Lycée Josy Barthel (English: Josy Barthel High School ), abbreviated to LJBM , is a high school in Mamer , in south-western Luxembourg . It was opened in September 2003, and cost € 67.4m to build. It comprises 60 classrooms and 16 workshops, and has a capacity of 1,300 students. It is named after Josy Barthel , winner of Luxembourg's only Olympic gold medal-winner and former cabinet member.
124-558: It is served by its own railway station , Mamer Lycée , which lies 500 metres (550 yards) to the west. The first denomination of the highschool was Lycée technique Josy Barthel and has been changed into Lycée Josy Barthel on 1 September 2009. Since then the school offers all class from 7th to 1st degree (enseignement secondaire (in French) ). 49°37′12″N 06°01′51″E / 49.62000°N 6.03083°E / 49.62000; 6.03083 This Luxembourg school-related article
248-404: A bar or pub . Other station facilities may include: toilets , left-luggage , lost-and-found , departures and arrivals schedules , luggage carts, waiting rooms , taxi ranks , bus bays and even car parks . Larger or staffed stations tend to have a greater range of facilities including also a station security office. These are usually open for travellers when there is sufficient traffic over
372-416: A station building providing such ancillary services as ticket sales, waiting rooms , and baggage/freight service. Stations on a single-track line often have a passing loop to accommodate trains travelling in the opposite direction. Locations at which passengers only occasionally board or leave a train, sometimes consisting of a short platform and a waiting area but sometimes indicated by no more than
496-665: A bridge was destroyed (the wreckage burned for months and melted the metal coal hoppers), as well as later ironclad trains (one only disabled by an artillery shell piercing the boiler). On April 18, 1861, the day after Virginia seceded from the Union, Virginia militia seized the federal arsenal at Harpers Ferry , which was also an important work station on the B&O's main westward line. The following day, Confederate rioters in Baltimore attempted to prevent Pennsylvania volunteers from proceeding from
620-406: A bypass line, used by freight trains that do not need to stop at the terminus. Some termini have a newer set of through platforms underneath (or above, or alongside) the terminal platforms on the main level. They are used by a cross-city extension of the main line, often for commuter trains , while the terminal platforms may serve long-distance services. Examples of underground through lines include
744-520: A comprehensive fashion as commercial ventures. Their investigation completed, they held an organizational meeting on February 12, 1827, including about twenty-five citizens, most of whom were Baltimore merchants or bankers. Chapter 123 of the 1826 Session Laws of Maryland , passed February 28, 1827, and the Commonwealth of Virginia on March 8, 1827, chartered the Baltimore and Ohio Rail Road Company , with
868-404: A few intermediate stations that take the form of a stub-end station, for example at some zigzags . If there is a station building , it is usually located to the side of the tracks. In the case of intermediate stations used for both passenger and freight traffic, there is a distinction between those where the station building and goods facilities are on the same side of the tracks and those in which
992-472: A few small railway stations are designated as "halts" ( Irish : stadanna , sing. stad ). In some Commonwealth countries the term "halt" is used. In Australia, with its sparse rural populations, such stopping places were common on lines that were still open for passenger traffic. In the state of Victoria , for example, a location on a railway line where a small diesel railcar or railmotor could stop on request, allowing passengers to board or alight,
1116-794: A further 40 from other companies at the Grouping of 1923. Peak building periods were before the First World War (145 built) and 1928–1939 (198 built). Ten more were opened by British Rail on ex-GWR lines. The GWR also built 34 "platforms". Many such stops remain on the national railway networks in the United Kingdom, such as Penmaenmawr in North Wales , Yorton in Shropshire , and The Lakes in Warwickshire , where passengers are requested to inform
1240-813: A lawsuit against it by the Washington and Baltimore Turnpike Road. The B&O wanted links to Virginia's Shenandoah Valley , as well as the parts of western Virginia draining into the Ohio River valley and ultimately the Mississippi River , such as Wheeling (where the National Road crossed the Ohio River) and the Kanawha River valley. However, many Virginia politicians wanted the minerals, timber and produce of those areas to instead ship through Richmond and reach
1364-571: A line was dual-purpose there would often be a freight depot apart from the passenger station. This type of dual-purpose station can sometimes still be found today, though in many cases goods facilities are restricted to major stations. Many stations date from the 19th century and reflect the grandiose architecture of the time, lending prestige to the city as well as to railway operations. Countries where railways arrived later may still have such architecture, as later stations often imitated 19th-century styles. Various forms of architecture have been used in
SECTION 10
#17328692739621488-407: A long enough period of time to warrant the cost. In large cities this may mean facilities available around the clock. A basic station might only have platforms, though it may still be distinguished from a halt , a stopping or halting place that may not even have platforms. Many stations, either larger or smaller, offer interchange with local transportation; this can vary from a simple bus stop across
1612-504: A member of on-board train staff if they wish to alight, or, if catching a train from the station, to make themselves clearly visible to the driver and use a hand signal as the train approaches. Most have had "Halt" removed from their names. Two publicly advertised and publicly accessible National Rail stations retain it: Coombe Junction Halt and St Keyne Wishing Well Halt . A number of other halts are still open and operational on privately owned, heritage, and preserved railways throughout
1736-610: A new through-station, including the cases of Berlin Hauptbahnhof , Vienna Hauptbahnhof and numerous examples throughout the first century of railroading. Stuttgart 21 is a controversial project involving the replacement of a terminus station by a through-station. An American example of a terminal with this feature is Union Station in Washington, DC , where there are bay platforms on the main concourse level to serve terminating trains and standard island platforms one level below to serve trains continuing southward. The lower tracks run in
