107-602: The R160 is a class of New Technology Train subway cars built for the New York City Subway 's B Division . Entering service between 2006 and 2010, they replaced all R38 , R40 , and NYCT -operated R44 cars, and most R32 and R42 cars. The R160s are very similar to the earlier R143s and later R179s . The biggest difference between the R160 and R143 is the Flexible Information and Notice Display (FIND) system on
214-463: A $ 16.9 billion offer, comprising a $ 13.5 billion value plus $ 3.4 billion cash. On 5 May, GE offered to buy one-fourth of the shares in Alstom's Indian power and distribution companies – Alstom T&D India and Alstom India – at 261.25 and 382.20 rupees a share (value US$ 278 million and $ 111 million respectively) subject to its bid for Alstom SA being successful. On 5 May 2014,
321-560: A 2003 deal in Indonesia valued at $ 118 million in particular. On April 13, 2013, Alstom senior executive Frédéric Pierucci was arrested at the John F. Kennedy International Airport in New York . He was accused of willful blindness of his company's suspected corruption and was imprisoned in a high security facility for 14 months and denied release on bail until the week of Alstom's acquisition by
428-529: A 51% shareholding in Linke-Hofmann-Busch from Salzgitter AG . In 1995, the company acquired the remaining shares in the steam turbine manufacturer MAN Energie . In early 1998, GEC Alsthom acquired the electrical contractor Cegelec , renaming it Alstom Power Conversion . In 1998, GEC Alsthom bought Italian firm SASIB 's rail signalling subsidiary Sasib Railways , which included the former General Railway Signal (USA). In June 1998, GEC Alsthom
535-512: A common car design; stainless-steel car bodies with a black (blue on the R211) front fascia on the "A" (cab) cars, open lexan -glass windows on non-cab ends allowing passengers to see through to the next car, and electronic outer route signs, as opposed to the rollsigns used by previous models. Improvements to the conductors' interface include the addition of speedometers as well as electronic consoles that monitor mechanical problems that may occur on
642-520: A consortium of Alstom ( Alstom Wind ), EDF , and DONG Energy was awarded three major French offshore wind farm contracts, the company initiated construction of factories at Cherbourg-en-Cotentin (turbine blades in association with LM Power , also wind turbine towers) and Saint-Nazaire (Nacelles and generators). Also in 2012, the company formed a joint venture with RusHydro to manufacture hydropower equipment for small and medium power hydropower plants. (up to about 100MW.) Late in 2012, to further
749-637: A day for five-car trains, though the Transit Authority had not yet fined Alstom for its late deliveries and was actually negotiating with Alstom to accelerate their delivery schedule. The 200 cars were finally delivered 7 months late in early April 2008. On November 10, 2008, the MTA exercised options for 140 R160B cars (9803–9942) and 242 R160A cars, broken down into 32 cars arranged as 4-car sets (9943–9974) and 210 cars arranged in 5-car sets (9593–9802). The option order cars were delivered starting in late 2009, and
856-559: A design flaw inherited from the acquisition of ABB 's turbine business, in addition to losses in other business sectors. In 2014, General Electric (GE) announced that it reached a deal to purchase Alstom's power and grid divisions for US$ 17 billion (€12.4 billion). The deal came under heavy scrutiny from French regulators who saw the business as a strategically important domestic industry. To secure approval, GE agreed to form joint ventures with French companies in power generation and transmission, Alstom's heavy gas turbine business
963-403: A further 10% stake from shareholder Bouygues and an option to form a rail transport joint venture. On 19 June, GE revised its bid, matching the same price with a lower cash transaction value; it also proposed forming a joint venture of their renewable, electric grid, steam turbine and nuclear power businesses. GE announced a memorandum of understanding between the two firms in the rail sector and
1070-588: A greater product overlap and thus a greater risk to jobs, along with potential issues with EU competition regulators. Siemens' offer was characterised as "defensive", being skeptically received by investors and analysts. On 29 April, Reuters reported that Alstom's board had accepted a €10 billion bid by GE for its energy division; In a letter from GE executive Jeffrey R. Immelt to President François Hollande published in Les Echos , Immelt gave assurances about continued investment in Alstom's French activities,
1177-463: A joint venture of Alstom and Gibela began construction of a new 60,000 square metres (650,000 sq ft) train building factory in Dunnotar , outside of Johannesburg , South Africa . Initial orders for the factory included 580 X'Trapolis Mega passenger trains for Passenger Rail Agency of South Africa under a €4 billion contract that was awarded in 2013. In September 2016, Alstom announced it
SECTION 10
#17330855705401284-517: A more comfortable ride, and employ regenerative braking which converts the energy from brake application into electricity that is fed back into the third rail . All NTT trains are capable of being equipped with communications-based train control (CBTC) technology, which is installed in the "A" cars behind the train operator's cab. Until the late 2010s, only the R143s and R188s, as well as sixty-eight R160As, had been upgraded for automated service on
1391-473: A proposal to merge with Siemens Mobility , the rolling stock division of German conglomerate Siemens ; this merger was promoted as the creation of "a new European champion in the rail industry". The combined rail business, which was to have been reportedly named Siemens Alstom and headquartered in Paris, would have $ 18 billion U.S. in revenue and employ 62,300 people in more than 60 countries. During November 2018,
