Misplaced Pages

Mossburn Branch

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
#368631

73-475: The Mossburn Branch was a branch line railway in New Zealand from Lumsden on the Kingston Branch to the town of Mossburn in northern Southland . Construction began in 1879, Mossburn was reached in 1887, and the line closed in 1982. It was operated by the New Zealand Railways Department . The line was intended to open up land to the west of Lumsden and perhaps even reach Manapouri or Te Anau in Fiordland . Construction began in July 1879 and

146-502: A slipformed (or pre-cast) concrete base (development 2000s). The 'embedded rail structure', used in the Netherlands since 1976, initially used a conventional UIC 54 rail embedded in concrete, and later developed (late 1990s) to use a 'mushroom' shaped SA42 rail profile; a version for light rail using a rail supported in an asphalt concrete –filled steel trough has also been developed (2002). Modern ladder track can be considered

219-440: A "clickety-clack" sound. Unless it is well-maintained, jointed track does not have the ride quality of welded rail and is less desirable for high speed trains . However, jointed track is still used in many countries on lower speed lines and sidings , and is used extensively in poorer countries due to the lower construction cost and the simpler equipment required for its installation and maintenance. A major problem of jointed track

292-547: A certain industrial site such as a power station either because of a location away from the main line or to reduce congestion. They were typically built to lower standards, using lighter rail and shallow roadbeds when compared to main lines. Much of Canada's branch line history relates to large rail transport conglomerates (such as the Grand Trunk , Canadian National , or Canadian Pacific ) which would acquire formerly independent short line railways for use as branch lines, with

365-648: A common sleeper. The straight rails could be angled at these joints to form primitive curved track. The first iron rails laid in Britain were at the Darby Ironworks in Coalbrookdale in 1767. When steam locomotives were introduced, starting in 1804, the track then in use proved too weak to carry the additional weight. Richard Trevithick 's pioneering locomotive at Pen-y-darren broke the plateway track and had to be withdrawn. As locomotives became more widespread in

438-415: A continuous reinforced concrete slab and the use of pre-cast pre-stressed concrete units laid on a base layer. Many permutations of design have been put forward. However, ballastless track has a high initial cost, and in the case of existing railroads the upgrade to such requires closure of the route for a long period. Its whole-life cost can be lower because of the reduction in maintenance. Ballastless track

511-481: A development of baulk road. Ladder track utilizes sleepers aligned along the same direction as the rails with rung-like gauge restraining cross members. Both ballasted and ballastless types exist. Modern track typically uses hot-rolled steel with a profile of an asymmetrical rounded I-beam . Unlike some other uses of iron and steel , railway rails are subject to very high stresses and have to be made of very high-quality steel alloy. It took many decades to improve

584-411: A larger yard, where these railcars are sorted and dispatched in larger trains with other cars destined to similar locations. Because industrial spurs generally have less capacity and traffic than a mainline, they tend to have lower maintenance and signaling (train control) standards. Before the rise of the long-distance trucking in the early 1930s, railroads were the primary means of transportation around

657-464: A modern station building replaced the previous shelter shed and a station master was appointed. A train ran from Invercargill every weekday, with allowances made for a second when required. As well as relevant freight for the Manapouri project, the line also carried significant quantities of livestock, fertiliser, and serpentine for local fertiliser manufacturing plants. It was not until around 1980 that

730-786: A section of the West Rail line . Discontinued services include the Sha Tau Kok Railway and the Wo Hop Shek Branch . A spur line to Siu Sai Wan has been proposed. Delhi On the Delhi Metro , the Blue Line has a Branch Line with 8 Stations, linking Yamuna Bank to Ghaziabad via Anand Vihar ISBT and terminating at Vaishali. The first section of the Branch opened on 8 January 2010 with Anand Vihar as its terminal with six stations. It

