Misplaced Pages

Sakatah Singing Hills State Trail

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

Sakatah Singing Hills State Trail is a 41-mile-long (66 km) paved multi-use rail trail connecting Faribault and Mankato , Minnesota . It is maintained by the Minnesota Department of Natural Resources , which converted it from a railroad line. The name derives from the Dakota people who lived in the region; "Sakatah" translates into "singing hills". It began as a snowmobile trail and is now shared by hikers, joggers and cross-country skiers. There are sections of parallel dirt trail for horseback riders but they are not continuous. The landscape is mostly cultivated land with remnant stands of prairie and Big Woods . The trail passes through Sakatah Lake State Park and runs through city streets in Waterville .

#938061

75-745: The trail uses segments from two different rail lines that were built into Mankato, one from the Chicago Great Western Railway (CGW), and one from the Chicago and North Western Transportation Company (C&NW). The more southern C&NW rail line was the original Winona and St. Peter Railroad , one of the first railroads in Minnesota. Originally it curved north in the Lime valley away from Mankato towards Kasota to St. Peter in 1871. It branched south at what became Mankato Junction, also known as Burdette. This

150-571: A grain elevator in Fremont, NE , while several other GP7's, GP9's, and a few other CNW locomotives are owned by regional railroads, short lines, or industries. As of 2020, 9771 and 6706 have yet to be repainted. Union Pacific continues to follow its new tradition of releasing "Heritage" EMD SD70ACe units to represent the paint schemes of companies absorbed by UP. After painting at the Wisconsin and Southern Railroad 's Horicon, WI shop, UP 1995 , painted in

225-737: A "Heritage" C&NW paint scheme, was unveiled on July 15, 2006, at North Western Station in Chicago, IL. The North Western Station was rechristened to the Ogilvie Transportation Center in 1997 to honor Richard B. Ogilvie , a former governor of Illinois and well as the creator of the Regional Transportation Authority . The station serves as UP's Metra terminus for its three lines ( Union Pacific West Line , Union Pacific Northwest Line , and Union Pacific North Line ). However, many longtime Chicago residents still refer to

300-464: A capacity of more than 20,000 cars. Potatoes from the west were one of the main crops carried by the CNW, and its potato sheds in Chicago were the nation's largest. It also carried western sugar beets and huge amounts of corn and wheat. This road, like other lines depending strongly on transportation of crops, was adversely affected by government agricultural credit policies, which sealed a lot of products on

375-500: A consolidating railroad market. Testifying in 1965, before the Interstate Commerce Commission in Chicago, President Reidy stated that although it was operating in the black it would not able to continue: The simple fact is that there is just too much transportation available between the principal cities we serve. The Great Western cannot long survive as an independent carrier under these conditions. The CGW, therefore,

450-681: A dozen of C&NW's bilevel railcars and painted them with the Phase III paint used with Amtrak's EMD F40PH locomotives. They are no longer in use. In conjunction with Union Pacific and Southern Pacific , the North Western operated some long distance passenger trains , including the Overland Limited , City of Los Angeles , City of San Francisco , City of Denver , and the Challenger . These services lasted from 1889 to 1955, after which

525-467: A few of them. The railroad operated what was once the largest "potato yard" or potato market, at its Chicago Wood Street yards. Potatoes came to the yard from every point in the United States to be bought or traded by produce dealers and brokers. While the facility came to be known as the "potato yard", it was also a site where other vegetables could be bought, sold or traded. In 1891, the CNW adopted

600-674: A limited operation, instead of a full-blown program. The steam tour took place in May 1982, dubbed the "Prosperity Special" , to promote the C&;NW's locomotive and rolling stock upgrades. As a result of the Prosperity Special’ s success, additional steam tours took place in the ensuing years throughout Wisconsin, Minnesota, Iowa, and Illinois. Some of the trains used C&NW track rights to travel over Milwaukee Road and Burlington Northern trackage. The final steam tour took place in 1987, during