1498-591: A reported cost of €54 million. As a consequence of an alignment agreement between Transmashholding and another entity, LocoTech-Service , Alstom's stake in the former decreased to 20% in August 2018. In 2011, Alstom and the Iraqi government signed a memorandum of understanding regarding the construction of a new high-speed rail line between Baghdad and Basra . In 2012, Alstom opened construction of factories at Sorel-Tracy , Quebec, Canada (passenger rail vehicles). After
1605-499: A stop is being approached, and while idle at that stop. Lights turned off to indicate a stop already reached, or a part of the route not serviced on that particular trip. LED arrows at either end of the map indicate the direction of service. Electronic strip maps were first tested on the R110A and R110B in the 1990s. While an upgrade from static route maps, most of the strip maps can only facilitate one service and must be turned off when
1712-617: A train is used on another route. This problem is common on the 2 and 5 trains, which both use R142 cars based from the East 180th Street and 239th Street yards and have large amounts of route overlap on the IRT White Plains Road , Eastern Parkway , and Nostrand Avenue lines. The problem is also seen occasionally on the J/Z and L trains, which use R143 cars from the East New York yard that
1819-550: A variant of their TGV family specially designed for traversing the Channel Tunnel between the UK and France. Although collectively operated by Eurostar , the type was ordered by three different railway companies: 16 by SNCF , four by NMBS/SNCB , and 18 by British Rail , of which seven were shortened North of London sets. The first Class 373 set was completed at GEC Alstom's Belfort facility during 1992. In 1994, GEC Alsthom acquired
1926-478: A wheel-rotation counter to make accurate stop announcements. The recordings began in the late 1990s and feature Bloomberg Radio on-air speakers, who volunteered at the request of their employer Michael Bloomberg , who would later become mayor of New York City. Voices include Dianne Thompson (for the 1, 2, and 3 (and the discontinued 9) trains), Melissa Kleiner (original voice of the 4 and 5 trains outside of Manhattan), Jessica Ettinger Gottesman (current voice for
2033-534: A year of successful non-revenue service tests. While Kawasaki had few or no problems in delivering the R160Bs, Alstom was behind on its delivery schedule early on in the R160A order. Alstom was to deliver 200 out of the 400-car base order by September 2007. However, by that month, Alstom had only delivered 80 cars. Under the base contract, Alstom agreed to pay damages of $ 800 a day for late deliveries of four-car trains, and $ 1000
2140-401: A €700 million deal), refocused on rail transport. Due to the acquisition, GE accrued $ 17.3bn of goodwill, consisting of Alstom's negative book value of $ 7.2bn at the time of acquisition and the $ 10.1bn purchase price. In October 2018, GE wrote-off $ 23bn from the value of its power industry division, largely attributed to the Alstom purchase. In November 2015, Alstom was awarded a contract by
2247-452: Is shared by all three services. To solve this problem, the MTA began replacing the individual strip maps for cars assigned to these routes in 2016, with combined strip maps showing both services; the R143s would later be retrofitted with strip maps that also show all stops used by all three services beginning in late 2019. The R160s, R179s, and R211s employ digital display systems as an advanced alternative to strip maps. These systems update
SECTION 20
#17330855705402354-475: The Eighth Avenue Line . On July 31, 2002, it was announced that New York City Transit awarded a $ 961,687,121 contract to Alstom for 660 new cars, with two new options that could provide for a total of 1,040 cars. Kawasaki and Alstom organized a joint venture called Alskaw Inc. for project management, engineering, and equipment purchasing to pursue the contract, and to allow for operational compatibility with
2461-452: The French : Constructions Électriques de France , Tarbes; a manufacturer of electric locomotives as well as electrical and hydraulic equipment. In 1969, Compagnie Générale d'Électricité (CGE) became the majority shareholder of Alsthom. In 1976, Alsthom merged with Chantiers de l'Atlantique , becoming Alsthom Atlantique. Thus, the business expanded into marine. The next year, it constructed
2568-502: The L alongside the line's fleet of R143s. The remaining 630 R160A cars as well as all R160Bs are configured as five-car sets and maintained at Jamaica Yard for the E , F , G and R trains. The R160A base order was part of a $ 961,687,121 contract funded in part by a grant from the Federal Transit Administration . The primary base order of the R160 class consisted of 660 cars, 400 R160As to be built by Alstom , and
2675-646: The L and 7 routes. During the late 2010s and early 2020s, most of the remaining R160s were also retrofitted with CBTC. All existing cars in the R142 and R142A fleets and future cars in the R211 and R262 fleets will also be equipped with CBTC in the future. The NTTs are the first rolling stock in the system to utilize pre-recorded train announcements, as opposed to live announcements from conductors. The recorded announcements are used for station information, closing doors, and other general messages. Station announcements rely on
2782-475: The L were later given the same exterior wrapping, LED interior lighting, yellow-painted looped stanchions, traffic flow signage, and LCD information screens (that replaced the Art-for-Transit cards), plus folding seats and pivoted grabhandles previously tested in 2010. Passengers sometimes vandalize the seats when they are locked in the up position during rush hours. After Hurricane Ida , R160B set 9108–9112
2889-597: The Metropolitan Transportation Authority (MTA) beginning in 1982, when the subway "was on the verge of collapse" . The New Technology program officially began in 1988, the first effort at a technologically advanced subway car since the R44 in the early 1970s. In 1989, the MTA awarded contracts for two prototype test trains: the R110A (contract R130) for the A Division built by Kawasaki Heavy Industries , and