1860-501: A point near Parr's Ridge (now known as Mount Airy ), where the railroad would cross a height of land and descend into the valley of the Monocacy and Potomac rivers. Further extensions opened to Frederick (including the short Frederick Branch ) on December 1, 1831; Point of Rocks on April 2, 1832; and Sandy Hook on December 1, 1834. Sandy Hook, Maryland , on the north shore of the Potomac,
1984-399: A sign, are variously referred to as "stops", " flag stops ", " halts ", or "provisional stopping places". The stations themselves may be at ground level, underground, or elevated. Connections may be available to intersecting rail lines or other transport modes such as buses , trams , or other rapid transit systems. Train station is the terminology typically used in the U.S. In Europe,
2108-407: A spot at the station to board and disembark trains is called station track or house track regardless of whether it is a main line or loop line. If such track is served by a platform , the track may be called platform track. A loop line without a platform, which is used to allow a train to clear the main line at the station only, is called passing track. A track at the station without a platform which
2232-417: A station and various other features set certain types apart. The first is the level of the tracks . Stations are often sited where a road crosses the railway: unless the crossing is a level crossing , the road and railway will be at different levels. The platforms will often be raised or lowered relative to the station entrance: the station buildings may be on either level, or both. The other arrangement, where
2356-576: A station stop does not. A station stop usually does not have any tracks other than the main tracks, and may or may not have switches (points, crossovers). An intermediate station does not have any other connecting route, unlike branch-off stations , connecting stations, transfer stations and railway junctions . In a broader sense, an intermediate station is generally any station on the route between its two terminal stations . The majority of stations are, in practice, intermediate stations. They are mostly designed as through stations ; there are only
2480-405: A station track as a temporary storage of a disabled train. A "terminus" or "terminal" is a station at the end of a railway line. Trains arriving there have to end their journeys (terminate) or reverse out of the station. Depending on the layout of the station, this usually permits travellers to reach all the platforms without the need to cross any tracks – the public entrance to the station and
2604-515: A steam locomotive from a New York foundry (which would reach 25 miles per hour and became the first passenger service by locomotive), while the B&O was still experimenting with horse power and sails. The B&O's first locomotive, Tom Thumb , was made in America as a demonstrator and could pull passenger and freight cars at 18 miles per hour. Developers decided to follow the Patapsco River to
SECTION 20
#17328692739622728-405: A three-way junction and platforms are built on all three sides, for example Shipley and Earlestown stations. In a station, there are different types of tracks to serve different purposes. A station may also have a passing loop with a loop line that comes off the straight main line and merge back to the main line on the other end by railroad switches to allow trains to pass. A track with
2852-636: A tunnel beneath the concourse and emerge a few blocks away to cross the Potomac River into Virginia. Terminus stations in large cities are by far the biggest stations, with the largest being Grand Central Terminal in New York City. Other major cities, such as London, Boston , Paris, Istanbul , Tokyo, and Milan have more than one terminus, rather than routes straight through the city. Train journeys through such cities often require alternative transport ( metro , bus , taxi or ferry ) from one terminus to
2976-464: Is Arbroath . Occasionally, a station serves two or more railway lines at differing levels. This may be due to the station's position at a point where two lines cross (example: Berlin Hauptbahnhof ), or may be to provide separate station capacity for two types of service, such as intercity and suburban (examples: Paris-Gare de Lyon and Philadelphia's 30th Street Station ), or for two different destinations. Stations may also be classified according to
3100-404: Is a stub . You can help Misplaced Pages by expanding it . Railway station A train station , railroad station , or railroad depot (mainly North American terminology) and railway station (mainly UK and other Anglophone countries) is a railway facility where trains stop to load or unload passengers , freight , or both. It generally consists of at least one platform , one track , and
3224-455: Is any longer served by trains), or military base (such as Lympstone Commando ) or railway yard. The only two such "private" stopping places on the national system, where the "halt" designation is still officially used, seem to be Staff Halt (at Durnsford Road, Wimbledon) and Battersea Pier Sidings Staff Halt, both of which are solely for railway staff. In Portugal , railway stops are called halts ( Portuguese : apeadeiro ). In Ireland ,
3348-404: Is frequently, but not always, the final destination of trains arriving at the station. Especially in continental Europe, a city may have a terminus as its main railway station, and all main lines converge on it. In such cases all trains arriving at the terminus must leave in the reverse direction from that of their arrival. There are several ways in which this can be accomplished: There may also be
3472-565: Is used for both passenger and freight facilities. The term depot is not used in reference to vehicle maintenance facilities in the U.S., whereas it is used as such in Canada and the United Kingdom. The world's first recorded railway station, for trains drawn by horses rather than engined locomotives , began passenger service in 1807. It was The Mount in Swansea , Wales, on the Oystermouth (later
3596-411: Is used for trains to pass the station without stopping is called through track. There may be other sidings at the station which are lower speed tracks for other purposes. A maintenance track or a maintenance siding, usually connected to a passing track, is used for parking maintenance equipment, trains not in service, autoracks or sleepers . A refuge track is a dead-end siding that is connected to
3720-508: The Tom Thumb in 1829. It built the first passenger and freight station (Mount Clare in 1829) and was the first railroad to earn passenger revenues in December 1829, and publish a timetable on May 23, 1830. On Christmas Eve 1852, the B&O line was completed between Baltimore and the Ohio River near Moundsville, West Virginia . Partial government ownership caused some operational problems. Of
3844-650: The Baltimore and Philadelphia Railroad in Delaware and Pennsylvania and built a parallel route, finished in 1886. The 10th president, Charles F. Mayer , spearheaded the development of the Baltimore Belt Line , which opened in 1895, and recruited engineer Samuel Rea to design it. This belt line connected the main line to the Philadelphia Branch without the need for a car ferry across the Patapsco River, but