675-684: A roundabout with the Capital City State Trail, which is not a rail trail. The former Illinois Central line , now the Badger State Trail , runs on a bridge directly above the roundabout and has ramps connecting to the Capital City and Cannonball Paths. This area is known as the "Velo Underround". The Cowboy Trail is a rail trail that follows the abandoned CNW line between Chadron, Nebraska and Norfolk, Nebraska . When completed, it will be 321 miles in length. The Glacial River Trail

750-543: Is a rail trail that follows the abandoned CNW line between Milton, Wisconsin and Fort Atkinson, Wisconsin . The Military Ridge State Trail runs from Fitchburg to Dodgeville on the former "Ridgerunner" line. It connects with the Cannonball Bike Path in Fitchburg. The Peace Trail runs between Janesville, Wisconsin and Beloit, Wisconsin next to the existing ex-Milwaukee Road line.. The Sangamon Valley Trail

825-501: Is another rail trail, currently 5.5-mile (8.9 km) in length, on the west side of Sangamon County in Illinois , which skirts Springfield, Illinois . It is a segment of a former St. Louis, Peoria and North Western Railway 38-mile (61.2 km) right-of-way (which was later folded into the CNW) that has been set aside for rail trail use. The entire right-of-way connects Girard, Illinois , on

SECTION 10

#1732869600939

900-500: The C&;NW North Line to Kenosha, Wisconsin . At Crystal Lake Junction, some trains branched off to Williams Bay, Wisconsin . The West Line also had branches to St. Charles , Aurora , Freeport , and Crystal Lake . A fourth commuter line operated on the KD Line between Kenosha and Harvard until 1939. In 1974, responsibility for the commuter lines and equipment ownership transferred to

975-619: The CNW Corporation was formed to take over the Chicago and North Western Transportation Company; the employee-owned stock of the Chicago and North Western Transportation Company was transferred to the new CNW Corporation. In 1988, the Blackstone Capital Partners formed the Chicago and North Western Acquisition Corporation to purchase the CNW Corporation; the CNW Corporation was acquired by Blackstone Capital Partners under

1050-524: The Chicago Great Western Railway , Minneapolis and St. Louis Railway and others. By 1995, track sales and abandonment had reduced the total mileage to about 5,000. The majority of the abandoned and sold lines were lightly trafficked branches in Iowa , Illinois , Minnesota , South Dakota and Wisconsin . Large line sales, such as those that resulted in the Dakota, Minnesota and Eastern Railroad , further helped reduce

1125-503: The Litchfield and Madison Railway on January 1, 1958. The Litchfield and Madison railroad was a 44-mile (71 km) bridge road from East St. Louis to Litchfield, Illinois . On July 30, 1968, the North Western acquired two former interurbans — the 36-mile (58 km) Des Moines and Central Iowa Railway (DM&CI), and the 110-mile (180 km) Fort Dodge, Des Moines and Southern Railway (FDDM&S). The DM&CI gave access to

1200-653: The Sioux City and Pacific Railroad in 1880, the Fremont, Elkhorn and Missouri Valley Railroad in 1884, and the Milwaukee, Lake Shore and Western Railway in 1893. They also held extensive property in Michigan, particularly its Upper Peninsula , to the point where they were one of the largest property owners in the state. By 1899, the company had rostered 1,380 locomotives, 1,176 passenger cars, and 49,484 freight cars. The first repair facilities for rolling stock were located along

1275-707: The Union Pacific Corporation acquired the former Chicago and North Western Holdings Corporation (the second Chicago and North Western Transportation Company) under subsidiary UP Rail, Union Pacific controls the former Chicago and North Western Holdings Corporation (now the second Chicago and North Western Transportation Company) and the Chicago and North Western Railway (formerly the first Chicago and North Western Transportation Company) under UP Rail subsidiary. The Chicago and North Western corporate structure under Union Pacific ownership: The Union Pacific Corporation merged UP Rail into Union Pacific and then merged

