The Japan Railways Group , more commonly known as the JR Group ( JRグループ , Jeiāru Gurūpu ) or simply JR , is a group of railway companies in Japan that underwent division and privatization of the government-owned Japanese National Railways (JNR) on April 1, 1987. It consists of six passenger railway companies, one freight railway company, and two non-service companies. Most of the liability of the JNR was assumed by the JNR Settlement Corporation .
64-791: The JR Group operates a large proportion of intercity rail service (including the Shinkansen high-speed rail lines) and commuter rail service. JR Hokkaido , JR Shikoku , and JR Freight ( JRF ) are governed by the Act for the Passenger Railway Companies and Japan Freight Railway Company [ ja ] , also known as the JR Companies Act , and are under the control of the public Japan Railway Construction, Transport and Technology Agency (JRTT), while JR East , JR Central , JR West , and JR Kyushu are completely floated in
128-550: A 25 kV AC overhead power supply (20 kV AC on Mini-shinkansen lines), to overcome the limitations of the 1,500 V direct current used on the existing electrified narrow-gauge system. Power is distributed along the train's axles to reduce the heavy axle loads under single power cars. The AC frequency of the power supply for the Tokaido Shinkansen is 60 Hz. Shinkansen trains are electric multiple units (EMUs), offering fast acceleration, deceleration and reduced damage to
192-500: A world record 603 km/h (375 mph) for SCMaglev trains in April 2015. The original Tokaido Shinkansen, connecting Tokyo , Nagoya , and Osaka , three of Japan's largest cities, is one of the world's busiest high-speed rail lines. In the one-year period preceding March 2017, it carried 159 million passengers, and since its opening more than six decades ago, it has transported more than 6.4 billion total passengers. At peak times,
256-514: A bullet and its high speed. The Shinkansen name was first formally used in 1940 for a proposed standard gauge passenger and freight line between Tokyo and Shimonoseki that would have used steam and electric locomotives with a top speed of 200 km/h (120 mph). Over the next three years, the Ministry of Railways drew up more ambitious plans to extend the line to Beijing (through a tunnel to Korea ) and even Singapore , and build connections to
320-437: A concern for residents living close to tunnel portals. The slab track consists of rails, fasteners and track slabs with a cement asphalt mortar. On the roadbed and in tunnels, circular upstands, measuring 400–520 mm (16–20 inches) in diameter and 200 mm (7.9 inches) high, are located at 5-metre intervals. The prefabricated upstands are made of either reinforced concrete or pre-stressed reinforced concrete; they prevent
384-535: A dispute between JR East and JR Central about the use of the two platforms which were added to the Tokaido line's half of Tokyo station. Before JNR's privatization, they were conceived as being shared with the Tohoku line, and their construction used funds allocated to the Tohoku line's extension to Tokyo; however, the extension was finished after privatization, by which time the platforms were owned by JR Central. Therefore, there
448-499: A high ride quality and less electrical equipment. ) In Japan, significant engineering desirability exists for the electric multiple unit configuration. A greater proportion of motored axles permits higher acceleration, so the Shinkansen does not lose as much time if stopping frequently. Shinkansen lines have more stops in proportion to their lengths than high-speed lines elsewhere in the world. The main Shinkansen lines are: In practice,
512-579: A low-interest loan of US$ 80 million from the World Bank . Initial estimates, however, were understated and the actual cost was about 380 billion yen. As the budget shortfall became clear in 1963, Sogo resigned to take responsibility. A test facility for rolling stock, called the Kamonomiya Model Section, opened in Odawara in 1962. The Tōkaidō Shinkansen began service on 1 October 1964, in time for
576-662: A minimum curve radius of 4,000 m (13,123 ft) (2,500 m (8,202 ft) on the oldest Tōkaidō Shinkansen). The Shinkansen uses 1,435 mm ( 4 ft 8 + 1 ⁄ 2 in ) standard gauge in contrast to the 1,067 mm ( 3 ft 6 in ) narrow gauge of most other lines in Japan. Continuous welded rail and swingnose crossing points are employed, eliminating gaps at turnouts and crossings. Long rails are used, joined by expansion joints to minimize gauge fluctuation due to thermal elongation and shrinkage. A combination of ballasted and slab track
640-461: A nationwide freight operator. Unlike some other groups of companies, the JR Group is made up of independent companies, and it does not have group headquarters or a holding company to set the overall business policy. The six passenger railways of the JR Group are separated by region. Nearly all their services are within the prescribed geographic area. However, some long-distance operations extend beyond