Lycée Technique Josy Barthel - Misplaced Pages Continue
3968-491: The CSX Transportation (CSX) network in 1980. The B&O is noted for its pioneering innovations in railroading. It was the first U.S. railroad to operate a steam locomotive , it built historic infrastructure , and it operated prestigious passenger trains. It gained additional fame by lending its name as one of the four railroads in the original version of the popular board game Monopoly . The railroad did not reach
4092-468: The Long Bridge caused the U.S. Army Corps of Engineers to construct a bridge along the original plan of the B&O: Alexandria to Shepherd's Landing, Washington. Trains of empty freight cars were routed north and south over the structure, which was demolished after the end of World War II . Before either connection was made, however, another branch was built around the west side of Washington. During
4216-567: The Ohio River until 1852, 24 years after the project started. Yet the Ohio River was from the beginning the destination the railroad was seeking to link with Baltimore, at the time a transportation center. By crossing the Appalachian Mountains , a technical challenge, it would link the new and booming territories of what at the time was the West, particularly Ohio , Indiana , and Kentucky , with
4340-661: The Shinkansen in Japan, THSR in Taiwan, TGV lines in France, and ICE lines in Germany. Stations normally have staffed ticket sales offices, automated ticket machines , or both, although on some lines tickets are sold on board the trains. Many stations include a shop or convenience store . Larger stations usually have fast-food or restaurant facilities. In some countries, stations may also have
4464-528: The Swansea and Mumbles ) Railway. The world's oldest station for engined trains was at Heighington , on the Stockton and Darlington railway in north-east England built by George Stephenson in the early 19th century, operated by locomotive Locomotion No. 1 . The station opened in 1827 and was in use until the 1970s. The building, Grade II*-listed , was in bad condition, but was restored in 1984 as an inn. The inn closed in 2017; in 2024 there were plans to renovate
4588-961: The Thameslink platforms at St Pancras in London, the Argyle and North Clyde lines of Glasgow's suburban rail network , in Antwerp in Belgium, the RER at the Gare du Nord in Paris, the Milan suburban railway service 's Passante railway , and many of the numerous S-Bahn lines at terminal stations in Germany, Austria and Switzerland, such as at Zürich Hauptbahnhof . Due to the disadvantages of terminus stations there have been multiple cases in which one or several terminus stations were replaced with
4712-635: The "branches" became the de facto mainline, though the Old Main Line was retained as a relief route. Meanwhile, the Pennsylvania Railroad (PRR) outmaneuvered the B&O to acquire the B&O's northern connection, the Philadelphia, Wilmington and Baltimore Railroad , in the early 1880s, cutting off the B&O's access to Philadelphia and New York . The state of Maryland had stayed true to its implicit promise not to grant competing charters for
4836-463: The 1850s after the completion of the C&O Canal, which brought additional competition to the B&O. In 1853, after being nominated by large shareholder and director Johns Hopkins , John W. Garrett became president of the B&O, a position he would hold until his death in 1884. In the first year of his presidency, corporate operating costs were reduced from 65 percent of revenues to 46 percent, and
4960-607: The 1880s the B&O had organised a group of bankrupt railroads in Virginia into the Virginia Midland Railroad . The VM track ran from Alexandria to Danville, Virginia . The line projected west across the Potomac River was intended to cross the Potomac just north of the D.C. line, to continue southwest to a connection with the B&O-controlled Virginia Midland (VM) in Fairfax (now Fairfax Station , to distinguish it from what
5084-644: The Atlantic through Norfolk , although the James River Canal required substantial maintenance and was never completed through the Appalachians to the Ohio River watershed. Thus, while the B&O reached Wheeling in 1853, political compromises meant the B&O would only reach Grafton to connect to Parkersburg on the Ohio River through a connection with the Northwestern Virginia Railroad which
Lycée Technique Josy Barthel - Misplaced Pages Continue
5208-462: The B&O began constructing the Metropolitan Branch west out of Washington, which was completed in 1873 after years of erratic effort. Before this line was laid, rail traffic west of Washington had to travel first to Relay or Baltimore before joining the main line. The line cut a more or less straight line from Washington to Point of Rocks, Maryland , with many grades and large bridges. Upon
5332-596: The B&O railroad during this period were: The second half of the Civil War was characterized by near-continuous raiding, which severely hampered the Union defense of Washington, D.C. Union forces and leaders often failed to properly secure the region, despite the B&O's vital importance to the Union cause. There is no interest suffering here except the Baltimore and Ohio Railroad and I will not divide my forces to protect it. This military strategy, or lack thereof, allowed Confederate commanders to contribute significantly to
5456-540: The B&O reached Sandy Hook, Maryland , in 1834; Cumberland in 1842; the Ohio River at Moundsville, Virginia , in 1852; Wheeling, Virginia , in 1853; and in 1857, Parkersburg, Virginia , below rapids that made navigation difficult during parts of the year. The railroad, whose owners were Union sympathizers, proved crucial to the North's success during the American Civil War , which caused considerable damage to
5580-987: The B&O shutdown, only partially alleviated by the summer 1861 Union army victories at the Battle of Philippi (West Virginia) and Rich Mountain , and vigorous army and company work crews which reduced the main-line gap to 25 miles between Harpers Ferry and Back Creek. Finally at year end, Samuel M. Felton , the PW&B President, wrote newspapers about the War Department's discrimination against his cooperating railroad line, which competed with Cameron's favored North Central and Pennsylvania Railroads. President Lincoln (familiar with railroad law since his days as an Illinois lawyer) in January 1862 replaced Cameron with Pennsylvania lawyer Edwin M. Stanton , who had been serving as Cameron's legal advisor. Furthermore, on January 31, 1862, Congress passed
5704-402: The B&O to pass no federal troops destined for any place in Virginia over the railroad, and threatening to confiscate the lines. Charles Town 's mayor also wrote, threatening to cut the B&O's main line by destroying the long bridge over the Potomac River at Harpers Ferry, and Garrett also received anonymous threats. Thus he and others asked Secretary of War Cameron to protect the B&O as