1350-572: The panic of 1907 caused Stickney to lose control of the railroad, and ownership passed to financier J. P. Morgan . In 1910, the CGW introduced four McKeen Motor Car Company self-propelled railcars, its first rolling stock powered by internal combustion engines. In the same year, the railroad also purchased ten large 2-6-6-2s from the Baldwin Locomotive Works . Two years later, the railroad acquired an experimental battery powered motorcar from

1425-531: The 1,500 mi (2,400 km) Chicago Great Western Railway merged with the North Western. This railroad extended between Chicago and Oelwein, Iowa . From there lines went to the Twin Cities, Omaha, Nebraska, and Kansas City, Missouri . A connection from Hayfield, Minnesota , to Clarion, Iowa , provided a Twin Cities to Omaha main line. The Chicago Great Western duplicated the North Western's routes from Chicago to

1500-678: The 1920–1940s. Almost every town on their route had at least the main crossing in town protected by them. The most common style were the Center Harp shorties. They were almost iconic to the CNW. Many of them, which were grandfathered in after the Federal Railroad Administration ruled them inadequate protection in 1949, survived until the 1970s and a few remain on lines in Wisconsin that have been sold off to other railroads. Lack of available parts and upgrades to roads have replaced all but

1575-513: The 1980s, and the right of way converted to a trail. Service was discontinued to St. Charles in 1951. Service between Geneva and Aurora and Elgin and Crystal Lake was discontinued in the early 1930s. Service to Freeport ceased in the late 1940s. By 1981, following the start of the early 1980s recession and the bankruptcy of the Milwaukee Road, public opinion on railroads around the Milwaukee area

SECTION 20

#1732869600939

1650-427: The C&NW's dry mainline through Iowa also became flooded. Upon learning about the flooding, some C&NW employees called into work during their time off, in order to help the railroad through the flood. By the time the flood ended, most of the C&NW's rail lines remained intact and were quickly reopened. In February 1994, the Chicago and North Western Acquisition Corporation and the CNW Corporation merged into

1725-484: The CGW began trial operations of trailer on flatcar trains, which were expanded the following year into regular service, initially between Chicago and St. Paul, but rapidly expanding across the system by 1940. In 1941, it was reorganized in bankruptcy, and late in the decade a group of investors, organized as the Kansas City Group, purchased the CGW. In 1946, a demonstrator EMD F3 diesel locomotive set operated on

1800-431: The CGW's trackage. In 1835, the Chicago, St. Charles & Mississippi Airline railroad was chartered with the intent of building a railroad west out of Chicago. The railroad never began construction, and its rights to build were transferred in 1854 to a new company, the Minnesota & North Western (M&NW), which eventually began construction in 1884 of a line south from St. Paul, Minnesota to Dubuque, Iowa. In 1887,

1875-408: The CGW, immediately prompting the company to purchase a wide variety of diesels, and by 1950 the railroad had converted completely to diesel motive power. In 1949, William N. Deramus III assumed the presidency, and began a program of rebuilding infrastructure and increasing efficiency, both by consolidating operations such as dispatching and accounting and by lengthening trains. In 1957, Deramus left

1950-642: The CGW, the CNW abandoned most of the former CGW trackage. A 20 mile section of the railroad right of way from Des Moines, IA south to Martensdale, IA was used to create a mixed use trail with the name of Great Western Trail. In addition, a section of track was converted to trail usage, also known as the Great Western Trail , running intermittently between Villa Park, Illinois and West Chicago, Illinois in DuPage County, and then through Kane and DeKalb counties to Sycamore, Illinois. The Chicago Great Western

2025-486: The CNW route to Chicago was changed to the Milwaukee Road's due to poor track conditions. Chicago and North Western also operated commuter train service in the Chicago area, where they developed what was perhaps the first control car . A modified gallery car was built in 1960 with locomotive controls to allow push-pull operation. which is preserved at the Illinois Railway Museum . The C&NW also pioneered