704-672: A passenger committed suicide on board a Shinkansen train by setting himself on fire, killing another passenger and seriously injuring seven other people. There have been two derailments of Shinkansen trains in passenger service. The first one occurred during the Chūetsu earthquake on 23 October 2004 . Eight of ten cars of the Toki No. 325 train on the Jōetsu Shinkansen derailed near Nagaoka Station in Nagaoka, Niigata . There were no casualties among
SECTION 10
#1733084751198768-422: A range of advanced technology compared with conventional rail, achieving not only high speed but also a high standard of safety and comfort. Its success has influenced other railways in the world, demonstrating the importance and advantages of high-speed rail . Shinkansen routes never intersect with slower, narrow-gauge conventional lines (except mini-shinkansen , which runs along these older lines). Consequently,
832-400: A standard-gauge rail has a curve with a maximum speed of 145 km/h (90 mph), the same curve on narrow-gauge rail will have a maximum allowable speed of 130 km/h (81 mph). Consequently, Japan had a greater need for new high-speed lines than countries where the existing standard gauge or broad gauge rail system had more upgrade potential. Among the key people credited with
896-659: A trainset in order to perform high-speed tests. This train gave designers the confidence that they could safely build an even faster standard gauge train. Thus the first Shinkansen, the 0 series, was built on the success of the Romancecar. In the 1950s, the Japanese national attitude was that as was happening in the United States, railways would soon be outdated and replaced by air travel and highways. However, Shinji Sogō , President of Japanese National Railways , insisted strongly on
960-551: Is Japan's, and one of the world's largest train stations by floor area (410,000 m ), and houses the headquarters of the Central Japan Railway Company (JR Central). Much of this space is located in the JR Central Towers atop the station, as well as in underground concourses. The current station complex was completed on December 20, 1999. The station and the area around it is officially called Meieki ( 名駅 ) in
1024-569: Is a network of high-speed railway lines in Japan . It was initially built to connect distant Japanese regions with Tokyo , the capital, to aid economic growth and development. Beyond long-distance travel, some sections around the largest metropolitan areas are used as a commuter rail network. It is owned by the Japan Railway Construction, Transport and Technology Agency and operated by five Japan Railways Group companies. Starting with
1088-714: Is no through service between those lines. All northbound services from Tokyo travel along the Tohoku Shinkansen until at least Ōmiya before splitting off towards Sendai or Takasaki. Two further lines, known as Mini-shinkansen , have also been constructed by re-gauging and upgrading existing sections of line: There are two standard-gauge lines not technically classified as Shinkansen lines but run Shinkansen trains as they use tracks leading to Shinkansen storage/maintenance yards: The following lines are under construction. These lines except Chūō Shinkansen , called Seibi Shinkansen [ ja ] or planned Shinkansen , are
1152-437: Is used to describe both the railway lines the trains run on and the trains themselves. In English, the trains are also known as the bullet train. The term bullet train ( 弾丸列車 , dangan ressha ) originates from 1939, and was the initial name given to the Shinkansen project in its earliest planning stages. Furthermore, the name super express ( 超特急 , chō-tokkyū ) , used exclusively until 1972 for Hikari trains on
1216-431: Is used, with slab track exclusively employed on concrete bed sections such as viaducts and tunnels. Slab track is significantly more cost-effective in tunnel sections, since the lower track height reduces the cross-sectional area of the tunnel, reducing construction costs up to 30%. However, the smaller diameter of Shinkansen tunnels, compared to some other high-speed lines, has resulted in the issue of tunnel boom becoming
1280-662: The 0 series , ran at speeds of up to 210 km/h (130 mph), later increased to 220 km/h (137 mph). The last of these trains, with their classic bullet-nosed appearance, were retired on 30 November 2008. A driving car from one of the 0 series trains was donated by JR West to the National Railway Museum in York , United Kingdom in 2001. The Tōkaidō Shinkansen's rapid success prompted an extension westward to Okayama , Hiroshima and Fukuoka (the San'yō Shinkansen ), which
1344-564: The Japanese addressing system . The station is adjacent to Meitetsu Nagoya Station , the terminal of Meitetsu , and Kintetsu Nagoya Station , the terminal of the Kintetsu Nagoya Line . The twin-towered station rises over 50 storeys, and is the tallest railway-station building in the world. In the middle of 2024, Nagoya was found to be one of the 50 busiest train stations in the world with an average number of 1.1 million people using