5828-555: The B&O to skirt around a corner of the state, even though the Pennsylvania Railroad didn't even operate in that area of Pennsylvania. The railroad grew from a capital base of $ 3 million in 1827 (equivalent to $ 81 million in 2023) to a large enterprise generating $ 2.7 million of annual profit on its 380 miles (610 km) of track in 1854, with 19 million passenger miles. The railroad fed tens of millions of dollars of shipments to and from Baltimore and its growing hinterland to
5952-679: The B&O water station and machine shops also destroyed and 102 miles (164 km) miles of telegraph wire removed by the time federal control was restored in March 1862). By the end of 1861, 23 B&O railroad bridges had been burned and 36.5 miles (58.7 km) of track were torn up or destroyed. Since Jackson cut the B&O main line into Washington for more than six months, the North Central and Pennsylvania Railroads profited from overflow traffic, even as many B&O trains stood idle in Baltimore. Garrett tried to use his government contacts to secure
6076-519: The B&O's monopolies on the Washington Branch (between Relay and Washington DC) and westward through Cumberland, Maryland. Raids and battles during the war also cost the B&O substantial losses, many never indemnified. Master of Transportation Prescott Smith kept a diary during the war years, describing incidents such as the June 1861 derailment of a 50 car coal train, which plunged into a ravine after
6200-650: The B&O's monumental bridges have survived to this day, and many are still in active railroad use by CSX. Baltimore's Carrollton Viaduct , named in honor of Charles Carroll of Carrollton , was the B&O's first bridge, and is the oldest railway bridge in the Americas still carrying trains (and the third oldest in the world, after the Skerne Bridge , Darlington, UK, of 1824–1825, and the Bassaleg Viaduct , Newport, UK, of 1826). The Thomas Viaduct at Relay, Maryland ,
6324-515: The B&O's right-of-way. The B&O approved the project with the agreement that the railroad would have free use of the line upon its completion. An impressive demonstration occurred on May 1, 1844, when news of the Whig Party 's nomination of Henry Clay for U.S. president was telegraphed from the party's convention in Baltimore to the Capitol Building in Washington. On May 24, 1844, the line
SECTION 50
#17328692739626448-602: The Baltimore/Washington line, but when a charter was granted in 1860 to build a line from Baltimore to Pope's Creek in southern Maryland, lawyers for the Pennsylvania RR picked up on a clause in the unfulfilled charter allowing branches up to 20 miles (32 km) long, from any point and in any direction. The projected route, passing through what is now Bowie, Maryland , could have a "branch" constructed that would allow service into Washington. The Pennsylvania picked up
6572-587: The British Isles. The word is often used informally to describe national rail network stations with limited service and low usage, such as the Oxfordshire Halts on the Cotswold Line . It has also sometimes been used for stations served by public services but accessible only by persons travelling to/from an associated factory (for example IBM near Greenock and British Steel Redcar – although neither of these
6696-557: The Civil War, being the main rail connection between Washington, D.C., and the northern states, especially west of the Appalachian mountains. However, its initial problem became Lincoln's first Secretary of War, Simon Cameron , a major stockholder in the rival North Central Railroad, which received long haul freight destined for Baltimore from the rival Pennsylvania Railroad . Furthermore, the Pennsylvania Railroad and other investors sought permission to construct rail lines which threatened
6820-575: The Declaration of Independence) performed the groundbreaking by laying the cornerstone. The initial tracks were built with granite stringers topped by strap iron rails . The first section, from Baltimore west to Ellicott's Mills (now known as Ellicott City ), opened on May 24, 1830. A horse pulled the first cars 26 miles and back, since the B&O did not decide to use steam power for several years. Railroad men in South Carolina had earlier commissioned
6944-506: The North Central Railway's Bolton station to the B&O's Mount Clare station, and Maryland's governor Hicks and Baltimore Mayor George W. Brown ordered 3 North Central and 2 Philadelphia, Wilmington and Baltimore Railroad (PW&B) bridges destroyed to prevent further federal troop movements through (and riots in) the city. Soon B&O president John Work Garrett received letters from Virginia's Governor John Letcher telling
7068-644: The Pennsylvania Railroad, by the time the line was completed in 1910 there was no longer any point to the river crossing. Thus, the renamed Georgetown Branch came to serve a wide range of customers in Maryland and in Georgetown , such as the Potomac Electric Power Company , the Washington Milling Company , and the U.S. government. The line cut directly across various creeks, and includes what
7192-779: The Railways and Telegraph Act of January 31, 1862, creating the United States Military Railroad and allowing it to seize and operate any railroad or telegraph company's equipment, although Stanton and USMRR Superintendent Daniel McCallum would take a "team of rivals" approach to railroad management and allow civilian operations to continue. In February 1862, Union forces recaptured Martinsburg and Harpers Ferry, and work crews continued replacing wrecked bridges and equipment, although bushwhacker raids continued. Even then train movements were sporadic and subject to frequent stoppages, derailments, capture and attack. Prominent raids on
7316-471: The Secretary of War to retake Harpers Ferry and capture the insurgent abolitionists, which they quickly did. Garrett reported with evident relief the next day that aside from the cut telegraph line, which was quickly repaired, there had been no damage to any B&O track, equipment, or facilities. The government of Maryland published in a book the many telegrams sent by B&O employees and management during
7440-467: The area. As preparations for the battle progressed, the B&O provided transport for federal troops and munitions, and on two occasions Garrett was contacted directly by President Abraham Lincoln for further information. Though Union forces lost this battle, the delay allowed Ulysses S. Grant to successfully repel the Confederate attack on Washington at the Battle of Fort Stevens two days later. After
7564-435: The battle, Lincoln paid tribute to Garrett as: The right arm of the Federal Government in the aid he rendered the authorities in preventing the Confederates from seizing Washington and securing its retention as the Capital of the Loyal States. The Confederate leaders who led these operations and specifically targeted the railroad included: Bases of operation involved in raiding the B&O Railroad: A steel and stone bridge
SECTION 60
