Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

A dot-matrix display is a low-cost electronic digital display device that displays information on machines such as clocks, watches, calculators, and many other devices requiring a simple alphanumeric (and/or graphic) display device of limited resolution.

#190809

90-587: The London Underground S7 and S8 Stock , commonly referred to as S Stock , is a type of passenger train running on the London Underground 's subsurface lines since 2010. Manufactured by Bombardier Transportation 's Derby Litchurch Lane Works , the S Stock was ordered to replace the A60, A62 , C69, C77 and D78 stock on the Metropolitan , District , Hammersmith & City , and Circle lines, which all dated from

180-589: A day use District Line tracks between Wimbledon and East Putney. London Underground trains come in two sizes, larger sub-surface trains and smaller deep-tube trains. Since the early 1960s all passenger trains have been electric multiple units with sliding doors and a train last ran with a guard in 2000. All lines use fixed-length trains with between six and eight cars, except for the Waterloo & City line that uses four cars. New trains are designed for maximum number of standing passengers and for speed of access to

270-451: A day. In 2023/24 it was used for 1.181billion passenger journeys. The system's first tunnels were built just below the ground, using the cut-and-cover method; later, smaller, roughly circular tunnels—which gave rise to its nickname, the Tube—were dug through at a deeper level. Despite its name, only 45% of the system is under the ground: much of the network in the outer environs of London

360-761: A diameter of about 11 feet 8 inches (3.56 m), with one tube for each direction. The seven deep-level lines have the exclusive use of tracks and stations along their routes with the exceptions of the Piccadilly line, which shares track with the District line, between Acton Town and Hanger Lane Junction, and with the Metropolitan line, between Rayners Lane and Uxbridge; and the Bakerloo line, which shares track with London Overground 's Watford DC Line for its above-ground section north of Queen's Park. Fifty-five per cent of

450-509: A more effective energy source that soldiers could use in their technology in the field. Japan and America were using the LCD matrices to develop Casio TVs from 1984 to 2000 creating and experimenting with different display setups. In the 1980s and 1990s, dot-matrix displays were introduced into several technologies including televisions, computers, video game systems, and pinball machines. Dot-matrix displays were added into new pieces of technology as

540-511: A potential difference of 630 V . On the sections of line shared with mainline trains, such as the District line from East Putney to Wimbledon and Gunnersbury to Richmond, and the Bakerloo line north of Queen's Park, the centre rail is bonded to the running rails. The average speed on the Underground is 20.5 mph (33.0 km/h). Outside the tunnels of central London, many lines' trains tend to travel at over 40 mph (64 km/h) in

630-573: A processor into signals that control the individual dots in the matrix so that the required display is produced. The dot-matrix display is also known by the obsolete term “punktmatrix display” ( German for dot-matrix) due to the dot matrix being created in Germany by Rudolf Hell in 1925. In September 1977, the US Army wrote up a form to the Westinghouse Research and Development Center requesting

720-579: A public transport system. The LPTB commissioned many new station buildings, posters and public artworks in a modernist style. The schematic Tube map , designed by Harry Beck in 1931, was voted a national design icon in 2006 and now includes other transport systems besides the Underground, such as the Docklands Light Railway , London Overground , Thameslink , the Elizabeth line , and Tramlink . Other famous London Underground branding includes

810-407: A sense of security. CCTV enables the driver to see into every car, while track-to-train video links give the driver a view of the train exterior before leaving a station. There is a fold-out set of steps in each driver's cab to allow fast evacuation in an emergency. The S stock has cantilevered seating for easy cleaning and accessible storage of bags. The seating configurations are different between

900-448: A wholly owned subsidiary of Transport for London (TfL), the statutory corporation responsible for the transport network in London. As of 2015 , 92% of operational expenditure is covered by passenger fares. The Travelcard ticket was introduced in 1983 and Oyster card , a contactless ticketing system, in 2003. Contactless bank card payments were introduced in 2014, the first such use on

990-518: Is 13 km/h (8 mph) slower than A Stock, but faster than C and D Stocks. During the period of dual operation with both old and new trains, the stock had its performance capped to match that of the older trains in order to comply with signalling constraints and avoid bunching of the service. S8 stock trains seat 306 passengers compared with 448 for A Stock, a reduction of 32%, but can accommodate 25% more standing passengers (1,226 compared with 976) and have dedicated space for wheelchairs. As of 2017,