2996-537: The New York City Transit Authority , forming a complete 10-car train for acceptance testing and evaluation. The R160As entered revenue service on the A on October 17, 2006, for in-service acceptance testing after several months of exhaustive non-revenue service tests. The first train of R160Bs (8713–8722) was delivered on July 22, 2005. The R160Bs entered revenue service on the N on August 17, 2006, for in-service acceptance testing after slightly over
3103-728: The Prevention of Corruption Act 1906 and Criminal Law Act 1977 . Further charges were brought in late 2014 by the SFO in relation to corrupt practices used to obtain energy contracts in Lithuania. Additional charges relating to contracts for the Budapest Metro in Hungary were added in April 2015. In December 2018, three executives of Alstom were found guilty of conspiracy to corrupt following an investigation by
3210-495: The R110B (contract R131) for the B Division built by Bombardier Transportation . The two New Technology test trains (NTTTs) began service in June 1993, testing features that would be implemented on future mass-production orders. Both trains were taken out of service by 2000, due to multiple issues with the trains. In 1997, the first mass order of New Technology trains was placed for
3317-816: The R142 and R142A trains of the A Division (awarded to Bombardier and Kawasaki respectively), in order to replace the final 1,410 Redbird cars in operation. In 1998, a smaller contract of 212 cars, consisting of 100 in the base order and 112 in the optional order, was awarded to Kawasaki Heavy Industries, to build the R143 model for the B Division's BMT Eastern Division (primarily the BMT Canarsie Line 's L train). The first R142s and R142As entered service beginning in July 2000. The R143s began operation in February 2002. In July 2002,
R160 (New York City Subway car) - Misplaced Pages Continue
3424-605: The R160B (built by Kawasaki, numbered 8713–9232 & 9803–9942). The two car types differ only in a few ways; both can interoperate with each other. The R160As and the majority of the R160Bs utilize the same traction motors as the R142s , while the rest of the R160Bs utilize traction motors similar to those tested on R143s 8205–8212. Both versions of the R160s are very similar to the R143s and R179s , but
3531-715: The R179 contract for 300 new B Division cars, to replace the 50 R42s on the BMT Jamaica Line ( J and Z trains). In December 2012, preliminary designs began on the R211 B Division contract, which entails 940 cars in order to expand the system fleet, and to replace the R46 fleet, and the R44 fleet of the Staten Island Railway ; both models were built in the 1970s. Both
3638-552: The 1,067.2 kilometres (663.1 mi) from Calais to Marseille in 3 hours and 29 minutes. In 1986, Alsthom Belfort received an order from EDF for the largest gas turbine in the world (212 MW). In 1988–89, holding company CGEE Alsthom acquired ACEC Énergie (hydroturbines and electrical equipment for the nuclear industry) and ACEC Automatisme (automation) from the dissolution of Belgian electrical engineering company ACEC . Alsthom acquired 100% of ACEC's transport division, renaming it ACEC Transport . In early 1989, GEC Alsthom
3745-497: The 10-car test train, which arrived five months late with Alstom requesting three additional months to deliver the test train. In addition, the Transit Authority rejected several car shells made earlier at their plant in Lapa, Brazil, near São Paulo, after discovering welding defects. The first 5-car set of R160As (8653–8657) was delivered on November 29, 2005, and the next remaining five cars (8658–8662) were delivered on December 6, 2005, to
3852-470: The 1990s, the company expanded its holdings in the rail sector, acquiring German rolling stock manufacturer Linke-Hofmann-Busch and Italian rail signaling specialist Sasib Railways. In 1998, GEC Alsthom was listed on the Paris Stock Exchange and, later that year, it was rebranded Alstom. At the time, the company was manufacturing railway rolling stock, power generation equipment and ships. In 2003,
3959-699: The 4, 5, and 6 trains), Annie Bergen (for the 7 train and 42nd Street Shuttle), Catherine Cowdery (for the B, D, E, G, J, L, M, N, Q, R, (V discontinued), W, and Z trains), Kathleen Campion (for the A, C, and F trains, as well as the Franklin Avenue Shuttle and Rockaway Park Shuttle), and Charlie Pellett (for other announcements). Since 2018, Velina Mitchell has also done some of the announcements formerly performed by Pellett, particularly informational messages and station accessibility information. Female voices are typically used for station, route, and transfer/connection announcements, although Pellett announces
4066-639: The Alstom-built cars were built in their Lapa plant, in São Paulo , Brazil , and shells for the Kawasaki-built cars were assembled at their Lincoln, Nebraska plant. The base order consisted of 660 cars, the first option included 620 cars, and the second option included 382 cars. Early on in the order, Alstom encountered significant start-up production problems since being awarded the base contract. In July 2005, Alstom missed its contractual deadline to deliver
4173-669: The Belfort plant's closure in the short to medium term. In June 2017, Alstom opened the largest train modernisation facility in the UK at Halebank on the outskirts of Liverpool . Initial work involved the repainting of the Class 390 Pendolino s. On 12 November 2024, Alstom announced on their official website that the first of 35 fully automated metropolis trains has been delivered to Taiwan . The four-car stainless-steel train can carry up to 700 passengers, including 108 seated, with speeds up to 100 km/h. On 26 September 2017, Alstom announced
4280-618: The European Commission voiced its concerns surrounding the proposed merger of the two companies, particularly that the combined entity would be too dominant in the European market; alleged impacts from such dominance included potential increases in passenger fares and cargo fees. Furthermore, a series of popular protests concerning the financial reforms of both the French territorial railway infrastructure and SNCF occurred. The proposed merger
