KL Metropolis is a 75.5-acre mixed development situated nearby the Kuala Lumpur Courts Complex in the district of Segambut , Kuala Lumpur , Malaysia . The term "KL" from its name is short for Kuala Lumpur. This RM21 billion development is envisioned to become the leading centre for international trade and exhibition of Kuala Lumpur, similar to the Tun Razak Exchange which on the other hand will become the city's new financial district. It will consist a total gross floor of 22,800,000 sq ft (2,120,000 m). KL Metropolis will integrate trade, commerce, living, and transport in one bustling hub located within the big city which will be built in stages over a duration of 20 years.
19-514: A proposed direct link road from the NKVE and DUKE Highway connecting Jalan Sultan Haji Ahmad Shah junction has also been planned to ease traffic for the development in the future. An MRT3 station will also be built along Jalan Dutamas 2. KL Metropolis' landmark building will be the 100-storey NAZA Signature Tower within MET 3, and is set to dominate the skyline in the western side of Kuala Lumpur. The tower
38-670: A 3.29 acres (1.33 ha) land. Arte Mont Kiara was developed by Arte Corp, formerly known as Nusmetro Property Sdn Bhd (Nusmetro), under a joint-venture with Naza TTDI. The project was launched in 2015 and completed in 2020. Housed the Malaysia External Trade Development Corporation headquarters and MATRADE Exhibition and Convention Centre (MECC). 33-storey office tower with the Ministry of International Trade and Industry 's main headquarters, commonly known as MITI Tower or Menara MITI , will be situated within
57-593: A gross development value of RM828 million. (Partnership with EXSIM Development Sdn Bhd) Proposed serviced residential towers with constructions expected to commence after the completion of MET 1. The MET is built through a partnership with Triterra Metropolis Sdn Bhd on 2.47 acres (1.00 ha) to the west of KL Metropolis. The construction of the 2 blocks commenced in 2018 and was completed in 2023. It features two Grade A strata office towers of Tower A and B, with 42-storey and 30-storey respectively. The Construction Industry Development Board Malaysia (CIDB) main headquarters
76-486: A luxury condominium, 5-star hotel together with Grade A office towers. In January 2022, Hap Seng Consolidated Berhad had plans to acquire the land of MET 3 under a purchase agreement to strengthen its property development business particularly in KL Metropolis. An 8.95 acres (3.62 ha) of land which was launched in 2018 and consist of a mixed-use development right next to Kuarters Kerajaan Jalan Duta. Met 5 will include
95-485: A retail mall, 2 office towers, 3 residential towers, a corporate tower and a 5-star hotel under Hyatt Regency . The 500,000 square feet shopping mall will be managed by AEON Co. (M) Bhd and will include a supermarket as well as a department store under its brand. (Partnership with Hap Seng Land Sdn Bhd) The Fiddlewoodz is currently being built on 1.86 acres (0.75 ha) of land and will feature 2 blocks of serviced apartments. It has been slated for completion by 2025 with
114-598: Is a proposed supertall skyscraper that will 412.8 m (1,354 ft) high above ground. The KL Metropolis development is being undertaken by Naza TTDI Sdn Bhd, a real estate company of Naza Group . The development is subdivided into nine parcels - MET 1, MET 2, MET 3, MET 5, MET 6, MET 7, MET 8, MET 9 as well as MITEC which was accordingly supposed to be the MET 4. Two of the precincts will be jointly developed with partners; MET 5 with Hap Seng Land Sdn Bhd while MET 8 with Triterra Metropolis Sdn Bhd. Three towers comprising simplex, duplex suites and serviced residences on
133-475: Is currently undergoing construction phase. TTDI KL Metropolis Sdn Bhd, a wholly-owned subsidiary of Naza TTDI, is currently constructing MET 1 on 4.25 acres of land right beside the Kuala Lumpur High Court . MET 1’s development will include an office tower, 55-storey MET1 Residences, Somerset KL Metropolis by The Ascott Limited (Ascott) and MET Galleria. It is also one of the first retail component of
152-769: Is for full length journey between Jalan Duta toll plaza and Bukit Raja toll plaza: Due to their fare integration with most of North-South Expressway parts and ELITE in a single closed toll system (up to system terminus in Sungai Besi, Jalan Duta, Bukit Raja, Juru and Skudai), the rates would be higher depending on their entry point. Passenger passing through this expressway (between Shah Alam and Bukit Lanjan to ELITE and Northern Route respectively) will have their fare includes distance travelled along this section of NKVE as well in their exit points in other expressways, but they not need to pay any tolls in between. Siemens Healthineers AG Too Many Requests If you report this error to