SECTION 10

#1733085823191

1080-687: Is identified by a letter (such as S Stock , used on the Metropolitan line ), while tube stock is identified by the year of intended introduction (for example, 1996 Stock , used on the Jubilee line). The Underground is served by the following depots: In the years since the first parts of the London Underground opened, many stations and routes have been closed. Some stations were closed because of low passenger numbers rendering them uneconomical; some became redundant after lines were re-routed or replacements were constructed; and others are no longer served by

1170-475: Is on the surface. The early tube lines, originally owned by several private companies, were brought together under the Underground brand in the early 20th century, and eventually merged along with the sub-surface lines and bus services in 1933 to form London Transport under the control of the London Passenger Transport Board (LPTB). The current operator, London Underground Limited (LUL), is

1260-581: Is the first on the Metropolitan line with dot-matrix indicators and automated voice announcements. Unlike the deep-tube stock, the DMIs are ceiling-hung rather than on the wall. The air-conditioning system, the first on London Underground trains, is supplied by Mitsubishi and has two circuits so that if one fails there is still 50% capacity. Open gangways from car to car (similar to London Overground 's Class 378 ) allow passengers to move from crowded cars to ones with more room, provide extra room for standing, and create

1350-550: The City & South London Railway in 1890, is now part of the Northern line . The network has expanded to 11 lines with 250 miles (400 km) of track. However, the Underground does not cover most southern parts of Greater London ; there are only 33 Underground stations south of the River Thames . The system's 272 stations collectively accommodate up to 5million passenger journeys

1440-575: The Class 499/5 designation on the TOPS system in order to operate on the District line between Gunnersbury and Richmond , and between East Putney and Wimbledon , as these track sections are owned by Network Rail . From 2016, the Four Lines Modernisation project has been converting the four sub-surface lines to automatic train operation using communications-based train control . Upon completion of

1530-632: The District line . Part of Bombardier's Movia family, the stock consists of 192 trains, with 133 S7 seven-car trains for the Circle, District and Hammersmith & City lines, and 59 S8 eight-car trains for the Metropolitan line. The order was said to be the biggest single rolling-stock order in Britain at a cost of £1.5 billion. S Stock trains have faster acceleration than previous models, at 1.3 m/s (2.9 mph/s); their top speed of 100 km/h (62 mph)

1620-524: The Great Northern and City Railway , which opened in 1904, was built to take main line trains from Finsbury Park to a Moorgate terminus in the City and had 16-foot (4.9 m) diameter tunnels. While steam locomotives were in use on the Underground there were contrasting health reports. There were many instances of passengers collapsing whilst travelling, due to heat and pollution, leading for calls to clean

1710-765: The London 2012 Olympic and Paralympic Games , the Underground saw record passenger numbers, with over 4.3   million people using the Tube on some days. This record was subsequently beaten in later years, with 4.82   million passengers in December 2015. In 2013, the Underground celebrated its 150th anniversary, with celebratory events such as steam trains and installation of a unique Labyrinth artwork at each station. Under TfL, London's public transport network became more unified, with existing suburban rail lines across London upgraded and rebranded as London Overground from 2007, with

1800-581: The London Blitz , a bomb penetrated the booking hall of Bank Station , the blast from which killed 111 people, many of whom were sleeping in passageways and on platforms. On 3 March 1943, a test of the air-raid warning sirens, together with the firing of a new type of anti-aircraft rocket, resulted in a crush of people attempting to take shelter in Bethnal Green Underground station . A total of 173 people, including 62 children, died, making this both

1890-532: The London Passenger Transport Board , which used the London Transport brand . The Waterloo & City Railway , which was by then in the ownership of the main line Southern Railway , remained with its existing owners. In the same year that the London Passenger Transport Board was formed, Harry Beck 's diagrammatic tube map first appeared. In the following years, the outlying lines of

SECTION 20

#1733085823191

1980-563: The M25 London Orbital motorway ( Amersham , Chalfont & Latimer , Chesham , and Chorleywood on the Metropolitan line and Epping on the Central). Of the thirty-two London boroughs , six ( Bexley , Bromley , Croydon , Kingston , Lewisham and Sutton ) are not served by the Underground network, while Hackney has Old Street (on the Northern line Bank branch) and Manor House (on