803-607: A serious chance of being realised. Only three stations were on the Mossburn line (in brackets is the distance from Mararoa Junction): The end of rails was just beyond Mossburn station, 16.9 km from the junction. Traffic on the line was never heavy until the 1960s; for many years, two mixed trains ran a week from Lumsden. These trains carried both passengers and goods, with the usual inbound cargo consisting of agricultural lime and fertiliser, and wool and livestock outbound. Passengers were no longer carried after 4 October 1937, and

SECTION 10

#1733086305369

876-484: A single track, the journey is 0.8 miles (1.3 kilometres) long and the train takes around two and a half minutes to complete its journey. In North America, little-used branch lines are often sold by large railroads to become new common carrier short-line railroads of their own. Throughout the United States and Canada, branch lines link smaller towns too distant from the main line to be served efficiently, or to serve

949-523: A subsidy for grain transport, and instead allowed railways to absorb branch line subsidies freely without making effort to improve the profitability of the lines. The term "grain-dependent branch lines" began being used as early as 1978 to refer to the special case of these branch lines in agricultural areas whose viability depended on the economics of grain transport. The Western Grain Transportation Act of 1983 addressed this case specifically, but

1022-465: A temperature roughly midway between the extremes experienced at that location. (This is known as the "rail neutral temperature".) This installation procedure is intended to prevent tracks from buckling in summer heat or pulling apart in the winter cold. In North America, because broken rails are typically detected by interruption of the current in the signaling system, they are seen as less of a potential hazard than undetected heat kinks. Joints are used in

1095-462: Is 115 to 141 lb/yd (57 to 70 kg/m). In Europe, rail is graded in kilograms per metre and the usual range is 40 to 60 kg/m (81 to 121 lb/yd). The heaviest mass-produced rail was 155 pounds per yard (77 kg/m), rolled for the Pennsylvania Railroad . The rails used in rail transport are produced in sections of fixed length. Rail lengths are made as long as possible, as

1168-408: Is a manual process requiring a reaction crucible and form to contain the molten iron. North American practice is to weld 1 ⁄ 4 -mile-long (400 m) segments of rail at a rail facility and load it on a special train to carry it to the job site. This train is designed to carry many segments of rail which are placed so they can slide off their racks to the rear of the train and be attached to

1241-556: Is a type of secondary track used by railroads to allow customers at a location to load and unload railcars without interfering with other railroad operations. Industrial spurs can vary greatly in length and railcar capacity depending on the requirements of the customer the spur is serving. In heavily industrialized areas, it is not uncommon for one industrial spur to have multiple sidings to several different customers. Typically, spurs are serviced by local trains responsible for collecting small numbers of railcars and delivering them to

1314-488: Is cracking around the bolt holes, which can lead to breaking of the rail head (the running surface). This was the cause of the Hither Green rail crash which caused British Railways to begin converting much of its track to continuous welded rail. Where track circuits exist for signalling purposes, insulated block joints are required. These compound the weaknesses of ordinary joints. Specially-made glued joints, where all

1387-459: Is graded by its linear density , that is, its mass over a standard length. Heavier rail can support greater axle loads and higher train speeds without sustaining damage than lighter rail, but at a greater cost. In North America and the United Kingdom, rail is graded in pounds per yard (usually shown as pound or lb ), so 130-pound rail would weigh 130 lb/yd (64 kg/m). The usual range

1460-402: Is scarce and where tonnage or speeds are high. Steel is used in some applications. The track ballast is customarily crushed stone, and the purpose of this is to support the sleepers and allow some adjustment of their position, while allowing free drainage. A disadvantage of traditional track structures is the heavy demand for maintenance, particularly surfacing (tamping) and lining to restore

1533-456: Is starting to paint rails white to lower the peak temperatures reached in summer days. After new segments of rail are laid, or defective rails replaced (welded-in), the rails can be artificially stressed if the temperature of the rail during laying is cooler than what is desired. The stressing process involves either heating the rails, causing them to expand, or stretching the rails with hydraulic equipment. They are then fastened (clipped) to

