A medium-capacity system ( MCS ), also known as light rapid transit or light metro , is a rail transport system with a capacity greater than light rail , but less than typical heavy-rail rapid transit . MCS trains are usually 1 to 4 cars. Most medium-capacity rail systems are automated or use light-rail type vehicles.
39-490: Orlyval is a light metro shuttle service at Paris's Orly Airport using the Véhicule Automatique Léger (VAL, English: automatic light vehicle) driverless, rubber-tyred people mover technology. The line, which opened on 2 October 1991, offers free service between the two airport terminal stations, and premium fare service to Antony station, where passengers can connect to the city's RER B trains. Orlyval
78-469: A nonprofit organisation , also categorises several public transport systems as "light metro". The main reason to build a light metro instead of a regular metro is to reduce costs, mainly because this system employs shorter vehicles and shorter stations. Light metros may operate faster than heavy-rail rapid transit systems due to shorter dwell times at stations, and the faster acceleration and deceleration of lighter trains. For example, express trains on
117-437: A cost-cutting method to be able to collect increased fares without having to upgrade fare collection equipment at station entrances. The perceived unfairness of this system (what to do with a passenger who can't pay the exit fare?) prompted Boston politician Walter A. O'Brien to commission the protest song " M.T.A. ", which later became a hit song by The Kingston Trio . The last of the subway exit fares were eliminated from
156-535: A fare upon entry. Metro Transit in King County, Washington , used a similar system until it was ended on September 29, 2012, as well as TriMet in Downtown Portland, Oregon from 1975 to 1982, when its Fareless Square went to pay on boarding, with transfers as a fare receipt for those leaving the area. Many lower-volume point-to-point ticket -based transit services use exit fares in one direction, to avoid
195-525: A heavy-capacity transport system, such as an airport or a main route of a metro network. The definition of a medium-capacity system varies due to its non- standardisation . Inconsistencies in international definitions are even reflected within individual countries. For example, the Taiwan Ministry of Transportation and Communications states that each MCS system can board around 6,000 to 20,000 passengers per hour per direction (p/h/d or PPHPD), while
234-563: A result of the study, in June 1994, RATP increased operating hours of the Orlyval to enable connections to the first and last domestic flights. Since the 2000s, traffic has experienced an annual increase of 8 to 10%. Ridership for the year 2013 amounted to 3.1 million trips. Travel between the airport's terminals is free of charge. Passengers travelling to or from Antony station must pay, and exit fare gates are in place at Antony for passengers coming from
273-509: A section of single track rail) can only achieve lesser headways (e.g. every 15 minutes) which result in lower passenger volume capacities, and thus would be more accurately defined as "light metro" or "medium-capacity" systems as a result. An example is the LA Metro B/D line during the COVID-19 pandemic, as headways were reduced to every 12-20 minutes on each line. In addition to MCS, light metro
312-556: A similar fare-collecting method, based on distance but not time of day. On BART, while ticket vending machines outside the paid area accept credit and debit cards as well as cash, the Addfare machine inside the paid area, which must be used if the ticket has insufficient value, accepts cash only. Also, the Oakland Airport Connector charges exit fare for riders leaving the airport. Prior to the fare system being overhauled in 2017,
351-487: Is a common alternative word in European countries, India, and South Korea. In some countries, however, light metro systems are conflated with light rail . In South Korea, light rail is used as the translation for the original Korean term, "경전철" – its literal translation is "light metro", but it actually means "Any railway transit other than heavy rail, which has capacity between heavy rail and bus transit". For example,
390-499: Is also within walking distance of the ferry terminal. Before exit fares were charged at Tompkinsville, one could avoid paying the exit fare at St. George by exiting at Tompkinsville and walking to the ferry terminal. By charging entry and exit fares at St. George and Tompkinsville, the other stations on the Staten Island Railway can be run at far lower cost, without any fare collection equipment or station employees present. On
429-476: Is indicated. An MCS may also result when a rapid transit service fails to achieve the requisite ridership due to network inadequacies (e.g. single-tracking ) or changing demographics. In contrast with light rail systems, an MCS runs on a fully grade separated exclusive right-of-way . In some cases, the distance between stations is much longer than typically found on heavy rail networks. An MCS may also be suitable for branch line connections to another mode of
SECTION 10
#1733084571452468-482: Is the list of former-MCSs that either developed into a full rapid transit system, or which are no longer in operation: Exit fare An exit fare is a method of collecting ridership fees, or fares , from a transportation system, where the fee (or part of the fee) is collected from passengers upon reaching their destination. Exit fares were used on the subway lines of the early MBTA in Boston, Massachusetts , as
507-513: Is the second line to use the VAL technology after the Lille Metro and the first airport people mover system to use VAL. The line was financed and initially operated by private companies including Matra , the company that developed the VAL technology, along with several international developers. The line was a commercial failure and the operators went bankrupt. RATP Group , the transportation operator for
