Champlain, where I-87 encounters the northernmost community along its course, the village of Champlain . I-87 veers slightly westward to avoid the village, and in doing so it meets US 11 at exit 42,

23547-403: The two junctions is the busiest of the Thruway's exits, serving an estimated 27 million vehicles a year. I-87 then widens to six lanes and runs across the capital city's residential suburbs for six miles (9.7 km) to exit 24, a complex interchange with I-90. At this point, I-87 leaves the Thruway to access the nearby south end of the toll-free Adirondack Northway, also known simply as

23714-534: The two-mile (3.2 km) I-587 and the 10-mile (16 km) I-787 , link I-87 to the cities of Kingston and Albany , respectively. Two other spurs of I-87 were planned but never constructed, with no plans to sign them in the near future. In the Hudson Valley, I-487 would have run along the Hudson River from I-87 and I-287 in Tarrytown to I-84 east of Beacon . The other spur, I-687 , would have connected I-90 in Albany to I-87 near Albany International Airport in Colonie . Both routes were canceled in

23881-434: The viaduct structure of the Gowanus Expressway has deteriorated. In 1998, a $ 16-million (equivalent to $ 27.9 million in 2023 ) feasibility study for a tunnel for the Gowanus Expressway was awarded. NYSDOT was considering putting the road in a tunnel, but, in November 2011, the FHWA canceled the project. The viaduct's vertical steel supports show material missing due to rust, but the federal government has stated that it

24048-411: The viaduct within Downtown Brooklyn and Fort Greene . Simultaneously, the Queens section of the BQE between Queens Boulevard and 25th Avenue was also renovated. The Koscisuzko Bridge was replaced from 2014 to 2017 with a new eastbound span that temporarily served both directions of traffic. A second span of the Kosciuszko Bridge opened in 2019 for westbound traffic, adding more lanes to the BQE across

24215-425: The village of Lake George , where I-87 meets NY 9N via exits 21 and 22. Route 9N veers to the northeast along the shore of Lake George as "Lake Shore Drive", toward the town of Bolton Landing , a popular village on the shore of Lake George with shops and restaurants. Exit 22 is the last exit before the Northway begins traversing approximately 90 miles (140 km) of mostly rural areas where

24382-417: The western leg is signed as part of I-278. I-278 turns west to run along the eight-lane state-maintained Grand Central Parkway , with Astoria Boulevard (and Hoyt Avenue later on) serving as a frontage road. The road runs along a depressed alignment, passing under Amtrak 's Northeast Corridor , then the New York City Subway 's BMT Astoria Line at 31st Street. The Grand Central Parkway overlap ends at

24549-438: Was able to fight these proposed routes, which created the two-tiered section above Furman Street with the promenade over it. Several tunnels were later proposed to replace the promenade, but none of the tunnel proposals were supported or funded. In 1958, existing segments of the expressway were eligible for Interstate Highway funding. For a short time, the segment of highway between the Robert F. Kennedy and Williamsburg bridges

24716-425: Was also planned to extend east beyond I-278 to John F. Kennedy International Airport , and then curve northward on the Clearview Expressway , ending at the Bruckner Interchange in the Bronx. If these plans were fully completed, I-78 and I-278 would have met at three interchanges. Two segments of I-278 have had different route number designations formerly planned or designated for it. I-87 was once planned to follow

24883-414: Was built in 2005. After Todt Hill Road and Slosson Avenue, I-278 runs through a wooded area where it comes to an incomplete interchange that was to be the northern terminus of the Richmond Parkway . The road continues back into residential areas and comes to an interchange serving Clove Road and Richmond Road. Past this, I-278 passes over the Staten Island Railway rapid transit line. The next interchange

25050-418: Was built on and over the roadway of Bruckner Boulevard (originally called Eastern Boulevard). Unlike the Cross Bronx Expressway, which cut through the existing street grid, the Bruckner Expressway was built along the Bruckner Boulevard alignment (except at its western end, where the Bruckner Expressway and Major Deegan Expressway meet). Between Sheridan Boulevard and the eastern end of the Bruckner Expressway,

25217-417: Was built, however. The aborted section, from the expressway to Richmond Avenue, has become a part of the Staten Island Greenbelt , one of New York City's public parks. A ramp stub of an interchange on the expressway, cut into the hills of Todt Hill , still exists. Part of the trail system of the greenbelt was using the abandoned overpass bridge as pedestrian crossing of the expressway up until 2013, when it

25384-434: Was chosen as America's Most Scenic New Highway of 1966 by Parade . It became the second New York highway to win the award, as a stretch of NY 17 in Broome and Delaware counties was selected for the title in 1964. The gap in the Northway between Pottersville and Keeseville was narrowed considerably by July 1967 with the completion of a 25-mile (40 km) segment from Pottersville to exit 30 at Underwood. It

25551-437: Was closed further on July 25, 1967, with the opening of a three-mile (4.8 km) stretch near Keeseville between exits 34 and 33. The last section of the Northway to be built, a 30-mile (48 km) stretch between Underwood and Keeseville (exit 33), was finished on August 31, 1967. The completion of the Northway linked New York City with Montreal by way of a direct, limited-access highway, with I-87 becoming A-15 at