2070-480: The Northern line from Kennington to Battersea Power Station via Nine Elms . The extension was privately funded, with contributions from developments across the Battersea Power Station , Vauxhall and Nine Elms areas. As of 2021, the Underground serves 272 stations . Sixteen stations (eight on each of the Metropolitan and Central lines) are outside the London region , with five of those beyond

2160-517: The Victoria line was dug under central London and, unlike the earlier tunnels, did not follow the roads above. The line opened in 1968–71 with the trains being driven automatically and magnetically encoded tickets collected by automatic gates gave access to the platforms. On 1 January 1970, responsibility for public transport within Greater London passed from central government to local government, in

2250-528: The West London line were suspended, leaving Olympia exhibition centre without a railway service until a District line shuttle from Earl's Court began after the war. After work restarted on the Central line extensions in east and west London, these were completed in 1949. During the war many tube stations were used as air-raid shelters. They were not always a guarantee of safety however; on 11 January 1941 during

2340-605: The roundel and the Johnston typeface , created by Edward Johnston in 1916. The idea of an underground railway linking the City of London with the urban centre was proposed in the 1830s, and the Metropolitan Railway was granted permission to build such a line in 1854. To prepare construction, a short test tunnel was built in 1855 in Kibblesworth , a small town with geological properties similar to London. This test tunnel

2430-475: The 1960s and 1970s. The order was for a total of 192 trains (1,403 cars), and consisted of two types, S7 Stock for the Circle, District and Hammersmith & City lines, and S8 Stock for the Metropolitan line, with differences in the arrangement of seating and number of cars. Both types have air-conditioning and lower floors to ease accessibility for people with disabilities, and also have open gangways to allow passengers to move from one car to another whilst

2520-468: The Central line east of St Paul's station); or trains run on the right (for example on the Victoria line between Warren Street and King's Cross St. Pancras, to allow cross-platform interchange with the Northern line at Euston ). The lines are electrified with a four-rail DC system: a conductor rail between the rails is energised at −210 V and a rail outside the running rails at +420 V , giving

2610-503: The Circle and Hammersmith & City lines, 78 trains for the District line, and 72 trains for the Metropolitan line. All the trains would be built to the same design, saving on parts and maintenance costs for Metronet. The only difference would be the length of the train, given different platform lengths on different lines. The first train was planned to enter service on the Metropolitan line by 2009, with all trains in service by 2015. In December 2006, Metronet and London Underground unveiled

2700-411: The Circle line on 2 September 2013, and completely replaced the C Stock trains on the line by 11 February 2014. The Circle line's C Stock were replaced ahead of the District line's D Stock, as they were described by London Underground as being "in an increasingly poor state", and the D Stock had been extensively refurbished between 2005 and 2008. The District line was the last line to be fully served by

2790-791: The District Railway and established the Underground Electric Railways Company of London (UERL) in 1902 to finance and operate three tube lines, the Baker Street and Waterloo Railway (Bakerloo), the Charing Cross, Euston and Hampstead Railway (Hampstead) and the Great Northern, Piccadilly and Brompton Railway , (Piccadilly), which all opened between 1906 and 1907. When the "Bakerloo" was so named in July 1906, The Railway Magazine called it an undignified "gutter title". By 1907

London Underground S7 and S8 Stock - Misplaced Pages Continue

2880-668: The District and Metropolitan Railways had electrified the underground sections of their lines. In January 1913, the UERL acquired the Central London Railway and the City & South London Railway , as well as many of London's bus and tram operators. Only the Metropolitan Railway , along with its subsidiaries the Great Northern & City Railway and the East London Railway , and the Waterloo & City Railway , by then owned by

2970-462: The District line; the Circle and Hammersmith & City lines are fully automatic. The S Stock is air-conditioned throughout: the sub-surface tunnels (unlike deep-level tube lines) allow the exhausted hot air to disperse, and two-thirds of the sub-surface network is in the open air. The stock has regenerative brakes , returning around 20% of their energy to the network and thus increasing energy efficiency. End external displays show two lines of text:

3060-606: The Edgware Road branch of the District line in June 2014; it fully replaced the D Stock on the rest of the District line in April 2017. The S designation stands for suburban , following the practice of designating sub-surface London Underground stock with a letter associated with its intended route— A Stock on the Metropolitan line to Amersham , C Stock on the Circle line , and D Stock on