#17328692739627688-487: The beginning of the federally-financed National Road , provided a road link for animal-powered transport between Cumberland, Maryland , on the Potomac River and Wheeling, Virginia , in present-day West Virginia , on the Ohio River, when completed in 1837. It was the second paved road in the country. However, the 1831 DeWitt Clinton locomotive , running between Albany and Schenectady, New York , demonstrated speeds of 25 miles (40 km) per hour, dramatically decreasing
7812-431: The best means of restoring "that portion of the Western trade which has recently been diverted from it by the introduction of steam navigation." Their answer was to build a railroad: one of the first commercial lines in the world. Their plans worked well, despite many political problems from canal backers and other railroads. For example, only the Pennsylvania Railroad was allowed to build in its namesake state, requiring
7936-492: The bridge at Sandy Hook, Maryland (end of the line before the bridge was built), and troops continued across the bridge on foot. Soon Garrett's Master of Transportation William Prescott Smith left Baltimore City, together with Maryland Gen. Charles G. Egerton Jr. and the Second Light Brigade , which train also picked up the Marines on the federal troop train at the junction in Relay, Maryland . All awaited Lt.Col. Robert E. Lee and Lt. J.E.B. Stuart , who had received orders from
8060-419: The charter through the agency of the Baltimore and Potomac Railroad and in 1872 service between Baltimore and Washington began. ( See Pope's Creek Subdivision .) At the same time, the PRR outmaneuvered the B&O and took control of the Long Bridge across the Potomac River into Virginia, the B&O's connection to southern lines. In response, the B&O chartered the Philadelphia Branch in Maryland and
8184-504: The charter, it was understood that the state of Maryland would not charter any competing line between Baltimore and Washington, and no such charters were approved until well after the American Civil War, when the Pennsylvania Railroad acquired a railroad on the Delmarva Peninsula, which had the power to build short branch lines, so it was able to connect to Washington through Bowie, Maryland . The B&O also wanted access to Pittsburgh and coal fields in western Pennsylvania and Ohio. Although
8308-436: The confluence of the Kanawha and Elk Rivers) and ultimately Huntington (which was named after a major B&O investor) on the Ohio River more than a decade after the American Civil War and the creation of the state of West Virginia . Meanwhile, the State of Maryland granted the B&O a charter to build a line from Baltimore to Washington, D.C. , in 1831, and the Washington Branch was opened in 1835. This line joined to
8432-439: The construction of Washington Union Station saw the south end of the branch realigned to link to the PRR trackage in Anacostia, across the Anacostia Railroad Bridge , into the Virginia Avenue Tunnel , through Southwest Washington, D.C. , to Potomac Yard in Alexandria, Virginia . ( See RF&P Subdivision .) The Alexandria Branch trackage to Shepherd's Landing was heavily used during World War II when traffic congestion on
8556-480: The construction of stations, from those boasting grand, intricate, Baroque - or Gothic -style edifices, to plainer utilitarian or modernist styles. Stations in Europe tended to follow British designs and were in some countries, like Italy, financed by British railway companies. Train stations built more recently often have a similar feel to airports, with a simple, abstract style. Examples of modern stations include those on newer high-speed rail networks, such as
8680-432: The cost of constructing the Howard Street Tunnel drove the B&O to bankruptcy in 1896. Two other lines were built in attempts to reconnect to the south. The Alexandria Branch (now called the Alexandria Extension ) was built in 1874, starting from Hyattsville, Maryland , and ending at a ferry operation at Shepherd's Landing. The ferry operation continued until 1901 when the trackage rights agreement concluded as part of
8804-404: The cost of transportation and announcing the coming end of the canal and turnpike (road) systems, many of which were never completed since they were or would soon be obsolete. In New York, political support for the Erie Canal detracted from the prospect of building a railroad to replace it, whose full length did not open until 1844. Mountains in Pennsylvania made construction in the western part of
8928-465: The cross-loading of freight and may be known as transshipment stations, where they primarily handle containers. They are also known as container stations or terminals. Baltimore and Ohio Railroad The Baltimore and Ohio Railroad ( reporting mark BO ) was the first common carrier railroad and the oldest railroad in the United States . It operated as B&O from 1830 until 1987, when it
9052-483: The derelict station in time for the 200th anniversary of the opening of the railway line. The two-storey Mount Clare station in Baltimore , Maryland , United States, which survives as a museum, first saw passenger service as the terminus of the horse-drawn Baltimore and Ohio Railroad on 22 May 1830. The oldest terminal station in the world was Crown Street railway station in Liverpool, England , built in 1830, on
9176-542: The directors of the Pennsylvania Railroad wanted a monopoly in their state, delays in laying track to Pittsburgh led the Pennsylvania legislature in 1846 to require construction to be completed within 10 years, else competition would be allowed. The Pennsylvania Railroad finished its trans-Allegheny track with two years to spare, thus the B&O would only be able to extend its tracks up the Youghiogheny River valley to
9300-528: The east coast rail and boat network, from Maryland northward. There was no rail link between Maryland and Virginia until the B&O opened the Harpers Ferry bridge in 1839. Starting in 1825, the Erie Canal provided an animal-powered water facility, connecting New York City with Ohio via Lake Erie . It took ten days to travel downstream from Buffalo, New York , to New York City. The Cumberland Road , later
9424-454: The end of the line. The final section linked Piedmont on July 21, 1851, and Fairmont on June 22, 1852. It first reached the Ohio River at Moundsville later in 1852, and port facilities were built there. The B&O reached Wheeling, West Virginia (then part of Virginia) on January 1, 1853. That would remain the terminus through the American Civil War (apart from conflict-related outages principally between Cumberland and Martinsburg during
9548-770: The federal government. In May, CSA Colonel Jackson's operations against the B&O Railroad (1861) began. Stonewall Jackson initially permitted B&O trains to operate during limited hours over the approximately 100 miles from Point of Rocks to Cumberland. On June 20, 1861, Jackson's Confederates seized Martinsburg , a major B&O work center, having blown up the Harpers Ferry railroad bridge on June 14. Confederates confiscated dozens of locomotives and train cars and ripped up double track in order to ship rails for Confederate use in Virginia (14 locomotives and 83 rail cars were dismantled and sent south, and another 42 locomotives and 386 rail cars damaged or destroyed at Martinsburg, with