2100-740: The Chicago Great Western from Cannon Falls to Red Wing is now the Cannon Valley Trail . The section of the Chicago Great Western Railway between Faribault and Cannon Falls is being developed by the Mill Towns Trail Association which would result in the former route of the entire Chicago Great Western from Mankato to Red Wing being converted to trail use. Chicago Great Western Railway The Chicago Great Western Railway ( reporting mark CGW )

2175-459: The Chicago River near the center of Chicago , but these were abandoned for a more extensive, 240-acre plot of land to the west along West Kinzie Street. The facilities were expanded in 1900 and became known as the 40th Street Shops, which at that point included three roundhouses, extensive locomotive overhauling capabilities, and a complete set of passenger and freight car shops. These shops served

2250-411: The Chicago and North Western Acquisition Corporation subsidiary from the employee owned stock; Blackstone Capital Partners controls the CNW Corporation and the Chicago and North Western Transportation Company under the Chicago and North Western Acquisition Corporation subsidiary. Chicago and North Western Holdings Corporation (or "CNW Holdings Corporation" and "Chicago and North Western Holdings Company")

2325-510: The Chicago and North Western Holdings Corporation, leaving only the Chicago and North Western Holdings Corporation and the Chicago and North Western Transportation Company. In May 1994, the Chicago and North Western Transportation Company reverted to its original name, Chicago and North Western Railway and the Chicago and North Western Holdings Corporation was renamed to the second Chicago and North Western Transportation Company . The Chicago and North Western corporate structure: In April 1995,

Sakatah Singing Hills State Trail - Misplaced Pages Continue

2400-562: The Chicago, St. Paul & Kansas City Railroad acquired the M&;NW, and by the end of the decade, under the leadership of St. Paul businessman A.B. Stickney , it had established routes west to Omaha, Nebraska, south to St. Joseph, Missouri, and east to Chicago, Illinois, via the Winston Tunnel near Dubuque. In 1892, the railroad was reorganized as the Chicago Great Western. The first repair shops for locomotives and freight cars were built at

2475-621: The Federal Storage Battery Car Company. In 1916, the railroad began standardizing on 2-8-2 steam locomotives, which served through the 1920. In 1923 CGW purchased from the soon to be dominant company EMC, two of EMD's first gasoline-powered cars. During the 1920s, as ownership changed again to the Bremo Corporation, a group of investors led by Patrick Joyce, an executive at the Standard Steel Car Company ,

2550-649: The Firestone plant in Des Moines, Iowa , and the FDDM&;S provided access to gypsum mills in Fort Dodge, Iowa . On November 1, 1960, the CNW acquired the rail properties of the 1,500-mile (2,400 km) Minneapolis and St. Louis Railway . In spite of its name, it ran only from Minneapolis, Minnesota , to Peoria, Illinois . This acquisition provided traffic and modern rolling stock, and eliminated competition. On July 1, 1968,

2625-687: The Galena & Chicago Union started operating in December 1848, and the Fond du Lac railroad started in March 1855, the Galena and Chicago Union Railroad is considered to be the origin of the North Western railroad system. Other lines acquired and added to the network included the Chicago, St. Paul and Fond du Lac Railroad in 1859, the Winona and St. Peter Railroad in 1867, the Chicago, Milwaukee and North Western Railway in 1883,

2700-596: The Geneva line having been extended west to Elburn . However, service on the branch to Williams Bay was gradually cut back over the years, also resulting in changes to the name of the branch. In 1965, service was abandoned between Williams Bay and Lake Geneva. In 1975, service ended between Lake Geneva and Richmond. In 1981, service between McHenry and Richmond ended. Rails and ties north of the Cargill plant in Ringwood were removed during