SECTION 20

#1733086305369

1606-754: Is to bolt them together using metal fishplates (jointbars in the US), producing jointed track . For more modern usage, particularly where higher speeds are required, the lengths of rail may be welded together to form continuous welded rail (CWR). Jointed track is made using lengths of rail, usually around 20 m (66 ft) long (in the UK) and 39 or 78 ft (12 or 24 m) long (in North America), bolted together using perforated steel plates known as fishplates (UK) or joint bars (North America). Fishplates are usually 600 mm (2 ft) long, used in pairs either side of

1679-435: Is usually considered for new very high speed or very high loading routes, in short extensions that require additional strength (e.g. railway stations), or for localised replacement where there are exceptional maintenance difficulties, for example in tunnels. Most rapid transit lines and rubber-tyred metro systems use ballastless track. Early railways (c. 1840s) experimented with continuous bearing railtrack, in which

1752-529: The Bay of Plenty Region , lines were built inland to provide rail access to large logging operations. Today, many of the branch lines have been closed, including almost all of the general-purpose country lines. Those that remain serve ports or industries far from main lines such as coal mines, logging operations, large dairying factories, and steelworks . In Auckland and Wellington , two branch lines in each city exist solely for commuter passenger trains. For more, see

1825-717: The Gladstone Branch in New Jersey; as well as the New Canaan Branch , Danbury Branch , and Waterbury Branch in Connecticut . The Long Island Rail Road also refers to its services as "branches". In Chile, there are a lot of branch lines on its main line, of only a few remain operational. Most only operating in turistic services (like the Antilhue-Valdivia branch line), others have been taken over by other railways (like

1898-489: The London, Midland and Scottish Railway pioneered the conversion to flat-bottomed rail in Britain, though earlier lines had made some use of it. Jointed rails were used at first because contemporary technology did not offer any alternative. However, the intrinsic weakness in resisting vertical loading results in the ballast becoming depressed and a heavy maintenance workload is imposed to prevent unacceptable geometrical defects at

1971-761: The North South Line between Jurong East and Choa Chu Kang stations was operated as a separate line, known as the Branch line . It was merged into the North–South Line with the opening of the Woodlands Extension in 1996. The future Jurong Region Line and Cross Island Line will also have branch lines. New Zealand once had a very extensive network of branch lines, especially in the South Island regions of Canterbury , Otago , and Southland . Many were built in

2044-592: The Pisa-Rome railway mainline at Roma San Pietro railway station , to Vatican City station . Many British railway branch lines were closed as a result of the " Beeching cuts " in the 1960s, although some have been re-opened as heritage railways . The smallest branch line that is still in operation in the UK is the Stourbridge Town Branch Line from Stourbridge Junction going to Stourbridge Town . Operating on

2117-672: The South Tseung Kwan O Spur Line to LOHAS Park station , opened in 2009. Earlier, a spur line was built in 1985 on the East Rail line to serve Racecourse station , bypassing Fo Tan station . Also, the Tsim Sha Tsui Extension  [ yue ] was built in 2004 on the East Rail line to serve East Tsim Sha Tsui station . However, after the Kowloon Southern Link was completed in 2009, this spur line turns into

2190-512: The list of New Zealand railway lines . Track (rail transport) A railway track ( British English and UIC terminology ) or railroad track ( American English ), also known as a train track or permanent way (often " perway " in Australia or " P Way " in Britain and India), is the structure on a railway or railroad consisting of the rails , fasteners , railroad ties (sleepers, British English) and ballast (or slab track ), plus

2263-537: The 1810s and 1820s, engineers built rigid track formations, with iron rails mounted on stone sleepers, and cast-iron chairs holding them in place. This proved to be a mistake, and was soon replaced with flexible track structures that allowed a degree of elastic movement as trains passed over them. Traditionally, tracks are constructed using flat-bottomed steel rails laid on and spiked or screwed into timber or pre-stressed concrete sleepers (known as ties in North America), with crushed stone ballast placed beneath and around