3150-687: The London Underground. In 1976, the Northern City Line was taken over by British Rail and linked up with the main line railway at Finsbury Park , a transfer that had already been planned prior to the accident. In 1979, another new tube, the Jubilee line , named in honour of the Silver Jubilee of Elizabeth II , took over the Stanmore branch from the Bakerloo line, linking it to a newly constructed line between Baker Street and Charing Cross stations. Under

3240-573: The Metropolitan line and about half of the District line; the Circle and Hammersmith & City lines are fully automatic. Each car has a five-digit number: the second digit identifies the type of car , the last three digits the set number (001–116, 301–568). A-end cars have odd numbers; D-end even numbers. 25 nnn cars replace 23 nnn cars on trains equipped with de-icing equipment. [REDACTED] London transport portal [REDACTED] London transport portal London Underground The London Underground (also known simply as

3330-517: The Piccadilly line) just inside its boundaries. Lewisham was served by the East London line (with stations at New Cross and New Cross Gate ) until 2010 when the line and the stations were transferred to the London Overground network. London Underground's eleven lines total 402 kilometres (250 mi) in length, making it the eleventh longest metro system in the world . These are made up of

3420-501: The S7 Stock, due to its existing D78 Stock being newer than other trains that the S7 Stock was ordered to replace, as well as its most recent refurbishment in 2005. The first S7 Stock train entered passenger service on the line between Olympia and West Ham on 2 September 2013. On 6 February 2014, the S7 Stock started running between Wimbledon and Edgware Road. The S7 Stock started services to Ealing Broadway on 13 June 2014, and on 17 June saw

3510-402: The Tube has taken place - with new trains (such as London Underground S7 and S8 Stock ), new signalling, upgraded stations (such as King's Cross St Pancras ) and improved accessibility (such as at Green Park ). Small changes to the Tube network occurred in the 2000s, with extensions to Heathrow Terminal 5 , new station at Wood Lane and the Circle line changed from serving a closed loop around

3600-580: The Underground or by its nickname the Tube ) is a rapid transit system serving Greater London and some parts of the adjacent home counties of Buckinghamshire , Essex and Hertfordshire in England. The Underground has its origins in the Metropolitan Railway , opening on 10 January 1863 as the world's first underground passenger railway. The Metropolitan is now part of the Circle , District , Hammersmith & City and Metropolitan lines . The first line to operate underground electric traction trains ,

3690-436: The Underground but remain open to National Rail main line services. In some cases, such as Aldwych and Ongar , the buildings remain and are used for other purposes. In others, such as British Museum , all evidence of the station has been lost through demolition. London Transport Museum runs guided tours of several disused stations including Down Street and Aldwych through its "Hidden London" programme. The tours look at

London Underground S7 and S8 Stock - Misplaced Pages Continue

3780-599: The advent of electric Tube services (the Waterloo and City Railway and the Great Northern and City Railway), the Volks Electric Railway , in Brighton , and competition from electric trams, the pioneering Underground companies needed modernising. In the early 20th century, the District and Metropolitan railways needed to electrify and a joint committee recommended an AC system, the two companies co-operating because of

3870-483: The air through the installation of garden plants. The Metropolitan even encouraged beards for staff to act as an air filter. There were other reports claiming beneficial outcomes of using the Underground, including the designation of Great Portland Street as a " sanatorium for [sufferers of ...] asthma and bronchial complaints", tonsillitis could be cured with acid gas and the Twopenny Tube cured anorexia . With

3960-528: The alarm buttons next to wheelchair spaces. Although S Stock trains can operate on all four sub-surface lines, S8 trains are used on the Metropolitan line and S7 trains are used on the other three lines. Selective door operation is used at certain stations that are shorter than the train. S7 Stock has seven cars per train, while S8 Stock has eight. As part of the Transported by Design programme of activities, on 15 October 2015, after two months of public voting,

4050-764: The all-longitudinal seating of the S7, and thus could be distinguished from the remaining S8s. Two of these trains were modified back to seven-car trains and transferred for service on the Circle, District and Hammersmith & City Lines in 2018. The first trains entered service on 6 July 2012, from Hammersmith to Moorgate. S7 trains are longer than the C69 and C77 trains they replaced (seven cars and 117.45 m (385 ft 4 in) long instead of six cars and 93 m (305 ft 1 in) long), so some station platforms had to be lengthened to allow for S7 operations. For stations where this has proved physically impossible, such as Baker Street ,