546-637: The Kelana Jaya , Ampang and Sri Petaling lines as "light rail transit" systems; when originally opened, the original Malay abbreviations for the lines, PUTRA-LRT ( Projek Usahasama Transit Ringan Automatik /Automatic Light Transit Joint Venture Project) and STAR-LRT ( Sistem Transit Aliran Ringan /Light Flow Transit System) did not clearly distinguish between light rail and light rapid transit. Some articles in India also refer to some "light metro"-type systems as "light rail". The Light Rail Transit Association (LRTA),
585-735: The New York City Subway are about as fast as the Vancouver SkyTrain , but these express trains skip most stops on lines where they operate. Medium-capacity systems have restricted growth capacities as ridership increases. For example, it is difficult to extend station platforms once a system is in operation, especially for underground railway systems, since this work must be done without interfering with traffic. Some railway systems, like Hong Kong and Wuhan, may make advance provisions for longer platforms, for example, so that they will be able to accommodate trains with more, or longer cars, in
624-488: The Orlyval service is free of charge between the airport's terminals, but passengers alighting at Antony station need to pay. The IND Rockaway Line charged a double fare south of Howard Beach Station which entailed the deposit of two tokens for those entering along the line or one token on exit for those arriving from other parts of the system. The unpopular double fare was abolished in 1975. Exit fares are also charged on
663-570: The RER B , and an extension of the RER C . Ultimately, in December 1987, authorities opted for the construction of a shuttle line from the airport to Antony station on the RER B line using the Véhicule Automatique Léger (VAL) technology developed by Matra for the Lille Metro which opened in 1983. The project was seen (and criticized) as a showcase project for Matra who was hoping to sell VAL systems to cities across
702-549: The Staten Island Railway at St. George Terminal and Tompkinsville station, because the primary function of the railway is to transport commuters on Staten Island to/from the Staten Island Ferry terminal at St. George. Commuters heading to Manhattan via the ferry pay upon exiting the train at St. George in the morning, and upon entry at St. George in the afternoon. Exit fares are charged at Tompkinsville because it
741-505: The U Line in Uijeongbu utilises VAL system, a variant of medium-capacity rail transport, and is therefore categorised "light metro" by LRTA and others, though the operator itself and South Korean sources refer to the U Line as "light rail". Busan–Gimhae Light Rail Transit is also akin to a light metro in its appearance and features, thought the operator refers it as a "light rail". Likewise, Malaysian officials and media commonly refer to
780-570: The VAL system used on the Taipei Metro , is sometimes recommended, due to its low running noise , as well as the ability to climb steeper grades and turn tighter curves, thus allowing more flexible alignments. Fully heavy rail or metro systems generally have train headways of 10 minutes or better during peak hours. Some systems that qualify as heavy rail/metro in every other way (e.g. are fully grade separated ), but which have network inadequacies (e.g.
819-492: The Washington Metro , riders process their SmarTrip cards for both entering and exiting the system. The fare is actually deducted from the rider's card upon exiting the system based on the time of day and distance traveled. Exitfare machines located near the fare gates allow riders to add additional value to their cards should they lack sufficient value to exit the station at that location. Bay Area Rapid Transit also uses
SECTION 20
#1733084571452858-609: The Boston rail transit lines on December 4, 2006, with the implementation of the CharlieCard (its name a reference to the main character in the protest song). However, the MBTA's trackless trolley routes that used left-side boarding in the lower bus tunnel at Harvard station had exit fares because fares could not be collected during boarding. With the final two trackless trolley routes being converted to standard bus routes with boarding relocated to
897-496: The Paris region, took over the line in 1992. Orly Airport is the primary airport for domestic flights between Paris and other cities in France. During the 1980s, the only transportation options to the airport were by road. Bus routes to the airport were often crowded and traffic jams were frequent. Several projects were suggested: an extension of Paris Métro Line 7 , an additional branch of
936-498: The Port Authority of Allegheny County (since rebranded as Pittsburgh Regional Transit ) used exit fares to implement a free ride zone in downtown Pittsburgh . Riders going toward downtown (and on routes that did not enter downtown) paid on entry. Riders leaving downtown before 7 pm paid on exit. Riders traveling entirely within downtown did not pay at all. After 7 pm, no free rides were provided downtown and all trips were charged
975-490: The RER B and C lines at Massy-Palaiseau in late 2027. The towns of Antony and Wissous as well as the Paris-Saclay community have lobbied to keep the Orlyval line and convert it into something that more closely resembles a metro line for their community, adding three additional stations on the line. However, after more than 30 years in service, the infrastructure needs a major renovation. The other options being considered are
1014-669: The Taiwan Department of Rapid Transit Systems (TCG) suggests an MCS has a capability of boarding around 20,000 to 30,000 p/h/d, and a report from the World Bank places the capacity of an MCS at 15,000 to 30,000 p/h/d. For comparison, ridership capacity of more than 30,000 p/h/d has been quoted as the standard for metro or "heavy rail" standards rapid transit systems, while light rail systems have passenger capacity volumes of around 10,000 to 12,000 p/h/d or 12,000 to 18,000 p/h/d. VAL (Véhicule Automatique Léger) systems are categorised in