4387-675: The FIND has gone blank, the R179 FIND displays "Route change: this map is not in use", as opposed to the R160 FIND, which displays "Listen to train crew for announcement." The R211 introduces a new digital display system, known as the Flexible Ceiling Strip Display (FCSD). There are eight of these in each car, located above each set of doors. An LCD strip map displays the next ten stations, plus consecutive "further stops". The screens of
R160 (New York City Subway car) - Misplaced Pages Continue
4494-419: The French government stated it did not back GE's bid, citing concerns on the future of Alstom's rail division as a smaller separate entity, suggesting that GE transfer its own rail division to Alstom; other concerns were over the civil nuclear field's national independence, and French jobs. On 14 May, France issued a decree ( Décret n° 2014-479 du 14 mai 2014 . ), nicknamed " décret Alstom ", extending to power of
4601-507: The French government's 21% holding in Alstom for €2 billion. Later that year, Bouygues elected to increase its shareholding in the firm to 24%. In 2007, the TGV POS set the world speed record for rail vehicles of 574.8 kilometres per hour (357.2 mph). In March, Alstom acquired Power Systems Manufacturing LLC ( Florida , USA) a manufacturer of gas turbine components from Calpine Corporation for $ 242 million. In June, Alstom acquired
4708-752: The French state agreed terms with Bouygues, buying a 20% stake in Alstom from Bouygues at a 2–5% discount on a minimum value of ≈€35 per share. Initially, the acquisition was expected to be finalised by early 2015. In early 2015, the EU Competition Commission began examining the deal. Both EU and US competition regulators approved the deal by September 2015, subject to the divestiture of Alstom's large and very large gas turbine (GT26 and GT36 models) manufacturing and service business; and its GE7FA gas turbine aftermarket parts subsidiary business, Power Systems Mfg. LLC (PSM), to another company, Ansaldo Energia . The sale of Alstom's energy division to GE
4815-656: The Indian Railways to construct an electric locomotive factory in Madhepura ( Bihar ), receiving an initial order of 800 twin-section 9MW locomotives for use on the Eastern Dedicated Freight Corridor , valued at ₹190 billion (about US$ 2.9 billion). This factory was to be operated under a joint venture with the Ministry of Railways (26%) at a cost of ₹ 13 billion (roughly US$ 200 million). In September 2015, it
4922-525: The MTA Board suggested that Kawasaki Rail Car Corp., a subsidiary of Kawasaki Heavy Industries , be awarded the $ 3.7 billion base order for the first 535 new R211 cars. The cars are anticipated to be delivered from 2020 to 2023, with the option orders to be delivered by 2025. The R211 base order includes 20 R211T cars with open gangways ; 75 R211S cars for the Staten Island Railway, to be delivered near
5029-484: The MTA and Comedy Central to promote actress Awkwafina 's TV show Nora From Queens , the default pre-recorded announcements for the 7 train on the R188s were replaced with those from Awkwafina for one week. The announcements from Awkwafina featured jokes in addition to the standard station announcements. The agreement was the first time that the MTA has replaced train announcements as a form of advertising. In April 2024,
5136-525: The MTA announced plans to add 31,000 digital advertising screens in 5,134 cars, which were installed by Outfront Media starting in 2019. In 2020, the MTA started displaying real-time service metrics on the screens, such as service changes and dynamic transfer information. In the R211s, twelve digital advertising displays may be installed in each car, six on either side. There are also provisions for eight Flexible Wall Displays, which are to be mounted next to
5243-472: The MTA awarded contracts to Kawasaki and Alstom for the R160 order for the B Division, with options for up to 1,700 cars to replace many 1960s- and 1970s-era cars. The first R160 train, built by Kawasaki under the contract R160B, began service on August 17, 2006, on the N . The initial 660-car base order was filled by October 2008, with a total of 1,662 cars delivered by May 6, 2010. On May 5, 2010, Kawasaki
5350-428: The MTA indicated that it would record public service announcements by celebrities, which would be played on New Technology Trains for one year as part of a pilot program. The R142s, R142As, R143s, and R188s feature electronic "strip maps." These maps utilize a total of 63 amber LED lights, numbered 001–063, to display stops, with a plastic card on top showing the route, stations, and transfers. A light will flash when
5457-551: The R143s, which were built by Kawasaki. The two companies built and delivered the rolling stock through the joint venture. Kawasaki not only manufactured 260 cars for the base contract but was also the engineering leader for the whole project and provided the trucks for all cars. Alstom assembled 1002 R160A cars at its manufacturing plant in Hornell, New York , while Kawasaki assembled 660 R160B cars at its plant in Yonkers, New York . Shells for
SECTION 50
#17330855705405564-595: The R160s have seen mass refurbishments. A majority of the R160s have been given LED interior lighting, yellow-painted looped stanchions, traffic flow signage, and LCD information screens (that replaced the Arts-for-Transit cards). Some R160s have also been deep-cleaned. Twenty 5-car sets (100 cars) assigned to the E received the same features, but the seats at the end of the cars were removed to increase capacity. To identify these cars, they were given interior artwork and exterior wrapping. Two 4-car sets (8 cars) assigned to
5671-487: The R160s in place of static LED maps on the R143s and all A-Division New Technology fleet. In total, 1,662 cars comprise the R160 class, which consists of two models, the 1,002 Alstom -built R160A cars and the 660 Kawasaki -built R160B cars. The R160A cars are organized in two different configurations, with 372 cars arranged in four-car sets and 630 cars arranged in five-car sets. All R160B cars are in five-car sets, but are subdivided by which propulsion system they use;
