Misplaced Pages

SpaceX CRS-11

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

SpaceX CRS-11 , also known as SpX-11 , was a Commercial Resupply Service mission to the International Space Station , launched successfully on 3 June 2017. The mission was contracted by NASA and was flown by SpaceX . The mission utilized a Falcon 9 launch vehicle and was the first reuse of C106 , a CRS Dragon cargo vessel that was previously flown on the CRS-4 mission.

#541458

42-648: CRS-11 was the penultimate of the first twelve missions awarded to SpaceX under the Commercial Resupply Services contract to resupply the International Space Station. The CRS-11 mission was the first time that a Dragon spacecraft has been reused, helping SpaceX to scale back its production line and shift focus to Dragon 2 . CRS-11 launched aboard a Falcon 9 launch vehicle on 3 June 2017 at 21:07:38 UTC from Kennedy Space Center 's Launch Complex 39A (LC-39A). The spacecraft rendezvoused with

84-458: A Dragon capsule's ability to remain in orbit, receive and respond to ground commands, and communicate with NASA's Tracking and Data Relay Satellite System . On 15 August 2011, SpaceX announced that NASA had combined the objectives of the COTS Demo Flight 2 and following Flight 3 into a single mission. The rescoped COTS Demo Flight 2 successfully launched on 22 May 2012, delivering cargo to

126-528: A combined, not-to-exceed value of $ 14 billion. NASA officials explained that selecting three companies rather than two for CRS-2 increases cargo capabilities and ensures more redundancy in the event of a contractor failure or schedule delay. The CRS-2 flights commenced in November 2019 with the launch of Cygnus NG-12 mission. Inside-cargo is typically transported to and from the space station in "the form factor of single Cargo Transfer Bag Equivalent (CTBE) [which

168-559: A competitive range determination to remove Boeing and Lockheed Martin. Orbital ATK (later purchased by Northrop Grumman), Sierra Nevada, and SpaceX were awarded CRS-2 contracts in January 2016 with initial task orders awarded in June 2016. Each of the three companies is guaranteed at least six cargo missions under the CRS-2 contract. As of December 2017, NASA had awarded $ 2.6 billion on three contracts with

210-554: A further enlarged Mission B version of Cygnus, with a 1.5 m (4.9 ft) stretch to the payload module and payload mass increased to 5,000 kg (11,000 lb). This version is expected to enter service with the NG-23 mission in 2025 (the first to use the new Antares 330 launch vehicle). In August 2019, NASA decided to sole source its design for the Minimal Habitation Module (Habitation and Logistics Outpost, or HALO) of

252-454: A gross mass of 1,800 kg (4,000 lb), 32 thrusters for attitude control and one BT-4 main engine fuelled with 800 kg (1,800 lb) of hypergolic propellants, hydrazine and nitrogen tetroxide . The SM is capable of producing up to 4 kW of electrical power via two solar arrays. The PCM is manufactured by Thales Alenia Space in Turin , Italy. The first "Standard" PCMs had

294-400: A length of 5.14 meters (16.9 ft), a payload capacity of 2,000 kilograms (4,400 lb), and a pressurized cargo volume of 18.9 cubic metres (670 cu ft). The fourth and all subsequent Cygnus spacecraft are the "Enhanced" variant. These have a stretched PCM with a length of 6.39 meters (21.0 ft), a payload capacity of 3,500 kilograms (7,700 lb), an increase of 32%, and

336-408: A payload mass simulator to low Earth orbit on April 21, 2013. On September 18, 2013, Antares successfully launched a Cygnus spacecraft on a flight test to rendezvous with the International Space Station. On 12 January 2014, the first scheduled Cygnus resupply mission arrived at the space station; the capsule carried Christmas presents and fresh fruit for the astronauts. Its arrival was delayed, first by

378-409: A pressurized cargo volume of 27 cubic metres (950 cu ft), an increase of 19.5%. To launch the added weight, Orbital used the more powerful Castor 30XL solid-fuel rocket as a second-stage. Starting in mid-2025, a further enlarged "Mission B" Cygnus will be introduced with a length of 7.89 meters (25.9 ft), a payload capacity of 5,000 kilograms (11,000 lb), an increase of 19.5%, and

420-575: A pressurized cargo volume of 36 cubic metres (1,300 cu ft), an increase of 15.5%. During a typical CRS missions, Cygnus maneuvers close to the International Space Station, where the Canadarm2 robotic arm grapples the spacecraft and berths it to a Common Berthing Mechanism , typically the nadir port of the Unity module . Cygnus does not provide cargo return capability. However, it can be loaded with obsolete equipment and trash which will burn up as