2775-575: The Midwest. The first routes on the C&NW to be flooded were the routes south of St. Paul, Minnesota. Ten miles of their line between North Freedom , Baraboo , and Devil's Lake were also flooded, and it isolated the C&NW's quarry supply in Rock Springs (a vintage diesel switcher from the nearby Mid-Continent Railway Museum assisted the Rock Springs quarry, until the flood cleared). During July,

2850-535: The Twin Cities and Kansas City, Missouri, via Des Moines, Iowa . The Interstate Commerce Commission (ICC) approved North Western's bid of $ 93 million on June 20, 1983. The line was well-engineered, but because of deferred maintenance on the part of the bankrupt Rock Island, it required a major rehabilitation in 1984. The company then began to abandon the Oelwein to Kansas City section of its former Chicago Great Western trackage, which duplicated Spine Line service. In 1985,

2925-505: The Twin Cities and Omaha, but went the long way. This merger provided access to Kansas City and further eliminated competition. After abandoning a plan to merge with the Milwaukee Road in 1970, Benjamin W. Heineman , who headed the CNW and parent Northwest Industries since 1956, arranged the sale of the railroad to its employees in 1972; they formed Northwest Industries to take over the CNW in 1968. The words " Employee Owned " were part of

3000-509: The abandoned Chicago Great Western Railroad from Forest Park to St. Charles . The Glacial Drumlin State Trail of 52 miles follows the abandoned CNW line between Madison, Wisconsin and Milwaukee, Wisconsin . The Three Rivers Trail Trailhead is located 2 miles west of Eagle Grove, IA extending west 33 miles to Rolfe, IA. It is a crushed limestone trail that has been developed over the abandoned railroad right-of-way. The trail also features

3075-484: The acquisition (although some of them were gradually repainted into UP colors.) Many former CNW units have received "patches" with a new road number and reporting mark to match their new owner's roster. Only 2 "patched" units remain on the Union Pacific, UP AC44CW 6706, and UP C44-9W 9771. Several others work under different owners. However, it is still possible to find untouched CNW units in service. CNW 8646 and 8701 were

Sakatah Singing Hills State Trail - Misplaced Pages Continue

3150-487: The centennial of the City of Chicago. By which time, there was an insurance crisis within the railroad industry. The railroad's management had also changed, and enthusiasm on the C&NW to operate steam tours was lost. The CNW was known for running on the left-hand side when running on double track mainlines. In the United States, most railroads used the right-hand track along double-track mainlines, while left-hand running

3225-528: The cities in 400 minutes. CNW was the first system to start a high-speed Chicago-Twin Cities schedule because it used refurbished rather than new equipment, but in 1939, modernized the 400 with new E3A diesel locomotive pairs and streamlined cars. Other named trains the CNW operated included the Ashland Limited , Duluth-Superior Limited , and the North Western Limited CNW eventually renamed

3300-514: The company logo in the ensuing period. The railroad was renamed from Chicago and North Western Railway to Chicago and North Western Transportation Company . The railroad's reporting marks (CNW) remained the same. After the Chicago, Rock Island and Pacific Railroad (Rock Island) ceased operating on March 31, 1980, the North Western won a bidding war with the Soo Line Railroad to purchase the roughly 400-mile (640 km) " Spine Line " between

3375-562: The company, and Edward Reidy assumed the presidency. As early as 1946, the first proposal was advanced to merge the Great Western with other railroads, this time with the Chicago and Eastern Illinois Railroad and the Missouri–Kansas–Texas Railroad . Upon the failure of a later merger opportunity with the Soo Line Railroad in 1963, the board of the Great Western grew increasingly anxious about its continued viability in

3450-411: The concept of Head End Power (HEP), generating 480 volt electricity from the locomotive to power the air conditioning, lighting, and heating on the new bi-level cars. This eventually became the standard for all railroads in the United States. Three commuter lines radiated from North Western Station ; the C&NW West Line to Geneva, Illinois ; the C&NW Northwest Line to Harvard , Illinois; and