5778-646: The R160s through the 2010s. 64 R160A cars were fitted with communications-based train control (CBTC) equipment installed for service on the Canarsie Line ( L train), while the rest of the remaining fleet has CBTC equipment installed for service on the Queens Boulevard Line ( E , F , M , and R trains). There are two versions of the R160: the R160A (built by Alstom, numbered 8313–8712, 9233–9802, & 9943–9974) and
5885-553: The R179 and R211 orders were supposed to replace the 222 remaining R32 cars, which were built in the 1960s and have run well past their expected lives, by the year 2022., however, in January 2020, it was decided that the R179 fleet was to replace all remaining R32s. The R179 order fell significantly behind schedule, with first test train delivered in September 2016. On January 19, 2018,
5992-610: The R211As were placed into revenue service on the A for a 30-day in-service acceptance test. In January 2019, the MTA announced that the R262s would be replacing the R62 and R62A fleets, a new fleet that would be ordered as part of a future capital program. In June 2023, the MTA hinted towards the existence of the R268 subway car contract. More information is to be announced. The NTT models utilize
6099-588: The R211s have the ability to display additional information when arriving at a station, such as specific bus transfers, elevator locations, and which car the customer is located in. When the display is not being used for wayfinding purposes, the FCSD will show the text "Route Change: This Map is Not in Use", a media display, or an informational message. New Technology Trains built between the 1990s and mid-2010s did not originally have digital advertising displays. In September 2017,
6206-449: The SFO into allegations of several Lithuanian politicians and officials being offered bribes in return for securing contracts. In February 2020, the United Nations published a database of all business enterprises involved in certain specified activities related to the Israeli settlements . Alstom has been listed on the database in light of its involvement in activities related to "the provision of services and utilities supporting
6313-450: The Spanish wind turbine manufacturer Ecotècnia, renamed as Alstom Ecotècnia (since 2010 Alstom Wind ). The company also adopted a new graphic chart (logo, corporate identity) using "alstom" as its trading name, reserving "Alstom SA" for legal documents. In 2009, Alstom acquired a 25% stake in the Russian locomotive manufacturer Transmashholding . Six years later, Alstom decided to increase its shareholding in Transmashholding to 33% at
6420-480: The US conglomerate General Electric . In late 2014, Alstom was fined $ 772 million by the DOJ, and admitted guilt under the Foreign Corrupt Practices Act in relation to bribes paid to obtain contracts in various countries. In mid-2014, Alstom Network UK was charged by the UK Serious Fraud Office (SFO) in relation to corruption offences alleged to have been committed when obtaining transportation contracts in India, Poland and Tunisia, covered under sections 1 of
6527-416: The cars to capture the braking energy as trains enter a station and transfer it to trains on nearby tracks. One of the major changes and highlights of the new cars is the addition of an electronic "FIND" (Flexible Information and Notice Display) system , which includes an LCD screen displaying the route, route information, and advertisements, and a tri-color (red, yellow, green) LED strip map which displays
SECTION 60
#17330855705406634-429: The company bought out ABB's share in the former joint venture ABB Alstom Power. In 2000, Alstom sold its diesel engine businesses ( Ruston , Paxman , and Mirrlees Blackstone ) to MAN Group . It also acquired a 51% stake in Italian rail manufacturer Fiat Ferroviaria , a world leader in tilting technology. In April 2003, Alstom sold its industrial turbine business to Siemens for €1.1 billion. By 2003, Alstom
6741-401: The company required a €3.2 billion bailout from the French government. As a result, Alstom was compelled to dispose of several of its divisions, including shipbuilding and electrical transmission to Areva , in order to comply with European Union rules on state aid . In 2004, Alstom remained in financial difficulties, having incurred massive unexpected costs (€4 billion) arising from
6848-468: The company signed a letter of agreement to purchase the transportation division of the financially struggling Bombardier Inc. The purchase was finalized in January 2021. Alsthom was founded in 1928 from the merger of French heavy engineering subsidiary of the Thomson-Houston Electric Company – the Compagnie Française Thomson Houston, CFTH – and the Société Alsacienne de Constructions Mécaniques . In 1932, Alsthom expanded into transportation by acquiring
6955-411: The correct information, which includes, but is not limited to, the omitting of certain stops. As part of a 2010 pilot program to increase security and capacity, R160B cars 8713–8722 tested folding seats, CCTV, pivoted grabhandles, and looped stanchions. Following passenger complaints and Kawasaki's refusal to test the same equipment on a set of R142 cars, the program was canceled in 2012 and the equipment
7062-691: The current R142 , R142A , R143 , R160 , R179 , R188 and R211 models, along with the planned R262 and R268 models. Two prototypes, the R110A and R110B , were used to test the features that would be found on all NTT trains today. Sometimes referred to as New Millennium Trains , they are known for improvements in technology, energy efficiency, reliability, and comfort along with advanced passenger information systems. All of these trains are capable of operating with communications-based train control (CBTC)—which can allow for automatic train controls and compatibility with updated signal systems—and either already have CBTC or are scheduled to be retrofitted with
7169-644: The development of its tidal energy business, Alstom acquired Tidal Generation Ltd from Rolls-Royce , however this was later sold to GE in 2015 as part of the sale of Alstom's energy business. In November 2013, Alstom announced it planned to raise €1 to €2 billion through sale of some non-core assets, plus the possible sale of a stake in Alstom Transport, and cut 1,300 jobs. In 2014, Alstom sold its steam auxiliary components activities (air preheaters and gas-gas heaters for thermal power, other industrial heat transfer equipment, and grinding mills) to Triton Partners for €730 million. In November 2014 Alstom