462-501: A result Russia's invasion of Ukraine, Northrop Grumman was left with only two remaining Antares 230+ launch vehicles which were used for the CRS NG-18 and CRS NG-19 missions. Northrop Grumman acquired three flights from SpaceX with the Falcon 9 rocket while a replacement first stage and its engine are developed for its Antares 330 rocket. Northrop Grumman plans to launch further missions using

SECTION 10

#1732869110542

504-706: A series of flights awarded by NASA for the delivery of cargo and supplies to the International Space Station (ISS) on commercially operated spacecraft. The first phase of CRS contracts (CRS-1) were signed in 2008 and awarded $ 1.6 billion to SpaceX for twelve Dragon 1 and $ 1.9 billion to Orbital Sciences for eight Cygnus flights, covering deliveries to 2016. The first operational resupply missions were flown by SpaceX in 2012 ( CRS SpX-1 ) and Orbital in 2014 ( CRS Orb-1 ). In 2015, NASA extended CRS-1 to twenty flights for SpaceX and twelve flights for Orbital ATK . A second phase of contracts ( CRS-2 )

546-670: A service module based on Orbital's Star Bus , a satellite bus in use since 1997, which would be attached to a pressurized cargo module built by Thales Alenia Space , which had also built the MPLM cargo module used by the Space Shuttle, the cargo module for the European ATV spacecraft and several permanent modules on the ISS. Cygnus was awarded a COTS contract worth $ 170 million in February 2008, which

588-509: Is a breakdown of cargo bound for the ISS: A constellation of five CubeSats was also carried on the mission as part of Birds-1 , one each from the countries of Japan , Nigeria , Bangladesh , Ghana , and Mongolia . The satellites from Bangladesh ( BRAC ONNESHA ), Ghana ( GhanaSat-1 ), and Mongolia ( Mazaalai ) were those countries' first satellites in space. Commercial Resupply Services Commercial Resupply Services ( CRS ) are

630-591: Is considerably less. CRS-2 launches commenced in 2019 and will extend to at least 2024. Three more CRS-2 missions for Dragon 2 covering up to CRS-29 were announced in December 2020. When NASA issued the Commercial Resupply Services phase 2 (CRS-2) request for proposal (RFP) in September 2014, it received interest from five companies: Lockheed Martin, Boeing, Orbital ATK, Sierra Nevada, and SpaceX. NASA made

672-470: Is the] unit for size of bag used to transport cargo from visiting vehicles , such as SpaceX Dragon , Northrop Grumman Cygnus , or JAXA H-II Transfer Vehicle (HTV). The bags are sized at 48 cm × 41 cm × 23 cm (19 in × 16.25 in × 9 in) and limited in transport mass to 27 kg (60 lb) each. CTBE units are also used to price, and charge, commercial users of US Orbital Segment stowage space. As

714-529: The Automated Transfer Vehicle , to be jointly developed with Thales Alenia Space . Three companies were awarded contracts on January 14, 2016. Sierra Nevada Corporation 's Dream Chaser , the SpaceX Dragon 2 , and Orbital ATK Cygnus were selected, each for a minimum of six launches. The maximum potential value of all the contracts was indicated to be $ 14 billion, but the minimum value

756-611: The Commercial Orbital Transportation Services (COTS) program. To create Cygnus, Orbital paired a pressurized cargo module, largely based on the Multi-Purpose Logistics Module , built by Thales Alenia Space and previously used by the Space Shuttle for ISS resupply, with a service module based on Orbital's GEOStar , a satellite bus . After a successful demonstration flight in 2013, Orbital

798-544: The Lunar Gateway to Northrop Grumman Innovation Systems, which offered a minimalist 6.1 m (20 ft) by 3 m (9.8 ft) design based directly on the Enhanced Cygnus, as well as a larger 7 m (23 ft) by 4.4 m (14 ft) design having radial docking ports, body-mounted radiators (BMRs), batteries and communications antennas added on the outside. Northrop Grumman Innovation Systems opted to build

840-715: The Wallops Flight Facility in Virgina, however it is able to fly on other launch vehicles. After the failure of an Antares rocket destroyed Cygnus CRS Flight 3 and damaged the Wallops facility, two Cygnus missions were launched with Atlas V rockets in 2015 and 2016. Additionally, two Cygnus missions have launched on the Falcon 9 rocket in 2024 with one more scheduled to launch in 2025, operated by CRS competitor SpaceX . In addition to Cygnus, ISS resupply missions have been flown by

882-574: The 2000s funding was authorized for the Commercial Orbital Transportation Services program, followed by the Commercial Crew Development program. On 23 December 2008, NASA announced the initial awarding of cargo contracts - twelve flights to SpaceX and eight flights to Orbital Sciences Corporation . PlanetSpace , which was not selected, submitted a protest to the Government Accountability Office . On 22 April 2009,