SECTION 20
#17330847511981408-730: The Narita Sky Access Line which opened in 2010, and the Keiyo Line reused space originally set aside for the Narita Shinkansen terminus at Tokyo Station . Although the Sky Access Line uses standard-gauge track, it was not built to Shinkansen specifications and there are no plans to convert it into a full Shinkansen line. Many Shinkansen lines were proposed during the boom of the early 1970s but have yet to be constructed and have subsequently been shelved indefinitely. In addition,
1472-687: The Railway Technical Research Institute and Railway Information Systems Co., Ltd. To cover various non-railway business areas, each regional operator in the JR Group has its own group of subsidiary companies with names like "JR East Group" and "JR Shikoku Group". Owned by JRTT Owned by JRTT Owned by JRTT Owned by the 7 railway companies above JR maintains a nationwide railway network as well as common ticketing rules that it inherited from JNR. Passengers may travel across several JR companies without changing trains and without purchasing separate tickets. However, trains running across
1536-489: The Tokaido Shinkansen (515.4 km; 320.3 mi) in 1964, the network has expanded to consist of 2,951.3 km (1,833.9 mi) of lines with maximum speeds of 260–320 km/h (160–200 mph), 283.5 km (176.2 mi) of Mini-shinkansen lines with a maximum speed of 130 km/h (80 mph), and 10.3 km (6.4 mi) of spur lines with Shinkansen services. The network links most major cities on
1600-582: The Trans-Siberian Railway and other trunk lines in Asia. These plans were abandoned in 1943 as Japan's position in World War II worsened. However, some construction did commence on the line; several tunnels on the present-day Shinkansen date to the war-era project. Following the end of World War II, high-speed rail was forgotten for several years while traffic of passengers and freight steadily increased on
1664-736: The Tōhoku Shinkansen ; only the Shanghai maglev train , China Railway High-speed networks, and the Indonesian Jakarta-Bandung High-speed railway have commercial services that operate faster. Since 1970, development has also been underway for the Chūō Shinkansen , a planned maglev line from Tokyo to Osaka. On 21 April 2015, a seven-car L0 series maglev trainset set a world speed record of 603 km/h (375 mph). To enable high-speed operation, Shinkansen uses
1728-576: The Tōkaidō Shinkansen , is used today in English-language announcements and signage. Japan was the first country to build dedicated railway lines for high-speed travel. Because of the mountainous terrain, the existing network consisted of 1,067 mm ( 3 ft 6 in ) narrow-gauge lines, which generally took indirect routes and could not be adapted to higher speeds due to technical limitations of narrow-gauge rail. For example, if
1792-431: The first Tokyo Olympics . The conventional Limited Express service took six hours and 40 minutes from Tokyo to Osaka, but the Shinkansen made the trip in just four hours, shortened to three hours and ten minutes by 1965. It enabled day trips between Tokyo and Osaka, the two largest metropolises in Japan, significantly changed the style of business and life of the Japanese people, and increased new traffic demand. The service
1856-554: The locomotive (also known as power car) configuration with the Renfe Class 102 and continues with it for the Talgo AVRIL because it is not possible to use powered bogies as part of Talgo's bogie design, which uses a modified Jacobs bogie with a single axle instead of two and allows the wheels to rotate independently of each other, on the ICE 2, TGV and KTX it is because it easily allows for
1920-636: The 154 passengers. Another derailment happened on 2 March 2013 on the Akita Shinkansen when the Komachi No. 25 train derailed in blizzard conditions in Daisen, Akita . No passengers were injured. In the event of an earthquake, an earthquake detection system can bring the train to a stop very quickly; newer trainsets are lighter and have stronger braking systems, allowing for quicker stopping. New anti-derailment devices were installed on tracks after analysis of
1984-475: The 1970s, passenger and freight business had declined, and fare increases had failed to keep up with higher labor costs. The JR Group companies were formed out of the privatization of the Japanese National Railways in 1987. In 1987, the government of Japan took steps to divide and privatize JNR. While division of operations began in April of that year, privatization was not immediate: initially,
Japan Railways Group - Misplaced Pages Continue
2048-565: The Basic Plan specified that the Jōetsu Shinkansen should start from Shinjuku , not Tokyo Station , which would have required building an additional 30 km (19 mi) of track between Shinjuku and Ōmiya. While no construction work was ever started, land along the proposed track, including an underground section leading to Shinjuku Station, remains reserved. If capacity on the Tokyo–Ōmiya section proves insufficient at some point, construction of