1053-461: The airport. The one-way fare for the six-minute ride from Orly to Antony or vice-versa is €11 as of March 2023; this is not affected by the fare cap of €5 on RER tickets announced in March 2022. Children aged 4 to 10 pay half fare and babies aged 3 and under are free. Combined tickets valid onwards to a RER station are available with fares depending on the distance travelled. The only other ticket valid for
1092-428: The complete dismantling of the infrastructure with possible reuse of the right of way as a cycle path or bus lane. Light metro Since ridership determines the scale of a rapid transit system, statistical modeling allows planners to size the rail system for the needs of the area. When the predicted ridership falls between the service requirements of a light rail and heavy rail or metro system, an MCS project
1131-402: The consortium was owned by several banks including Caisse des Dépôts , Crédit Lyonnais , and Indosuez. With daily ridership forecasted at over 14,000 passengers, the banks helped the group secure loans worth 1.55 billion french francs (about €21.65 million). The Orlyval opened on 2 October 1991, about three months ahead of schedule. Almost immediately, ridership was lower than expected. Blame
1170-721: The future. Taipei Metro , for example, constructed extra space for two extra cars in all its Wenhu Line stations. The following is the list of currently-operating MCSs which are categorised as light metros by the Light Rail Transit Association (LRTA) as of March 2018 , unless otherwise indicated. The list does not include, for example, monorails and urban maglev , despite most of them also being "medium-capacity rail system". Bombardier Innovia Metro 300 Trains: 4-car configuration AMPANG AND SRI PETALING LINES: CRRC Zhuzhou LRV Trains: 6-car configuration SHAH ALAM LINE: 3-car CRRC Light Rail vehicles The following
1209-460: The line remained higher than other forms of transportation in the region. As of the end of 2016, the line generated about 10.5 million euros in fares per year. Ridership increased after the RATP took over operation of the line. The RATP carried out a study of riders in early 1994 and learned the clientele mostly consisted of businessmen traveling between the city and the airport for professional reasons. As
Orlyval - Misplaced Pages Continue
1248-446: The line was put into compulsory liquidation. Operation of the line was taken over by RATP, who would receive an operating subsidy of ten million francs per year until the end of 2021, paid by the Île-de-France region. The settlement also included the requirement that until the end of 2021, a portion of each fare should go to repaying creditors, expected to return about 67% of their original investment. Because of this agreement, fares on
1287-466: The medium-capacity rail systems because their manufacturer defines their passenger capacities as being up to 30,000 p/h/d. In Hong Kong , MTR 's Ma On Shan line could, in some contexts, are classified as a medium-capacity system (as it used shorter 4-car SP1950 trains, compared to 7- to 12-car trains on other heavy rail lines) but can attain up to 32,000 p/h/d which is comparable to the passenger capacity of some full metro transit networks. However, it
1326-460: The route is the Paris Visite 1 to 5 day pass; Mobilis day tickets and Navigo season tickets are not valid. With Aéroport d'Orly station opening on 24 June 2024 as an extension of Paris Métro Line 14 , shortly before the start of the 2024 Summer Olympics and 2024 Summer Paralympics , the Orlyval faces an uncertain future. Additionally, Paris Métro Line 18 is scheduled to link the airport with
1365-532: The same technology as the full-capacity rapid transit lines. Generally speaking, medium capacity designation is created from relative lower capacity and/or train configuration comparisons to other heavy rail systems in the same area. For example, the train in an MCS may have a shorter configuration than the standard metro system, usually three (though, in some cases, just two) to six traincars , allowing for shorter platforms to be built and used. Rather than using steel wheels, rubber-tyred metro technology, such as
1404-529: The upper bus tunnel at Harvard, exit fares were entirely eliminated from the MBTA system beginning March 13, 2022. In New York City , this system is used on the AirTrain at John F. Kennedy International Airport . The system uses an exit fare to distinguish between intra-airport trips, which are free, and connections to the subway and commuter rail, which are not. A similar system applies at Orly Airport in Paris, where
1443-474: The world. The government of Jacques Chirac was skeptical about financing the shuttle line and instead offered up a concession : the right for a private company to operate the shuttle line on the airport grounds. A consortium was formed to build the line, consisting of the domestic airline Air Inter (26.7% share), builder Lyonnaise des Eaux-Dumez (18% share), VAL manufacturer Matra (17.3% share), and public transport operator RATP (3.3% share). The other 34.7% of
1482-637: Was built to the full heavy rail standard as it was designed to be extended. Full-length, 8-car trains were deployed on the line in advance of its extension and the line was extended into the Tuen Ma line in June 2021. Two other lines, the Disneyland Resort line shuttle service to Hong Kong Disneyland Resort since 2005 and the South Island line since December 2016, are also classified as MCS because of their shorter trains and smaller capacity, however they use
1521-418: Was placed on the premium fare, 55 francs (about €8), and the transfer between VAL and RER trains at Antony station. Daily ridership was around 4,500, only a third of the predicted traffic. After a few months of operation, fares were reduced, but ridership remained low. In the first full year of operation, the line only served 1.2 million travelers, instead of the 4.3 million initially forecasted. In December 1992,
#451548