SECTION 20

#1732869110542

924-671: The CRS-11 mission from SpaceX and therefore determines the primary payload, date/time of launch, and orbital parameters for the Dragon space capsule . CRS-11 carried a total of 2,708 kg (5,970 lb) of material into orbit. This included 1,665 kg (3,671 lb) of pressurised cargo with packaging bound for the International Space Station, and 1,002 kg (2,209 lb) of unpressurised cargo composed of three external station experiments: Neutron Star Interior Composition Explorer (NICER), MUSES and Roll Out Solar Array (ROSA). The following

966-719: The Cygnus makes a destructive reentry . An earlier proposed version of Cygnus would have replaced the PCM with the Unpressurized Cargo Module (UCM), based on NASA's ExPRESS Logistics Carrier , and would have been used to transport unpressurized cargo, such as ISS Orbital Replacement Units . Another proposed variant would have replaced the PCM with the Return Cargo Module (RCM), which would have allowed Cygnus to return cargo to Earth. In August 2023, Northrop Grumman announced

1008-516: The Dream Chaser spaceplane itself. Boeing's proposal likewise used a cargo version of its CST-100 crew vehicle. Lockheed Martin proposed a new cargo spacecraft called Jupiter , derived from the designs of the NASA's MAVEN and Juno spacecraft. It would have included a robotic arm based on Canadarm technology and a 4.4-meter (14 ft) diameter cargo transport module called Exoliner based on

1050-447: The GAO publicly released its decision to deny the protest, allowing the program to continue. The Antares and Falcon 9 launch vehicles and Cygnus and Dragon cargo spacecraft were developed using Space Act Agreements under NASA's Commercial Orbital Transportation Services (COTS) program. The first flight contracted by NASA, COTS Demo Flight 1 , took place on 8 December 2010, demonstrating

1092-636: The ISS. The spacecraft reentered on 31 May, landed in the Pacific Ocean, and was recovered, completed CRS certification requirements. Orbital Sciences first launched the Antares rocket from the Mid-Atlantic Regional Spaceport on 21 April 2013 with a test payload. Orbital Sciences completed the Cygnus Orb-D1 demonstration flight on 29 September 2013, and the operational Cygnus CRS Orb-1

1134-819: The Russian Progress spacecraft , the European Automated Transfer Vehicle , the Japanese H-II Transfer Vehicle and the American SpaceX Dragon . Cygnus is the Greek word for swan and the name of a constellation . After the retirement of the Space Shuttle was announced, NASA began to look for commercial space launch companies who could fly cargo to the ISS. In early 2006, the agency started its Commercial Orbital Transportation Services (COTS) program, where it would help fund

1176-528: The development of cargo spacecraft after a competitive process. SpaceX and Rocketplane Kistler won contracts in the COTS program, however Rocketplane Kistler failed to meet several financial milestones and on 18 October 2007, NASA announced it would terminate its contract and re-award it after a second competition. Orbital Sciences Corporation participated in this second round, proposing a largely "off-the-shelf" design. The spacecraft, named Cygnus, would be built around

1218-674: The extra capabilities of the Atlas allowed payload to be increased to 3,500 kg (7,700 lb). The Cygnus spacecraft consists of two basic components: the Service Module (SM) and the Pressurized Cargo Module (PCM). The SM was based on prior products developed by Orbital including the GEOStar and LEOStar (collectively known as Star Bus ) satellite buses and the Dawn spacecraft . It has

1260-494: The fifth successful touch down on land and the 11th overall. The CRS-11 Dragon remained attached to the ISS for just over 27 days. Having been filled with around 2,708 kg (5,970 lb) of cargo, Dragon was unberthed from the station on 2 July 2017 at approximately 18:00 UTC. It was moved to its release position by Canadarm2, but poor sea conditions forced a delay to the following day. On 3 July 2017, at 06:41 UTC, crew members commanded Canadarm2 to release Dragon, and soon after

1302-604: The first stage was subcontracted to Ukrainian companies and used refurbished NK-33 engines, remnants of the Soviet N1 moon rocket. The second stage was the Castor 30 , which Orbital had previously used on another rocket project (the Minotaur-C ) and was based on a Peacekeeper ICBM first stage. The first Cygnus flight was originally planned to occur in December 2010, but was repeatedly delayed. The Antares made its maiden flight lifting