2112-575: The Jōetsu derailment. Several months after the exposure of the Kobe Steel falsification scandal , which is among the suppliers of high-strength steel for Shinkansen trainsets, cracks were found upon inspection of a single bogie , and removed from service on 11 December 2017. Nagoya Station Nagoya Station ( 名古屋駅 , Nagoya-eki ) is a major railway station in Nakamura-ku, Nagoya , Japan. It
2176-520: The L0 series could be a passenger train. The Shinkansen is very reliable thanks to several factors, including its near-total separation from slower traffic. There are separate laws governing interfering with or otherwise obstructing Shinkansen trains, tracks, or its operation. In 2016, JR Central reported that the Shinkansen's average delay from schedule per train was 24 seconds. This includes delays due to uncontrollable causes, such as natural disasters. Over
2240-549: The Shinjuku–Ōmiya link may be reconsidered. In December 2009, then transport minister Seiji Maehara proposed a bullet train link to Haneda Airport , using an existing spur that connects the Tōkaidō Shinkansen to a train depot. JR Central called the plan "unrealistic" due to tight train schedules on the existing line, but reports said that Maehara wished to continue discussions on the idea. The succeeding minister has not indicated whether this proposal remains supported. While
2304-540: The Shinkansen projects designated in the Basic Plan of the Shinkansen Railway [ ja ] decided by the government. The Narita Shinkansen project to connect Tokyo to Narita International Airport , initiated in the 1970s but halted in 1983 after landowner protests, has been officially cancelled and removed from the Basic Plan governing Shinkansen construction. Parts of its planned right-of-way were used by
2368-500: The Shinkansen's 60-plus year history, carrying over 10 billion passengers, there have been no passenger fatalities due to train accidents such as derailments or collisions, despite frequent earthquakes and typhoons. Injuries and a single fatality have been caused by doors closing on passengers or their belongings; attendants are employed at platforms to prevent such accidents. There have, however, been suicides by passengers jumping both from and in front of moving trains. On 30 June 2015,
2432-526: The Tokaido, San'yō, and Kyushu lines form a contiguous west/southbound line from Tokyo, as train services run between the Tokaido and San'yō lines and between the San'yō and Kyushu lines, though the lines are operated by different companies. The Tokaido Shinkansen tracks are not physically connected to the lines of the Tohoku Shinkansen at Tokyo Station, as they use different electrification standards, signaling systems, and earthquake mitigation devices. There also exists
2496-455: The boundaries of JR companies have been reduced. JR maintains the same ticketing rules based on the JNR rules and has an integrated reservation system known as MARS (jointly developed with Hitachi ). Some types of tickets (passes), such as Japan Rail Pass and Seishun 18 Ticket , are issued as "valid for all JR lines" and accepted by all passenger JR companies. Various unions represent workers at
2560-422: The boundaries. The Shirasagi train service between Nagoya and Kanazawa , for instance, uses JR West rolling stock but the segment of track between Nagoya and Maibara is owned by JR Central, whose crew manage the train on that section. Japan Freight Railway Company operates all freight service on the network previously owned by JNR. In addition, the group includes two non-operating companies. These are
2624-500: The construction of the first Shinkansen are Hideo Shima , the Chief Engineer, and Shinji Sogō , the first President of Japanese National Railways (JNR) who managed to persuade politicians to back the plan. Other significant people responsible for its technical development were Tadanao Miki, Tadashi Matsudaira, and Hajime Kawanabe based at the Railway Technical Research Institute (RTRI), part of JNR. They were responsible for much of
Japan Railways Group - Misplaced Pages Continue
2688-528: The conventional Tōkaidō Main Line along with the reconstruction of Japanese industry and economy. By the mid-1950s the Tōkaidō Line was operating at full capacity, and the Ministry of Railways decided to revisit the Shinkansen project. In 1957, Odakyu Electric Railway introduced its 3000 series SE Romancecar train, setting a world speed record of 145 km/h (90 mph) for a narrow gauge train when JNR leased
2752-525: The conventional loading gauge for 1,067mm lines still applies on mini-Shinkansen lines. The Shinkansen has used EMUs from the outset, with the 0 Series Shinkansen having all axles powered. Other railway manufacturers were traditionally reluctant or unable to use distributed traction configurations ( Talgo , the German ICE 2 and the French (and subsequently South Korean) TGV (and KTX-I and KTX-Sancheon ) use