4140-432: The cars and have regenerative braking and public address systems. Since 1999 all new stock has had to comply with accessibility regulations that require such things as access and room for wheelchairs, and the size and location of door controls. All underground trains are required to comply with The Rail Vehicle Accessibility (Non Interoperable Rail System) Regulations 2010 (RVAR 2010) by 2020. Stock on sub-surface lines

4230-650: The centre of London to a spiral also serving Hammersmith in 2009. In July 2005, four coordinated terrorist attacks took place, three of them occurring on the Tube network. It was the UK's deadliest terrorist incident since 1988. Electronic ticketing in the form of the contactless Oyster card was first introduced in 2003, with payment using contactless banks cards introduced in September 2014. In 2019 , over 12million Oyster cards and 35million contactless cards were used, generating around £5billion in ticketing revenue. During

4320-404: The completed design, with air-conditioning and walk through carriages for the first time on the Underground. London Underground also announced that 40 additional cars had been ordered from Metronet/Bombardier at a cost of £105 million. This would allow for a seventh carriage on Circle and Hammersmith & City line trains, unifying the fleet with the District line trains. In July 2007, Metronet,

4410-551: The control of the GLC, London Transport introduced a system of fare zones for buses and underground trains that cut the average fare in 1981. Fares increased following a legal challenge but the fare zones were retained, and in the mid-1980s the Travelcard and the Capitalcard were introduced. In 1984, control of London Buses and the London Underground passed back to central government with

4500-520: The creation of London Regional Transport (LRT), which reported directly to the Secretary of State for Transport , still retaining the London Transport brand. One person operation had been planned in 1968, but conflict with the trade unions delayed introduction until the 1980s. On 18 November 1987, fire broke out in an escalator at King's Cross St Pancras tube station . The resulting fire cost

4590-653: The early 1960s, the Metropolitan line was electrified as far as Amersham , British Railways providing services for the former Metropolitan line stations between Amersham and Aylesbury. In 1962, the British Transport Commission was abolished, and the London Transport Executive was renamed the London Transport Board , reporting directly to the Minister of Transport . Also during the 1960s,

SECTION 50

#1733085823191

4680-463: The early 2000s, London Underground was reorganised in a Public-Private Partnership (PPP) as part of a project to upgrade and modernise the system. Private infrastructure companies (infracos) would upgrade and maintain the railway, and London Underground would run the train service. One infraco – Metronet – went into administration in 2007, and TfL took over the other – Tube Lines – in 2010. Despite this, substantial investment to upgrade and modernise

4770-682: The emergency services. In April 1994, the Waterloo & City Railway , by then owned by British Rail and known as the Waterloo & City line, was transferred to the London Underground. In 1999, the Jubilee Line Extension project extended the Jubilee line from Green Park station through the growing Docklands to Stratford station . This resulted in the closure of the short section of tunnel between Green Park and Charing Cross stations. The 11 new stations were designed to be " future-proof ", with wide passageways, large quantities of escalators and lifts, and emergency exits. The stations were

4860-596: The first on the Underground to have platform edge doors , and were built to have step-free access throughout. The stations have subsequently been praised as exemplary pieces of 20th-century architecture. In 2000, Transport for London (TfL) was created as an integrated body responsible for London's transport system. Part of the Greater London Authority , the TfL Board is appointed by the Mayor of London , who also sets

4950-429: The fleet is significantly more reliable than older trains, averaging around 110,000 km (68,000 mi) between failures – around seven times further than A Stock and C Stock trains, and three times further than D Stock. The voltage has been increased from nominal 630 volts to 750 volts. This allows for better performance and also for the increased power demands of air-conditioned, fully motored-axle trains, and allow

5040-606: The form of the Greater London Council (GLC), and the London Transport Board was abolished. The London Transport brand continued to be used by the GLC. On 28 February 1975, a southbound train on the Northern City Line failed to stop at its Moorgate terminus and crashed into the wall at the end of the tunnel, in the Moorgate tube crash . There were 43 deaths and 74 injuries, the greatest loss of life during peacetime on