171-515: Is located here at tower B, while tower A is currently leased out to German-based Siemens Healthineers AG . A proposed 5-star luxury hotel next to MITEC. In the future, the district will be served by the proposed CC06 Dutamas MRT station on the MRT Circle Line . The station is still in planning stage as the developer is working with the Malaysian government to identify a site for
190-708: Is one of the most heavily utilised expressways in the Klang Valley region. The expressway shares its designation with the North–South Expressway Northern Route . Plans for the NKVE began in 1985 after the North–South Expressway was constructed and the Federal Highway had become a busing traffic during rush hour between Kuala Lumpur and Klang. Construction began in 1988, and the first section of
209-487: The government 's Greener KL initiative. It will be integrated to the other precincts via pedestrian walkaways in the district while Naza TTDI Sdn Bhd will be managing the RM20 million park over 15 years. Among the facilities included will be a dry and wet playground, jogging park, kinetic fitness stations, therapeutic garden, terrace garden, sculpture park, picnic mound, nightscapes, event lawn, amphitheatre and dry fountain. The park
SECTION 10
#1732869077149228-480: The KL Metropolis development with 80,000 sq ft (7,400 m) space on 3 levels of retail. The project was officially kicked off in 2017 and is expected to be completed in 2023. Consist of strata offices with a 4-star hotel. 15.3-acre land for the proposed 2,000,000 sq ft (190,000 m) lifestyle mall located at the foot of the NAZA Signature Tower. MET 3 will also be built together with
247-431: The NKVE between Bukit Raja and Damansara opened to traffic on 7 December 1990. The section between Bukit Lanjan and Jalan Duta was constructed by Pati Sdn Bhd and TAS industries. The fully completed NKVE spanning between Bukit Raja and Jalan Duta was officially opened by Prime Minister Mahathir Mohamad at Jalan Duta toll plaza on 11 January 1993. In July 2010, the operator, PLUS Expressways Berhad , announced that
266-755: The Penchala, Bukit Lanjan and Segambut viaducts. Persada PLUS is the main headquarters of the PLUS Expressways located at Subang Interchange. The expressways also includes spectacular sceneries of Mont Kiara and the Kuala Lumpur skyline. A restricted route has been implemented on the New Klang Valley Expressway between Shah Alam and Jalan Duta during workdays or peak hours. Heavy vehicles (except buses and tankers) with laden and unladen heavy vehicles weighing 10,000 kg or more are not allowed to enter
285-560: The development. 13-acre land developed on top of MET 4 with a total area of 1.5 million square feet. The Malaysia International Trade and Exhibition Centre (MITEC) is the first flagship and component of the development which officially opened in August 2017. Also known as the KL Metropolis Park, it will have 8 acres (3.2 ha) of urban park and recreational facilities which will be constructed in between MET 3 and MITEC lands as part of
304-463: The expressway between 6:30 am until 9:30 am on Monday to Friday (except public holidays). A compound fine will be issued to heavy vehicles which flout the rule. On 26 November 2003, a rockfall near the Bukit Lanjan interchange caused the expressway to close for more than six months, causing massive traffic jams to occur in areas surrounding Klang Valley . After clearance of debris and road repairs,
323-514: The expressway was reopened to public by mid-2004. On 10 July 2005, a section of the Setia Alam flyover interchange – which was under construction then – collapsed, resulting in the death of two Bangladeshi workers and injuring seven others. (Source: New Straits Times 21 July 2005) NKVE applied closed toll system in their entire route, implemented in all their access points where vehicles are charged according to distance travelled. The rates below
342-510: The government had awarded contracts to build a fourth lane on a stretch from Shah Alam to Jalan Duta. The construction was completed in 2015. NKVE is the second link between Kuala Lumpur and Klang after the Federal Highway. It has no rest and service areas, though there are many petrol station laybys situated along the highway. Other features of this highway include traffic CCTVs and VMS. Many viaducts are located along this expressway including
361-693: The station. The nearest station to the area as for now is the KA05 Segambut Komuter station of the 2 Port Klang Line . New Klang Valley Expressway The New Klang Valley Expressway ( NKVE ), designated E1 , is an expressway entirely within the Klang Valley region of Selangor and Kuala Lumpur in Peninsular Malaysia . The expressway begins at the settlement of Bukit Raja near Klang , and ends at Jalan Duta in Kuala Lumpur . The 35-kilometre (22-mile) expressway