7276-410: The diesel locomotive manufacturer Meinfesa to Vossloh , and Alstom Power Rentals to APR LLC. Six years later, Alstom re-acquired the electric power transmission division of Areva. In 2005, the former Metro-Cammell rail vehicle works in Washwood Heath closed. In the same year, Alstom sold its Australian subsidiary, Alstom Transport Australia and New Zealand, to United Group , which became part of
7383-406: The door leaves. Alstom Alstom SA is a French multinational rolling stock manufacturer which operates worldwide in rail transport markets. It is active in the fields of passenger transportation, signaling, and locomotives, producing high-speed, suburban, regional and urban trains along with trams. The company and its name (originally spelled Alsthom) was formed by a merger between
7490-422: The electric engineering division of Société Alsacienne de Constructions Mécaniques (Als) and Compagnie Française Thomson-Houston (thom) in 1928. Significant acquisitions later included the Constructions Électriques de France (1932), shipbuilder Chantiers de l'Atlantique (1976), and parts of ACEC (late-1980s). A merger with parts of the British General Electric Company formed GEC Alsthom in 1989. Throughout
7597-427: The end of the base order; and 440 cars similar to the R143/R160 series, operating in five-car units. The cars will be assembled at Kawasaki's factories in Lincoln, Nebraska , and Yonkers, New York . After multiple delays, the first R211A test train was delivered in July 2021, with the production cars being delivered between 2021 and 2023. The first of the R211Ts were delivered on October 31, 2022. On March 10, 2023,
7704-600: The express tracks of the IND Culver Line , and later returned to service. 1,486 additional R160 cars, comprising all 5-car sets and many 4-car sets, have been equipped with CBTC for use on the Queens Boulevard Line ( E , F , M , and R trains). The CBTC equipment for the Queens Boulevard Line cars was manufactured by a joint venture between Siemens and Thales Group . As of November 2021, the remaining 4-car sets will be equipped with CBTC for $ 11.9 million for use on
7811-400: The final cars were delivered on May 6, 2010. By June 2010, all R160A and R160B cars were in revenue service. After Hurricane Sandy , R160B set 8738–8742 was damaged and required an extensive electrical reconstruction at Coney Island Shops. In March 2016, the set underwent pre-service testing and finally returned to service in fall 2016. In response to the 2017 New York City transit crisis ,
7918-502: The first 1300 MW generator set for the Paluel Nuclear Power Plant , setting a world record with an output of 1500 MW. In 1978, Alsthom delivered its first TGV to SNCF . The TGV went on to break world rail speed records in 1981 (at 380 kilometres per hour (240 mph)) and in 1990 (at 515.3 kilometres per hour (320.2 mph)). It also set the world endurance record for high-speed train lines in 2001, travelling
8025-537: The latter's UGL Rail division. Alstom would restart its manufacturing operations in Australia by the early 2010s. In 2006, Alstom sold its Marine Division to the Norwegian group Aker Yards , with a commitment to retain 25% of the shares until 2010; it also sold Alstom Power Conversion, which became Converteam , in a leveraged buy-out deal funded by Barclays Private Equity France SAS. In June 2006, Bouygues acquired
8132-501: The maintenance and existence of settlements" and "the use of natural resources, in particular water and land , for business purposes". On 5 July 2021, Norway 's largest pension fund KLP said it would divest from Alstom together with 15 other business entities implicated in the UN report for their links to Israeli settlements in the occupied West Bank. On 24 April 2014, unconfirmed reports claimed that US conglomerate General Electric (GE)
8239-569: The majority of the transfers on the A Division instead of the female voices. Pellett's recordings are used for most of the remaining announcements, most notably "Stand clear of the closing doors, please" before train doors closing, but also for safety announcements such as " Please be careful of the gap between the platform and the train " before entering a station with curved platforms, and "If you see something, say something." With regard to why certain messages are voiced by males and others by females, MTA spokesperson Gene Sansone said in 2006, "Most of
8346-672: The majority use the Alstom ONIX propulsion system also found on the R160A cars, while cars 8843-9102 use Siemens SITRAC propulsion. Kawasaki had little to no problems in delivering the R160B cars, which entered service on August 17, 2006. Alstom was behind the delivery schedule early on for the R160As, which first ran on October 17, 2006. The Metropolitan Transportation Authority exercised options for both contracts, and by June 2010, all R160 cars were in service. Numerous experimental features were added to
8453-554: The marine market. Alstom's share price had dropped by 90% over two years. European competition commission law required Alstom to sell several of its subsidiaries, including its shipbuilding and electrical transmission assets, when it accepted a €3.2 billion rescue plan involving the French state. In 2004, the French state took a 21% stake in Alstom for €772 million and Alstom received an EU-approved bailout worth in total €2.5 billion. The company sold its electrical transmission and distribution ("grid") activities to Areva ,
8560-477: The next ten stations, plus five consecutive "further stops" to riders. There are three of these in every car. The display updates the stations at every stop, also giving the number of stops to each station listed. The FIND system replaces a plastic card that had a set route and stations printed on, which was used on the R142 , R142A , R143 , and R188 subway cars, each of which has 64 amber LED dot station indicators. This allows for instant route or line changes with