Mossburn Branch - Misplaced Pages Continue

2336-415: The 20th century, rail track used softwood timber sleepers and jointed rails, and a considerable amount of this track remains on secondary and tertiary routes. In North America and Australia, flat-bottomed rails were typically fastened to the sleepers with dog spikes through a flat tie plate. In Britain and Ireland, bullhead rails were carried in cast-iron chairs which were spiked to the sleepers. In 1936,

2409-666: The San Rosendo-Talcahuano branch line, which has been taken over by Biotrén and the Laja-Talcahuano train service) however, there is one branch line that still remains as fully operative. The Talca-Constitución branch line, which uses trains with bus motors. Two extensions to the MTR rapid transit network were built as branches of existing lines: the Lok Ma Chau Spur Line to Lok Ma Chau station , which opened in 2007; and

2482-543: The U.S. state of New Jersey . The line is a short branch of the Northeast Corridor Line , running from Princeton Junction northwest to Princeton with no intermediate stops. Also known as the "Dinky Line", at 2.9 mi (4.7 km) it is the shortest scheduled commuter rail line in the United States. The run takes 4 minutes, 47 seconds. Other than the Princeton Line, other surviving branch lines include

2555-400: The bolt heads on the same side of the rail. Small gaps which function as expansion joints are deliberately left between the rail ends to allow for expansion of the rails in hot weather. European practice was to have the rail joints on both rails adjacent to each other, while North American practice is to stagger them. Because of these small gaps, when trains pass over jointed tracks they make

2628-458: The continuous welded rail when necessary, usually for signal circuit gaps. Instead of a joint that passes straight across the rail, the two rail ends are sometimes cut at an angle to give a smoother transition. In extreme cases, such as at the end of long bridges, a breather switch (referred to in North America and Britain as an expansion joint ) gives a smooth path for the wheels while allowing

2701-440: The desired track geometry and smoothness of vehicle running. Weakness of the subgrade and drainage deficiencies also lead to heavy maintenance costs. This can be overcome by using ballastless track. In its simplest form this consists of a continuous slab of concrete (like a highway structure) with the rails supported directly on its upper surface (using a resilient pad). There are a number of proprietary systems; variations include

2774-484: The effects of the Long Depression of the 1880s. The first three kilometres opened to Castle Rock on 1 April 1881, but almost five years passed before the next section, six and a half kilometres to Murray Creek, was opened on 13 March 1886. The final six and a half kilometres were built much quicker and the line was opened all the way to Mossburn on 21 January 1887. No proposals to continue construction westwards ever had

2847-440: The end of one rail to expand relative to the next rail. A sleeper (tie or crosstie) is a rectangular object on which the rails are supported and fixed. The sleeper has two main roles: to transfer the loads from the rails to the track ballast and the ground underneath, and to hold the rails to the correct width apart (to maintain the rail gauge ). They are generally laid transversely to the rails. Various methods exist for fixing

2920-552: The first president of the Canadian National Railway , said that although most branch lines cannot pay for themselves, they are even essential to make main lines pay. In the United States, abandonment of unproductive branch lines was a byproduct of deregulation of the rail industry through the Staggers Act . The Princeton Branch is a commuter rail line and service owned and operated by New Jersey Transit (NJT) in

2993-509: The formation is still visible, but due to the flat nature of the land, it is insubstantial, lacking cuttings or embankments . A new road bridge across the Ōreti River has been built and all traces of the railway bridge have been obliterated except for a few rails pointing to nowhere on the Lumsden bank. In Mossburn, a hotel has "Railway Hotel" moulded into its concrete façade. Nearby, the site of Mossburn's yard has been mostly bulldozed flat and only

Mossburn Branch - Misplaced Pages Continue

3066-428: The gaps are filled with epoxy resin , increase the strength again. As an alternative to the insulated joint, audio frequency track circuits can be employed using a tuned loop formed in approximately 20 m (66 ft) of the rail as part of the blocking circuit. Some insulated joints are unavoidable within turnouts. Another alternative is an axle counter , which can reduce the number of track circuits and thus