3525-611: The eastern section of the CNW system. Meanwhile, the western section was served by back shops in Clinton, Iowa and the northern section was served by facilities in Winona, Minnesota . In 1911 a new freight yard and shops were built 13 miles west of Chicago in Proviso Township, which featured a mammoth, 58-stall roundhouse (a twin of the one in Fulton, Illinois ). Changing traffic patterns and competition with automobiles and trucking disrupted

3600-416: The famous "ball and bar" logo, which survived a few modifications throughout its 104-year existence. This included the changing of text: The railroad also purchased a great deal of its equipment second-hand. CNW shop forces economized wherever possible, earning the railroad the nickname "Cheap and Nothing Wasted." Sometimes employees referred to the condition of equipment as "Cardboard and No Wheels." One of

3675-456: The farms where they were produced. Although it stood sixteenth in operating revenue in 1938, it was eighth in passenger revenue among American railroads. It served Chicago commuters; its 400 streamliners provided intercity transportation, and it provided an eastern link to bring the Union Pacific 's passengers from Omaha, Nebraska and points west to Chicago. The CNW had owned a majority of

3750-628: The first 400 to the Twin Cities 400 as the CNW labeled almost all of its passenger trains with variations of the 400 moniker, including the Flambeau 400 , Minnesota 400 , Valley "400" , Shoreland "400" , Dakota 400 and the Kate Shelley 400 . CNW ceased running the Twin Cities 400 in 1963, and all intercity passenger service on CNW ended with the formation of Amtrak in 1971. Amtrak bought

3825-535: The first rail trails created in the United States was the 32.5-mile (52.3 km) Elroy-Sparta State Trail in Wisconsin, which used a segment abandoned in 1965. The 400 State Trail runs from Reedsburg to Elroy on the former main line. The Cannonball Bike Path runs on a 5-mile stretch in Madison, Wisconsin on the old "Ridgerunner line". It connects with the Military Ridge State Trail in Fitchburg at

SECTION 50

#1732869600939

3900-604: The last unpatched CNW locomotives on the UP roster which railfans referred to them as the "CNW twins". In 2017 after years of surviving untouched they were repainted and renumbered to 9750 (ex 8646) and 9805 (ex 8701) respectively. 9750 is in storage as of 2020 while 9805 is active and was rebuilt by GE/Wabtec into a C44ACM. CNW 6847 and CNW 7009 are preserved at the Illinois Railway Museum in their original factory paint. CNW 1518, CNW 411, and CNW 414 (METX 308) are also at IRM, with 1518 and 411 having been restored in CNW paint. CNW 4153 works at

3975-621: The line for a few years after the CGW merger, but abandoned the portion from Lime Siding east in the early 1970s. The C&NW, working with the State of Minnesota, used the more favorable CGW grade into Mankato. The C&NW built a link between the two lines where they neared each other on the outskirts of Mankato before they both descended into the Minnesota River Valley. The Dakota, Minnesota and Eastern Railroad uses these joined segments as its Tracy Subdivision . The remaining segments became

4050-477: The newly formed Regional Transportation Authority , whose rail division was later branded in 1984 as Metra . The C&NW continued to run the lines under a "purchase of service" contract, in which the railroad maintained the right-of-way and operated trains on behalf of Metra. All three C&NW commuter lines live on in the Metra system, and are still operated by Union Pacific under a purchase of service contract, with

4125-477: The original terminus in St. Paul, Minnesota , known as the South Park Shops. In 1892 the city of Oelwein, Iowa was chosen as the headquarters and primary shop site due to its central location on the mainline. Construction was completed in 1899, and soon Oelwein became known as "Shop City" for its mammoth shop site. The two-story combination machine, boiler, and coach shop alone measured 700 feet (213 meters) long and had 27 pits for overhauling locomotives. In 1907,