SpaceX CRS-11 - Misplaced Pages Continue

1344-486: The introduction of a larger Enhanced Cygnus, enabled Orbital ATK to cover their initial CRS contracted payload obligation by OA-7. During August 2015, Orbital ATK disclosed that they had received an extension of the resupply program for four extra missions. These flights enable NASA to cover ISS resupply needs until CRS-2 begins. NASA began a formal process to initiate Phase 2 of the Commercial Resupply Services, or CRS-2, in early 2014. Later that year, an "Industry Day"

1386-679: The minimalist design, which offered the advantage of component compatibility and expedited testing of life support systems on existing Cygnus spacecraft. On 5 June 2020, NASA awarded Northrop Grumman Innovation Systems a $ 187 million contract to complete the preliminary design of HALO. NASA will sign a separate contract with Northrop for the fabrication of the HALO, and for integration with the Power and Propulsion Element (PPE), being built by Maxar . The following list includes only missions that have flown and six planned missions. As of August 2024 one more mission

1428-459: The need to repair the station, and then by frigid weather at the launch site and solar flares that forced postponements. With the December 2015 launch of Orb CRS-4 on Atlas V, the enhanced version of Cygnus made its debut. While it was planned from the beginning to fly on the fifth mission, the Orb CRS-3 failure and subsequent move to Atlas V meant a delay. However, lessons learned on packing and

1470-482: The new Antares 300 series (Antares 330) rockets with booster stage and engines developed by Firefly Aerospace . These missions are also slated to use a new enlarged "Mission B" variant of the Cygnus spacecraft. Cygnus (spacecraft) Cygnus is an expendable American automated cargo spacecraft designed for International Space Station (ISS) resupply missions. It was initially developed by Orbital Sciences Corporation with financial support from NASA under

1512-433: The spacecraft began a series of thruster firings to move it away from the station. About five hours after departing from ISS, Dragon closed its guidance, navigation, and control (GNC) bay door and conducted a 10-minute deorbit burn. Immediately after, the spacecraft jettisoned its cargo trunk and oriented itself for reentry. Dragon splashed down in the Pacific Ocean off Baja California at 12:12 UTC. NASA has contracted for

1554-466: The station on 5 June 2017 and conducted a series of orbit adjustment burns to match speed, altitude, and orientation with the ISS. After arriving at the capture point at 13:37 UTC, the vehicle was snared at 13:52 UTC by the Canadarm2 , operated by Peggy Whitson and Jack Fischer . It was berthed to the Harmony module at 16:07 UTC. The Falcon 9 first stage landed successfully on Landing Zone 1 , making it

1596-420: Was chosen to receive a Commercial Resupply Services (CRS) contract. A larger Enhanced Cygnus was introduced in 2015. Orbital Sciences merged into Orbital ATK in 2015; Northrop Grumman purchased Orbital ATK in 2018 and has continued to operate Cygnus missions. A further enlarged Mission B Cygnus is expected to be introduced in 2025. Cygnus is typically launched using its parent company's Antares rocket from

1638-612: Was held in Houston, with seven high-level requirements disclosed to interested parties. The contracts were expected to include a variety of requirements: CRS-1 contractors Orbital Sciences and SpaceX each submitted CRS-2 proposals, joined by Sierra Nevada , Boeing , and Lockheed Martin . SNC's proposal would use a cargo version of its Dream Chaser crew vehicle, the 'Dream Chaser Cargo System'. The proposed cargo Dream Chaser included an additional expendable cargo module for uplift and trash disposal. Downmass would only be provided via

1680-469: Was later increased to $ 288 million. On 23 December 2008, NASA awarded Orbital Sciences a $ 1.9 billion contract under the Commercial Resupply Services (CRS) program. Under this contract, Orbital Sciences agreed to deliver up to 20 tons of cargo to the ISS through 2016 in eight Cygnus spacecraft flights. To propel Cygnus into space, Orbital developed the Antares rocket , which also leveraged lower-cost, off-the-shelf parts and designs. Construction and design of

1722-450: Was launched 9 January 2014. Transport flights began under Commercial Resupply Services phase 1 (CRS-1) in 2012: Following the failure, the Antares 230 system was upgraded with newly built RD-181 first-stage engines to provide greater payload performance and increased reliability. The next two spacecraft were launched on the Atlas V . With the switch to more powerful launch vehicles and

SpaceX CRS-11 - Misplaced Pages Continue

1764-519: Was solicited in 2014. CRS-2 contracts were awarded in January 2016 to Orbital ATK’s continued use of Cygnus , Sierra Nevada Corporation ’s new Dream Chaser , and SpaceX’s new Dragon 2 , for cargo transport flights beginning in 2019 and expected to last through 2024. NASA has been directed to pursue commercial spaceflight options since at least 1984, with the Commercial Space Launch Act of 1984 and Launch Services Purchase Act of 1990. By

#541458