3139-416: The greater flexibility and economic savings of trucking. Today, railroads remain the most economical way to ship large quantities of material, a fact that is reflected in industrial spurs. Most modern day spurs serve very large industries that require hundreds, if not thousands, of carloads a year. There is an international branch line between Italy and Vatican: the 300-metre Vatican Railway , connecting from

3212-474: The iron came loose, began to curl, and intruded into the floors of the coaches. The iron strap rail coming through the floors of the coaches came to be referred to as "snake heads" by early railroaders. The Deeside Tramway in North Wales used this form of rail. It opened around 1870 and closed in 1947, with long sections still using these rails. It was one of the last uses of iron-topped wooden rails. Rail

3285-402: The joints between rails are a source of weakness. Throughout the history of rail production, lengths have increased as manufacturing processes have improved. The following are lengths of single sections produced by steel mills , without any thermite welding . Shorter rails may be welded with flashbutt welding , but the following rail lengths are unwelded. Welding of rails into longer lengths

3358-440: The joints. The joints also needed to be lubricated, and wear at the fishplate (joint bar) mating surfaces needed to be rectified by shimming. For this reason jointed track is not financially appropriate for heavily operated railroads. Timber sleepers are of many available timbers, and are often treated with creosote , chromated copper arsenate , or other wood preservatives. Pre-stressed concrete sleepers are often used where timber

3431-534: The late 19th century to open up inland regions for farming and other economic activities. The branches in the South Island regions were often general-purpose lines that carried predominantly agricultural traffic, but lines elsewhere were often built to serve a specific resource: on the West Coast , an extensive network of branch lines was built in rugged terrain to serve coal mines, while in the central North Island and

3504-638: The line left the Kingston Branch just outside the north side of Lumsden at a location named Mararoa Junction that was simply a set of points . The only real obstacle was the Ōreti River , which was crossed by the end of March 1880, though an 1880 Royal Commission into New Zealand's railways was so unimpressed by the line's prospects that it declared "the railway bridge over the Oreti should be decked over and thrown open for dray traffic." Nonetheless, construction progressed onwards towards Mossburn, albeit slowly due to

3577-419: The loading bank and a few rails and sleepers remain. Branch line A branch line is a secondary railway line which branches off a more important through route, usually a main line . A very short branch line may be called a spur line . Branch lines may serve one or more industries, or a city or town not located on a main line. Branch lines may also connect two or more main lines. An industrial spur

3650-503: The low freight figures implied that the line was set for a slow descent into oblivion. The Mossburn Branch did not have a predictable demise, however. Mossburn was the nearest railhead to the Manapouri hydro-electric project and the branch suddenly became very busy with traffic not only for Manapouri but also for other government schemes in the area that centred on the development of farming. Mossburn station and yard were wholly re-organised;

3723-863: The mid- to late-20th century used rails 39 feet (11.9 m) long so they could be carried in gondola cars ( open wagons ), often 40 feet (12.2 m) long; as gondola sizes increased, so did rail lengths. According to the Railway Gazette International the planned-but-cancelled 150-kilometre rail line for the Baffinland Iron Mine , on Baffin Island , would have used older carbon steel alloys for its rails, instead of more modern, higher performance alloys, because modern alloy rails can become brittle at very low temperatures. Early North American railroads used iron on top of wooden rails as an economy measure but gave up this method of construction after

SECTION 50

#1733086305369

3796-620: The number of insulated rail joints required. Most modern railways use continuous welded rail (CWR), sometimes referred to as ribbon rails or seamless rails . In this form of track, the rails are welded together by utilising flash butt welding to form one continuous rail that may be several kilometres long. Because there are few joints, this form of track is very strong, gives a smooth ride, and needs less maintenance; trains can travel on it at higher speeds and with less friction. Welded rails are more expensive to lay than jointed tracks, but have much lower maintenance costs. The first welded track