8667-411: The ones onboard all R143 cars; however, they can display a range of colors instead of just red, orange, and green. In 2018, R160A car 8395 had its truck suspension system replaced with carbon fiber reinforced plastic " efWING [ ja ] " leaf springs from Kawasaki , to determine the feasibility of them replacing the heavier coil spring suspension found on all other R160s. R160B car 9116
8774-420: The orders are given by a male voice, while informational messages come from females. Even though this happened by accident, it is a lucky thing because a lot of psychologists agree that people are more receptive to orders from men and information from women." Manual announcements can still be made over the public address system by train operators and conductors. In January 2020, as part of an agreement between
8881-442: The proposed merger with Siemens. On 6 February 2019, the planned merger between the two companies was vetoed by the European Commission. In response to this ruling, Alstom's Chief Executive Officer Henri Poupart-Lafarge stated that he viewed the decision to block the merger was a result of "ideological prejudices". In mid-February 2020, Alstom announced that it had signed a Memorandum of Agreement to buy Bombardier Transportation ,
8988-431: The remaining 260 R160Bs to be built by Kawasaki. The contract included options for further orders, which, if exercised, would have brought the total business with NYCT to about US$ 2.4 billion, for 1,700 subway cars, and Kawasaki would have manufactured 40% (680 cars) of the 1,700 cars. The R160 fleet was purchased at an average cost of $ 2.0 million USD per car. The R160s are equipped with regenerative braking, which allows
9095-452: The route, route information, and advertisements, as well as a dynamic red, yellow, and green LED strip map that displays the next ten stations, plus five consecutive "further stops" to riders. Although they function the same on both models, the FIND systems used on the R179s have slight differences. The LCD displays where the route's emblem is displayed are slightly larger than those on the R160s. If
9202-630: The sale of GE's rail signalling unit to Alstom. On 20 June, Siemens and MHI modified their bid, with MHI increasing its stake in Alstom's steam, hydro, and grid businesses to 40% in all three (total €3.9 billion) while Siemens increased its offer by €400 million to €4.3 billion. Subsequently, Economy minister Arnaud Montebourg stated he would block both bids, but the French government backed GE's offer and had given GE more specifications on commitments and guarantees; it also intended to buy two-thirds of Bouygues' shareholding (20%). The next day, Alstom's board backed GE's revised bid. On 22 June,
9309-421: The security of the civil nuclear sector, and on job commitments made by Alstom Wind , whilst making its wind activities available to investors. On 30 April, Alstom confirmed that an offer for its power and grid divisions (representing an equity value of €12.35 billion, €11.4 billion enterprise value ) was under review with key interests including the French state. On 30 April, GE confirmed it had made
9416-762: The state to veto the takeover of "strategic interests" into areas of energy supply, water, transport, telecoms and public health. Both the French employer organisation MEDEF and the European Commissioner for Internal Market and Services ( Michel Barnier ) responded negatively to the decree. On 16 June, Siemens and Mitsubishi Heavy Industries (MHI) submitted a competing offer for Siemens to acquire Alstom's gas turbine activities for €3.9 billion while MHI would form joint ventures with Alstom, acquiring 40%, 20% and 20% stakes in Alstom's steam and nuclear, electrical grid, and hydroelectric businesses respectively, for €3.1 billion. The proposal included an offer to buy
9523-568: The stations at every stop, also giving the number of stops to each station listed. As the displays can be used by multiple routes instead of one, this allows for instant route or line changes with the correct information, which includes, but is not limited to, omitting certain stops (displayed as "Will not stop" in red). The R160s and R179s employ a system called the Flexible Information and Notice Display, or FIND. There are three of these in every car. This includes an LCD screen displaying
9630-525: The subway system. The R160 fleet is equipped with communications-based train control (CBTC). 64 R160As (8313–8376) have CBTC equipment installed for use on the Canarsie Line ( L train), alongside already-equipped R143 cars. The CBTC equipment used in the Canarsie Line cars was manufactured by Siemens Transportation Systems . R160As 8313–8316 and 8377–8380 were temporarily taken out of service to test equipment between Bergen Street and Church Avenue on
9737-488: The system. Much of the engineering and construction efforts for the fleet have been done by Kawasaki Heavy Industries and Bombardier Transportation , with Alstom also participating in the construction of the R160 fleet. This is a list of all NTT trains operated by the New York City Subway, as well as future trains and retired trains of the MTA. The New Technology program emerged from modernization efforts by
9844-489: The three car types are not interoperable with each other due to electrical incompatibilities between them. The R160 cars are configured in either four-car sets or five-car sets. 372 R160A cars (8313–8652 & 9943–9974) are configured as four-car sets and maintained at East New York Yard for the BMT Eastern Division . All four-car sets are assigned to the J , M and Z trains, but sets 8313-8376 are able to run on
9951-499: The train. The cars feature a white fiberglass interior with blue-gray plastic bench seats both to combat vandalism, along with bright fluorescent lighting and LED interior passenger information signs. The bench-style seats, designed with lumbar supports, also replaced the bucket-style seats used on rolling stock built in the 1970s and '80s, which were uncomfortable for some passengers and harder to clean. The trains utilize an airbag suspension (replacing conventional springs) for