9672-470: The goods facilities are on the opposite side of the tracks from the station building. Intermediate stations also occur on some funicular and cable car routes. A halt , in railway parlance in the Commonwealth of Nations , Ireland and Portugal , is a small station, usually unstaffed or with very few staff, and with few or no facilities. In some cases, trains stop only on request , when passengers on
9796-401: The layout of the platforms. Apart from single-track lines, the most basic arrangement is a pair of tracks for the two directions; there is then a basic choice of an island platform between, two separate platforms outside the tracks ( side platforms ), or a combination of the two. With more tracks, the possibilities expand. Some stations have unusual platform layouts due to space constraints of
9920-400: The length of the war, by conducting free-ranging military operations against the region and railroad. Before the Battle of Monocacy , B&O agents began reporting Confederate troop movements eleven days prior to the battle, and Garrett had their intelligence passed to authorities in the War Department and to Major General Lew Wallace , who commanded the department responsible for defense of
10044-417: The less developed KTM East Coast railway line to serve rural 'kampongs' (villages), that require train services to stay connected to important nodes, but do not have a need for staff. People boarding at halts who have not bought tickets online can buy it through staff on board. In rural and remote communities across Canada and the United States, passengers wanting to board the train at such places had to flag
10168-530: The loading and unloading of goods and may well have marshalling yards (classification yards) for the sorting of wagons. The world's first goods terminal was the 1830 Park Lane Goods Station at the South End Liverpool Docks. Built in 1830, the terminal was reached by a 1.24-mile (2 km) tunnel. As goods are increasingly moved by road, many former goods stations, as well as the goods sheds at passenger stations, have closed. Many are used purely for
10292-543: The locomotive-hauled Liverpool to Manchester line. The station was slightly older than the still extant Liverpool Road railway station terminal in Manchester. The station was the first to incorporate a train shed . Crown Street station was demolished in 1836, as the Liverpool terminal station moved to Lime Street railway station . Crown Street station was converted to a goods station terminal. The first stations had little in
10416-403: The main reception facilities being at the far end of the platforms. Sometimes the track continues for a short distance beyond the station, and terminating trains continue forward after depositing their passengers, before either proceeding to sidings or reversing to the station to pick up departing passengers. Bondi Junction , Australia and Kristiansand Station , Norway are examples. A terminus
10540-451: The national capitol's main westward link. Cameron instead warned Garrett that passage of any rebel troops over his line would be treason. The Secretary of War agreed to station troops to protect the North Central, the Pennsylvania Railroad, and even the PW&B, but flatly refused to help the B&O, his main competition. The B&O had to repair damaged line at its own expense, and often received late or no payment for services rendered to
10664-549: The needed protection, from Maryland Delegate Reverdy Johnson to General George McClellan and Treasury Secretary Salmon P. Chase . As winter began, coal prices soared in Washington, even though the B&O in September arranged for free coal transport from its Cumberland, Maryland, terminal down the C&O Canal (which reduced prices somewhat, although Confederates also damaged the C&O canal that winter). Furthermore, western farmers could not get their produce to markets because of
10788-468: The opening of this line, through passenger traffic was rerouted through Washington, and the Old Main Line from Point of Rocks to Relay was reduced to secondary status as far as passenger service was concerned. The Washington to Gaithersburg section of the Met Branch was double-tracked during 1886–1893. Rebuilding in the early 20th century and complete double-tracking of the branch by 1928 increased capacity;
10912-477: The original mainline at Relay, Maryland , crossing the Patapsco River on the Thomas Viaduct (which remains one of the B&O's signature structures). This line was partially funded by the state of Maryland, and was operated separately until the 1870s, with Maryland receiving a 25 percent cut of gross passenger receipts. The B&O's charter also forbade further taxation of the railroad, and that no-tax provision
11036-784: The other. For instance, in Istanbul transfers from the Sirkeci Terminal (the European terminus) and the Haydarpaşa Terminal (the Asian terminus) historically required crossing the Bosphorus via alternative means, before the Marmaray railway tunnel linking Europe and Asia was completed. Some cities, including New York, have both termini and through lines. Terminals that have competing rail lines using
11160-585: The platform indicate that they wish to board, or passengers on the train inform the crew that they wish to alight. These can sometimes appear with signals and sometimes without. The Great Western Railway in Great Britain began opening haltes on 12 October 1903; from 1905, the French spelling was Anglicised to "halt". These GWR halts had the most basic facilities, with platforms long enough for just one or two carriages; some had no raised platform at all, necessitating
11284-466: The provision of steps on the carriages. Halts were normally unstaffed, tickets being sold on the train. On 1 September 1904, a larger version, known on the GWR as a "platform" instead of a "halt", was introduced; these had longer platforms, and were usually staffed by a senior grade porter, who sold tickets and sometimes booked parcels or milk consignments. From 1903 to 1947 the GWR built 379 halts and inherited
11408-628: The raid. At the outset of the Civil War , the B&O possessed 236 locomotives, 128 passenger coaches, 3,451 rail cars and 513 miles (826 km) of rail road, all in states south of the Mason–Dixon line , as Garrett had noted before the war began. Although many Marylanders had Southern sympathies , Garrett and Hopkins supported the Union . The B&O became crucial to the Federal government during
11532-452: The railroad began distributing profits to its shareholders. The B&O played a major role, and got national attention, in the response to abolitionist John Brown's raid on Harpers Ferry , Virginia (since 1863, West Virginia), in October 1859. Black porter Hayward Shepherd , to whom there is a monument in Harpers Ferry , was the first man killed; stationmaster Fontaine Beckham, who was also
