Krümmel Nuclear Power Plant is a German nuclear power plant in Geesthacht , Schleswig-Holstein , near Hamburg . It was taken into operation in 1983 and is owned 50% by Vattenfall via Vattenfall Europe Nuclear Energy GmbH and 50% by E.ON , and operated by the Swedish Vattenfall. Its gross power production is 1,401 MW , using a boiling water reactor .
7-482: The reactor was the world's second largest of its type in commercial operation. It is nearly identical to three other German nuclear reactors, namely Brunsbüttel Nuclear Power Plant (near Hamburg), Philippsburg Nuclear Power Plant Block 1 and Isar Nuclear Power Plant Block 1, as well as the Austrian Zwentendorf Nuclear Power Plant , that never went into service. Since July 4, 2009, after
14-559: A short circuit in a transformer that was very similar to what caused the June 2007 fire. The reactor shut down normally and was not affected. The plant's general manager resigned. In a press conference July 9, Ernst Michael Züfle, head of the nuclear division of Vattenfall, acknowledged that there was damage to "perhaps a few fuel elements." Even before the shutdown, foreign bodies—sharp shards of metal from earlier work that should have been flushed—were found to have ended up, potentially dangerously, in
21-461: Is about 9.1 billion Euros before calculation of the nuclear waste management. As part of the nuclear power phase-out , it was taken out of service in 2007. [REDACTED] Media related to Brunsbüttel Nuclear Power Plant at Wikimedia Commons This article about a Schleswig-Holstein building or structure is a stub . You can help Misplaced Pages by expanding it . This article about nuclear power and nuclear reactors for power generation
28-457: The neighboring areas. The sequence of events caused the dismissal and resignation of several Vattenfall Europe AG employees. On June 21, 2009, the Krümmel reactor was restarted for the first time since the 2007 fire, and the plant started to produce electricity again but was shut down for the second time on July 4, 2009, only a few days after its two-year-long repair period. The shutdown was caused by
35-616: The reactor and had, to some degree, been cleaned out. On July 7, Wulf Bernotat, CEO of E.on, wrote in a sharply worded letter to Vattenfall management in Sweden that his company was "appalled" by the handling of safety procedures at the plant, according to a lengthy report in Spiegel . The report went on to discuss how the accident could impact the German national debate about nuclear power plant license extensions . Before new transformers could be installed, it
42-403: The reactor is not running, and since 2011 it is definitely shutdown due to popular demand. (Atomausstieg). Since 1986, a significantly higher than average number of cases of leukemia have been found in the area around the power plant. On June 28, 2007, a short circuit caused a fire in the transformer of the power plant and required the plant to be shut down. Power outages were experienced in
49-618: Was decided in March 2011 to decommission the plant. [REDACTED] Media related to Krümmel Nuclear Power Plant at Wikimedia Commons Brunsb%C3%BCttel Nuclear Power Plant The Brunsbüttel Nuclear Power Plant is a nuclear power plant in Brunsbüttel near Hamburg , Germany. It is owned 67% by Vattenfall and 33% by E.ON . It started operation in 1976 and has a gross power production of 806 MW . During its lifetime, it produced 130,000 GW hours of electricity. The value of this electricity