3869-404: The outside of sharp curves compared to the rails on the inside. Rails can be supplied pre-drilled with boltholes for fishplates or without where they will be welded into place. There are usually two or three boltholes at each end. Rails are produced in fixed lengths and need to be joined end-to-end to make a continuous surface on which trains may run. The traditional method of joining the rails

3942-423: The quality of the materials, including the change from iron to steel. The stronger the rails and the rest of the trackwork, the heavier and faster the trains the track can carry. Other profiles of rail include: bullhead rail ; grooved rail ; flat-bottomed rail (Vignoles rail or flanged T-rail); bridge rail (inverted U–shaped used in baulk road ); and Barlow rail (inverted V). North American railroads until

4015-682: The rail by special clips that resist longitudinal movement of the rail. There is no theoretical limit to how long a welded rail can be. However, if longitudinal and lateral restraint are insufficient, the track could become distorted in hot weather and cause a derailment. Distortion due to heat expansion is known in North America as sun kink , and elsewhere as buckling. In extreme hot weather special inspections are required to monitor sections of track known to be problematic. In North American practice, extreme temperature conditions will trigger slow orders to allow for crews to react to buckling or "sun kinks" if encountered. The German railway company Deutsche Bahn

4088-425: The rail ends and bolted together (usually four, but sometimes six bolts per joint). The bolts have alternating orientations so that in the event of a derailment and a wheel flange striking the joint, only some of the bolts will be sheared, reducing the likelihood of the rails misaligning with each other and exacerbating the derailment. This technique is not applied universally; European practice being to have all

4161-494: The rail to the sleeper. Historically, spikes gave way to cast iron chairs fixed to the sleeper. More recently, springs (such as Pandrol clips ) are used to fix the rail to the sleeper chair. Sometimes rail tracks are designed to be portable and moved from one place to another as required. During construction of the Panama Canal , tracks were moved around excavation works. These track gauge were 5 ft ( 1,524 mm ) and

4234-630: The rail was supported along its length, with examples including Brunel's baulk road on the Great Western Railway , as well as use on the Newcastle and North Shields Railway , on the Lancashire and Yorkshire Railway to a design by John Hawkshaw , and elsewhere. Continuous-bearing designs were also promoted by other engineers. The system was tested on the Baltimore and Ohio railway in the 1840s, but

4307-556: The railways had owned. However, by the mid-20th century, railways began neglecting lines in western agricultural regions. This was historically driven by factors such as the Crow Rate , which regulated the price railways could charge for shipping grain. Railways had little incentive to invest in rural Prairie branch lines, but were legally unable to abandon them under the National Transportation Act , which also did not provide

4380-549: The rolling stock full size. Portable tracks have often been used in open pit mines. In 1880 in New York City , sections of heavy portable track (along with much other improvised technology) helped in the move of the ancient obelisk in Central Park to its final location from the dock where it was unloaded from the cargo ship SS Dessoug . Cane railways often had permanent tracks for the main lines, with portable tracks serving

4453-804: The short line often continuing to exist as a subsidiary. For example, when the Canadian Pacific acquired the Algoma Eastern Railway (a short line) in 1930, it soon after abandoned much of the Algoma Eastern mainline, but retained sections close to Algoma Eastern–Canadian Pacific junctions as short branch lines or spurs. The National Transportation Act of 1967 provided government subsidies for branch lines. Western railway development in Canada worked in concert with land settlement and cultivation, as pioneers were settled near railway lines, often on land

SECTION 60

#1733086305369

4526-426: The sleepers in their expanded form. This process ensures that the rail will not expand much further in subsequent hot weather. In cold weather the rails try to contract, but because they are firmly fastened, cannot do so. In effect, stressed rails are a bit like a piece of stretched elastic firmly fastened down. In extremely cold weather, rails are heated to prevent "pull aparts". CWR is laid (including fastening) at

