GE Power (formerly known as GE Energy ) was an American energy technology company owned by General Electric (GE). In April 2024, GE completed the spin-off of GE Power into a separate company, GE Vernova . Following this, General Electric ceased to exist as a conglomerate and pivoted to aviation, rebranding as GE Aerospace .
28-404: Southern California Edison ( SCE ), the largest subsidiary of Edison International , is the primary electric utility company for much of Southern California . It provides 15 million people with electricity across a service territory of approximately 50,000 square miles. SCE owns all of its electrical transmission facilities and equipment. Deregulation of California's electricity market in
56-483: A renewables mix of 23%. By 2016, 28.2% of SCE's power sources were renewable. In 2017, the company opened two new hybrid electric gas turbine (EGT) units called peaker plants, that combine gas turbines and storage batteries at the same site. Each plant delivers around 50-megawatts; the batteries can provide 10-megawatts and four megawatt-hours of power. Both the turbines and the batteries are designed and manufactured by General Electric’s Power Division . The plant runs
84-569: A "green rate". In 2006, Southern California Edison planned to secure 1,500 megawatts or more of power generated from new projects to be built in the Tehachapi Pass Wind Farm area. The contract, which more than doubles SCE's wind energy portfolio, envisions more than 50 square miles (130 km) of wind parks in the Tehachapi region, which is triple the size of any existing U.S. wind farm. In March 2008, Southern California Edison announced
112-499: A $ 875 million project to build a network of 250 megawatts of photovoltaic solar power generation, making it the biggest solar cell project in the nation. The photovoltaic cells will cover 65,000,000 square feet (6,000,000 m) of rooftops in southern California and will generate enough power to serve 162,000 homes. In 2009, Southern California Edison entered into a contract with Solar Millennium to purchase solar thermal power up to 726 MW. Southern California Edison also entered into
140-599: A GE company (BHGE), a new tier-1 business inside the parent group. In June 2017, GE Energy Connections merged again with GE Power & Water, to become the present GE Power. The new combined business unit is led by Scott Strazik. Swiss-based ABB announced in September 2017, a $ 2.6 billion deal with GE Power to acquire the Industrial Solutions division. In October 2017, GE Power sold its Water & Process Technology division to French-based utility company Suez for
168-478: A company founded in 1886 as a provider of street lights in Visalia, California . The company was first incorporated in 1909 as Southern California Edison Company after Southern California acquired the assets of Edison Electric Company ; it was known as Southern California Edison until 1996, when it adopted its current name in recognition of its growing business abroad and in other industry sectors. Edison first became
196-433: A contract with Stirling Energy Systems to buy electricity from a 500 megawatt, 4,600 acre (19 km), solar power plant which was due to open in 2009. The purchase was canceled in late 2010, as changes in technology reduced the cost of photovoltaic-based solar power to below that of solar Stirling generated power. This would have been the first commercial application of the dish stirling system . A different technology from
224-525: A holding company in 1988 when it made a small change to its original name, becoming known as SCEcorp. Edison International acquired the naming rights for the Anaheim Angels ' stadium (previously known as Anaheim Stadium ) in 1998, in a deal running for 20 years. The company backed out of the naming rights deal after the 2003 season, and the stadium is now called Angel Stadium. In 2001, Edison's main holding, Southern California Edison, faced bankruptcy after
252-536: A model 9FB gas turbine in Texas was shut down for two months due to the break of a turbine blade . This model uses similar blade technology to GE's newest and most efficient model, the HA. After the break, GE developed new protective coatings and heat treatment methods. Gas turbines represent a significant portion of GE Power's revenue, and also represent a significant portion of the power generation fleet of several utility companies in
280-542: A number of resources and a rate designed specifically for electric vehicle users. As of July 2018, Southern California Edison planned to add thousands of new charging stations for passenger electric vehicles (EV). This addition is a component of the company's "Charge Ready" program, a pilot program with the aim of increasing the availability of charging ports for EVs. Since 2016, Southern California Edison has installed 1,000 charging stations throughout their Southern and Central California service area. The company also runs
308-459: A rebate program for electric vehicle purchases. Southern California Edison has a long history of research in the energy arena. Often this includes working with other companies and government entities. One example is the SOLARII feasibility generator, which was a solar-powered energy plant that could produce electricity 24 hours a day. This was done by heating molten salts that would hold the heat during
SECTION 10
#1733085355755336-539: A record-capacity three-phase generator for Niagara Falls in 1918 and installation of generators at the Grand Coulee Dam in 1942. On March 29, 2011, GE Energy announced plans to acquire a 90% stake in the French company Converteam for $ 3.2 billion. In July 2012, John Krenicki announced that he would be stepping down as president of GE Energy, and the business would be broken into three new GE businesses consisting of
364-414: A state senate bill regarding financial assistance came up short by $ 1 billion. GE Energy As of July 2019, GE Power is divided into the following divisions: GE Power Systems was a division of General Electric operating as supplier of power generation technology, energy services and energy management and also included oil and gas, distributed power and energy rental related solutions. The unit
392-666: A total of $ 3.4 billion. In June 2018, the private equity firm Advent International agreed to buy GE's distributed power unit for $ 3.25 billion. In 2019, in a strategic realignment to cut costs and satisfy the surging demand in the renewable power market, it was decided to merge the Grid Solutions portfolio into the Renewable Power business. That move took GE assets on electrical transmission grids, battery storage and solar inverters away from GE Power. In June 2019, GE Steam Power started manufacturing half-speed steam turbines for