11656-622: The report was not a hoax, Garrett telegraphed President James Buchanan , the Secretary of War , the Governor of Virginia , and Maryland Militia General George Hume Steuart about the insurrection in progress. The B&O made its rolling stock available to the military. At 3:20 pm a train left Washington Depot with 87 U.S. Marines and two howitzers, and a 3:45 p.m. train from nearer Frederick, Maryland , carried three Maryland militia companies under Col. Edward Shriver. These trains stopped before
11780-597: The same year, workers began the Great Railroad Strike of 1877 on July 14 in Martinsburg, West Virginia . Striking workers would not allow any of the trains, mainly freight trains, to roll until the third wage cut was revoked. West Virginia Governor Henry M. Mathews sent in state militia units to restore train service but the soldiers refused to fire on the strikers. The strike spread to Cumberland , and when Maryland Governor John Lee Carroll attempted to put down
11904-429: The soft coal fields in 1871. When construction began on the B&O in the 1820s, railroad engineering was in its infancy. Unsure exactly which materials would suffice, the B&O erred on the side of sturdiness and built many of its early structures of granite. Even the track bed to which iron strap rail was affixed consisted of the stone. Though the granite soon proved too unforgiving and expensive for track, most of
12028-484: The state expensive and technically challenging, and the Pennsylvania Railroad , linking Pittsburgh and Philadelphia, did not open its full length until 1852, and there was no rail link west from Pittsburgh to Ohio for several more years. The fast-growing port city of Baltimore, Maryland , faced economic stagnation unless it opened a route to the Western states. On February 27, 1827, twenty-five merchants and bankers studied
12152-405: The station entrance and platforms are on the same level, is also common, but is perhaps rarer in urban areas , except when the station is a terminus. Stations located at level crossings can be problematic if the train blocks the roadway while it stops, causing road traffic to wait for an extended period of time. Stations also exist where the station buildings are above the tracks. An example of this
12276-477: The station frequently set up a jointly owned terminal railroad to own and operate the station and its associated tracks and switching operations. During a journey, the term station stop may be used in announcements, to differentiate halts during which passengers may alight and halts for another reasons, such as a locomotive change . While a junction or interlocking usually divides two or more lines or routes, and thus has remotely or locally operated signals ,
12400-561: The station location, or the alignment of the tracks. Examples include staggered platforms, such as at Tutbury and Hatton railway station on the Crewe–Derby line , and curved platforms, such as Cheadle Hulme railway station on the Macclesfield to Manchester Line. Stations at junctions can also have unusual shapes – a Keilbahnhof (or "wedge-shaped" station) is sited where two lines split. Triangular stations also exist where two lines form
12524-557: The street to underground rapid-transit urban rail stations. In many African, South American, and Asian countries, stations are also used as a place for public markets and other informal businesses. This is especially true on tourist routes or stations near tourist destinations . As well as providing services for passengers and loading facilities for goods, stations can sometimes have locomotive and rolling stock depots, usually with facilities for storing and refuelling rolling stock and carrying out minor repairs. The basic configuration of
12648-482: The strike by sending the state militia from Baltimore, riots broke out resulting in 11 deaths, the burning of parts of Camden station, and damage to several engines and cars. The next day workers in Pittsburgh staged a sympathy strike that was also met with an assault by the state militia; Pittsburgh then erupted into widespread rioting. The strike ended after federal troops and state militias restored order. In 1866
12772-540: The system. After the Civil War, the B&O consolidated several feeder lines in Virginia and West Virginia, and expanded westward into Ohio, Indiana, and Illinois. At the end of 1970, the B&O operated 5,552 miles of road and 10,449 miles of track, not including the Staten Island Rapid Transit (SIRT) or the Reading Railroad and its subsidiaries. After a series of mergers, the B&O became part of
12896-470: The task of building a railroad from the port of Baltimore west to a suitable point on the Ohio River. The railroad, formally incorporated April 24, was intended to provide a faster route for Midwestern goods to reach the East Coast than to the hugely successful but slow Erie Canal across upstate New York . Thomas was elected as the first president and Brown the treasurer. The capital of the proposed company
13020-468: The terms train station and railway station are both commonly used, with railroad being obsolete. In British Commonwealth usage, where railway station is the traditional term, the word station is commonly understood to mean a railway station unless otherwise specified. In the United States, the term depot is sometimes used as an alternative name for station , along with the compound forms train depot , railway depot , and railroad depot —it
13144-514: The thirty members on its board of directors , twelve were elected by shareholders, while eighteen were appointed either by Maryland or the Baltimore City Council . Many had conflicting interests: the directors appointed by the state and city desired low fares and all construction to be funded from corporate revenues, while the directors elected by shareholders desired greater profits and dividends . These conflicts became more intense in
13268-562: The time, the line had three, the York, Atlantic, and the Franklin. When planning the extension to Sandy Hook, Maryland , and then Harpers Ferry , the company was uncertain if the engines' metal wheels would grip the metal rails sufficiently to pull a train up to the top of the ridge. The railroad decided to construct two inclined planes , one on each side of the ridge, along which teams of horses, and perhaps steam-powered winches, would assist pulling
13392-464: The town's mayor, was killed the next day. Raiders had cut the telegraph line, and stopped the 1:30 am Wheeling to Baltimore express, but after several hours the train was allowed to continue and at the first station with a working telegraph (Monocacy) the conductor sent a telegram to B&O headquarters. After confirming from the Martinsburg station (via Wheeling, because of the cut telegraph line) that
13516-442: The train down to stop it, hence the name " flag stops " or "flag stations". Accessibility for disabled people is mandated by law in some countries. Considerations include: In the United Kingdom, rail operators will arrange alternative transport (typically a taxi ) at no extra cost to the ticket holder if the station they intend to travel to or from is inaccessible. Goods or freight stations deal exclusively or predominantly with