10058-424: Was also equipped with the new suspension. In September 2020, a set of R160s received digital display advertising as a pilot test. This is similar to the digital advertising found on R188 cars 7847–7848. Multiple R160s have since had these screens installed in place of the paper advertisements. The R160 cars began to receive CCTV security cameras in mid-2022 as part of a program to combat the rise of vandalism within
10165-516: Was announced that Amtrak would award Alstom a contract for $ 2.5 billion for the next generation high-speed train sets for the Northeast Corridor . This would result in the creation of 750 jobs across upstate New York with 400 direct manufacturing jobs at Alstom. The order for 28 Avelia Liberty trainsets was officially confirmed in August 2016 by Amtrak. These trainsets are manufactured at Alstom's plant in Hornell, New York . In March 2016,
10272-637: Was awarded a $ 429.4 million contract to modernise 85 trains for the Mexico City Metro system. Starting in 2009, Alstom's practices were questioned by the United States Department of Justice (DOJ), which violated the 1977 Foreign Corrupt Practices Act . This American law has extraterritorial scope. At the time, Alstom seemed to cooperate with the proceedings. In 2010, the DOJ opened an investigation into Alstom's commercial practices, focusing on
10379-562: Was awarded the contract for the R188 A Division order, to provide 46 CBTC -ready 11-car trains for the IRT Flushing Line ( 7 and <7> trains). Unlike the other orders, the R188 constructed only 126 new subway cars, with the remaining 380 cars consisting of converted R142As. The first R188s entered service on November 9, 2013. On June 4, 2012, Bombardier was awarded
10486-484: Was damaged and required an extensive electrical reconstruction at Coney Island Shops. It was moved to the shops on September 22, 2021. It returned to service almost two years later on July 3, 2023. New Technology Train New Technology Train ( NTT ) is the collective term for the modern passenger fleet of the New York City Subway that has entered service since the turn of the 21st century. This includes
10593-401: Was facing a financial crisis caused by a mix of poor sales and over $ 5 billion of debt liabilities. It reportedly had the potential to force the company's liquidation. These heavy debts were largely due to a $ 4 billion charge over a design flaw in a turbine developed by ABB , acquired by Alstom in 2000, as well as the collapse of customer Renaissance Cruises amid a general downturn in
10700-500: Was finalised on 2 November 2015; the final valuation being €12.4 billion, of which €9.7 billion was transferred to Alstom, the remainder being reinvested in GE/Alstom joint ventures plus other corrections. The acquired businesses were reorganised within GE's existing power generation business ( GE Power & Water ) as GE Power . The remainder of Alstom Group, including GE Signalling (acquired via
10807-610: Was formed from a 50–50 merger of Alsthom and the Power Systems Division of the British General Electric Company ; for Alsthom this move was intended to aid Alsthom in selling its products outside the French market. In May of that year GEC Alsthom bought British rail vehicle manufacturer Metro-Cammell . During the early-1990s, GEC Alsthom was the principal manufacturer of the British Rail Class 373 ,
10914-481: Was in acquisition talks with Alstom for $ 13 billion with the support of 29%-shareholder Bouygues, causing Alstom's share price to rise 18% in one day. On 27 April, Le Figaro reported that a rival 'cash plus asset swap' offer was issued by Siemens , trading Alstom's power business for part of its rail arm, plus a cash offer as good as GE's and job guarantees. Siemens' bid was reportedly promoted by French economic minister Arnaud Montebourg . Siemens and Alstom had
11021-486: Was listed on the Paris Stock Exchange ; both GEC and Alcatel elected to sell off part of their stakes (23.6% each). Around this time, the company was officially renamed Alstom . In 1999, Alstom bought half of ABB 's power systems division, forming a 50-50 joint company known as ABB Alstom Power. Alstom also bought Canada's Télécité, a passenger information and security solutions company, and sold its heavy-duty gas turbine business to General Electric . The next year,
11128-481: Was removed. Some of the remaining grabhandles and folding seats from the program have been reused to address a state of emergency in 2017, but have been the subject of vandalism. In 2016, a non-advertised pilot program saw 20 R160 sets based out of Jamaica Yard testing onboard WiFi. That same year, many cars had their Arts for Transit boards replaced with LCD information screens to display public safety announcements, advertisements, and trivia. These screens are similar to
11235-532: Was sold to Ansaldo Energia , and GE agreed to sell Alstom's rail signalling business. The deal was finalised in November 2015; since then, Alstom has been operating solely in the rail sector. In an attempt to grow its rail business, in late-2017, Alstom announced a proposed merger with Siemens Mobility . However, in February 2019, the European Commission prohibited the merger. Subsequently, in February 2020,
11342-524: Was to cease locomotive manufacturing at its Belfort (France) site by 2018 due to low orders; remaining production activity was to be transferred to its facility of Alstom DDF in Reichshoffen , Alsace . However, during October 2016, the French state placed an order of about €650 million for 15 TGV Euroduplex trains; an order for 20 locomotives; plus an order for 30 intercity trains to be built at Reichshoffen. Together, these orders were sufficient to prevent
11449-464: Was viewed by some as a measure to counter the rise of rival Chinese rail business CRRC ; it reportedly received support from many figures within both the French and German governments. The transaction, which was originally due to close by the end of 2018, was met with opposition by French trade union officials who voiced their concerns that such a merger would have the potential for job losses. On 17 July 2018, Alstom shareholders overwhelmingly approved