5130-532: The former East London line becoming part of the Overground network in 2010. Many Overground stations interchange with Underground ones, and Overground lines were added onto the Tube map. In the 2010s, the £18.8   billion Crossrail project built a new east–west railway tunnel under central London. The project involved rebuilding and expanding several central Underground stations including Tottenham Court Road and Whitechapel . By increasing rail capacity,

5220-559: The former Metropolitan Railway closed, the Brill Tramway in 1935, and the line from Quainton Road to Verney Junction in 1936. The 1935–40 New Works Programme included the extension of the Central and Northern lines and the Bakerloo line to take over the Metropolitan's Stanmore branch. The Second World War suspended these plans after the Bakerloo line had reached Stanmore and the Northern line High Barnet and Mill Hill East in 1941. Following bombing in 1940, passenger services over

5310-404: The height of the handrails as compared with A Stock. By 15 September 2012, all 58 S8 trains had been delivered to Neasden Depot. The A Stock trains were completely withdrawn 11 days later. In November 2012, it was reported that 37 of the new trains would be sent back to Bombardier for urgent modification at Bombardier's cost, and that drivers were unhappy with their cabs. An additional S8 train

5400-533: The history of the network and feature historical details drawn from the museum's own archives and collections. Dot-matrix display The display consists of a dot matrix of lights or mechanical indicators arranged in a rectangular configuration (other shapes are also possible, although not common) such that by switching on or off selected dots, text or graphics can be displayed. These displays are normally created using LCD , OLED , or LED technology. A dot-matrix display controller converts instructions from

5490-516: The line aims to reduce overcrowding on the Tube and cut cross-London journey times. The railway opened as the Elizabeth line in May 2022. Although not part of the Underground, the line connects with several Underground stations. In 2020, passenger numbers fell significantly during the COVID-19 pandemic and 40 stations were temporarily closed. The Northern Line Extension opened in September 2021, extending

SECTION 60

#1733085823191

5580-411: The line. Electrification was extended north from Harrow to Rickmansworth , and branches opened from Rickmansworth to Watford in 1925 and from Wembley Park to Stanmore in 1932. The Piccadilly line was extended north to Cockfosters and took over District line branches to Harrow (later Uxbridge) and Hounslow. In 1933, most of London's underground railways, tramway and bus services were merged to form

5670-530: The lives of 31 people and injured a further 100. London Underground was strongly criticised in the aftermath for its attitude to fires underground, and publication of the report into the fire led to the resignation of senior management of both London Underground and London Regional Transport. Following the fire, substantial improvements to safety on the Tube were implemented – including the banning of smoking, removal of wooden escalators, installation of CCTV and fire detectors, as well as comprehensive radio coverage for

5760-501: The main line London and South Western Railway , remained outside the Underground Group's control. A joint marketing agreement between most of the companies in the early years of the 20th century included maps, joint publicity, through ticketing and U NDERGROUN D signs, incorporating the first bullseye symbol, outside stations in Central London. At the time, the term Underground was selected from three other proposed names; 'Tube' and 'Electric' were both officially rejected. Ironically,

5850-434: The need for weekend or evening closures of lines in London to test trains. The first train was delivered to London Underground in October 2009. Built at Bombardier's Derby Litchurch Lane Works, trains were constructed at a rate of six a week at the height of production. In 2015, TfL ordered an additional S8 train as part of the Croxley Rail Link at a cost of £15.5   million, taking the total ordered to 192. The final set

5940-461: The private consortium responsible for the infrastructure for the sub-surfaces lines, collapsed due to financial difficulties. Following negotiations with Bombardier to allow for continued delivery of 2009 Stock and S Stock trains, TfL took ownership of Metronet in May 2008. A mockup of the train was shown off to the public in September 2008. From March 2009, trains were tested prior to delivery at Old Dalby Test Track in Leicestershire , preventing

6030-618: The project, there will be more frequent service as well as faster journey times. The section between Latimer Road and Hammersmith was the first to be switched over to automatic operation on 10 March 2019, with further extensions being implemented in stages called Signal Migration Areas (SMA); as of January 2023 the first six SMA areas have been implemented. Due to various reasons such as funding and technical difficulties, District line automation where it shares tracks with Network Rail or Piccadilly line services has been scaled back until further notice. As of 2023, trains are manually operated on most of