13640-564: The trains uphill. The planes, about a mile long on each side, quickly proved an operational bottleneck . Before the decade of the 1830s ended, the B&O built a 5.5-mile-long (8.9 km) alternate route that became known as the Mount Airy Loop. The planes were quickly abandoned and forgotten, though some artifacts survive to the present. In 1843, Congress appropriated $ 30,000 for construction of an experimental 38-mile (61 km) telegraph line between Washington, D.C., and Baltimore along
13764-484: The war) until a railroad bridge could be constructed across the Ohio River. The narrow strip of available land along the Potomac River from Point of Rocks to Harpers Ferry caused years of legal battles between the B&O and the Chesapeake and Ohio (C&O) Canal , as both sought to exclude the other from its use. A compromise eventually allowed the two companies to share the right of way . The B&O also prevailed in
13888-543: The way of buildings or amenities. The first stations in the modern sense were on the Liverpool and Manchester Railway , opened in 1830. Manchester's Liverpool Road Station , the second oldest terminal station in the world, is preserved as part of the Museum of Science and Industry in Manchester . It resembles a row of Georgian houses. Early stations were sometimes built with both passenger and freight facilities, though some railway lines were goods-only or passenger-only, and if
14012-567: The west, thus making the city the commercial and financial capital of the region south of Philadelphia. Although the Albany and Schenectady Railroad was chartered a year earlier, in 1826, the B & O Railroad was the first to open in the US. Philip E. Thomas and George Brown were the pioneers of the railroad. In 1826, they investigated railway enterprises in England , which were at that time being tested in
14136-613: Was Fairfax Court House and is now the City of Fairfax, Virginia ), and if possible to a connection with the Richmond, Fredericksburg and Potomac Railroad in Quantico . The branch was started in 1892 and reached Chevy Chase, Maryland , the same year. Financial problems in both the VM and B&O forced a halt to construction and led to the B&O's loss of control of the VM. Following bankruptcy, and control by
14260-527: Was built across the Ohio River between Bellaire, Ohio , and Wheeling, West Virginia, in 1871, connecting the B&O to the Central Ohio Railroad , which the B&O had leased starting in 1866. This provided a direct rail connection to Columbus, Ohio , and the lease marked the beginning of a series of expansions to the west and north. Other railroads included in the B&O were: (This list omits certain short lines.) The Chicago and Alton Railroad
14384-526: Was called a "rail motor stopping place" (RMSP). Usually situated near a level crossing , it was often designated solely by a sign beside the railway. The passenger could hail the driver to stop, and could buy a ticket from the train guard or conductor. In South Australia, such facilities were called "provisional stopping places". They were often placed on routes on which "school trains" (services conveying children from rural localities to and from school) operated. In West Malaysia , halts are commonplace along
14508-525: Was completed in 1857. During the "Great Railway Celebrations of 1857", a large group of notables boarded the B&O in Baltimore, then transferred to steamboats that took them from Wheeling to Marietta, Ohio , where they boarded a railroad to Cincinnati, where after another celebration, they boarded the Ohio and Mississippi Railroad , which brought them to St. Louis, Missouri, three days after they had started their journey. The B&O would only reach Charleston (at
14632-521: Was fixed at five million dollars, but the B&O was initially capitalized in 1827 with a three million dollar issue of stock. Half of this stock was reserved for the Maryland state government and the municipal government of Baltimore, which invested $ 1,000,000 and $ 500,000, respectively, in the new company. Around twenty-two thousand people—a quarter of the city's population—bought the remaining private equity. Construction began on July 4, 1828, when Charles Carroll of Carrollton (the last living signer of
14756-510: Was merged into the Chessie System ; its lines are today controlled by CSX Transportation . The railroad was founded to serve merchants from Baltimore who wanted to do business with settlers crossing the Appalachian Mountains . It would compete with several existing and proposed turnpikes and canals, including the Erie and Chesapeake and Ohio Canal . Building west from the port of Baltimore,
14880-531: Was officially opened as Samuel F. B. Morse sent his famous words, "What hath God wrought", from the B&O's Mount Clare station to the Capitol by telegraph. Contrary to legend, the B&O was not the first chartered railroad in the United States; John Stevens obtained a charter for the New Jersey Railroad in 1815. The B&O was, however, the first company to operate a locomotive built in America, with
15004-549: Was purchased by the B&O in 1931 and renamed the Alton Railroad . It was always operated separately and was eventually bought by the Gulf, Mobile and Ohio Railroad after receivership in 1942. As a result of poor national economic conditions in the mid-1870s following the Panic of 1873 , the B&O attempted to reduce its workers' wages. After a second reduction in wages was announced in
15128-533: Was the end of the line until the B & O Railroad Potomac River Crossing opened in 1836, linking Harpers Ferry, West Virginia (until 1863, Virginia). The connection at Harpers Ferry with the Winchester and Potomac Railroad , running southwest to Winchester, Virginia , opened in 1837, then the line northwest to Martinsburg in May 1842; Hancock in June 1842; and Cumberland, Maryland , on November 5, 1842, for some years
15252-480: Was the longest bridge in the United States upon its completion in 1835. It also remains in use. The B&O made extensive use of the Bollman iron truss bridge design in the mid-19th century. Its durability and ease of assembly aided faster railroad construction. As the B&O built the main line west to Parr's Ridge , near Mount Airy, Maryland , it had limited information about the capabilities of steam locomotives; at
15376-593: Was upheld in the 1840s after Baltimore City tried to tax it. This Washington Branch line was built in stone, much like the original mainline. By this time, however, strap rail was no longer used for new construction. Most of the stone bridges on the Old Main Line did not last long, being washed out by the periodic flooding of the Patapsco River and replaced at first by Bollman Truss bridges . The Annapolis and Elk Ridge Railroad to Annapolis connected to this line at Annapolis Junction in 1840. As an unwritten condition for
#961038