420-594: Is linked to other California ISO resources by the Path 26 transmission lines that generally follow Interstate 5 over Tejon Pass . The interconnection takes place at a large substation at Buttonwillow . CAISO's and WAPA 's Path 15 and Path 66 , respectively, from Buttonwillow north eventually connect to BPA 's grid in the Pacific Northwest . There are several other interconnections with local and out-of-state utilities, such as Path 46 . Southern California Edison has
448-504: The United States. Chubu Electric of Japan and Électricité de France also had units that were impacted. Initially, GE did not realize the turbine blade issue of the 9FB unit would impact the new HA units. Forced by a wave of very negative financial results, the company went through a series of disinvestments and reorganization in 2017. In May 2017, GE Oil & Gas was combined with Baker Hughes Incorporated to create Baker Hughes ,
476-401: The battery first in a series of short bursts, saving gas usage for longer power demand. The combination of a 30-minute duration battery improves the environmental impact of the gas turbine. The SCE setup (the first of its kind) cut greenhouse gas emissions by 60%, reduced annual water usage by 2 million gallons and lowered the number of gas starts by 50%. Southern California Edison's power grid
504-476: The day and would be used to generate power at night. Dr. John Jurewitz served as Director of Regulatory Policy for Southern California Edison for 15 years until his retirement in July 2007. His major areas of research are in oil, gas, and electricity policy and greenhouse gas regulation. He has testified and participated in government-sponsored proceedings addressing electric industry restructuring and energy policy at
532-450: The following divisions: After lengthy negotiations, on 2 November 2015, GE finalized the acquisition of Alstom 's power generation and electricity transmission business, that were integrated into GE Power & Water. Later, the newly acquired Hydro and Wind business of Alstom, together with GE's own Wind Energy division, were spun-off to create a new subsidiary called GE Renewable Energy . In 2015, GE Power garnered press attention when
560-521: The four Rosatom VVER-1200s being built at Akkuyu Nuclear Power Plant , Turkey's first nuclear power plant. This is part of a joint venture established in 2007, between General Electric and Rosatom subsidiary Atomenergomash , called AAEM Turbine Technology, to supply equipment for VVER nuclear power plants. The joint venture includes the manufacture of heat exchange equipment in Russia. GE has installed about half of all nuclear power plant steam turbines around
588-415: The late 1990s forced the company to sell many of its power plants, though some were probably sold by choice. SCE retained its hydroelectric plants, totaling about 1,200 MW, and its 75% share of the 2,150-MW San Onofre Nuclear Generating Station . The plant is being decommissioned. In addition to its electric business, SCE operates the sole gas utility and water utility on Santa Catalina Island , under
SECTION 20
#1733085355755616-674: The more familiar solar panel, the dish concentrates solar energy by the use of reflective surfaces and by the use of the Stirling heat engine to convert the heat into electricity. In 2014, Southern California Edison installed the Tehachapi Energy Storage Project , which is composed of more than 600,000 lithium-ion battery cells at Monolith Substation in Tehachapi, California in order to test storing power generated from an area that currently has 5,000 wind turbines. In 2014 SCE had
644-508: The names Catalina Island Gas Company and Catalina Island Water Company. The origins of the company lie with the grand scheme of business magnate Henry E. Huntington and hydraulic engineer John S. Eastwood , developed around 1908, for a vast complex of reservoirs to be constructed in the Sierra Nevada Mountains of central California. Huntington founded Pacific Light and Power, one of the roughly two dozen companies he controlled at
672-461: The state, federal, and international levels. In November, 2014, SCE announced a partnership with Ice Energy to provide more efficient energy storage by freezing water at night when electricity is cheaper. (Ice Energy filed for Chapter 7 bankruptcy in December 2019.) In 2015, Southern California Edison laid off about 400 IT employees, with an additional 100 IT workers leaving voluntarily. Meanwhile,
700-739: The time, to execute what would eventually become one of the largest hydropower systems in the United States, the Big Creek Hydroelectric Project . Pacific Light and Power was one of the predecessor companies to SCE, along with Edison Electric, Mt. Whitney Power & Electric Co., California Electric Power Co., Southern California Power Co., and others. In 2011, a shooting occurred when an employee of Southern California Edison opened fire at an office building in Irwindale . Southern California Edison allows its customer to obtain their electricity entirely from renewable sources by subscribing to
728-778: The utility company hired immigrants from India through Infosys , based in Bangalore , and Tata Consultancy Services in Mumbai , which are among the largest users of H-1B visas . SCE was subsequently investigated by the US Department of Labor for potential H1-B visa abuse. Edison International Edison International is a public utility holding company based in Rosemead, California . Its subsidiaries include Southern California Edison , and unregulated non-utility business assets Edison Energy . Edison's roots trace back to Holt & Knupps,
756-432: The world. In November 2022, Électricité de France (EDF) agreed the acquisition of GE Steam Power's nuclear activities, including the manufacture of non-nuclear equipment for new nuclear power plants including steam turbines and the maintenance and upgrade of existing nuclear power plants outside America. In 2021 GE announced a plan to split GE into three new public companies: GE Vernova , GE HealthCare and GE Aerospace
784-706: Was based originally in Schenectady, NY and relocated to Atlanta, GA in 2000. It acquired Enter Software in 2001. It acquired Enron's Wind solution in 2002. GE Energy was a division of General Electric and was headquartered in Atlanta , Georgia , United States . In 2008, a company-wide reorganization prompted by financial losses led to the unit's formation from companies within GE Infrastructure division. Before this reorganization, GE had nine decades of history in industrial power production including building
#754245