6120-508: The roads to avoid the need for agreement with owners of property on the surface. This opened in 1890 with electric locomotives that hauled carriages with small opaque windows, nicknamed padded cells . The Waterloo and City Railway opened in 1898, followed by the Central London Railway in 1900, known as the "twopenny tube". These two ran electric trains in circular tunnels having diameters between 11 feet 8 inches (3.56 m) and 12 feet 2.5 inches (3.72 m), whereas

6210-430: The service. The Metropolitan District Railway (commonly known as the District Railway ) opened in December 1868 from South Kensington to Westminster as part of a plan for an underground "inner circle" connecting London's main-line stations. The Metropolitan and District railways completed the Circle line in 1884, built using the cut and cover method. Both railways expanded, the District building five branches to

6300-421: The shared ownership of the inner circle. The District, needing to raise the finance necessary, found an investor in the American Charles Yerkes who favoured a DC system similar to that in use on the City & South London and Central London railways. The Metropolitan Railway protested about the change of plan, but after arbitration by the Board of Trade , the DC system was adopted. Yerkes soon had control of

6390-414: The start of commercial service to Richmond. On 16 January 2015, the S7 Stock began running to Upminster. Withdrawal of the D78 Stock began on 19 January. In November 2016, the last of 192 S stock trains were completed by Bombardier and handed over to London Underground. The D78 Stock was completely replaced by the S7 with the withdrawal of the final unit from service on 21 April 2017. The S7 Stock received

6480-540: The structure and level of public transport fares in London. The day-to-day running of the corporation is left to the Commissioner of Transport for London . TfL eventually replaced London Regional Transport, and discontinued the use of the London Transport brand in favour of its own brand. The transfer of responsibility was staged, with transfer of control of London Underground delayed until July 2003, when London Underground Limited became an indirect subsidiary of TfL. In

6570-612: The sub-surface network and the deep-tube lines. The Circle , District , Hammersmith & City , and Metropolitan lines form the sub-surface network, with cut-and-cover railway tunnels just below the surface and of a similar size to those on British main lines They converged on a bi-directional loop in central London, sharing tracks and stations with each other at various places along their respective routes. The Bakerloo , Central , Jubilee, Northern, Piccadilly, Victoria and Waterloo & City lines are deep-level tubes, with smaller trains that run in circular tunnels ( tubes ) with

6660-513: The suburban and countryside areas. The Metropolitan line can reach speeds of 62 mph (100 km/h). The London Underground was used for 1.181   billion journeys in the year 2023–2024. The Underground uses several railways and alignments that were built by main-line railway companies. Chiltern Railways shares track with the Metropolitan Line between Harrow-on-the-Hill and Amersham. Three South Western Railway passenger trains

6750-418: The system runs on the surface. There are 20 miles (32 km) of sub-surface tunnels and 93 miles (150 km) of tube tunnels. Many of the central London Underground stations on deep-level tube routes are higher than the running lines to assist deceleration when arriving and acceleration when departing. Trains generally run on the left-hand track. In some places, the tunnels are above each other (for example,

6840-457: The term Tube was later adopted alongside the Underground. The Bakerloo line was extended north to Queen's Park to join a new electric line from Euston to Watford , but the First World War delayed construction and trains reached Watford Junction in 1917. During air raids in 1915 people used the tube stations as shelters. An extension of the Central line west to Ealing was also delayed by

6930-426: The top line for the destination, and the bottom for the line. Internally, it has larger dot matrix indicators (DMIs) than D Stock (A and C Stock lacked DMIs). The DMIs show destination and line, and can display other messages such as safety notices. There are also DMIs on the exterior, with text alternating between destination and line, and on S8 Stock the stopping pattern (fast, semi-fast or all stations). The S8 Stock

7020-567: The train is moving. The order was said to be the biggest single rolling-stock order in Britain at a cost of £1.5 billion. Passenger service began on the Metropolitan line in July 2010, the Hammersmith & City line in July 2012, and the Circle and District lines in September 2013. The S Stock completely replaced the A Stock on the Metropolitan line in September 2012, and the C Stock on the Circle and Hammersmith & City lines in February 2014, and on