2816-590: The different JR Group companies, such as the National Railway Workers' Union , All Japan Construction, Transport and General Workers' Union , Doro-Chiba , and the Japan Confederation of Railway Workers' Unions . Shinkansen The Shinkansen ( Japanese : 新幹線 , [ɕiŋkaꜜɰ̃seɴ] , lit. ' new trunk line ' ) , colloquially known in English as the bullet train ,
2880-604: The east of JR Nagoya Station. The southern part of the platform is used for the trains for Fujigaoka and the northern one is for the trains for Takabata. Nagoya Station first opened on 1 May 1886. Station numbering was introduced to the sections of the Chuo, Kansai, and Tōkaidō Main Lines operated JR Central in March 2018; Nagoya Station was assigned station number CF00 for the Chuo Line, CJ00 for
2944-709: The effects of the COVID-19 pandemic ), rail projects in the vicinity of Haneda Airport, including the Haneda Airport Access Line and the Tokyo Rinkai Subway Line , continue to undergo planning. Originally intended to carry passenger trains by day and freight trains by night, the Shinkansen lines carried exclusively passengers for the first five and a half decades of their operation. Lght freight has been carried on some passenger services since 2019, and there are plans to expand this with freight-only trains in
3008-896: The future. The system shuts down between midnight and 06:00 every day for maintenance. Japan's few remaining overnight passenger trains run on the older, narrow-gauge network that the Shinkansen parallels. There are three principal service types on the Shinkansen: Trains are up to sixteen cars long. With each car measuring 25 m (82 ft) in length, the longest trains are 400 m ( 1 ⁄ 4 mile) end to end. Stations are similarly long to accommodate these trains. Some of Japan's high-speed maglev trains are considered Shinkansen, while other slower maglev trains (such as Linimo , serving local communities in and nearby Nagoya , Aichi Prefecture ) are intended as alternatives to conventional urban rapid transit systems. These trains were and are used only for experimental runs, though
3072-470: The government retained ownership of the companies. Privatization of some of the companies began in the early 1990s. By October 2016, all of the shares of JR East, JR Central, JR West and JR Kyushu had been offered to the market and they are now publicly traded. On the other hand, all of the shares of JR Hokkaido, JR Shikoku and JR Freight are still owned by Japan Railway Construction, Transport and Technology Agency , an independent administrative institution of
3136-461: The high cost of building the Shinkansen network. By the early 1980s, the company was practically insolvent, leading to its privatization in 1987. Development of the Shinkansen by the privatised regional JR companies has continued, with new train models developed, each generally with its own distinctive appearance (such as the 500 series introduced by JR West ). Since 2014, Shinkansen trains run regularly at speeds up to 320 km/h (200 mph) on
3200-413: The islands of Honshu and Kyushu , and connects to Hakodate on the northern island of Hokkaido . An extension to Sapporo is under construction and scheduled to open in March 2031. The maximum operating speed is 320 km/h (200 mph) (on a 387.5 km (241 mi) section of the Tōhoku Shinkansen ). Test runs have reached 443 km/h (275 mph) for conventional rail in 1996, and up to
3264-653: The line carries up to 16 trains per hour in each direction with 16 cars each (1,323-seat capacity and occasionally additional standing passengers) with a minimum headway of three minutes between trains. The Shinkansen network of Japan had the highest annual passenger ridership (a maximum of 386 million in 2007) of any high-speed rail network until 2011, when the Chinese high-speed railway network surpassed it at 370 million passengers annually, reaching over 2.9 billion annual passengers in 2023. Shinkansen ( 新幹線 ) in Japanese means 'new trunk line' or 'new main line', but this word
SECTION 50
#17330847511983328-452: The more common 4-abreast (2+2) seating usually found elsewhere. On occasions, this wider loading gauge was also used to allow 6-abreast seating (3+3) on certain trains, such as the E1 and E4 series sets. This, combined with a lack of power cars, allows for a higher passenger capacity within a shorter train length. However, since mini-Shinkansen lines are effectively track-regauged conventional lines,
3392-591: The plan may become more feasible after the opening the Chūō Shinkansen (sometimes referred to as a bypass to the Tokaido Shinkansen) frees up capacity, construction is already underway for other rail improvements between Haneda and Tokyo station expected to be completed prior to the opening of the 2020 Tokyo Olympics , so any potential Shinkansen service would likely offer only marginal benefit. Despite these plans ultimately not being realized (owing in part due to