25718-405: Was completed just one month later. Exit 6 on the Adirondack Northway was originally a diamond interchange . Construction to convert the junction into a single-point urban interchange began in mid-2008 and was completed on September 12, 2010. The total cost of the project was $ 41.9 million (equivalent to $ 57.2 million in 2023 ). Until October 2019, there was no exit 3 on

25885-415: Was completed on October 31, 2015. In August 2018, plans were announced to build a new exit 3 on the Northway, providing more direct access from both directions to Albany International Airport. The project was completed by Lancaster Development and Tully Construction at a cost of $ 50 million, with a target completion date of mid-2020. As part of the interchange, a flyover ramp was constructed over

26052-459: Was dismantled for lane widening improvements. The first link of the SIE opened in January 1964, from the Goethals Bridge to Victory Boulevard . The remainder opened later that year. The freeway had a total cost of $ 47 million (equivalent to $ 353 million in 2023 ). In 1998, bus lanes were created on the eastern part of the SIE near the Verrazzano-Narrows Bridge; they were extended west to Todt Hill Road/Slosson Avenue in 2005. In 2008,

26219-413: Was finished on July 19, 1963, and the entire NY 67–US 9 segment was completed by 1964. An extension linking NY 149 to NY 9N south of Lake George village opened in mid-1963. By July 1963, the Northway was completed from the Canada–United States border south to exit 34 at Keeseville . Additionally, the existing Albany–Lake George section was extended slightly by May 1966 to serve

26386-403: Was modified slightly by 1968: I-87 still began in New York City, then overlapped with I-287 east to Purchase. From there, I-87 headed north along the now-open expressway to Armonk, where it ended at NY 22 . Another portion of the highway, from Goldens Bridge ( NY 138 ) to Brewster, was open as well while the part from Armonk to Katonah was under construction. This segment, as well as

26553-527: Was opened in pieces from the 1930s through the 1960s. Some of its completed segments predated the Interstate Highway System and are thus not up to standards , and portions of I-278 have been upgraded over the years. In New York, the various parts of I-278 were planned by Robert Moses , an urban planner in New York City. The segments proposed tore through many New York City neighborhoods, causing controversy. Despite its number, I-278 does not connect to I-78 . There were once plans to extend I-278 west to I-78 east of

26720-480: Was opened, it featured one of the few railroad grade crossings on an Interstate Highway, just south of the Thaddeus Kosciusko Bridge over the Mohawk River. This at-grade crossing was removed within a couple of years when the railroad line was cut backward and the crossing was no longer needed. Construction on the portion of highway between the two segments began c.  1962 . The 1.8-mile (2.9 km) part between NY 9P and NY 50 near Saratoga Springs

26887-443: Was originally intended to be part of the Southern Albany Expressway, a proposed highway which would have connected the Northway to Interstate 787 and run parallel to the Thruway between exits 23 and 24. Exit 1 of the Northway is the only exit on the highway that is within Albany, it connects the highway to Interstate 90 (I-90). The highway connects Albany to the suburbs to the north such as Latham, and Clifton Park ;

27054-401: Was originally intended to be part of the Southern Albany Expressway, a proposed highway which would have connected the Northway with I-787 and run parallel to the Thruway between exits 23 and 24. The Northway was built in segments, which became I-87 as they were completed and linked to the preexisting route. Construction began in the late 1950s on the portion of the Northway between

27221-420: Was shifted to the New York State Thruway between Newburgh and the Deegan Expressway; its previous alignment between Brewster and White Plains was redesignated as I-684 . Meanwhile, all of the Adirondack Northway, the portion of I-87 slated to extend from Albany north to the Canada–United States border, had yet to be built. Fuller Road Alternate, the spur leading south from the Adirondack Northway to US 20 ,

27388-439: Was three miles (4.8 km) long and spanned the Hudson at its second-widest point. Before its replacement in 2017, the deteriorating structure carried an average of 138,000 vehicles per day, substantially more traffic than its designed capacity. During its first decade, the bridge carried fewer than 40,000 vehicles per day. Part of the justification for replacing the bridge stems from its construction immediately following

27555-461: Was to be designated I-87 and continue north as the Major Deegan Expressway. By 1959, the I-278 designation was given to the entire length of the highway. Since the roadway was constructed prior to modern expressway standards, the road needed to be upgraded to meet these standards. By the 1990s, a major multiyear project beginning in the 1980s brought upgrades to the BQE. In the early 2000s, the expressway underwent another upgrade project that replaced

27722-407: Was to repair the existing six-lane highway one lane at a time. The promenade walkway would be closed for up to six years under the first option and for two years under the second option, with periodic closures for construction use. The NYCDOT commissioner, Polly Trottenberg , called the project "the most challenging project not only in New York City, but arguably in the United States right now". For

27889-435: Was to run along an abandoned railroad right-of-way , it would traverse through dense development in Roselle Park , Kenilworth , and Union Township, thereby making the project further disliked. By 1967, state officials decided not to pursue the continuation of I-278 and used the funds for I-278 to build I-195 across Central Jersey instead. The only section of I-278 in New Jersey was built between US 1/9 in Linden and

#145854