4200-421: The railroad ended passenger operations when the overnight trains between the Twin Cities and Omaha arrived at their respective endpoints. Chicago and North Western Railway The Chicago and North Western ( reporting mark CNW ) was a Class I railroad in the Midwestern United States . It was also known as the "North Western" . The railroad operated more than 5,000 miles (8,000 km) of track at

4275-426: The railroad expanded its use of self-propelled vehicles. At the end of the decade, 36 2-10-4 steam locomotives were purchased from Baldwin and the Lima Locomotive Works . During the Great Depression , the railroad trimmed operations by closing facilities and abandoning trackage. It purchased its first diesel-electric locomotive, an 800 horsepower (600 kW) yard switcher from Westinghouse , in 1934. In 1935,

4350-477: The railroad to a mainline core with several regional feeders and branches. Union Pacific (UP) purchased the company in April 1995 and integrated it with its own operation. The Chicago and North Western Railway was chartered on June 7, 1859, five days after it purchased the assets of the bankrupt Chicago, St. Paul and Fond du Lac Railroad. On February 15, 1865, it merged with the Galena and Chicago Union Railroad , which had been chartered on January 16, 1836. Since

4425-420: The railroad's profitability by mid-20th century. After nine years in bankruptcy, the CNW was reorganized in 1944. It had turned rapidly to diesel power, and established a huge diesel shop in Chicago . Its Proviso Freight Yard, located 12 miles (19 km) west of the city center in suburban Cook County, was constructed between 1926 and 1929 and remained the largest such in the world, with 224 miles of trackage and

4500-459: The same territory, and developed a corporate culture of innovation and efficiency to survive. Nicknamed the Corn Belt Route because of its operating area in the midwestern United States , the railroad was sometimes called the Lucky Strike Road , due to the similarity in design between the herald of the CGW and the logo used for Lucky Strike cigarettes . In 1968 it merged with the Chicago and North Western Railway (CNW), which abandoned most of

4575-465: The second Chicago and North Western Transportation Company and the Chicago and North Western Railway into the Union Pacific Railroad; the Chicago and North Western system became part of the Union Pacific Railroad system. A joint UP-CNW subsidiary, Western Railroad Properties, Inc. , was also merged into the Union Pacific system in the acquisition. Chicago and North Western locomotives continued to operate in their own paint schemes for several years after

SECTION 60

#1732869600939

4650-501: The south end, to Athens, Illinois , at the north end. The right-of-way spans the western half of Sangamon County in a north–south direction, and also traverses small sections of Macoupin County and Menard County . The Three Eagles Trail runs for a couple miles south of Eagle River, Wisconsin . The Wild Rivers Trail is a 104-mile-long rail trail that follows the abandoned CNW line between Rice Lake, Wisconsin and Superior, Wisconsin . The Great Western Trail of 17 miles follows

4725-425: The station as "North Western Station," and many longtime employees still call it "CPT," for "Chicago Passenger Terminal." The CNW's most famous train, the Twin Cities 400 from Chicago to Minneapolis/St. Paul, was introduced in 1935 to compete with the Chicago, Burlington and Quincy 's Zephyr s and the Milwaukee Road 's Hiawatha s. This train was so named because it traveled the 400 mi (640 km) between

4800-476: The stock of the Chicago, St. Paul, Minneapolis and Omaha Railway (Omaha Road) since 1882. On January 1, 1957, it leased the company, and merged it into the North Western in 1972. The Omaha Road's main line extended from an interchange with the North Western at Elroy, Wisconsin , to the Twin Cities, south to Sioux City, Iowa , and then finally to Omaha, Nebraska . The CNW acquired several important short railroads during its later years. It completed acquisition of

4875-428: The trail, with a route necessary around a farm that had taken over the abandoned route across from Lime Siding. Area snowmobile riders began using the trail. The State's acquisition of the route, with their view toward creating a rail trail, began in 1974. The Sakatah Singing Hills State Trail was officially dedicated in 1980. It was a dirt trail for its first decade. The entire length was paved in 1995. The section of