4599-407: The sleepers. Most modern railroads with heavy traffic use continuously welded rails that are attached to the sleepers with base plates that spread the load. When concrete sleepers are used, a plastic or rubber pad is usually placed between the rail and the tie plate. Rail is usually attached to the sleeper with resilient fastenings, although cut spikes are widely used in North America. For much of

4672-511: The ties (sleepers) in a continuous operation. If not restrained, rails would lengthen in hot weather and shrink in cold weather. To provide this restraint, the rail is prevented from moving in relation to the sleeper by use of clips or anchors. Attention needs to be paid to compacting the ballast effectively, including under, between, and at the ends of the sleepers, to prevent the sleepers from moving. Anchors are more common for wooden sleepers, whereas most concrete or steel sleepers are fastened to

4745-546: The underlying subgrade . It enables trains to move by providing a dependable surface for their wheels to roll upon. Early tracks were constructed with wooden or cast iron rails, and wooden or stone sleepers; since the 1870s, rails have almost universally been made from steel. The first railway in Britain was the Wollaton Wagonway , built in 1603 between Wollaton and Strelley in Nottinghamshire. It used wooden rails and

4818-484: The various government projects wound down and required the railway less. The line reverted to a twice-weekly level of service, with trains running from Invercargill on Tuesdays and Thursdays. Traffic from this point became economically unsustainable and the branch closed on 16 December 1982, the same day as the section of the Kingston Branch from Makarewa to Lumsden. Very little remains of the Mossburn Branch. Most of

4891-467: The world. Industries of the era were commonly built along railroad lines specifically to allow for easy access to shipping. Short (under a mile, oftentimes only several hundred yards) industrial spurs with very small (under ten car) capacities were a common sight along railroads in industrial and rural cities alike. As automobile and roadway technology improved throughout the early and mid-20th century, most low volume industry spurs were abandoned in favor of

4964-467: Was first introduced around 1893, making train rides quieter and safer. With the introduction of thermite welding after 1899, the process became less labour-intensive, and ubiquitous. Modern production techniques allowed the production of longer unwelded segments. Newer longer rails tend to be made as simple multiples of older shorter rails, so that old rails can be replaced without cutting. Some cutting would be needed as slightly longer rails are needed on

5037-432: Was found to be more expensive to maintain than rail with cross sleepers . This type of track still exists on some bridges on Network Rail where the timber baulks are called waybeams or longitudinal timbers. Generally the speed over such structures is low. Later applications of continuously supported track include Balfour Beatty 's 'embedded slab track', which uses a rounded rectangular rail profile (BB14072) embedded in

5110-496: Was further extended to Vaishali in 2011. The line is planned to be extended from Vaishali to Mohan Nagar via Sahibabad Station to link with the main line. The East West Line of the MRT system in Singapore has a two-station branch to Changi Airport . The first station, Expo , opened in 2001. It was extended to Changi Airport station the next year. From 1990 to 1996, the section of

5183-488: Was repealed in 1994 in the wake of the North American Free Trade Agreement and budget-balancing initiatives in favour of a one-time payout by the federal government directly to farmers, to arrange transport of grain themselves. From the mid-1970s to the late 2010s, more than 9,300 kilometres (5,800 mi) of Prairie branch lines were abandoned or had a discontinuance of service. David Blyth Hanna ,

5256-475: Was the first of around 50 wooden-railed tramways built over the next 164 years. These early wooden tramways typically used rails of oak or beech, attached to wooden sleepers with iron or wooden nails. Gravel or small stones were packed around the sleepers to hold them in place and provide a walkway for the people or horses that moved wagons along the track. The rails were usually about 3 feet (0.91 m) long and were not joined - instead, adjacent rails were laid on

5329-500: Was used in Germany in 1924. and has become common on main lines since the 1950s. The preferred process of flash butt welding involves an automated track-laying machine running a strong electric current through the touching ends of two unjoined rails. The ends become white hot due to electrical resistance and are then pressed together forming a strong weld. Thermite welding is used to repair or splice together existing CWR segments. This

#368631