3456-453: The possibility of high-speed rail , and the Shinkansen project was implemented. Government approval came in December 1958, and construction of the first segment of the Tōkaidō Shinkansen between Tokyo and Osaka started in April 1959. The cost of constructing the Shinkansen was at first estimated at nearly 200 billion yen, which was raised in the form of a government loan, railway bonds and
3520-628: The shinkansen is not affected by slower local or freight trains (except for Hokkaido Shinkansen while traveling through the Seikan Tunnel ), and has the capacity to operate many high-speed trains punctually. In addition, shinkansen routes (excluding mini-shinkansen) are completely grade separated from roads and highways, meaning railway crossings are almost eliminated. Tracks are strictly off-limits with penalties against trespassing strictly regulated by law. The routes use tunnels and viaducts to go through and over obstacles rather than around them, with
3584-736: The state. All the JR Group companies operating in the Honshū region are constituents of the Nikkei 225 and TOPIX 100 indexes. [REDACTED] [REDACTED] Hokkaido [REDACTED] [REDACTED] East [REDACTED] [REDACTED] Central [REDACTED] [REDACTED] West [REDACTED] [REDACTED] Shikoku [REDACTED] [REDACTED] Kyushu The Japan Railways Group consists of seven operating companies and two other companies that do not provide rail service. The operating companies are organized into six passenger operators and
3648-460: The station everyday. The platforms and the tracks are elevated. Six island platforms for the Tōkaidō Main Line, Chuo Line, and Kansai Line are situated in the eastern part of the station (the side where JR Central Towers are situated) and serve 12 tracks. Two island platforms for the Tokaido Shinkansen are situated in the western part and serve four tracks. The station is situated in
3712-440: The stock market ; in addition, JR East, JR Central and JR West are constituents of the Nikkei 225 and TOPIX 100 indices. Because the railways used to be owned by the government, Japanese people generally make a distinction between JR railways (including former JR lines that are now third sector ) and other private railways , and JR railways are almost always denoted differently from other private railways when shown on maps. By
3776-407: The technical development of the first line, the Tōkaidō Shinkansen . All three had worked on aircraft design during World War II . The popular English name bullet train is a literal translation of the Japanese term dangan ressha ( 弾丸列車 ) , a nickname given to the project while it was initially discussed in the 1930s. The name stuck because of the original 0 Series Shinkansen 's resemblance to
3840-501: The track because of the use of lighter vehicles compared to locomotives or power cars. The coaches are air-sealed to ensure stable air pressure when entering tunnels at high speed. Shinkansen trains (excluding mini-Shinkansen) are also built to a larger loading gauge compared to conventional-speed rolling stock. This larger loading gauge permits wider coaches, allowing for 5-abreast seating (2+3) in Standard Class coaches, compared to
3904-697: The track slab from moving latitudinally or longitudinally. One track slab weighs approximately 5 tons and is 2,220–2,340 mm (87–92 inches) wide, 4,900–4,950 mm (193–195 inches) long and 160–200 mm (6.3–7.9 inches) thick. The Shinkansen employs an ATC (Automatic Train Control) system, eliminating the need for trackside signals. It uses a comprehensive system of Automatic Train Protection . Centralized traffic control manages all train operations, and all tasks relating to train movement, track, station and schedule are networked and computerized. Shinkansen uses
SECTION 60
#17330847511983968-693: The west of the JR Central Lines, on the Inazawa Line. The station has an island platform serving two tracks with platform gates . An island platform for the Sakura-dori Line serving two tracks is located east to west under the central concourse of JR Nagoya Station. The platform is fenced with platform gates. An island platform for the Higashiyama Line serving two tracks is located south to north under underground city Meieki Chikagai (Meichika), in
4032-680: Was an immediate success, reaching the 100 million passenger mark in less than three years on 13 July 1967, and one billion passengers in 1976. Sixteen-car trains were introduced for Expo '70 in Osaka. With an average of 23,000 passengers per hour in each direction in 1992, the Tōkaidō Shinkansen was the world's busiest high-speed rail line. As of 2014, the train's 50th anniversary, daily passenger traffic rose to 391,000 which, spread over its 18-hour schedule, represented an average of just under 22,000 passengers per hour. The first Shinkansen trains,
4096-410: Was completed in 1975. Prime Minister Kakuei Tanaka was an ardent supporter of the Shinkansen, and his government proposed an extensive network paralleling most existing trunk lines. Two new lines, the Tōhoku Shinkansen and Jōetsu Shinkansen , were built following this plan. Many other planned lines were delayed or scrapped entirely as JNR slid into debt throughout the late 1970s, largely because of
#197802