7110-402: The trains to return energy to the network through regenerative braking. From 2016, the fleet has been converted to use communications-based train control (CBTC) as part of the Four Lines Modernisation . Upon completion of the project, there will be more frequent service as well as faster journey times. As of 2023, trains are manually operated on most of the Metropolitan line and about half of

7200-448: The trains use their selective-door-opening capability whereby the doors at the end of the train will not open. On 4 December 2012, an S7 train went east of Moorgate to Barking for testing. This was the first time an S7 train had been seen in peak hours. S7 Stock began operating a full service from Hammersmith to Barking on 9 December 2012. The line was completely operated with S7 stock from 11 February 2014. The S7 Stock entered service on

7290-596: The two models of trains: the S7 Stock, used on inner city lines with higher passenger traffic, has longitudinal seating throughout, while the S8 Stock, used for the longer journeys from the outer suburbs, has a mix of transverse and longitudinal seating, with four wheelchair spaces per train. S7 Stock trains are 117.45 metres (385 ft 4 in) long, while the S8 trains measure 133.68 m (438 ft 7 in). To prevent accidental pressing of emergency alarms, there are flaps over

7380-689: The walk-through S Stock train was elected by Londoners as one of the 10 favourite transport design icons. Following the implementation of the London Underground Public Private Partnership (PPP) in 2003, the Metronet consortium became responsible for the infrastructure on the District, Circle, Hammersmith & City and Metropolitan lines. As part of the consortium, Bombardier Transportation would design, build and maintain new trains for these lines. 190 trains would be built by Bombardier at Derby Litchurch Lane Works – 40 trains for

7470-437: The war and was completed in 1920. After the war, government-backed financial guarantees were used to expand the network and the tunnels of the City and South London and Hampstead railways were linked at Euston and Kennington; the combined service was not named the Northern line until later. The Metropolitan promoted housing estates near the railway with the " Metro-land " brand and nine housing estates were built near stations on

7560-555: The west reaching Ealing , Hounslow , Uxbridge , Richmond and Wimbledon and the Metropolitan eventually extended as far as Verney Junction in Buckinghamshire – more than 50 miles (80 km) from Baker Street and the centre of London. For the first deep-level tube line, the City and South London Railway , two 10 feet 2 inches (3.10 m) diameter circular tunnels were dug between King William Street (close to today's Monument station ) and Stockwell , under

7650-478: The whole Metropolitan line. Deliveries were suspended by Transport for London in November 2011 due to concerns over reliability. A number of trains were delivered to London Underground's Neasden Depot , but were not accepted to enter service. Deliveries resumed in mid-December 2011. In August 2012, London Underground confirmed that strap handles would be introduced on S8 Stock, in response to passenger complaints over

7740-668: The worst civilian disaster in Britain during the Second World War, and the largest loss of life in a single incident on the London Underground network. On 1 January 1948, under the provisions of the Transport Act 1947 , the London Passenger Transport Board was nationalised and renamed the London Transport Executive , becoming a subsidiary transport organisation of the British Transport Commission , which

7830-477: Was delivered 10 November 2016. The extension to the Metropolitan line was cancelled in 2017. S8 Stock was initially tested overnight between Amersham and Watford via the Watford North Curve from 9 November 2009. Driver training began in early January 2010, and the first train entered revenue service on 31 July 2010, shuttling between Wembley Park and Watford. By 27 June 2011, S8 Stock was running along

7920-430: Was formed on the same day. Under the same act, the country's main line railways were also nationalised, and their reconstruction was given priority over the maintenance of the Underground and most of the unfinished plans of the pre-war New Works Programme were shelved or postponed. The District line needed new trains and an unpainted aluminium train entered service in 1953, this becoming the standard for new trains. In

8010-419: Was later delivered, as part of the subsequently cancelled Croxley Rail Link project. There were also three additional eight-car trains called an S7+1 in use on the Metropolitan Line while the eight-car S8 trains were returned for engineering modifications and ATC fitment. These trains were formed of a seven-car S7 and an additional car from another S7, forming an eight-car train. These trains, however, retained

8100-453: Was used for two years in the development of the first underground train, and was later, in 1861, filled up. The world's first underground railway, it opened in January 1863 between Paddington and Farringdon using gas-lit wooden carriages hauled by steam locomotives. It was hailed as a success, carrying 38,000 passengers on the opening day, and borrowing trains from other railways to supplement