4950-416: The turn of the 20th century, and over 12,000 miles (19,000 km) of track in seven states before retrenchment in the late 1970s. Until 1972, when the employees purchased the company, it was named the Chicago and North Western Railway (or Chicago and North Western Railway Company ). The C&NW became one of the longest railroads in the United States as a result of mergers with other railroads, such as

5025-503: Was a Class I railroad that linked Chicago , Minneapolis , Omaha , and Kansas City . It was founded by Alpheus Beede Stickney in 1885 as a regional line between St. Paul and the Iowa state line called the Minnesota and Northwestern Railroad . Through mergers and new construction, the railroad, named Chicago Great Western after 1892, quickly became a multi-state carrier. One of the last Class I railroads to be built, it competed against several other more well-established railroads in

5100-436: Was beginning to sour. In response, management of the C&NW explored options to generate public awareness that the C&NW was still a healthy company. Manager of the railroad's Wisconsin Division, Chris Burger, pitched the idea of the railroad hosting a steam excursion program, using steam locomotive No. 1385 from the Mid-Continent Railway Museum. Because of the recession, C&NW President James R. Wolfe only approved

5175-434: Was completed in 1882, and the route from Waterville to Mankato, Minnesota, was completed in 1887. By 1889, the line had been renamed Wisconsin, Minnesota & Pacific and was under the trusteeship of the Rock Island railroad. The Rock Island sold the WM&P to the Chicago Great Western in the mid-1890s which operated the line until 1968 when the CGW was merged in to the Chicago & Northwestern . The C&NW operated

5250-445: Was formed and took control of the Chicago and North Western Acquisition Corporation, which controlled the CNW Corporation and which the CNW Corporation controlled the Chicago and North Western Transportation Company. The Chicago and North Western corporate structure under the Blackstone ownership: In 1993, several of the C&NW's routes became flooded by that year's Great Flood , which also affected other railroads that operated in

5325-400: Was more common in countries where British companies built the railroads. According to a display in Metra 's Lake Forest station, the reason for this was a combination of chance and inertia. When originally built as single-line trackage, the C&NW arbitrarily placed its stations on the left-hand side of the tracks (when headed inbound toward Chicago). Later, when a second track was added, it

5400-522: Was not known for its passenger trains, although it did operate several named trains, mostly running between Chicago and the Twin Cities. Despite the railroad's small size and meager passenger fleet, it looked for ways to more efficiently move passengers, such as employing all-electric (battery powered) and gas-electric motorcars on light branch lines, which were cheaper to operate than traditional steam or diesel-powered trains. Notable passenger trains from its major terminals included: On September 30, 1965,

5475-515: Was open to a merger with the Chicago and North Western Railway (CNW), first proposed in 1964. After a 4-year period of opposition by other competing railroads, on July 1, 1968, the Chicago Great Western merged with Chicago and North Western. At the time of the merger, the CGW operated a 1,411 miles (2,271 km) system, over which it transported 2,452 million ton-miles of freight in 1967, largely food and agricultural products, lumber, and chemicals, for $ 28.7 million of revenue. After taking control of

5550-480: Was placed on the side away from the stations so as not to force them to relocate. Since most passengers waiting at the stations were headed toward Chicago, the inbound track remained the one closest to the station platforms. The expense of reconfiguring signals and switches has prevented a conversion to right-hand operation ever since. The Chicago and North Western was known for its installation of Western Railroad Supply Company wigwag signals at many of its crossing in

5625-575: Was the segment of the Winona, Mankato and New Ulm Railway. The more northern CGW rail line was surveyed in the late 1870s between Red Wing and Waterville . Construction did not begin until 1882 by the Central Railway Company of Minnesota under the management of A. B. Stickney . Stickney was head of the Minnesota & Northwestern Railroad which would later become the Chicago Great Western Railway in 1891. The route from Red Wing to Waterville

#938061